Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (380)
M EC2018 - 00791 me e / r>G�J ?c,17 Olaq-A-kv \):) wog,\ . . (2-Ct • ICA` COPY c'� -k \' \\ ._c \ kRECEIVED OCT -3 2018 tt CITY OF TIGARD pr - 4;_f BUILDING DIVISION Cif) fR MECHANICAL SYMBOL LEGEND GENERAL NOTES BRUCE M. co y : CARLSON - DOMESTIC COLD WATER (CW) p CONCENTRIC REDUCER �` SUPPLY, RETURN AND EXHAUST AIR architecture • planning interior N1. Work to be accomplished on these Drawings end the accompanying specifications 25. Access panels shell be furnished by the trade requiring them and delivered to the `s -H-- DOMESTIC HARD COLD WATER (CW) pppd FLEXIBLE CONNECTION (PIPE) © MOTORIZED DAMPER includes the furnishing of all labor, materials, equipment, end services necessary for general contractor for installation. BRUCE M. CARLSON ARCHITECT, PLLC --- -- ._ the proper completion of all mechanical work. 800 WASHINGTON AVE. N., SUITE 208 -T --- TEMPERED DOMESTIC HOT WATER (110' F) -- I I EXPANSION JOINT (LOOP) BD BACKDRAFT DAMPER 26. Access panels shall be as manufactured by Milcor, or approved equal, and of type the MINNEAPOLIS, MN 55401-1330 c ----120- DOMESTIC HOT WATER (120' F) 2. Before submitting a proposal on the work contemploted on these drawings and is compatible with construction and finish of the wall and/or ceiling. �� PIPE ANCHOR to FIRE/SMOKE DAMPER accompanying specifications, each bidder shall examine the site, check as to the PHONE: (612) 547-1300 RECIRCULATION HOT WATER (CHW) ALIGNMENT GUIDES - means of making connections to services, and shall become familiar with all the 27. Each trade shall perform all cutting and patching necessary in order to perform the FAX: (612) 547-1301 -� 0 SMOKE DAMPER existing conditions and limitations. No extras will be allowed because of the work, unless such work has been delegated to the general contractor/another trade. c W SANITARY WASTE UNDERGROUND i CHECK VALVE - contractor's as to the amount of work involved or his lack of CONTACT: CORY BILL)G 0 1 misunderstanding However, special permission shall be obtained from the engineer before cutting FIRE DAMPER cbillig@crnarch.com GATE VALVE knowledge of any site conditions which may affect his work. Any apparent variance of structural members or finished materials. Allg - W SANITARY WASTE ABOVE GROUND � __." -_____-_- patching shall be performed in such - _ the plan or specification from existing conditions at the site shall be caned to the manner as to leave no visible trace and to return the part affected to the condition -V VENT IJ GAS COCK VALVE __1_11 LOW-LEAK SMOKE DAMPER attention of the Engineer during the bid period so clarification can be made by of undisturbed work. Patching work shall be performed by persons experienced, II�R VENT THRU ROOFS OR ' VOLUME DAMPER (MANUAL_) a en um. skilled, and licensed for the particular type of work involved. Inferior work will not be STOP & WASTE VALVE _..__ accepted. All holes in masonry shall be drilled with rotary drills. Impact tools shall 3. Existence of any wires, conduits, pipes, ducts, or other facilities are shown in a not be used. II (GPM) CIRCUIT BALANCING VALVE [71EXHAUST REGISTER general way o duty -G NATURAL GAS nly. It will be the of the contractor to visit the site and make • 171 ------------_.._- exact determination of the existence of anysuch facilities prior to the submission of 28. Each trade shall bear the expense o� all cutting, patching, repairing, or replacing of STRAINER _ _ -CWS CHILLED WATER SUPPLY E CEILING SUPPLY DIFFUSER his bid. It is understood that he will be responsible for making the exact the work of other trades required because of his fault, error, or tardiness of because N, STRAINER WITH BLOW DOWN determination of the location and condition of such facilities. of any damage done by him. a htIab i1.Ie ■�as - -CM- - CHILLED WATER RETURN pp �-� - r.7nxn I n0 tir:�i-■t HWS HEATING WATER SUPPLY TA _ PRESSURE REDUCING VALVE ee• RETURN AIR GRILLE/REGISTER 4. All required fees, permits, and inspections shall be obtained and/or arranged for by 29. Each trade shall provide all holes and openings required for his work, unless such PRESSURE RELIEF VALVE ,. - the contractor under the section of the Specifications for which they are required. holes and openings are shown to be provided on the architectural or structural - -HWR- -•- HEATING WATER RETURN t . br.�nrr :r•I::�� rr: lL l BALL VALVE �- RETURN AIR GRILLE REGISTER WITH SOUND BOAT. drawings. -CD CONDENSATE DRAIN PIPING - �_ 5. Regular inspections shall be arranged by the contractor as required by any and all ,,� L.,., r,4- ff BUTTERFLY/SHUT-OFF VALE regulations. All charges from regulating agencies for inspections of installations or 30. Each trade shall remove existing work that is shown, specified, or obviously necessary RL LIQUID REFRIGERANT - ^ I- SIDEWALL SUPPLY REGISTER review of plans and Specifications shall be paid by the contractor. for completion of his work. Owner shall have the option of retaining any item or fi �L tYLr' '"•I. ' - - �! GLOBE VALVE __ -_._-__..._ material removed under this contract. Items or materials not retained by owner shall RS SUCTION REFRIGERANT6. Contractor to provide Certificate of Final Inspection. become the property of the trade and shall be removed from the premises. A OS&Y VALVE / OS&Y VALVE WIRED I-±- SIDWALL RETURN OR EXHAUST GRILLE O THERMOSTAT n Di SOLENOID VALVE 7. All mcterials and workmanship shall comply with all current and applicable codes, 31. Each trade shall periodically clear away all debris, surplus materials, etc., resulting ON THERMOSTAT - NIGHT SET BACK - 1 I FLOOR REGISTER specifications, ordinances, laws, regulations, industry standards, and utility company from his work or operations, leaving the job and the equipment furnished under any O SPACE TEMPERATURE SENSOR PM) FLOW MEASURING STATION regulations. or all contracts in a clean condition. r LINEAR DIFFUSER SEAL:LIMITING VALVE u 8. In case of difference among building codes, specifications, state laws, local ordinances, 32. Each trade shall test the equipment provided and/or installed under the specification� role] CONTROL VALVE (TWO-WAY) industry standards, and utility company regulations and the Contract Documents, the and shall demonstrate its proper operation to the owner's operating engineer. ..---------- FLEX DUCT most stringent shall govern. Contractor shall promptly notify the Engineer in writing of CO CARBON DIOXIDE SENSOR CONTROL VALVE (THREE-WAY) ------- - any such difference. 33. Each trade shall furnish, without additional expense to the owner, the services of Q AQUASTAT ("•� GLOBE ANGLED VALVE e�i ROOF (PRV) EXHAUST FAN competent instructors, who will give full instruction in the care, adjustment, and t 9. All applicable federal, state, and local laws and ordinances shall be adhered to operation and maintenance of allparts of the equipment to the owner'spermanent sn i �"` yPS PRESSURE SWITCH throughout the construction project. P A illi Ls', 4 FLOW DIRECTION g 9 P J employees who are to have charge of the equipment. :11 .- .f, Q FLOW SWITCH I CABINET UNIT HEATER 171151r ir: --- ----- - \-----wePIPE PITCH DIRECTION _. _ . 10. Non-Compliance. Should the contractor perform any work that does not comply with 34. HVAC subcontractor shall be responsible for tested & rated fire stop systems for all '71. TEMPERATURE GAUGE the requirements of the applicable building codes, state laws, local ordinances, industry thru-penetration of walls, floors & roof assemblies resulting from piping & other work e. III PIPE UNION VAV BOX WITH COIL standards, and utilitycompany regulations, he shall bear all costs arisingto correct P Y 9 � under his contract. refer to specification section for fire stopping for requirements. N.O. NORMALLY OPEN 8 OR © IN-LINE PUMP - the deficiencies. A - _ SUPPLY DUCT ELBOW WITH TURNING VANES 35. All wood mailers and other lumber which is installed in contact with metal, concrete, N.C. NORMALLY CLOSED Q AIR VENT - AUTOMATIC Ae 11. Contractor shall initiate, maintain, and supervise all safety pre-cautions required for or masonry shall be pressure treated against decoy (unless otherwise noted). M his work, including regulations of the Occupational Safety and Health Administration + ,. VFD VARIABLE FREQUENCY DRIVES Q AIR VENT - MANUAL - �, - STANDARD OR LINED DUCT (SUPPLY, RETURN, EXHAUST), DUCT IS (OSHA). r• �' Y SENSOR TAP RPZ VALVE (REDUCED PRESSURE BACKFLOW) 14x10 ' � � LABELED TO INDICATE INTERNAL DUCT DIMENSION. SEE SPECIFICATION -.i. • FOR INSULATION. 12. Drawings are to scale as noted, but the contractor shall refer to Architectural and WATER HAMMER ARRESTER WITH BFP BACKFLOW PREVENTOR STANDARD ROUND TAKEOFF (CONICAL BELL MOUTH) WITH VOLUME Structural Drawings for exact location of partitions, walls, beams, shafts, equipment, etc. ro li '' e.� '�Q18 4 CM) BACKWATER VALVE lippr DAMPER PRESSURE GAUGE WITH ISOLATION VALVE HOPPER DRAIN OR FLOOR SINK AFMS AIR FLOW MEASURING STATION 13. Each trade shall obtain drawings and specifications of all other trades and coordinate W- _ __. o his work with all other trades. ❑o FLOOR DRAIN ly4 GAS PRESSURE REGULATOR '- --0 ELBOW UP (PIPE) ----- _ 14. Drawings show the general arrangement of ductwork, piping, equipment, and MICHAEL A. WEBERT UNION 1--4-WH WALL HYDRANT appurtenances and shall be followed as closely as actual building construction and SIGNATURE °' D ELBOW DOWN (PIPE) --- -----�- --- work of other trades will permit. Mechanical work shall conform to the requirements �- S BREAK IN MATERIAL VISUAL PURPOSES r TEE UP H-HB HOSE BIBB shown on all of the drawings. Architectural and Structural Drawings shall take 04.06.2 018 DRAIN VALVE precedence over Mechanical Drawings. Because of the small scale of the Mechanical DATE ISSUED T TEE-OFF THE BOTTOM / DOWN THERMOMETER Drawings, it is not possible to indicate all offsets, fittings, and accessories that may INDEX TO SHEETS co S FINISHED FLOOR ELEVATION F5 be required. 77467 0 _ FLOW SWITCH REG. NO. co o 0 FCO -•--IiCO CLEANOUT FLOOR / CEILING CLEANOUT i--< SIAMESE FIRE DEPT. CONNECTION - - 15. Discrepancies discovered before or cfter work hos started shall be brought to the M1 MECHANICAL TITLE SHEET 14x10 DOUBLE WALL (SUPPLY, RETURN, EXHAU5 . DUCT IS LABELED TO attention of the Engineer immediately, and the Engineer reserves the right to require re - - -- � 9 Y 9� 9 q M2 HVAC PLANS o ] PIPE CAP e CONNECT TO EXISTINGet 1111 INDICATE INTERNAL DUCT DIMENSION. minor changes in the work of any contractor to eliminate such discrepancies with no cc re- ECCENTIC REDUCER change in contract cost. M3 HVAC DETAILS AND SCHEDULES o P1 PLUMBING PLANS DETAILS AND SCHEDULES 16. Plans and specifications are complementary, and what is called for in either one shall o be as binding as if called for in both. R4 MECHANICAL SPECIFICATIONS WASHINGTON SQUARE 6' R5 MECHANICAL SPECIFICATIONS MALL 17. Where a disagreement exists between the plans and specifications, the item or HVAC GENERAL NOTES arrangement of better quality, greater quality, or higher cost shall be included in the bid. 9712 SW 0 18. Normal use of the facility shall not be disturbed, except within the immediate 1- 1. THE ABBREVIATION G.C. WHEREVER IT APPEARS IN THESE MECHANICAL AND ELECTRICAL construction area. All walks, driveways, and entrances shall be kept clear and free of WASHINGTON SQ ROAD c DRAWINGS SHALL REFER TO THE GENERAL CONTRACTOR. TIGARD, OR 97223 1E all contractor's equipment, material, and debris at all times. ce a 2. THE CONTRACTOR FOR THE DIVISION OF WORK 1S REQUIRED TO READ THE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF WORK AND IS 19. All materials and equipment shall be stared in such a place and in such a 1 RESPONSIBLE FOR THE COORDINATION OF THIS WORK AND THE WORK OF ALL manner that a minimum of congestion will result. the placing of such materials GRILLE, REGISTER AND DIFFUSER KEY SPACE #F03 -o SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. IT IS THE CONTRACTOR'S and equipment shall be subject to the approval of the owner. • re RESPONSIBILITY TO PROVIDE ALL O4513 SUBCONTRACTORS WITH A COMPLETE SET OF BID A 2 s/�DIA�5IZE (INCHES) OR DIFFUSER NECK SIZE m DOCUMENTS. 20. Contractor shall thoroughly examine the existing building with regard to what temporary 12TYP CFM >, measures he must take in order to permit the owner to occupy specific areas of the I NO INDICATION = 1 UNIT SPECIALTY DESIGN 3. ALL ROOF CUTTING, PATCHING AND FLASHING REQUIRED TO INSTALL THE HVAC SYSTEMS building during the various construction phases. in general, systems must remain in SHALL BE BY A LANDLORD APPROVED ROOFING CONTRACTOR. COORDINATE ROOF use in those designated areas to permit the owner to function in a pre-construction - DEVICE STYLE, SEE SCHEDULE IIIII a, PENETRATIONS REQUIREMENTS WITH LANDLORD AND G.C. VERIFY SCOPE OF WORK WITH mariner. NOTE: o G.C. PRIOR TO BID AND INCLUDE ALL COSTS IN BID AS DIRECTED BY G.C. SEE GRILLE, REGISTER AND DIFFUSER SCHEDULE FOR FURTHER SHEET TITLE: o 21. Each contractor shall coordinate work with other trades in the installation of DETAILS. Lei4. THE CONTRACTOR SHALL COORDINATE WITH G.C. ON ANY ADDITIONAL STRUCTURAL STEEL equipment, piping, conduit, and ductwork. MECHANICAL TITLE eo oREQUIRED TO SUPPORT MECHANICAL EQUIPMENT PER DETAILS SHOWN ON STRUCTURAL SHEET PLANS. THE CONTRACTOR SHALL COORDINATE LOCATIONS AND REQUIREMENTS WITH G.C. 22. HVAC/sheet-metal contractor shall initiate the coordination process by providing I- AND LANDLORD. VERIFY SCOPE OF WORK WITH G.C. PRIOR TO BID AND INCLUDE ALL reproducible plan drawings showing ductwork and equipment. ALL FLEX DUCT MUST BE INSTALLED PER THE ADC (AIR DIFFUSION COUNCIL) uu COSTS IN BID AS DIRECTED BY G.C. INSTALLATION STANDARDS (MOST CURRENT EDITION), INCLUDING A BEND RADIUS OF O 23. Drawings to be forwarded to the piping contractor and electrical contractor for ONE DUCT DIAMETER OR GREATER, PROPERLY SEALED AND SECURED WITH 2 INCH cc 5. THE CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT, PIPING AND DUCTWORK, NOT inclusion of their systems work. BEADED COLLARS, PROPERLY SUPPORTED AND FULLY EXTENDED DUCT. FAN REVISIONS: BEING USED OR SHOWN TO REMAIN, IS FULLY REMOVED AND NOT ABANDONED. CALCULATIONS FOR THIS PROJECT WERE SIZED FOR 4 FOOT MAXIMUM FLEX DUCT NO: DATE: BY: 0 COORDINATE REQUIREMENTS WITH G.C. AND LANDLORD. REFER TO SPECIFICATIONS FOR 24. Contractors shall solve all coordination conflicts among themselves when possible. INSTALLED PER THE ADC INSTALLATION STANDARDS. FLEX DUCT SHOWN ON PLANS ADDITIONAL INFORMATION VERIFY SCOPE OF WORK WITH G.C. PRIOR TO BID AND INCLUDE Engineer will arbitrate when necessary, and his judgment will stand, with no additional IS FOR SCHEMATIC PURPOSES ONLY AND SHALL IN NO INSTANCE EXCEED 4 FOOT. co ALL COSTS IN BID AS DIRECTED BY G.C. cost to the owner. Y 6. PROVIDE ALL LOW VOLTAGE CONTROL WIRING FOR THE TEMPERATURE CONTROL SYSTEM. D COORDINATE WITH THE ELECTRICAL CONTRACTOR FOR CONTROL SYSTEM CONDUIT AND J POWER REQUIREMENTS. COORDINATE EXACT LOCATION WITH THE G.C. FOR ALL M TEMPERATURE CONTROL COMPONENTS. 0 et 7. PROVIDE IDENTIFICATION ON ALL HVAC EQUIPMENT. PROVIDE STENCIL WITH A MINIMUM OF I- 4 HIGH BLACK SPRAY PAINTED LETTERS, INDICATING TENANTS NAME, HVAC UNIT NUMBER o AND SPACE NUMBER, VERIFY ADDITIONAL REQUIREMENTS WITH LANDLORD. Lu -e PROJECT NO: 4036.0006 cc 8. CONTRACTOR TO VERIFY THAT ALL ITEMS ON CONTRACTOR CHECKLIST ARE COMPLETED % PRIOR TO MEP COMMISSIONING. CONTRACTOR WILL RECEIVE CONTRACTOR CHECKLIST IN DRAWN BY: JwIH ELECTRONIC FORM WITH BID DOCUMENTS. M COPYRIGHT BRUCE M. CARLSON ARCHITECT,PLLC 2018 N riliMMIBB ' A A m L� np. A �TYP. BRUCE M. o �- TYP. 6) e TYP. I�` TYP. TYP. CARLSON N --,,; GENERAL NOTES architecture • planning • Interior design '�in � t tu1•�[u� 1 CONNECTION TO LANDLORD PROVIDED ROOFTOP UNITS IS SUBJECT TO BRUCE M. CARLSON ARCHITECT, PLLC i - IIIc �tiima I UNIT(S) N^ O !�' ./ I K/� I II■ r"'AAAAOAi BUILDING DEPARTMENT AND LANDLORD APPROVAL. CONTRACTOR SHALL 800 WASHINGTON AVE. N., SUITE 208 I �+• 5li 11 r- I + :/iii ,�iisii . 1 iii � Q Q / �' INSPECT/TEST HVAC SYSTEM FOR PROPER OPERATION AND COMPLIANCE WITH MINNEAPOLIS, MN 55401--1330 11111111111 . _ ALL CODES AND STANDARDS. PHONE: N 6,�r �LIO ��� ��, — t Q '' �� ---- �I II , FAX: ({fiz2}5547 1301 a� 'CI)1) "' 11I I ■■■ 11-1111111. _ ERIFYEXISTINGCONDITIONSINFIELDPRIORTOBID. TENANTCONTRACTOR TO I M 6-8 6O ��', r■rr■ri 4� 4 : `�0 �:—__■ ilf� INCLUDE ANY NECESSARY MODIFICATIONS TO MEET CODE IN ORIGINAL BID. CONTACT: CORY BILLIG °c' 1 w h II ._ a �� NOTIFY THE TENANT'S PROJECT MANAGER OF ALL REQUIRED MODIFICATIONS �-� 0�1�I1. �� iW.�MM� L�r� �� I II C91mimimwi ��1••���mtm AND INCORPORATE THEM INTO THE ORIGINAL BID. NO EXCEPTIONS. cbillig@cmarch.cam iiiire=,j liwr� ustr sz. IIMIIII — i ""-'"' �tOI1 •=�II���� /I L______ •Il �i�lalla�lilil�[Itl]liMIR .i GENERAL CONTRACTOR IS TO VERIFY ALL FIELD CONDITIONS PRIOR TO Irt711.7'7W-1'--0 x I F 4O ■■■ I TYp '� ( L r0�� „. ►1112 CONSTRUCTION FOR CONDITIONS PREVENTING LAYOUT AS SHOWN. askiim NM A . a;. MEM MI I E1 OBSTRUCTIONS THAT PREVENT LAYOUT AS SHOWN SHALL BE BROUGHT TO131 _ . THE ATTENTION OF THE TENANT/ARCHITECT IMMEDIATELY AND PRIOR TO ANY 11,11111111MECTEll24x24 $•� �� -_� �� I \� (`.�►' : ► a 1 CONSTRUCTION. NO EXCEPTIONS.��—w ww1 W RA ®i, 240PAI IIMIII 3 1_._-- 66 �.ialimi=i=imini Lllil�����1♦.____ ' -- I ► ■ 4+�11,"�r1419 4� "p ,'aT 8 , w 240 i i 4 FIRE SPRINKLER NOTES ;�noU I nit on --_ CV 1I I feu 240 ply'Pi"' -- j Ill i lin I Teem rr r,l ti-iY rr ` _ 24x24r--, ® � i i i 1 SPRINKLER CONTRACTOR SHALL PROVIDE IN THEIR BIDS: MODIFYING THE EXISTING ,{; ,ti�Itr,,, — „p1 . • NEIN __ ► ■ SPRINKLER SYSTEM, SPRINKLER HEADS, PIPING, ACCESSORIES, ETC FOR NEW & ' :i r'.P. NII ' li ,0 f k A �i' A rw` 6 HEAT LOSS AND HEAT GAIN CALCULATIONS VAV TERMINAL UNIT SCHEDULE ` 4.ft: LUCKY•PORTLAND,ORS BRUCE M. COOLING AIRFLOW FAN ELECTRIC REHEAT COIL � � co HEATING: COOLING: :: ° ' CARLSON o UNIT MANUFACTURER MODEL INLET MAXIMUM MINIMUM ESP TEMP NOTES IA:68°F IA:70'F150%RH architecture • planning • interior design o OA:22'F OA:90168(DB1WB)°F (CFM) (CFM) HP VOLTS FLA CFM IN CFM KW VOLTS RISE BRUCE M. CARLSON ARCHITECT, PLC u7 VAV•1,2,3 SALES/STOCK VAV-1 PRICE FDC-3012 12' 1800 300 1/2 120 7,1 1360 0.4 680 6 208 35 ALL 800 WASHINGTON AVE. N., SUITE 208 1 MINNEAPOLIS, MN 55401-1330 HEAT LOSS HEAT GAIN VAV-2 PRICE FDC-4012 12' 2000 300 314 120 9.9 1680 0.4 840 9 208 35 ALL PHONE: (612) 547-1300 `^ SENSIBLE SENSIBLE ' LATENT TOTAL FAX: (612) 547-1301 a`) VAV-3 PRICE FDC-1008 8' 950 150 114 120 4.5 600 0.4 300 3.5 208 35 ALL 11 ITEM (BTUH) (FM) (BTUH) (BTUH) CONTACT: CORY BILLIG VAV-4 PRICE FDC-3010 10' 1800 250 112 120 7,1 1160 0.4 580 6 208 35 ALL cbillipcmarch.com LIGHTING --- 17675 --- 17675 • IIMIMIMMIIIIMII PEOPLE --- 14709 11817 26526 , _ VENTILATION LL AHU LL AHU LL AHU LL AHU NOTES ROOF 10075 15909 --- 15909 1. COORDINATE CONTROLS WITH LANDLORD BUILDING AUTOMATION SYSTEM, ilk WALL 0 0 --- 0 2. SCR PROPORTIONAL CONTROLLER FOR ELECTRIC REHEAT COIL. GLASS 0 0 --- 0 3. ECM MOTOR. INFILTRATION 0 0 0 0 w1n InuQhi -podos 4. FILTERRACKASSEMBLYANDFILTER, .son .0 1 ng ons' - MISC --- 15359 --- 15359 VAV-1,2,3 10075 63652 11817 75469 I TIti v r"S. r,I'.tar re VENTILATION SCHEDULE DIFFUSER, REGISTER & GRILLE SCHEDULE k` L .NI .6•,r. %L.Y-L... ..^..., 1 1 ti UNIT OCC AREA EXHAUST MAX CFM MIN CFM PEOPLE MIN OA SUPPLY CFM SQ FT CFM UNIT LOCATION MANUFACTURER MODEL SERVICE TYPE SIZE FINISH NOTES VAV-1/2/3/4 4404 4800 - 57 957 100 A CEILING PRICE SCD SUPPLY SURFACE 24"x24 WHITE 1,2,4 SEAL: B CEILING PRICE SCD SUPPLY SURFACE 12'x12" WHITE 1,2,4 ASHRAE 62.1-2007 VENTILATION REQUIREMENT: C CEILING PRICE BO RETURN SURFACE 24"x24" WHITE 1,2,4 (Rp x Pz) + (Rex Az) = Vbz RETAIL SALES - (7.5cfm x 57 people)+(.12 x 3741 sq ft) = 877 cfm OA iti_.}. ' i.,i STORAGE - (.12 x 653 sq ft) = 80 cfm OA moi` -.1' MECHANICAL NOTES: .;. 1. SUPPLY AIR DIFFUSER WITH OPPOSED BLADE DAMPER. :r' TUrr r' SIZE EACH SPRING ISOLATOR PER 2. 35' DEFLECTION RETURN/EXHAUST GRILLE. ANCHOR UNISTRUT TO TOP MANUFACTURER'S CORNER WEIGHT 3. RAPID MOUNT FRAME. CHORD OF JOIST (TYP. OF DATA. SPRING VIBRATION EACH JOIST). SPAN ISOLATOR MP. OF 4. ALL GRILLES, REGISTERS & DIFFUSERS IN SALES AREA MUST BE PAINTED TO MATCH CEILING, MINIMUM OF 1 JOIST PAST EACH HANGER) VERIFY EXACT COLOR WITH ARCHITECT. ' ,5.., UNIT IN EACH DIRECTION. ' i1), If 4r -A "I 2 FAN SCHEDULE r5�-'' 4 ;• thiale96 PO PM on t■1 RUBBER FAN MOTOR GROMMET w�`'n MARK SERVES MFGR MQDEL# CFM ESP RPM DRIVE MOTOR VOLTS NOTES MICHAEL A. WEBERT c7) MI (IN WG) TYPE (AMPS) SIGNATURE NS MOUNTING BRACKET EF-1 TOILET GREENHECK SPB-110 100 0.25 1,300 DIRECT 1.14 120V/1PH ALL 04.06.2018 INTEGRAL TO UNIT MECH EQUIP 1 NOTES DATE ISSUED 77467 Q l 1. PROVIDE WITH INTEGRAL BACKDRAFT DAMPER. REG. NO. o . INTERLOCK WITH TOILET ROOM LIGHTS. co ro 0 HANGER ROD. TYP OF EACH SUPPORT. 3. MAINTAIN MINIMUM 10' CLEARANCE TO ALL AIR INTAKES. - REFERENCE MANUFACTURER'S DATA FOR LUC KY * BRAND cL 0 QUANTITY. v 0 HANGING DETAILAWASHINGMOL SQUARE ® UNIT I NO SCALE Cr �6L 9712 SW o WASHINGTON SQ ROAD c SEE PLAN FOR BRANCH SI �. OOF JOIST TIGARD, OR 97223 ALL FLEX DUCT MUST BE INSTALLED PER THE ADC (AIR DIFFUSION COUNCIL) ANGER WIRE I INSTALLATION STANDARDS (MOST CURRENT EDITION), INCLUDING A BEND RADIUS OFSHEET METAL DUCT HANGER SPACE #F03 v ONE DUCT DIAMETER OR GREATER, PROPERLY SEALED AND SECURED WITH 2 INCH o BEADED COLLARS, PROPERLY SUPPORTED AND FULLY EXTENDED DUCT. FAN SPIRAL DUCT `mCALCULATIONS FOR THIS PROJECT WERE SIZED FOR 4 FOOT MAXIMUM FLEX DUCT INSTALLED PER THE ADC INSTALLATION STANDARDS. FLEX DUCT SHOWN ON PLANS ,011 IS FOR SCHEMATIC PURPOSES ONLY AND SHALL IN NO INSTANCE EXCEED 4 FOOT, SPECIALTY DESIGN 1. 0A CONICAL BELLMOUTH TAP, AIR SCOOP AND VOLUME CAMPER NOT ALLOWED. CO SEE SCHED FOR SIZE 40 �1 o RECTANGULAR OR ROUND 11 ACCESS PANEL W/ SHEET TITLE: cDo SPIN-IN, CONICAL OR SUPPLY AIR DUCT CAM LOCKS BELL MOUTH TAKE-OFF HVAC DETAILS TRUNK DUCT AND SCHEUDLES ROUND RIGID DUCT SEE PLAN FOR SIZE VAV DEVICE SEE SCHEDULE o FOR SIZE o ELBOW RADIUS '1 'N, cc MINIMUM 1 DUCT RIGID, ROUND DUCT BRANCH CONNECTION TO VAV. MAINTAIN 3'-O" OF STRAIGHT REVISIONS: ,,,,-- o DIAMETER RUN ON INLET OF VAV BOX. WRAP DUCT NO: DATE: BY: z W/ INSULATION PER SPEC. Q 04.05.2018 PERMIT SET co Y DRAW BAND ` ROOF JOIST /`1 05.11.2018 CONST SET 0 (2 TYP) RUNOUT DUCT SIZE SHALL BE ANGER WIRE FLEXIBLE DUCT SAME AS DIFFUSER NECK �I CD OM/ EBOW SUPPORT DIAMETER UNLESS NOTED i____- SHEET METAL DUCT HANGER 0 AIR DIFFUSER immemmnow OTHERWISE ON DRAWINGS. FLEXIBLE AIR DUCT _...e______--RECTANGULAR DUCT to 1-- 11111111111111 4 4, MAX, ci ) SEE SPEC FOR Li.' INSULATION 0 eE j \—CEILING REQUIREMENTS PROJECT NO:DRAWN BY: 403fi.00� - DETAIL NOT USED DUCT HANGING DETAILS TERMINTAL UNIT DETAIL Ei) DIFFUSERTAKEOFF NO SCALE Go NO SCALE el NO SCALE i® NO SCALE M 3 COPYRIGHT BRUCE N. CARLSON ARCHITECT, PLC 2018