Loading...
Report (78) ...0,"'' � - _ aP le•y L �-A - L ii MIL Ma OFFICE COPY MILLER September 14,2018 Mr. Brad Satran REVISION 15410 SW Seine Court Tigard, Oregon 97224 Subject: Satran Residence Deck 15410 SW Seine Court,Tigard,Oregon MCE Project Number: 180573 Dear Mr. Satran During the course of construction of the deck and deck cover, it was requested that one of the upper deck support posts be shifted about 12 inches in order to clear an existing footing. This meant that the roof post would not align with the deck post below as noted in the original calculations. A review was done for the new loading and the specified 6 x 10 PT Hem-Fir#1 beam is still adequate for the loading. It is acceptable to shift the deck post and footing. If you have any additional questions or comments,please do not hesitate to contact me. Respectfully, Miller Consulting Engineers,Inc. ��`�f C R01G;° 'GiN` i ,; �.t, e 96655PE Kevin M. McCormick, S.E. YNR Managing Principal - OREGON ocl -e 41, CRY1 t' EXPIRES• t? 31--2- Iry Engineering Practical, Diverse. Structural Solutions Since 1978 FOR OFFICE USE ONLY-SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 11111 Transmittal Letter T c;A H l) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: 411 o= DATE RECE V DEPT: BUILDING DIVISION RECE1YED DEC 10 2018 FROM: �'�, A Jdc.bra°'` CITY OF TIGARD COMPANY: BUILDING DIVISION PHONE: 5c5-5 I _ 3 C"2 c( 14.3,:e RE: / Sy/ w 5„c,,:..... G 4 . Tcns--t-Q Arx I t 0 -CO t((3 (Site Address) (Permit Number) (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: De' ription: Additional set(s) of plans. ' evisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. 1.\\ Engineer's calculations. <— Other(explain): 1-e..44-tf -Rv-- \ • - ;,-ems '5i-c, i..,„, pcfg - pi Ace.,---e--.4- REMARKS: ce.,---e -. -REMARKS: i 5 cik . V)Ty FORFFI E USE ONLY Routed to Permit Technician: I .te: 12 7 O (1 Initials: M4— Fees Due: ❑ Yes WNo ee Description Amount Due: N.)0 i '3 $$/El- Special Instructions: Reprint Permit(per PE): ❑ Yes No [ . Done Applicant Notified: a Date: 0- tt/i( Initials: f 7\ I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012