Loading...
Specifications Hydraulic Calculations WcLq-\ l for Project Name: Landrover Jaguar Location: 10125 WASHINGTON SQ ROAD, PORTLAND OREGON, Drawing Name: Landrover FP r1.cad Calculation Date: 10/27/2018 Design Remote Area Number: 3 Remote Area Location: Showroom Occupancy Classification: Ordinary Group I Commodity Classification: Showroom NOV 14 2018 Density: 0.15gpm/ft2 CfTy '_iij Area of Application: 1500ft2(Actual 1570ft2) a;a !ti ,7-4to,toi Coverage per Sprinkler: 256ft2 Type of sprinklers calculated: Pendent No. of sprinklers calculated: 7 In-rack Demand: N/Agpm at Node: N/A Hose Streams: 250.00 at Node: 1 Type: Allowance at Source Total Water Required (including Hose Streams where applicable): From Water Supply at Node 1: 581.94 @ 69.820 Type of System: Wet Volume of Dry or PreAction System: N/A 0.0 PROP4-4, Name of Contractor: AFP SYSTEMS INC Af MOPE T Address: 19435 SW 129th Ave, Tualatin, OR 97062 Phone Number: (503)692-9284 OREGONAb ri Name of designer: DAVE PARFITT C. Authority Having Jurisdiction: Etpirer 7/1/2f Notes: �/©M.E.P.CAD, Inc. :AutoSPRINK 2018 v14.2.12.0 3 10/27/2018 6:31:31AM Page 1 Hydraulic Graph Job Name: Landrover Jaguar N 1.85 Remote Area Number: 3 Date: 10/27/2018 100 Water Supply = Summary Sheet 90 — Node: 1 - tatic Pressure 85.000 80 — Available Supply 581.94@77.138 E. 70 —- 331.94 0 69.820 - r . 581.94 with Hose Allowance at Source = 1 N 1200.00 ft 55.000 n _ 2 50 — — mm 40=System demand curve 30 ! • 20 _I 10 y - 0 71111uuuI a Ill I I I I I W I I I I I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I l I l l l l i l 1 1 1 1 1 1 1 1 1 I I I -t l l i i I 1 1 1 1 1 1 I I I 0250 500 750 1000 1250 1500 1750 2000 2250 2500 Flow-gpm ©M.E.P.CAD, Inc. 41 AutoSPRINK 2018 v14.2.12.0 10/27/2018 6:31:32AM Paqe 2 /r, Summary Of Outfiowing Devices Job Number:Landrover Jaguar Ti Report Description:Ordinary Group I(3) Actual Flow Minimum Flow 1 K-Factor I Pressure Device (gpm) 1 (gpm) (K) (psi) , Sprinkler 2157 40.34 i39.10 14 8.301 Sprinkler 2190 50.13 39.10 14 12.819 c✓ Sprinkler 2191 39.10 39.10 14 7.800 Sprinkler 2219 51.55 39.10 14 13.556 Sprinkler 2220 I 43.17 39.10 14 9.510 Sprinkler 2243 ! 56.50 39.10 14 16.290 Sprinkler 2244 j 51.16 39.10 14 13.352 ♦ Most Demanding Sprinkler Data ,©M.E.P.CAD,Inc. in AutoSPRINK 2018 v14.2.12.0 10/27/2018 6:31:38AM Page 3 Job Name: Landrover Jaguar Remote Area Number: 3 Date: 10/27/2018 Pipe Information Elev 1 Flow added Fittings& Length C Factor Total(Pt) Notes Node 1 (Foot) K-Factor this step Nominal ID Devices (Foot) Fitting/Device(Equivalent (q) Fitting Pf Friction Elev(Pe) Length) Fixed Pressure Losses, Elev 2 Total Flow Equiv. (Foot) Loss Per Unit when applicable,are added Node 2 (Foot) (Q) Actual ID Length0000Total (psi) Friction(Pf) directly to(Pf)and shown as (Foot) (Foot) a nor +i-Ja-al-fa 2191 25'-4'/2 14 39.10 1 (See 1'-4'/z 120 7.800 Route 1 Notes) Sprinkler, 7'-0 -0.307 0.449781 E(2'-0),PO(5'-0) 972 26'-1 39.10 1.0490 g'-4'/2 3.768 972 26'-1 40.34 1'/2 14'-9 120 11.261 Flow(q)from Route 2 1028 26'-1 79.44 1.6820 0.167459 14'-9 2.469 1028 26'-1 43.17 1% 14'-9 120 13.730 Flow(q)from Route 3 1067 26'-1 . .' 122.61 1.6820 14'9 0.373813 5.511 1067 26'-1 51.16 1% (See 16'-0% 120 19.241 Flow(q)from Route 5 Notes) 19'_91/2 1139 26'-1 173.77 1.6820 0.712562 P0(9'-11),C(9'-11) 35'-10 25.527 14'-8 120 44.768 1139 26'-1 4 k ; 0.007716 1136 26'-1 3; 173 .77 4.2600 14'-8 0.113 1136 26'-1 158.18 4 (See 396'-9 120 44.881 Notes) Flow(q)from Route 4 158'-0 10.242 545 2'-5'% 331.94 4.2600 554'-9 0.025550 14.174 8E(13'-2),2EE(5'-3),f(-0.000), BV(15'-9%),P0(26'-4) 545 2'-5'% 6 (See 4'-6 120 69.297 Notes) 37'-8'% -1.036 gme,526 4'-10 �, , i 331.94 6.3570 0.003637 - 3fE(12'-7) / 1 '-3 0.154 526 4'-10 6 (See 164'-0 140 68.415 Notes) 44'-1'h 0.801 1 3'-0 331.94 6.2800 0.002902 BFP,2E(22'-1),S 208'-1'% 0.604 250.00 69.820 Hose Allowance At Source ,., 1 ' 581.94 Total(Pt) Route 1 2157 25'-4'% 14 40.34 1 (See 1'-4'/2 120 8.301 Route 2 Notes) Sprinkler, 4'-0 -0.307 919 26'-1 - 40.34 1.0490 0.476433 2E(2'-0) f ,, 5'-4'% 2.562 ��� fy�.Sz• 919 26'-1 1% 14'-9 120 10.556 972 26'-1 40.34 1.6820 0.047798 14'-9 0.705 L©M.E.P.CAD,Inc. AutoSPRINK 2018 v14.2.12.0 3 10/27/2018 6:31:39AM Page 4 Job Name: Landrover Jaguar Remote Area Number: 3 Date: 10/27/2018 Pipe Information Flow added Length C Factor Notes Elev 1 Fittings& Total(Pt) Node 1 (Foot) K-Factor this step Nominal ID Devices g (Foot) Fitting/Device(Equivalent Length) Fitting Pf Friction Elev(Pe) Fixed Pressure Losses, ,.; Equiv. (Foot) when applicable,are added Elev 2 ,., Total Flow Loss Per Unit Node 2 (Foot) $, (Q) Actual ID Length Total (psi) Friction(Pf) direct) to(Pf)and shown as ... (Foot) (Foot) ( f) Y a nOg-tl-e-al-e 11.261 I Total(Pt) Route 2 2220 25'-4'% 14 43.17 1 (See 1'-4'% 120 9.510 Route 3 Notes) Sprinkler, 7'-0 -0.307 0.540317 - E(2'-0),PO(5'0) 1028 26'-1 43.17 1.0490 g'-4'/2 4.527 13.730 Total(Pt) Route 3 2190 25'-4'% 14 50.13 1 (See 1'-4'/2 120 12.819 Route 4 Notes) T-0 -0.307 - Sprinkler, 0.712170 E(2'-0), PO(5'-0) 970 26'-1 50.13 1.0490 g'-4'/2 5.966 970 26'-1 1% 14'-9 120 18.478 1026 26'-1 50.13 1.6820 0.071448 14'-9 1.053 1026 26'-1 51.55 1'/z 14'-9 120 19.532 Flow(q)from Route 6 °° 0.264361 1065 26'-1 W.. 101.67 1.6820 14'-9 3.897 1065 26'-1 56.50 1% (See 16'-0% 120 23.429 Flow(q)from Route 7 Notes) 19'-9'/2 14.1136 26'-1 158.18 1.6820 35'-10 0.598812 21.452 P0(9'-11),C(9'-11) 44.881 Total(Pt) Route 4 2244 25'-4'% 14 51.16 1 (See 1'-4'/2 120 13.352 Route 5 Notes) Sprinkler, 7'-0 -0.307 1067 26'-1 51.16 1.0490 0.739533 �� e E(2'-0),P0(5'-0) 8'-4'/ 6.196 19.241 Total(Pt) Route 5 2219 25'-4'% 14 51.55 1 (See 1'-4'/s 120 13.556 Route 6 Notes) Sprinkler, 7'-0 -0.307 0.749954 1026 26'-1 lE(2'-0), PO(5'0) ` 51.55 1.0490 g'-4'h 6.283 19.532 Total(Pt) Route 6 2243 25'-4'% 14 56.50 1 (See 1'-4'/: 120 16.290 Route 7 Notes) Sprinkler, 7'-0 -0.307 1065 26'-1 56.50 1.0490 0.888858 E(2'-0),P0(5'-0) 74'.K 8'-4% 7.447 23.429 Total(Pt) Route 7 k,©M.E.P.CAD,Inc. la AutoSPRINK 2018 v14.2.12.0 3 10/27/2018 6:31.39AM Page 5 Job Name: Landrover Jaguar Remote Area Number: 3 Date: 10/27/2018 Equivalent Pi4*gths of Valves and r s{C=120 only) I C Value tltiplier 1 Actual Inside Diameter 4.87 Value Of C 100 130 140 150 =Factor Schedule 40 Steel Pipe Inside Diameter ) Multiplying Factor 0.713 1.16 1.33 1.51 . ttingend s ALV Alarm Valve AngV Angle Valve b Bushing BaIV Ball Valve BFP Backflow Preventer BV Butterfly Valve C Cross Flow Turn 90° cplg Coupling Cr Cross Run CV Check Valve DeIV Deluge Valve DPV Dry Pipe Valve E 90°Elbow EE 45°Elbow Eel 11%°Elbow Ee2 22W Elbow f Flow Device fd Flex Drop FDC Fire Department Connection fE 90°FireLock(TM)Elbow fEE 45°FireLock(TM)Elbow flg Flange FN Floating Node fT FireLock(TM)Tee g Gauge GIoV Globe Valve GV Gate Valve Ho Hose Hose Hose HV Hose Valve Hyd Hydrant LtE Long Turn Elbow mecT Mechanical Tee Noz Nozzle P1 Pump In P2 Pump Out PIV Post Indicating Valve PO Pipe Outlet PrV Pressure Relief Valve PRV Pressure Reducing Valve red Reducer/Adapter S Supply sCV Swing Check Valve SFx Seismic Flex Spr Sprinkler St Strainer T Tee Flow Turn 90° Tr Tee Run U Union WirF Wirsbo WMV Water Meter Valve Z Cap ,+,,©M.E.P.CAD,Inc. AutoSPRINK 2018 v14.2.12.0 3 10/27/2018 6:31:39AM Page 6 ,A,:: I t.,,...,.e:.^ Flow Diagram (Current View) Job Number:Landrover Jaguar - Report Description:Ordinary Group I(3) (ri-:' , . ...., A r - 1 1 --I 1 i I _ k ,."--• ..!, , - ., .i,.. ..,- 4 I ,--IP,- 0 0 , ...:, . i I ... . i ..: 1 itz kz, . . . . ..... , .. .,.., , ..... .:. , A ..... ..... oil i w I 1 1 II ' C 111.*: A I' 2- 0 : * A 1 1 4,, . 4 s. • s kr 4 -,.. ) *1 . 1 *1 :13 qe ,--, .. &©M.E.P.CAD,Inc :::1:::AutoSPRINK 2018 v14.2.12.0 10/27/2018 6:31.39AM Page 7