Report (65) Bend Office (541)330-9155
Inc. Geotechnical Office (503)601-8250
Carlson T estin cEugene Office (541)345-0289
Salem Office (503)589-1252
Tigard Office (503)684-3460
Special Inspection 60,PQ r���`4,tu
FiNAL SUMMARY LETTER
� �y Sties MO'Sa h,Se,. IZG
November 27,2018
Job#: T1805169 TtUl
City of Tigard
13125 SW Hall Blvd
Tigard,OR 97223-8199
Attn: Building Division
Re: Project Name: Din Tai Fung Washington Square
Address: 9585 SW Washington Rd—Tigard,OR•%1}Z-4
Permit#: BUP2018-00140
Per Chapter 17,Section 1704.1.2 of the International Building Code(IBC),we have performed special inspection of the following
item(s)per our inspection reports only:
Reinforced Concrete
Structural Steel
All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of
our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable
workmanship,provisions of the State Building Code and Standards,as well as the structural engineer's design changes,approvals and
verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects,
deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type.
Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may
exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members
of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to
be conclusive representations of fact. Our reports pertain to the material tested/inspected only.
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods,
techniques,sequences or procedures of the construction or evaluating or reporting job conations related to health,safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office, If there are further
questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
Doug Loftesness
Project Manager
DUks
cc: Din Tal Fung—David Wasielewski
KPFF—Travis Smith
Chin-Ley Reche Associates—Sergio Chin-Ley
Emerick Construction Co—Paul Miller
Paragon Construction Consulting—Mike Kimmi
P:\Projects\General\Final Letter Forms\New Final Letter Templates\City of Tigard.doc Updated 11/30/11
November 29, 2018
Mr. Sergio Chin-Ley
Chin-Ley/Reche Associates
1516 Melrose Avenue, Suite 200
Seattle,WA 98122
Re: Din Tai Fung Washington Square
9585 SW Washington Rd—Tigard, OR
Permit#: BUP2018-00140
Final Structural Conformance Letter
Dear Sergio:
Based on the reports submitted to us, to date, including the final summary letter by Carlson Testing
Inc., dated November 27,2018,as well as our own observations during our site visits,we believe that
the Din Tai Fung Washington Square project was constructed in general compliance with the
structural plans and specifications.
If you have any questions or need further information, please call me.
Sincerely,
•
/r Zgt7CTpR
//c/?d/fic,„
4-4
Travis Smith, PE �' p'1?'�
Attachment � icr
�� 1c°
0-!EXPIRES: L-31-"�r
TS:kw
2018-11-29_Din Tai Fung Washington Square_10021800084_Conformance Letter
111 SW Fifth Avenue, Suite 2500 Portland, OR 97204 503 227-3251 kpff.com