Correspondence (3) Cae)t - 00104*
LOQ
Albert Shields
From: Albert Shields
Sent: Monday,July 2, 2018 5:14 PM
To: Matt Neish
Subject: Tigard Selt Storage aka SW Atlanta Storage, CUP2017-00004, BUP2018-00197
Attachments: Albert Shields.vcf
Matt, in reviewing your application and plans for your SW Atlanta Storage facility we note that of the 25 conditions of
approval of CUP2017-00004 that are required to be met prior to commencing site improvements only one has been met
at this time. Accordingly, I will classify this application as "Approved (for Plan Review) but Not Met." Plan Review will
proceed but the permit will otherwise be on Hold until the requisite conditions have been met. Please let me know if
you have any questions.
Albert Shields
City of Tigard
Permit Coordinator
(5031716-2426 Work
Albert tigard-or.gov
13125 SW Rail B[vd.
Tigard,Oregon 97217
www.tigard-or.gov
1
" i# DESCRIPTION STATUS STATUS DATE SEVERITY APPLIED BY ACTION BY
37.Prior to final building inspection,the applicant shall provide the City with as-built
drawings of the public improvements as follows:1)3 mil mylar,2)a diskette of
the as-builts in"DWG"format,if available;otherwise"DXF"will be acceptable,
and 3)the as-built drawings shall be tied to the City's GPS network.The
applicant's engineer shall provide the City with an electronic file with points for
each structure(manholes,catch basins,water valves,hydrants and other water
system features)in the development,and their respective X and Y State Plane
Coordinates,referenced to NAD 83(91)