Loading...
Report (64) ` tt5 c.Ao --?cc1/4.. 1-- L` S FN Ps 2D&- 00 017 Contractor's Material and Test Triad Fire Protection ROC319343 CCB#199988 S3DESDL863RZ Certificate for Above Ground 1927 NE Rodney Avenue Portland, Oregon 97212 Piping 503.856.6333 Fax 866.766.8862 office@triad-fire.com www.triad-fire.com Procedure Upon completion of work,inspection and tests shall be made by the contractor's representative and witnessed by the property owner or their agent. All defects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities,owners,and contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material,poor workmanship,or failure to comply with authority's requirements of local ordinances. Property Name Natural Grocers Property Address 13115 SW Pacific Hwy Accepted by approving authorities(names) City of Tigard Address 13125 SW Hall Blvd Plans Installation conforms to accepted plans K Yes No Equipment used is approved IKI Yes No If no,explain deviations Has person in charge of fire equipment been instructed as to location of control k Yes No valves and care and maintenance of this new equipment? If no,explain Instructions Have copies of the following been left on the premises? 1. System components instructions X1 Yes No 2. Care and maintenance instructions Yes I I No 3. NFPA 25 KI Yes No Location of Supplies buildings Entire Interior system Make Model Year of manufacture Orifice size Quantity Temperature rating Tyco EC-14 Upright 2018 3/4" 63 200 Sprinklers Tyco EC-14 Pendant 2018 3/4" 14 155 Tyco DS-1 2018 3/4" 8 200 Tyco FRB 2018 1/2" 12 155 Pipe and Type of pipe SCH 7 K SCH 10 K SCH 40 CPVC Other: fittings Type of fittings X Grooved x Welded X Threaded CPVC Other: Alarm device Maximum time to operate through test connection Alarm Type Make Model Minutes Seconds valve or Flow flow Potter VSR 0 45 indicator Dry valve Quick opening device Make Model Serial number Make Model Serial number Time to trip through test connection Water Air Trip point Time water reached Did alarms operate Dry pipe pressure pressure air pressure test outlet properly operating test Minutes Seconds PSI PSI PSI Minutes Seconds Yes No Without Q.O.D. With Q.O.D. If no,explain Page 1 of 3 Operation: Pneumatic Electric Hydraulics Piping supervised? Yes No Detecting media supervised? Yes No Deluge Does valve operate from the manual trip,remote,or both control stations? Yes No and Is there accessible facility in each circuit for testing? Yes No If no,explain pre-action valves Does each circuit operate Does each circuit operate valve Maximum time to operate release Make Model supervision loss alarm? release? Minutes Seconds Yes No Yes No Location and floor Make and model Setting Static Pressure Residual pressure(flowing) Flow rate Pressure reducing Inlet(psi) Outlet(psi) Inlet(psi) Outlet(psi) Flow(gpm) valve test HYDROSTATIC:Hydrostatic tests shall be made at not less than 200 psi(13.6 bar)for 2 hours or 50 psi(3.4 bar)above static pressure in excess of 150 psi(10.2 bar)for 2 hours. Differential dry-pipe valve clappers shall be left open during the test to prevent damage. All above ground piping Test leakage shall be stopped. description PNEUMATIC:Establish 40 psi(2.7 bar)air pressure and measure drop,which shall not exceed 1-1/2 psi(0.1 bar)in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop,which shall not exceed 1-1/2 psi(0.1 bar)in 24 hours. All piping hydrostatically tested at 200 psi( bar)for 2 hours If no,state reason Dry piping pneumatically tested Yes No Equipment operates properly rt,-Yes _No Do you certify as the sprinkler contractor that additives and corrosive chemicals,sodium silicate or derivatives of sodium silicate,brine,or other corrosive chemicals were not used for testing systems or stopping leaks? I)I Yes No Reading of gauge near water supply test connection 65 psi( bar) Tests Drain test Residual pressure with valve in test connection open wide 60 psi( bar) Underground mains and lead-in connection to system risers flushed before connection made to sprinkler piping.... Verified by copy of the Contractor's Material and Test Certificate for Underground Piping x Yes No If no,state reason Flushed by installer of underground piping I^I Yes ElNo If powder driven fasteners are used in concrete,has representative sample testing been satisfactorily completed? ri Yes n No If no,state reason Blank Number used Locations Number removed testing gaskets Welded piping? KI Yes No If yes... Do you certify as the sprinkler contractor that welding procedures used complied with the minimum requirements of AWS B2.1,ASME Section IX Welding and Brazing Qualifications,or other applicable x Yes No qualification standard as required by the AHJ? Welding Do you certify that all welding was performed by welders or welding operators qualified in accordance with the minimum requirements of AWS B2.1,ASME Section IX Welding and Brazing Qualifications,or x Yes No other applicable qualification standard as required by the AHJ? Do you certify that the welding was conducted in compliance with a documented quality control procedure to ensure that(1)all discs are retrieved;(2)that openings in piping are smooth,that slag and other residue are removed;(3)the internal diameters of piping are not penetrated;(4)completed x Yes No welds are free from cracks,incomplete fusion,surface porosity greater than 1/16 in.diameter,undercut deeper than the lesser of 25%of the wall thickness or 1/32 in.;and(5)completed circumferential butt weld reinforcement does not exceed 3/32 in.? Do you certify that you have a control feature in place to retrieve all cutout(disks)? x>Yes No Misc. Have you provided a hydraulic data plate? x Yes No If no,explain Date left in service with all control valves left open: 8-1-1 8 Name of Triad Fire Protection representative: Benjamin Esqueda Date: g_1_1 8 Signature of Triad Fire Protection Representative: ‘B04,y. 6,,y,uelG Signatures Name of property owner/agent: Title: Date: Signature of owner/agent: Page 2 of 3 • Additional Explanations/Notes: Page 3 of 3