November 15, 2018
Reminder: No ;;Lunch New-sletter produced a h nksgivinv Weei; sty no Thursday
1. CIP Project Updates for Nov. 20 Meeting
, 'ec. 7 I-Ioli�la��'iree .l..ig?.:�i: ?ig
City Engineer Lori Faha attached project management -
worksheets for the Council's Nov. 20 Workshop Details coming from TDA
discussion.
Tuesday, Dec. 11 Business Meeting
2. Economic Indicators 6:30 p.m.—Town Hall
The Oregon Employment Dept. shared the most
current economic indicators for Washington Count;•. Tuesday,Dec 18 Combo Business/Workshop
Meeting
3. Construction Project Update 6:30 p.m.—Town Hall
Christina Zellmer attached an overview of road, trail
and construction projects underway in the city.
4. Public Works Update
A summary of activity is attached.
5. Press Releases
- Tigard Key Bank robbery
- Tigard homeovmer confronts and shoots intruder
6. News Articles
✓ blAX expansion passes Tigard City Council
✓ Tigard homeowner kills suspected intruder,police
say
✓ flan shot,killed in Tigard
✓ Tigard council approves SWC light rail preferred
alternative route
✓ Tigard police seek suspect who robbed Key Bank
✓ Tigard council to mull SWC resolution Tuesday
7. Council Calendar
Tuesday,Nov. 20 Combo Business/Workshop
Meeting
6:30 p.m. —Town Hall
Tuesday,Nov. 27 Business Meeting
6:30 p.m.—Town Hall
Tuesday, Dec. 4 Business Meeting
6:30 p.m. —Town Hall
13125 SW Hall Blvd.ligard.OR.077-223 1 Web u-aw.rigald-or,goe I Phone:503.639.41?1 Fs.NZ.:503.684.729' j TDD 503.6134.2772
Item# f
Newsletter:
City of Tigard
Memorandum
To: Honorable Mayor& City Council
From: Lori Faha, P.E., City Engineer
Re: Supplemental Information for November 20, 2018 Council Workshop Session
Briefing on Capital Improvement Plan (CIP) Projects
Date: November 14, 2018
Attached please find copies of the October 2018 status reports for all FY2018-19 CIP projects
managed by Engineering. These reports summarize work, budget and schedule status for each
project. The reports support the first Quarter CIP status report that vill be presented to Council
at the November 20 Workshop Session.
PARKS
Fanno Creek Remeander(City/Clean Water Services) Andy Newbury
WENT 92013 10/17/18
This joint project with Clean Water Services will result in lengthening the stream channel,which is recommended in order to lower
or eliminate the rate of incision or erosion by decreasing the steepness/slope of the streambed.This will require the removal and
replacement of the Ash Avenue Pedestrian Bridge,replacing it with one designed for better flood passage.The project also
includes reconstructing a segment of the Fanno Creek Trail providing for an upgraded trail that is not subject to failures due to
creek bank erosion.
41 On Target * Clean Water Services
OMinor Issue HDR Engineering-
On Target
Total Project Budget: $1,400,000$1,600,000
Status: Construction City of Tigard Budget: $580,990 $675,000
Total Project
$109,281
External $638,000
$39,382
Internal = $37,000
FY 2018/19
$104
External $145,000
$18,170
Internal - $8,000
Total Project%Spent: 22% Project Manager's Total Project Estimated%Complete: 85%
Percent spent is low as CWS will bill us at end of project.
• Project is scheduled to be complete fall 2018.
• New pedestrian bridge has been placed.
• New trail has been paved.
• Complete trail construction.
• Final plantings
• Continued streambank failures with potential impacts to the Fanno Creek Trail and a sanitary sewer line under the trail
Risks/Issues are at risk until the project is completed.
• Due to permitting delays,construction is not scheduled to begin until summer 2018 and ending in fall 2018.
• Total project budget increase approved in FY18 budget to account for updated cost estimate.
■
Public Works Facility and Yard Brian R/Rob M
91021 10/17/18 7Z
Description This project is Phase 1,which includes concept planning/space needs assessment and property search/acquisition.A
new facility is needed to better meet the needs of our growing city functions.
On Target
• O Minor Issue
•• On Target I T
Total Project Budget: $2,145,000
Status: Not Started yet
Total Project
External $2,100,000
Internal , $45,000
Project Budget
FY 2018/19
External $100,000
Internal $20,000
Total Project%Spent: 0% Project Manager's Total Project Estimated%Complete: 0%
1) TBD
2)
M, I -
• Start project scoping
• Review City of Hillsboro's new PW facility and lessons learned
• SW Corridor light rail project and/or city civic center project may establish need and schedule for PW site move.
PARKS
Dirksen Nature Park-Oak Savanna Restoration Carla Staedter
1i P—MV 92016-02 10/17/18 °
A nine acre area of Dirksen Nature Park houses some remnant Oregon white oak populations.This area is being restored back to a
native oak savanna to be used for education and enjoyment by the public.The project will remove non-native trees,shrubs and
° grasses.Native grasses and wildflowers will be planted along with additional oak trees and a native shrub hedge around the
savanna.A walking trail through the savanna will be lined on each side with rustic buck and pole fencing made from trees taken
down as part of the restoration.
On Target * Ash Creek Forest Mgmt.–6/30/19
On Target
On Target
Total Project Budget: $316,000
Status: Construction
Total Project
$228,193
External $278,500
$24,112
Internal —$37,500
FY 2018/19
$12,716
External $45,000
$215
Internal $10,000
Total Project%Spent: 80% Project Manager's Total Project Estimated%Complete: 90%
1) Monitor Site Summer/Fall 2018 Spray if Needed 4)Camas Celebration Grand Opening May 2019
Project Schedule 2) Additional bulb planting–Oct-Dec.2018 5)Control Cattle Graze end of May 2019
3) Oak Planting Oct.18 to March 19
• • Summer mow completed. This allows camas and other native bulbs a head start on the more hardy grasses in the spring.
• Weed Control ahead of schedule diverted funding to additional planting.
• Begin transition to Parks Maintenance Staff. Have 1 year overlap to train.
• Fall 2018 Winter 2019 planting of oaks and additional shrubs as needed.
Upcoming Work • Remove Female Ash Trees along forest edge to significantly lower influx of Ash into the savanna
Items • Winter/Spring repair of area disturbed by construction staging for the shelter and nature play.
• Long-term management of Oak Savanna requires grazing or burning. Most of the savanna at Dirksen is wet meadow. If
grazing is chosen,need to get DSL/CWS approval to have animals in a wetland. If burning is used,need to have approval
and support of TVFR.
• Operations staff need to be updated and educated about the long-term care of the oak savanna. They may need an
annual budget to contract with a native area restoration company for an additional 5 years to ensure a strongly
established savanna.
• Extra seeding and weed removal of the area between Tigard Street and the edge of the savanna will be required as an
interim solution until half street improvements and the paved trail are constructed in 2021 or later.
Dirksen Nature Park-Nature Play Areas Carla Staedter
92016-04 10/17/18
This project will construct two play areas designed to provide park users with the opportunities to climb,run,jump and build with
rocks,logs and other natural features.One area will be designed for toddlers and younger children while the other will provide
more challenging natural play elements.The play areas will be sited on the outer edge of the park's mowed playfield bordering a
forest.They will be covered in bark chips and adjacent to the future restroom/interpretive shelter.
O Minor IssueColumbia Construction-11/14/18
• On Target
•• On Target
Total Project Budget: $226,000; 008336,000
Status: Construction
Total Project
$76,613
External $310,500
$20,856
Project Budget Internal _ $25,500
FY 2018/19
$76,418
External $300,000
$3,347
Internal . $10,000
Total Project%Spent: 29% Project Manager's Total Project Estimated%Complete: 55%
1) Park design completed—April 2016 4) Construction—August 2018
Project Schedule 2) Permitting completed—March 2018 5) Substantial completion—November 2018
3) Bidding—April 2018
• Started construction August 9,2018.
• • Excavated nature play areas,installed under drainage,and poured perimeter curb and sidewalk.
• • Contractor debarked/sanded logs for nature play.
• Install logs in large nature play.
• Complete landscape.
•
• Project construction was moved to summer 2018 to respond to funding availability. The above schedule reflects
approved adjustments.
• Bids were higher than estimated,removed one piece of play equipment installation to reduce costs,and Q1 budget
adjustment for remaining higher costs approved Oct 2018
A
Dirksen Nature Park-Interpretive Shelter and RestroomJeff Peck
92016-06 �10/17/18 ,m
This project will construct a covered interpretive shelter with attached restrooms adjacent to the nature play areas. It will include
a hard-surfaced pathway to the Fanno Creek Trail,benches,picnic tables,covered awning and all required site utilities. The facility
will be designed to accommodate undercover outdoor learning and picnicking and provide a needed gathering area for the park
and adjacent Fanno Creek Trail.
O Minor Issue * TS Gray Construction-Closed * Geodesign,Inc.-
On Target * Morgan Holen * Romtec-
•• On Target * Columbia Construction-11/14/18
Total Project Budget: $370,000 x,008$738,000
Status: Construction
Total Project
$357,477
External $693,695
$89,971
Internal — $44,241*
Project Budget
FY 2018/19
$353,922
External $516,000
$37,626
Internal = $20,000
*Q1 Requested
Total Project%Spent: 61% Project Manager's Total Project Estimated%Complete: 80%
E2)
Grant application and presentation—June 2016 5) Purchase Romtec Restroom—August 2018
Grant award—July 2016 6) Begin Construction—August 2018
IGA signed by Council—April 2017 7) Substantial completion—November 2018
Permitting—(March-July2018)
• Started construction August 9,2018.
• Installed utilities to Interpretive Shelter and Restroom.
• Erected the Interpretive Shelter and Restroom.
. • Performed preliminary walk-thru of Shelter on September 25,2018.
• Install site furnishings.
•
Install landsca landscaping.
g•
• Repave the Fanno Creek Trail from work area to Tigard Street.
Risks Issues
• Project construction was moved to summer 2018 to respond to funding availability. The above schedule reflects
approved adjustments.
• Bids were higher than estimated. A Q1 budget adjustment was approved for this project,Oct 2018.
Tigard Street Heritage Trail and Public Space Jeff Peck&Schuyler Warren 1
• 92034 10/17/18
The city has signed a lease for the use of the inactive railroad corridor from Tiedeman Avenue to Main Street.The City was
awarded a Connect Oregon VI Grant and Washington County MSTIP funding to assist with the development of a 3/4 mile,12'wide
multi-use pathway with amenities including fencing,lighting,landscape,and art features. A public open space will be created
adjacent to Main Street and the Tigard Chamber of Commerce building. This project is related to LQC 98009 which used porous
paving material to create a temporary pathway in advance of the full project.
O Minor Issue * Walker Macy—Closed * Alta—10/25/18
• O Minor Issue * CES I NW—Closed * Pacific Habitat—1/31/19
• 0 Minor Issue * AMEC—Closed * Applied Professional Svs.
Total Project Budget: $1,293,000 $1,300,99 1,425,000
City of Tigard Budget: $352,000 245,000
Total Project
$258,373
External $1,302,000
$112,810
Internal _ $123,000
Project Budget
FY 2018/19
$34,659
External $1,048,000
$14,923
Internal ■$40,000
Total Project%Spent: 26% Project Manager's Total Project Estimated%Complete: 23%
1) Connect Oregon grant award notification—Nov 2016 4) Invitation to Bid—November 2018
• 2) Begin design services—May 2017 5) Begin Construction—March 2019
3) Permitting—(January—November 2018)
• Received 90%Plans and Specifications for Review.
• Submitted Rail Order Crossing Applications to ODOT Rail on August 8,2018.
• Conducted 90%Design Team Review Meeting
• Received 90%Comments from ODOT
• • Send 90%Comments to Alta
• Final Plan Submittal
• Aesthetic elements including public plaza amenities may be limited due to ODOT rail limitations and requirements.
• All desired amenities will cost more than current budget and the city is exploring additional grant funding opportunities.
• Bidding and construction timing dependent on ODOT reviews and approvals.
• Project budget updated in FY19 budget reflecting updated cost estimate.
• Construction budget moved to FY19.
Fanno Creek Trail Connection(RFFA) Mike McCarthy
• 92046 10/17/18
This project constructs four segments of the Fanno Creek Trail.Segment 1-Grant Avenue to Woodard Park,Segment 2-Ash
Avenue to Hall Boulevard,Segment 3-City Library to Bonita Road,Segment 4-85th Avenue(south of Durham Road)to the
Tualatin River.There is a separate CIP(#92013-The Fanno Creek Remeander)which is realigning the trail from Main Street to Ash
Avenue.The Regional Flexible Funds Grant is federal Congestion Mitigation and Air Quality(CMAQ)dollars.
O Minor Issue JA
h Creek-Closed
OMinor Issue h Creek-
•• On Target
Total Project Budget: $5,461;000 $5,48699 $6,000,000
City of Tigard Budget: $1,111,090 t','^,r 9,^;;1,535,000
Total Project
$145,410
External $1,154,500
$134,995
Internal $380,500
BudgetProject
FY 2018/19
External $165,000
$13,826
Internal $50,000
Total Project%Spent: 5% Project Manager's Total Project Estimated%Complete: 10%
1) Design team selected—Feb 2016
2) Design Started—Nov 2017
3) Preliminary(30%)Plan Review—July/August 2018
4) Construction—2020-21
• Design is in progress;Preliminary(30%)Plans were submitted in August. Cost estimates exceeded the budget.
• • The trail alignment is being revised to reduce the amount of boardwalk needed.
• • The Ash to Main segment may be removed from the federal project,with a potential plan to pave the existing trail with
• local funds.
• Design work continues.
• Work with ODOT and Metro to accept revised trail alignment
• Public open house in to review alignment
• Design and construction contracts being run through ODOT.
• Extended duration of consultant scope and fee negotiations by ODOT has required more city staff coordination time and
cost than originally anticipated.
PARKS
Tiedeman Crossing/Fanno Creek Trail Carla Staedter
■
MEMO
92051 10/17/18
With the Open Spaces Bond Measure,Metro will fund the design and construction of the Tiedeman Connection gap in the Fanno
Creek Trail.The project will realign the trail near Tiedeman Avenue to address safety issues.Construction will include a new
pedestrian bridge over Fanno Creek.
O Minor Issue * IGA-Metro * Legacy Contracting
Minor Issue * IGA-Amendment w/Metro Completed
•• Minor Issue * Morgan Holen&Associates
Total Project Budget: $660,000 847,000
Status: Construction
Total Project
$228,864
External $741,000
$106,652
Internal —$106,000
FY 2018/19
$29,746
External $428,000
$25,329
Internal =$30,000
Totai rroject 7o spent: #u7o rroject ivianager s i otai rroJect csumateo 7o t.ompiete: i0%
High internal expenditures reflect staff time needed for complex permitting
1) Bridge fabrication contract released—July 2017 4) General construction start date—August 2018
2) Bridge Delivery date—October 2018 5) Complete construction—December 30,2018
3) Bid general contract—June 2018
• Bridge manufactured in Minnesota and on track for delivery October 25,2018.
• • Piles driven and abutment foundation poured.
• • Percent complete and budget spent numbers are misleading since%of the cost of the bridge is billed at delivery.
••"WIT Mm
• Bridge Placement October 25tH
• • Form/pour%2 of retaining wall,move PGE pole,form and pour remaining wall,pour bridge deck,pave path,clean-up and
seed.
• Finalizing PFI permit and easements so PGE line can be moved out of the construction area.
• Construction occurring prior to having a final sanitary easement in order to meet construction schedule.
• Difficult bidding climate
• Metro has agreed to fund$140K of project cost/scope increases due to increasing bridge width,current bidding climate,
and additional floodplain work. IGA amendment reflecting this increased funding was approved by Council,project
budget is updated to total$847,000 in FY19 budget. Q1 budget increase approved Oct 2018(Metro will still fund 90%of
project budget).
• Have entered into an agreement with Clean Water Services to take over site planting and plant establishment resulting in
a project cost savings of approx.$15K.
PARKS/FACILITIES/TRANSPORTATION
Americans with Disabilities Act Transition Plan Lori Faha
92055 10/17/18 °
The city must complete an up-to-date Americans with Disabilities Act(ADA)Transition Plan. The ADA Transition Plan will focus
primarily on accessibility and barrier removal needs in the city transportation,parks,and facilities(buildings)system. The city has
° previously completed accessibility and condition inventories of some parts of these systems. This data will be utilized in this effort.
The Plan will also integrate and coordinate the schedule of needed improvements with ongoing and planned projects such as the
Pavement Management Program.
On Target ]INV G-12/31/19
On Target
On Target
Total Project Budget: X25,008260,000
Status: Planning
Total Project
$143,680
External
$220,000
$23,900
Internal - $40,000
FY 2018/19
$33,866
External $20,000
$255
Internal $15,000
Total Project%Spent: 64% Project Manager's Total Project Estimated%Complete: 65%
1) Kickoff meeting Feb.2018
2) Facility&Parks Evals March-M"July 2018
3) ROW Evals April-A-ug Sept.2018
• 4) City Policies&Standards Eval March-June 2018
5) Citizen Focus Group Meetings April 2018 Nov.2018,&e-c-.Jan.2018 2019
6) Draft Plan Oct.-Dec.2018
7) Final Plan for Council JR Feb.2019
• • Consultant completed assessments of city buildings,parks and ROW(sidewalks&ramps).
• • Staff update to City Council.
• Consultant work on draft report elements,cost estimates
• Q1 budget update to carry over unused funds from last fiscal year so project can be completed in FY19.
• • Consultant present assessment findings.
• Develop prioritization criteria with staff,Citizen Focus Group and consultant.
• Prioritize projects,create draft plan.
Risks Issues • An up-to-date ADA Transition Plan is needed ASAP to comply with regulations and provide legal coverage.
• Consultant fees were somewhat larger than budget after negotiating needed scope elements-project budget increase
for consultant fees and additional staff time needed to manage longer project schedule were approved by Council in
FY19 CIP budget,reflected above.
• Carry-over of unused budget from prior fiscal year approved in the Q1-Oct.2018.
PARKS
Park System Master Plan Update Carla Staedter
92056 10/17/18
The Park System Master Plan Update will examine existing recreational facilities, programs,and services. Community
involvement and public input will be a critical component of the process that will help determine the current and
future parks and recreation service levels.The updated plan will prioritize the needs and desires for upgrading and
creating new facilities and services. The plan will focus on developing areas of Tigard such as River Terrace and the
Tigard Triangle in addition to existing parks and recreation services.
• On Target
On Target
•• On Target ]INV
Total Project Budget: $220,000
Status: Design
Total Project
External $180,000
Internal $40,000
FY 2018/19
External $80,000
Internal $20,000
Total Project%Spent: %0 Project Manager's Total Project Estimated%Complete:0%
1) Project Scoping/Chartering—Nov.2018
2) Consultant Selection—Dec.2018—Jan.2019
3) Data Collection/Existing conditions -Jan.-April 2019
4) Public Input/Needs Assessment-May 2019-Sep.2019(Includes some public events and stakeholder meetings)
• S) Future Park&Trails Planning/Recommendations- Sep.2019-Nov.2019
6) Draft Parks Master Plan—Nov.2019
7) Public Input/Review—Nov.—Dec.2019
8) Final Parks Master Plan Update—Jan.—Feb.2020
9) PRAB&Council Adoption-March 2020
• Chartering underway
• Consultant Selection
PARKS Im
Fanno Creek Trail Amenities Carla Staedter
92057 9/11/18 EEM
This is a companion project to#92046,which uses Federal funds to construct new and rebuilt sections of the Fanno
Creek Trail. This locally funded project will add amenities along the new trail sections such as interpretive signage,
overlooks, benches and artwork to enhance the experience of trail users.
• On Target
On Target
•• On Target
Total Project Budget: $730,000
Status: Design
Total Project
External $650,000
Internal - $80,000
FY 2018/19
External $20,000
Internal $20,000
Total Project%Spent: 0% Project Manager's Total Project Estimated%Complete: 0%
1) Scoping/Charter Development Oct.2018
2) On-call Consultant Selection 2018
Project Schedule3) Master Planning Nov.2018 to Feb.2019
4) Individual Amenity Implementation TBD
• • Project has not begun yet.
• • Scoping/Chartering.
• Consultant Selection from On-Call Services Contracts.
A
Fanno NEELL SANITARY SEWER
Creek Slope Stabilization(Arthur Court) Andy Newbury
93009 10/17/18
Sanitary sewer pipe and a section of Fanno Creek Trail are being threatened by erosion on the outside bend of Fanno Creek. A
section of the bank along Fanno Creek near Arthur Court has eroded due to high water levels. This is threatening a sanitary sewer
main and a portion of the Fanno Creek Trail. The project will restore the section of eroding bank and divert high flows from the
impacted areas.
0 Minor Issue * AMEC—Closed * Shannon&Wilson—6/30/18
QMinor Issue * Morgan Holen—Closed
.. 0 Minor Issue * Integrity Tree—Closed
Total Project Budget: $1,155,000
Status: Design $1,340,500
Total Project
$142,771
External $1,417,000
$53,997
Internal $75,000
Project Budget
FY 2018/19
External $1,230,500
$3,128
Internal ' $20,000
Total Project%Spent: 13% Project Manager's Total Project Estimated%Complete: 15%
1) 50%design—^eG 2017 September 2018 5) Bid and award—May March 2019
2) 75%design—';;R 201°^'9 November 2018 6) Begin construction— ',i�^'9 June 2019
Project Schedule 3) Final design—Feo. ro^�4^'8 December 2018 7) End construction—August 2018 October 2019
4) Permitting—ApF.2019 November 2018
Snapshot of Work • 50%plan design work.
and Schedule
Progress
•• 1 �
• • 50%design submittal.
• Permit submittal to DSL/Corps—Full stream bypass expected.
• Continued streambank erosion may occur with potential impacts to the Fanno Creek Trail and a sanitary sewer line near
the trail at risk until the project is completed.
• Due to meetings with the agencies and permitting timelines,construction of this project will occur in the summer of
2019.
• Project scope and budget increased to address larger bank erosion zone.
East Fork Derry Dell Creek(Viewmont Ct to Fairhaven Way) Carla Staedter
• 93057 M010/17/18
Erosion of the East Fork of Derry Dell Creek has resulted in exposed manholes and laterals of the adjacent sanitary sewer system
from approximately Viewmont Court to Fairhaven Way adjacent to 110th Avenue. The incised stream areas will be brought back up
to previous stream elevations to provide protection to the sanitary sewer system. Project will include new stream cross sections
and the insertion of wood logs and bank treatment.
.: On Target111UPacific
AK—1/31/19
• On Target Habitat—1/31/19
•• On Target
Total Project Budget: $980,000 752,000
Status:Design
Total Project
$64,390
External $680,000
$14,341
Internal — $72,000
Project Budget
FY 2018/19
$28,795
External $405,000
$4,475
Internal _ $31,500
Total Project%Spent: 10% Project Manager's Total Project Estimated Complete:10%
1) Design and permit preparation completed November 15'
2) Submit Environmental Permitting November—March
Project3) On-call Contractor Selection April 2019
4) Outreach to neighbors for native plant installation along creek December-June 2019
5) Move sani lateral out of creek(Tigard crew if schedule works)lune 2019 or as weather permits
• Fieldwork completed. Project will require full permits since fill quantities will exceed 50 CY.
• • Initial outreach and notification to neighbors completed.
•: • 30%design completed draft permitting document done.
• Permit submittal to Corp/DSL/CWS.
• Work with crews to move lateral line
• Meeting with The Soil and Water Conservation District and the Tualatin River Watershed Council to discuss partnering on
outreach to private landowners in areas of the creek that are less incised.
• Work with Green Team to install downstream unstructured wood placement to capture silt.
Risks Issues
• Project will be scaled back to reflect changes in site conditions as a result of past private landowner stream restoration
efforts. Light touch grade control is all that will be required in lower reaches of the creek. While creek bed below the
Gaarde Culvert will require stream channel reconstruction. These site changes may cut the cost of the project in half.
41
SANITARY SEW"
Fanno Creek Sanitary Siphon Repair IBMAndy Newbury
MEMO 93058 10/17/18 •
MWA—nexisting sanitary sewer line and manhole are exposed due to bank erosion along Fanno Creek. This project will use engineered
structures to stabilize the bank and protect the exposed sewer line.
40 On Target * AKS-6/30/18
0 Minor Issue
On Target
Total Project Budget: $290,000
Status: Design
Total Project
$61,656
External $395,000
$10,201
Internal _ $30,000
FY 2018/19
$2,236
External $315,000
$1,053
Internal , $8,000
Total Project%Spent: 17% Project Manager's Total Project Estimated%Complete: 20%
1) 30%design—Dec.2017 5) Bid and award—May 2018 January 2019
2) 60%design—Jan.2018 6) Begin construction— ',i�^'°^'4 March 2019
' 3) Final design—Feb.2018 7) End construction—August 2018 June 2019
4) Permitting—ApF.2019 July 2018
• Received final plans and specifications.
• Bid package submittal and advertise invitation to bid.
• Obtain easements from Bonita Park Apartments.
• Continued streambank erosion may occur with potential impacts to an existing sanitary sewer manhole and sewer line in
and adjacent to Fanno Creek.
• Met with owner of Bonita Park Apartments. City needs temporary and permanent easements at the site. Landowner
will be completing repairs along Fanno Creek adjacent to the apartments and has asked that the City not do any work
until they are complete. City project now estimated to begin in late winter. Landowner has not yet accepted valuations
for easements.
• The project scope has changed. The exposed siphon within Fanno Creek will be removed and the manholes that are near
the eroded bank will be moved further away. New lines will be placed by directional drilling.
STORMWATER
A
124-Ave/Ann Court Culvert Replacement Andy Newbury
• 94038 10/17/18
An existing 30"storm culvert is failing. It is undersized and erosion is threatening the road crossing. During heavy rain events,
stormwater will flow onto 124"Avenue. This project will replace approximately 85 lineal feet of 30"stormline with an
approximate 60"wide box culvert.
On Target * Century West—6/30/18
0 Minor Issue
• On Target
Total Project Budget: $230,000 295,000
Status: Design
Total Project
$49,162
External $264,000
$7,072
Internal —$30,600
FY 2018/19
$14,460
External $199,000
$1,836
Internal - $12,600
Total Project%Spent: 19% Project Manager's Total Project Estimated%Complete: 20%
1) 30%design—Dec.2017 5) Bid and award—May February 2019
2) 60%design—Jan.2018 6) Begin construction— ',i�^'°^'°June 2019
Project3) Final design—Feb.2018 Q^'8 August 2018 7) End construction—August 2019 September 2019
4) Permitting—ApF.2019 September 2018
• Received 90%design submittal.
SO • Review 90%plans.
• Prepare bid submittal.
• Project will be delayed until summer of 2019 due to permitting review timelines and in-water work windows.
STORMWATER
A
Project Name:
Stormwater Rate Study and Audit/Funding Strategy Toby LaFrance/Lori Faha
• 94039 10/17/18
The Stormwater master planning effort is identifying significant project and program needs that have not been quantified,
prioritized or addressed for many years(the city's last Stormwater Master Plan is over 30 years old). This project will provide an
analysis of options and impacts to current stormwater rates and charges if the city implements the projects being identified and
prioritized in the Stormwater Master Plan.
40 On Target
0 On Target
•• On Target
Total Project Budget: $100,000
Status: Not Started Yet
Total Project
External $85,000
$307
Internal $15,000
FY 2018/19
External $85,000
Internal - $13,000
Total Project%Spent: % Project Manager's Total Project Estimated%Complete: %
• Hire consultant.
• Implementation of most recommended projects in the Stormwater Master Plan adopted by Council in Feb 2018 requires
additional funds than are currently projected available in the city Stormwater Fund.
• Project moved to FY19 in requested CIP budget.
STORMW
Bridgeport Distribution Stormline ReplacementAndy Newbury
• 94040 10/17/18 •
This project will repair 335 lineal feet of damaged stormline using cured-in-place pipe(CIPP) method.
WN• 0 On Target
• 0 On Target
• 0 On Target
Total Project Budget: $115,000
Design
2018/19
External $100,000
$4,390
Internal —$15,000
Total Project%Spent: 4% Project Manager's Total Project Estimated%Complete:5%
:3)
30%Design —September 2019 4) Bid and award—February 2019
• 60%design—October 2019 5) Begin construction—March 2019 Final design—October 2019 6) End construction—June 2019 2020
. AT.
• Begin 30%design plans. Design work to be completed in-house.
• • Complete 60%and final design plans.
• Prepare bid documents.
Frewing Street Stormline Replacement Jeff Peck
• 94041 10/17/18
This project will replace 208 lineal feet of damaged stormline, eliminate bends in the mainline and replace two
substandard catch basins.
• On Target
On Target
•• On Target
Total Project Budget: $145,000
FY 2018/19
Project Budget
External $118,000
Internal $27,000
Total Project%Spent: %0 Project Manager's Total Project Estimated%Complete: 0%
1) Scope development—October 2018 2)
• Asbuilt and storm drainage video review.
sour.r. I -
• Prepare Charter and Communication Plan.
• Hire Consultant for survey and design services.
STORMWATER
Kruger Creek Predesign Andy Newbury
• 94043 10/17/18 •
Prepare a preliminary design of major project elements needed to stabilize, restore and prevent further erosion along
Kruger Creek. This includes consultation with permitting agencies,a constructability review and refinement of
concepts and cost estimates provided in the Tigard Stormwater Master Plan. This project provides the predesign
analysis for two high-priority projects in the master plan (projects 304 and 308), addressing eroding stretches of
Kruger Creek from the headwaters near Bull Mountain Park to Gaarde Street.
On Target
On Target
•• On Target ]INIf
Total Project Budget: $166,000
StL���
FY 2018/19
Project Budget
External $133,000
$1,740
Internal $33,000
Total Project%Spent: 1% Project Manager's Total Project Estimated%Complete:0
1) Hire consultant—October 2018 4) Natural resource services—February 2019
• 2) Topographic and boundary survey—December 2018 5) Design development—April 2019
3) Geotechnical investigation—December 2018
• Negotiated scope and fee from consultant. Consultant to be hired through City's on call contracts.
••. 10
Upcoming Work • Send task order to consultant to begin work.
Items • Begin survey.
Risks/Issues • Continued stream erosion within study area.
STREETS
Pavement Management Program(PMP) 1fflF!JHWMike McCarthy
95001 10/17/18
This project,funded by the Street Maintenance Fee, provides for the preservation or replacement of the asphaltic
concrete by overlays,crack sealing or slurry sealing.Streets and treatments are determined based on traffic volume,
pavement condition, opportunities to combine with other projects and other factors in order to maximize the utility
of the funding available.
On Target * Murraysmith—12/31/18 * NRC—11/30/18
On Target * S-2—Summer 2018
•• On Target * Intermountain—12/31/18
Status: Construction
FY 2018/19
$1,303,921
External $2,700,000
$55,137
Internal ■ $100,000
Total Project%Spent: 49% Project Manager's Total Project Estimated%Complete: 60%
1) Fall/Winter—Scoping,pavement analysis&design for the next summer
2) Spring—Bidding,Contractor selection&contracting
3) Summer—Slurry Seal,Pavement Overlays and Ramps
• • 2018 Work included 2 miles of paving and 20 miles of crack seal/slurry seal completed;invoices are being paid in
• September and October.
• New design consultant selected and contracted
• Kickoff 2019 design work in November,planned 2019 work includes about 2 miles of paving and 18 miles of slurry seal
with crack seal.
• Preliminary evaluation in November/December
• Paving and curb ramp design in January-March 2019
• Bidding in March/April for construction in Summer 2019.
• Asphalt and concrete flatwork prices have been increasing rapidly. This may reduce the amount of backlog streets that
can be addressed.
STREETS
Pedestrian and Cyclist Connections Program Mike McCarthy
95027 10/17/18
Projects may include sidewalk/bike lane/pathway construction,crosswalk treatments and minor intersection modifications.
Projects will typically cost less than$50,000.Funds from this program can also be used to cover matching funds for eligible grant
projects benefitting pedestrians and cyclists.
On TargetqMSA
CES NW-1/31/19 * Jamar
On Target1EffS-2-8/31/18
•• -12/31/18
On Target
Ongoing Program
FY 2018/19
$4,140
External $260,000
$12,294
Internal - $40,000
Total Project%Spent: 5% Project Manager's Total Project Estimated%Complete: 10%
• Multiple projects each fiscal year.
• FY 19 work to date:
o Pedestrian and bicyclist counts completed at priority locations.
o Paved shoulder area along Barrows Road between Springbrook and Anna.
o Installed'Your Speed Is'driver feedback signs to be used on various streets with speeding complaints.
o Constructed new Pathway from 92nd Ave to North Dakota St.
• Completed end of FY18:
o Added center islands and stop signs on 98th Ave at Summerfield Dr.
0 Constructed new pathway from 100th Ave to Highland Dr.
' o Installed new crosswalk and RRFB flashing lights on Bonita Road at 791h Ave/Fanno Creek Dr.
o Constructed curb ramp on 72nd at Fir Street.
o Constructed new sidewalk along part of 115th Ave.
o Installed new lights at 121st/Katherine and 121st/Springwood crosswalks.
o Installed markings,lights/signs,and new crosswalk on Walnut Street at 116th Ave.
o Built walkway along North Dakota St east of 114th Ave.
r.• 1 -
• Detailed design of sidewalk along Grant Ave from Fanno Creek Trail to Tigard St.
• Paving shoulder walkway area along North Dakota St between 119th and 1211t
• Studying potential crosswalk locations along busy corridors.
• Improvements for cyclists at 72nd Ave railroad crossing.
• Sidewalk along 124th Ave near Anne Ct along with culvert project.
• Help fund sidewalk along Commercial St from Lincoln to 95th
• $14,000 removed from budget to help fund sidewalk along Commercial St from Lincoln to 95tH
Tiedeman Ave Complete Street Fanno Creek to Greenburg Rd Jeff Peck
• 95038 10/17/18
Build a"complete street"with sidewalks and bike lanes along Tiedeman Avenue from Fanno Creek to Greenburg
Road.This will include a traffic signal and/or other improvements at the Tiedeman Avenue/Tigard Street
intersection.Associated stormwater infrastructure will be added to treat stormwater runoff.
• On Target
• On Target
•• • On Target
Total Project Budget:$7,000,000
Status:Awaiting Stan City of Tigard Cost$2,200,000
Total Project
External $1,990,000
Internal $210,000
FY 2018/19
External $
Internal $20,000
Total Project%Spent: % Project Manager's Total Project Estimated%Complete: %
1) TBD 2)
Snapshot of Work
and
Schedule
Progress
• Develop project charter and communication plan.
• Develop project scope of work and estimate of costs—will consider a first phase of sidewalk improvements only based
on available city funds.
• Create RFP
• Project scope reduction likely if County MSTIP or other grant funding not obtained.
STREETS
Upper Boones Ferry/Durham Adaptive Signals Mike McCarthy ■
95041 10/17/18 •
This project is installing traffic signal coordination from Durham Road to Pacific Highway including 13 traffic signals and two rail
crossings.Traffic users consist of residential,school,city park,office and retail.
0 Minor Issue * Washington County
0 Minor Issue
0 Minor Issue low
Total Project Budget: $1,000,000
Status: Design City of Tigard Budget: $150;999 $185,00 213,500
Total Project
$124,357
External $164,000
$22,046
Internal $49,500
FY 2018/19
External $30,000
$15
Internal $10,000
Total Project%Spent: 69% Project Manager's Total Project Estimated%Complete: 45%
*This project is primarily federally funded-$1M.Percent spent reflects that the city's match has been paid
1) Preliminary Implementation—2017 3) Adaptive Control Implementation—2019
2) Detailed design-2018-19 4) Detection System Improvements—Summer 2019
• Updated signal controllers and optimized time-of-day signal timing plans.
• Implemented pedestrian-friendly features.
• Implemented real-time coordination between the Durham/Summerfield and Durham/Hwy 99W signals.
• Installed travel time readers and high-capacity wireless communications.
• Installed pan/tile/zoom traffic cameras at several locations—now on www.tripcheck.com.
• Per the IGA,the city provided the county a 10.27%match in one lump sum payment due upon the execution of the
agreement. The county is responsible for administering the remainder of the grant funds.
• ADA ped button/landing inventory complete.
•• I -
• Implement adaptive signal control software and updated communications.
• Implement new beacon/signal system and crosswalk changes at High School.
• Implementation of technology new to Tigard.
• New ODOT ADA interpretations have added scope and cost to project.
• City will consider constructing some ADA elements in advance using ped/bike program funds.
• Budget increase in FY18 budget due to additional city engineering staff time needed to support lengthened duration of
project.
STREETS
McCommercial Street Sidewalk(Main to Lincoln) Andy Newbury
95042 10/17/18 -J'
This project will construct a sidewalk along one side of Commercial Street from Main Street under the Pacific Highway overcrossing
to Lincoln Avenue;a pedestrian path connecting Commercial Street to Center Street and sidewalk along east side of Pacific
Highway from Naeve Street to Beef Bend Road will be constructed.This is part of a larger TriMet-managed project to improve
access to transit along the Pacific Highway corridor. This portion of the project will be managed by ODOT.
On Target * TriMet
On Target
•• On Target
Total Project Budget: $',7-5,000 $4,30500 2,000,000
Status: Design City of Tigard: $610,000 $295-999 211,000
Total Project
$134,182
External $165,500
$19,959
Internal $45,500
FY 201819
External $145,000
$1,175
Internal —$15,000
Total Project%Spent: 73% Project Manager's Total Project Estimated%Complete: 15%
*This project will be partially funded with the STIP Enhance Project to be completed cooperatively with TriMet
%spent reflects Tigard's required funding match,which includes advance contribution to TriMet
1) Hire consultants—Oct 2016 5) Permitting—Sept 2018
2) Preliminary design—Jan 2017 6) Bid and award—October 2018
3) Draft acceptance plans—April 2017 7) Begin construction—April 2019
4) Final design—July 2018 8) End Construction—September 2019
Snapshot of Work • PFI,Noise Variance and Tree Removal permits issued.
and Schedule
Progress
Upcoming Work • Invitation to bid.
Items • ODOT is managing design,ROW acquisition and construction contracts for the sidewalk portion of the project.
Risks/Issues • Project scope could be revised due to cost issues.
• Total project budget reduced in FY18 budget because scope was reduced-stormwater quality facility was pulled out to
become a separately budgeted and scheduled city project.
STREETS
Hunziker Industrial Core Andy Newbury
95047 10/17/18 •
New public infrastructure improvements to SW Wall Street,providing a connection from SW Hunziker Road to Tech Center Drive.
The project supports development and redevelopment of adjacent industrial lands to achieve higher levels of employment.
On Target * MSA—6/30/18
On Target * Wallis—11/30/2020
On Target * Columbia Pacific—12/31/18
Total Project Budget: $5,S7-6,000 $4,713,000
Status: Construction
Total Project
$2,618,820
External $4,511,000
$220,948
Internal ■$202,000
Project Budget
FY 2018/19
$582,333
External $913,500
$24,365
Internal . $25,000
Total Project%Spent: 60% Project Manager's Total Project Estimated%Complete: 70%
1) RFP for Design and Construction Mgmt.—Nov 2015. 5) RFP construction services—Nov 2017
Project Schedule 2) Survey,geotechnical,traffic report—Feb 2016 6) Bid and award—February 2017
3) Design complete—Sept 2017 7) Begin construction—March 2018
4) Permits—Sept 2017 8) End construction—November 2018
• Completed curb work along east side of Wall St and began sidewalk construction.
Snapshot of Work • Treated subgrade on west side of Wall St.and begin curb and landscape planter work.
and Schedule • Completed landscape planter construction on east side of Wall St. Begin planting and irrigation.
Progress • Finish final grading on east side of Wall St.
• Completed paving in Wall St.
imv.-- Continued sidewalk and driveway construction.
Continued planting in landscape planters.
Begin curb and sidewalk work in Hunziker Road.
Final paving in Hunziker Road
• EDA grant and Developer Agreement may not fully pay for cost of internal staff time.
• Total project budget reduced because second phase of the project(Tech Center Drive Connections)has been divided out
as a separate project(to start in FY19).
• Project bids came in approximately$600,000 below estimate.
STREETS on
121St Ave(Whistlers Lane to Tippitt)Sidewalks and Bike Lanes Jeff Peck
95050 10/17/18 EEO.
Construct sidewalks, bike lanes, underground utilities, and landscaped planter strips along 121St Avenue from
Description Whistlers Lane to Tippitt Street.This will complete the sidewalks and bike lanes from Walnut Street to Gaarde Street.
Anticipated to be a context-sensitive design to minimize community impact,with two lanes(no center turn lane)and
the planter strip narrowing in constrained areas.
• On Target
• On Target
• On Target
Total Project Budget: 5,000,000
Status: Design City of Tigard Project Cost:1,035,000
Total Project
External $805,000
$6,828
Internal $230,000
FY 2018/19
External $35,000
$6,792
Internal $30,000
Total Project%Spent: 0% Project Manager's Total Project Estimated%Complete: 0%
1) Washington County Developing Project Number and Scope of Work-October 2018
2) Develop Scope of Work and bring consultant under Contract—January 2019
3) Design Development(Preliminary to Final)—February 2019 to February 2020
4) Bid Process—March 2020 to May2020
5) Construction—June 2020 to December 2020
• Walked site with MSTIP representative(Pat Oakes).
• Reviewed city as-builts.
• Develop project scope with Washington County project manager.
• Develop project charter and communication plan.
STREETS
72"d Avenue/Tigard Triangle Transportation Study Tegan Enloe
95051 10/17/18
This study will determine the ultimate desired configuration of 72"d Avenue from Pacific Highway south to the
Highway 217 interchange area. Existing issues in this area include poor walking and cycling conditions along 72nd
Avenue, particularly in the Highway 217 interchange area and near Pacific Highway.Significant traffic congestion
exists, primarily on southbound 72nd Avenue through the Highway 217 interchange.The study will take into account
desires and products from the Tigard Triangle planning and code process,current and future traffic data,Southwest
Corridor/transit study input,as well as ODOT and other stakeholder input.
On Target * Angelo Planning —12/31/19
On Target
•• On Target
Total Project Budget: $295,500
Status: Planning
Total Project
$21,814
External $240,500
$9,190
Internal $55,000
FY 2018/19
$21,814
External $240,000
$9,190
Internal $50,000
Total Project%Spent: 10% Project Manager's Total Project Estimated%Complete: 15%
• Project kick off—July 2018
• Evaluation framework—September 2018—January 2019
• Design tool kit—July 2018—October 2018
• Alternatives development—November 2018—February 2019
• Preferred alternative refinement—February 2019—June 2019
• Internal team meeting on project progress
• Completion of multimodal tool-kit and background information memorandum
• • Future forecasting for corridor volumes
• Stakeholder outreach.
• Alternatives development and analysis.
• Existing conditions analysis
• Develop evaluation criteria.
• This project needs to address multiple user needs that sometimes conflict with one another.
• High existing demand for vehicle capacity.
• Reallocated some project budget to add an existing conditions analysis
STREETS
North Dakota Street(Fanno Creek)Bridge Replacement Tegan Enloe
95056 10/17/18 7M
This project will replace the existing,structurally deficient bridge with a new bridge wide enough to accommodate
pedestrians and cyclists along with vehicles. Environmental regulations will require a new bridge to be significantly
higher and longer than the current bridge.The project may also reduce flooding over the roadway.
• O Minor Issue
O Minor Issue
• On Target I T
Total Project Budget: $4,359,000
Status: Pre-Design City of Tigard Budget: $1,294,000
Total Project
External $1,052,500
$11,952
Internal $241,500
FY 2018/19
External $125,000
$9,479
Internal $55,000
Total Project%Spent: 0% Project Manager's Total Project Estimated%Complete: 3%
1) Project Design Kick Off August 2019 5) 90%Design—complete August 2020
2) 30%Design-complete November 2019 6) Final PSE—complete November 2020
3) 60%Design- complete March 2020 7) Bid Project—January 2021
4) Environmental Permitting- begin January 2021 8) Construction:June 2019—June 2022
• • Working on IGA process with ODOT.Hope to have consultant contract in place by August 2019.
Nor
••
• Finalize ODOT IGA.
• • Work with ODOT to procure a consultant.
• Develop project scope of work.
• ODOT IGA process is taking longer than anticipated,which is delaying the project schedule.
• ODOT anticipates cost escalations,but will not able to fund the entire project cost.Some cost will need to be absorbed by
City of Tigard.Expect to increase city budget in FY20 budget process.
STREETS E
rNWHEMMENEF Wall Street/Tech Center Drive ConnectionAndy Newbury
■
• 95061 �10/17/18 �
Completion of a street system from Tech Center Drive to SW Wall Street. The project supports development of
adjacent undeveloped lands to achieve higher levels of employment.This street segment was divided off from the
Hunziker Industrial Core/Wall Street project(#95047)to allow for project phasing and different funding sources.
• O On Target
O On Target -
.. O On Target
Total Project Budget: $2,250,000
Status: Not yet started
Total Project
External $2,150,000
$2,098
Internal ■ $100,000
FY 2018/19
External $360,000
$2,098
Internal _ $30,000
Total Project%Spent: 0% Project Manager's Total Project Estimated%Complete: 0%
1) Issue RFP and hire consultants—March 2019 5) Permitting—October 2019
2) 30%design—July 2019 6) Bid and award—March 2020
Project Schedule 3) 60%design—September 2019 7) Begin construction—July 2020
4) 90%design—November 2019 8) End construction—April 2021
• Meeting with Metro to review IGA.
• Present IGA to council.
-WATER Im
Project Name: Red Rock Creek Waterline Relocation - Rob Murchison
Project Number: 96046 10/17/18
Decommissioning of over a half mile of existing 12"waterline currently located in Red Rock Creek. Installation of fire lines to
properties currently being served on the northwest and southwest side of creek.
• 0 On Target * Westlake—1/31/19
O Minor Issue MSA—X66/30/18
•• O Minor Issue
Total Project Budget: $467,000 $479700A 869,000
Status: ln-progress
Total Project
$69,285
External $778,000
$74,274
Project Budget Internal — $91,000
FY 2018/19
$2,795
External
$649,500
$8,715
Internal E$25,000
Total Project%Spent: 17% Project Manager's Total Project Estimated%Complete: 25%
1) Design—Winter 2018 3) Construction—Spring/Summer 2019
2) Permitting—Fall 2018 4) Project completion—Summer 2019
• Phase I-Wall Street/Red Rock Creek
o As part of the Wall Street project,the new waterline connection that feeds the east side of Red Rock Creek is
installed.
o Plans for the Hall Street connection to existing water system are 90%complete.
o Temporary construction easements are being developed.
• Phase II-Milton Ct to Tech Center Drive(internal budget increased expenditures are due to adding this work phase)
o Surveyor complete.
o Permitting in Progress-METRO has verbally agreed to a waterline easement.
o City staff to negotiate with an engineering consultant to provide permitting,design and bidding services.
• Complete design and permitting phase of the Tech Center Drive to Milton Ct phase. Currently negotiating scope and fee
for KPFF to design and permit Tech Center Drive to Milton Ct phase.
• Negotiate and obtain temporary construction easement for private properties off of Hall Blvd. 90%complete on
Owner/City agreement.Need to obtain City Attorney approval before moving forward.
• Obtain ODOT and Railroad permit to perform construction work within right of way.
• Existing water line in creek is inaccessible for maintenance and at risk of breakage without the project.
• Adding scope to complete needed water system pipe loop connections at Milton to Tech Center is anticipated to
increase total project budget—this request will be made in the FY19 budget process.
• Added the Milton Ct to Tech Center Drive phase in order to take advantage of the proposed Fanno Creek Trail project.
This will allow the dead end crossing of a waterline located in Tech Center drive to be connected to the dead end
waterline located in Milton Court.
• City of Tigard PW crews to construct Potso Dog Park 8 inch water line in Spring 2019.
• Design and construction schedule extended to occur after the Wall Street roadway improvements are complete.The
proposed Wall Street roadway will include a waterline to replace the existing waterline located in Red Rock Creek.
WATER
Canterbury Pump Station Rob Murchison
96047 RM10/17/18 •
IMtThitsproject will rehabilitate the existing pumps and electrical components.This will extend the life of the existing pump station
the Bull Mountain Road Water Pipeline is constructed.
0 On Target
Minor Issue
On Target IMT
Total Project Budget: $350,900 $250,000
Status:Planning
Total Project
$40,247
External $200,500
$34,255
Internal $49,000
FY 2017/18
External $160,000
$7,154
Internal - $25,000
Total Project%Spent: 30% Project Manager's Total Project Estimated%Complete:60%
• Consultant to deliver a preliminary design report(pdr)in summer 2018. This report will provide analysis,a
recommended solution and cost and schedule impacts. Once City staff reviews,the next project phase will be to design
and construct improvements,complete schedule to be developed at a later date after review of pdr.
• Engineering consultant on-site investigation,review of record files and coordinate hydraulic modeling with water master
plan project.
• City crews to pothole to verify pump station suction and discharge piping.
• PDR was delivered and City staff are reviewing and providing comments.
• City maintenance crews to perform fire flow analysis within the 530 zone and to provide Bonita Pump Station set points.
This information will be used to recommend improvements to the existing pump station or decide if the existing pump
station can be improved.
• Next phase will be to design a temporary resolution until the Bull Mtn Road waterline is constructed or a permanent
solution that incorporates ASR 1 air entrainment issues with a new Canterbury PS.
• In order to upgrade the reliability of ASR 1,the design of the pump station is to incorporate ASR I air entrainment issues
into pump station design and construction.
• Cost of rehabbing the existing pump station or building a new pump station will need to be evaluated to the cost and
schedule of constructing a new pipeline from Reservoir 16 to the Canterbury PS. Constructing of the Bull Mtn Road line
will help alleviate winter water quality concerns in Reservoir 16.
• Entrained air bubbles in the discharge of Aquifer Storage and Recovery Well 1 are limiting the ability to operate this
pump station during peak day demands. City may elect to incorporate this work to upgrade ASR within the Canterbury
PS work.
• � A
Water Master Plan/SBE-Study Rob Murchison
96048 10/17/18 °
The city conducts water master planning every five to ten years. The current Water Master Plan was adopted in May 2010,with a
minor addendum in 2014 to include River Terrace development. The Water System Master Plan is a comprehensive study of the
city's water source,storage and delivery systems and will be used to guide future water utility decisions. The master plan has a 30-
year planning horizon and is predicated on the city's anticipated population growth during that time.
O Minor IssueMSA-1/31/19
On Target
•• On Target
Total Project Budget:$350000$473,000
Status: Planning
Total Project
$15,736 8
External
$73,682
Internal - $35,-000$66;-999**$64 00-$83,000 $39
0,000
Project Budget
FY 2018/19
$15,728 _
External 249
0
00
$23,574 $340,000
Internal - $32,000
Total Project%Spent: 19% Project Manager's Total Project Estimated%Complete:30%
• Hydraulic model development-Summer 2018
• Draft 410 reservoir needs and subsequently siting analysis-Summer 2018
• Preliminary review of water system-Fall 2018
• • Draft of current hydraulic operations-Winter 2019
• Preliminary Draft of Recommendation-Spring 2019
• Final Document for Approval-Summer 2020
• Rate and SDC project analysis to follow
• Current work items include data gathering,hydraulic modeling and workshop planning. Considerable effort is in
identifying LOT policies for system management that will drive the decision process and ultimate master plan
recommendations
• Water Management and Conservation plan is being developed that will ultimately provide guidance on long term water
• supply. This plan is being coordinated with the City of Lake Oswego. Once complete,this plan will inform the master
plan on long term scenarios and subsequently the infrastructure improvements required
• City maintenance crews will conduct fire flow testing for approximately 40 hydrants within the Tigard Water Service Area
• • Consultant engineer will use collected data to evaluate how the system currently operates,provide data to insure the
hydraulic model is calibrated;and for planning purposes,help to analyze various future operating scenarios
• Not having clear and defined LOT operating procedures in place.These issues are under discussion and being identified in
the Water Management and Conservation plan and in operation supply plans
Risks issues • A June 2018 meeting with Lake Oswego staff and Tigard staff helped to define how the master plan process will inform
the operations of the water system and assist in developing operating procedures. These meetings are held monthly
with various issues discussed,concerns identified,and resolutions proposed
• Budget cost increase are due to higher consultant cost and staff time in FY 2018 and 2019
WATER
Fonner Street/1215'Avenue Valve and Piping ImprovementsIMPI, Rob Murchison
96050 10/17/18 °
The project includes design and construction of a pressure-reducing valve,approximately 900 feet of pipe and
associated appurtenances.
On Target
On Target
On Target
Total Project Budget:$1,250,000
Status:Pre-Design
Total Project
External $1,145,000
Internal $105,000
FY 2018/19
External $300,000
Internal - $50,000
Total Project%Spent: % Project Manager's Total Project Estimated%Complete:%
Project Schedule • This work is being coordinated with the Washington County Department of Land Use and Transportation project.
Snapshot .
and Schedule
Progress
• • Washington County in coordination with the City is currently developing a proposal for design. As part of this design,the
City will include at a minimum the location of the proposed waterline and pressure reducing vault.
WATER
1
Water Rate and System Development Charge(SDC)Study Rob Murchison
96051 10/17/18 °
The study will review the capital improvement requirements to meet current and future growth development needs,
° review the current water SDC and master fees and charges schedule and provide recommendations for any
methodology updates or policies as required by Oregon Revised Statute(ORS).
• On Target
On Target
•• On Target ]NET
Total Project Budget:$150,000
Status: Planning
FY 2018/19
$ $125,000
External
$25,000
Internal
Total Project%Spent: % Project Manager's Total Project Estimated%Complete:%
Project • This work is being coordinated with the Water System Master Plan.
• This work will follow the water master plan task to identify proposed projects and their eligibility to use system
development charge fees. This project will also be combined with the storm water rate and system development charge
project.
STREETS
Main Street Green Street Retrofit(Phase 2) TBD
97017 10/17/18 IP
The project will extend the improvements completed during Phase 1 to the improvements completed with the Pacific
Highway/Main Street/Greenburg Road project. Improvements include new sidewalks, new asphaltic concrete and
the collection and treatment of stormwater runoff using low impact development approaches(LIDA).
On Target
On Target
•• On Target INELI
Total Project Budget: $2,558,000
Status: Not yet started City of Tigard Project Cost:$1,971,000
Total Project
External $2,355,000
$3,471
Internal $203,000
FY 2018/19
External $280,000
$2,029
Internal — $40,000
T Total Project%Spent: 0% Project Manager's Total Project Estimated%Complete: 0%
Snapshot of Work • Council approved IGA with Metro for project funding.
and Schedule
Progress
• Initiate project-awaiting staffing resources—expect to start after hiring of new Assistant City Engineer.
• Project funding through Metro is half of originally budgeted amount. The grant funding is now de-federalized which
allows for complete local control which is anticipated to make up for most of the reduction.
Item#
Washington CountyNewsletter:
State of Oregon
Economic Indicators Employment Department
October 2018 (September Data) QUALITYINFO.ORG
Washington County's unemployment rate remained Unemployment Rates in Washington County Cities
at 3.2 percent in September 2018, a 0.4 percentage Sept.2018,not seasonally adjusted
point drop from last year. Some cities saw unem- Local Area unemployment Statistics
ployment rates below 3.5 percent (not seasonally
adjusted). 3.5% 3.5%
3.4%
The county added 3,600 jobs between September
2017 and September 2018. Construction led indus- 3.2% 3.2% 3.2%
try employment growth, and manufacturing added
the most jobs over the year. A decline in govern- 3.0%
ment employment is due to a legislatively mandated
reclassification of home care workers from state
government to private health care.
Unemployment Rate Hillsboro Tigard Cornelius Beaverton Tualatin Forest Sherwood
Sept.2008 to Sept.2018,seasonally adjusted Grove
Local Area Unemployment Statistics
12% 'rte
100/0
Oregon
3 8% —Washington
4% County
2% 3.2%
0%
Sep-08 Sep-10 Sep-12 Sep-14 Sep-16 Sep-18
Construction Leads Industry Employment Growth Net Job Growth in Washington County
Percentage change,Sept.2017 to Sept.2018 Net change,Sept.2017 to Sept.2018
Current Employment Estimates Current Employment Estimates
Total 1.2% Total 3,600
i
Construction 5.4% Manufacturing )• 1,700
Transportation&Warehousing i 3.7% Construction am 900
Manufacturing 3.5% Education&Health Services ii 800
Government Ili 3.4% Leisure&Hospitality N 800
Leisure&Hospitality • 3.0% Government 1 300
°
Education&Health Services 2.2% Professional& Business 200
Financial Activities 1 0.6% Transportation&Warehousing 200
Professional& Business 0.4% Retail i 100
Retail 0.3% Financial Activities 100
Information -1.3%4 Information -100
Wholesale Trade -2.3% Wholesale Trade -300
Have questions?Want to subscribe?Contact mel Emily.A.StarbuckAoregon.-gov
Emily Starbuck, Washington County Workforce Analyst 503.360.2421
�j
Construction Project Update — Noember Item#ember 15, 2018 Newsletter:
Cook Park Sewer Line
A portion of Clean Fater Services'West Durham Basin Improvement Program has started at Cook Park.The
project is replacing aging sewer interceptor pipes that help control water flow with larger,more resilient pipes to
improve wastewater capacity. Truck traffic, trail closures and detours at the park are planned through April
2019. Work began near the wastewater plant and progresses westward. More info is on the CWS website:
http•//www cleanwaterservices org/about-us/projects/west-durhatn-basin-improvement-program
Fanno Creek Trail—Woodard Park to Tiedeman Ave
The Fanno Creek trail is closed from Woodard Park to Tiedeman Ave to build a new bridge and trail connecting the
Fanno Creek Trail straight from Woodard.Park across the creek to the existing crosswalk on Tiedeman
Avenue. Detour routes are via Johnson Street and via the Tigard Street Heritage Trail.The new bridge has been
installed over Fanno Creek,and bridge deck has been poured. Work continues to complete a retaining wall, to pour
the back side of the bridge abutment, and to upgrade and move a 10-inch waterline. Delays possible on
Tiedeman Ave.
Dirksen Nature Park
Construction is in progress on a nature play area in Dirksen Nature Park south of Tigard Street. The Fanno Creek
Trail is closed between Tiedeman Ave and Tigard St. Detour routes are signed on soft-surface trails through
Dirksen Nature Park,and a longer paved detour via the Tigard Street Heritage Trail.
River Terrace Area Construction
• River Terrace subdivisions are under construction particularly on the east side of Roy Rogers Rd south of
Scholls Ferry Rd. If you have any questions,please contact Mike White at 503-718-2464.
• A contractor is building a new subdivision on the west side of 150t'Ave south of Hawksridge. Utility work
(with traffic delays)is in progress in 150'Ave.
• Bull Mountain Road Widening and Traffic Signal Construction: Bull Mountain Road (from 164`'to
Roy Rogers Rd) is open with a new roundabout at the future River Terrace Blvd,and a traffic signal at Bull
Mountain and Roy Rogers Road. Visit GetUsThere.org for information and updates. The contractor is
preparing the nearby subdivision site for wet fall/winter weather.
• There are other significant road, sewer and water projects underway or planned in the area. Visit
GetUsThere.org for information and updates.
Hwy 217 Auxiliary Lanes
The Oregon Department of Transportation (ODOT) is designing a project to add an auxiliary third lane on Hwy
217 southbound from Beaverton-Hillsdale Hwy to Hwy 99W, and Hwy 217 northbound from Hwy 99W to Scholls
Ferry Rd. More information is on the project website at hwY217.org.
92nd Avenue Pathway to North Dakota Street
The street crew has paved the new pathway connection in existing right-of-way from the north end of 92"d Ave (off
Greenburg Rd) to North Dakota Street.
Wall Street (south of Hunziker�
Wall Street is under construction south of Hunziker Rd.Access is available to local properties (including Potso Dog
Park) but drivers should expect dela]s.
Fanno Creek Trail (Woodard Park to Bonita and Hall Blvd to Tualatin)
Design work is in progress on a project to build the remaining segments of the Fanno Creek Trail from Woodard
Park to Bonita Road and build a new connection from the end of 85`h Avenue (Hall Boulevard) to the Tualatin
Bridge. Contact Carla Staedter at 503-718-2788, or carla(@tiga_ rd�-or.gov with any questions.
Oak Street near 901''Avenue
A contractor is working on Oak Street near 90''Avenue for a new apartment complex. Daytime delays likely.
76`' and 79`'Avenues south of Bonita Road
A developer is constructing the Elderberry Ridge subdivision on the south end of 76'Ave east of 79`'Ave south of
Bonita Road. The first layer of paving is done on 79th;utility work is underway.
Tiedeman Avenue and Tigard Street
A developer is building a new subdivision south of Tigard Street east of Tiedeman Avenue. The contractor is
working in Tiedeman Ave from 9am to 3pm installing storm and sanitary utilities. Expect delays on Tiedeman.
68'Parkway south of Hwy 99W
A developer is building a new self-storage facility- on the west side of 68`'Parkway south of Highway 99W. Some
delays possible.
72"d Avenue between Clinton St and Baylor St
A developer is building a new 37-unit apartment building on the east side of 72"d Ave between Clinton St and
Baylor St. Current work includes storm drainage and sanitary sewer pipes under 72"d Ave; some delays likely.
School Construction
Construction continues on Templeton Elementary School, and on the new Durham Center education services
building near Durham Elementary School. Tigard High School construction is in progress,with periodic sidewalk
closures (with pedestrian detours) while the contractor is working in the immediate area.
Item# q
Public Works Update 11/15/18 Newsletter:
Here is a summary of the work happening in Public Works.
Those pesky leaves keep piling up? Bring them to the city's free Leaf Disposal and
Food Drive event
Bring your leaves and non-perishable food
items to Cook Park between 9 a.m. and 3
ti p.m. this Saturday,Nov. 17.
The drop-off location is in Cook Park at
the end of 92"'Avenue,just off of
° Durham Road near Tigard High School.
Move Your Way to Better Health
According to the U.S. Department of
Health and Human Services updated
Physical Activity Guidelines for
Americans, any amount and type of
moderate-to-vigorous activity can
contribute to health and well-being.
Want to boost your mood, sharpen your focus,reduce your stress and improve your sleep? Get outside and
enjoy the autumn sunshine walking along one of Tigard's beautiful trails.
Download walking maps for Tigard's parks at http://v-,x-w.tigard-or.gov/community/parks.php.
To learn more about the updated guidelines,visit
https://health.gov/news/blog/2018/1 1/updated-physical-activity-guidelines-fox-americans-now-
available/?source=govdelivery&utm_medium=email&utm_source=govdeh er;
item#5
Newsletter:
Tigard Police Department
Media Release
13125 SVS'Hall Boulevard I Tigard,Oregon 97223 4 www.tigard-or.gov/police
FOR IMMEDIATE RELEASE / November 13, 2018
Contact:
Jim'X'olf,Public Information Officer
Tigard Police Department
Phone: 503-7118-2561
Email: jim@tigard-or.gov
Tigard Key Bank Robbery
Tigard Police are asking for help to identify and locate a suspect who allegedly robbed the
Tigard Key Bank on Tuesday, November 13th. The bank is located at 11665 SW Pacific
Highway in Tigard. A 9-1-1 call at approximately 2:20 p.m. alerted police of the robbery who
then quickly set up containment and searched the area. The suspect remains at large.
According to witness statements, the suspect, described as a white male in his 50s, entered
the bank and presented a demand note for money to an employee. No weapon was seen or
implied. The suspect then fled the bank on foot with an undisclosed amount of money. It is
unknown if the suspect departed the area in a vehicle.
Tigard Police investigators were able to obtain surveillance photos of the suspect. If anyone
has information regarding the suspect, they are urged to contact Detective Hockin at 503-
718-2553 or email at David.hockin(@dga�gov
s
Tigard Ke e
gu y Bank Robbery ry Su spect
Page 1 of 1
Tigard Police Department
Media Release
13125 SIX'Hall Boulevard I Tigard,Oregon 97223 www.tigard-or.gov/police
FOR IMMEDIATE RELEASE November 14,2018
Contact:
Jim Wolf,Public Information Officer
Tigard Police Department
Phone: 503-718-2561
Email: jitn@dgard-or.gov
Tigard Homeowner Confronts and Shoots Intruder
At approximately 7:15 a.m. on November 14,a 9-1-1 call alerted Tigard Police that an intruder was
attempting entry into a residence located at 11075 SW Sage Terrace in Tigard.The caller advised the
police dispatcher that he confronted the suspect and a gun was discharged.Tigard Police were on-
scene within minutes.
Upon arrival police were met by the homeowner. Further checking, officers located two teen
occupants in the three-story townhouse and escorted them to a safe place. The Washington County
Major Crimes Team was called to investigate the shooting death of the suspect,identified as 41-year-
old Jose Luis Gonzalez Jr. There is no known address for the suspect.The suspect is known to the
Tigard homeowner. The motive is unclear as towhy Gonzalez made attempts to enter the Tigard
property. The homeowner is fully cooperating with police.
Investigators are continuing to gather evidence and probe further into the shooting.
Page 1 of 1
MAX expansion passes Tigard City Council
Item#
by KATU News Newsletter:11-15-19
Tuesday,November 13th 2018
New MAX line (Courtesy TriMet)
TIGARD, Ore. —The Southwest Expansion of MAX is one step
closer to reality.
A new MAX train line could drastically change the commute
between Tigard and downtown Portland. For some, it could cut
their travel time in half.
t0 Commuting between Tigard and Portland on Interstate 5 can be
= horrendous, even taking a bus between the two cities can take an
hour.
TriMet says the new Southwest Corridor MAX line would cut
that time down to just 30 minutes.
Portland City Council decided to move forward with the plan at the
start of the month and Tuesday the plan passed 4-1 in Tigard City
Council.
The proposed line would connect Tigard to downtown Portland with construction to start as early as 2021 and
trains running by 2027. If it's approved, it's possible construction will begin in 2021. The target date for
ridership is six years later, in 2027. Metro estimates by 2035,the new line would take 43,000 riders on an
average weekday.
The proposed line would start near Portland State University. Some stops on the way to Tigard include
Burlingame, Hillsdale, Multnomah Village, and Mount Sylvania. The line would end next to Bridgeport
Village.
Now, it moves on to Metro for a vote on Thursday.
It's expected to cost$2.6 billion, making it the most expensive MAX line expansion in TriMet history.
Tigard homeowner kills suspected intruder, police
say
Updated Nov 14, 5:23 PM; Posted Nov 14, 11:03 AM
By Jim Ryan jryan@oregonian.com The Oregonian/OregonLive
A homeowner shot and killed a man trespassing on his property Wednesday in Tigard,police say.
Jim Wolf, a Tigard police spokesman, said Wednesday morning that he didn't know of any other injuries in the
shooting, which happened at a home on Southwest Sage Terrace. Police identified the man who was shot as 41-
year-old Jose Luis Gonzalez Jr.
Police said they were called to the home about 7:15 a.m., were met by the homeowner and escorted two teen
occupants of the home to safety.
Wolf said Gonzalez was either dead or dying by the time police arrived.
The homeowner knew Gonzalez, police said, but it's unclear why Gonzalez tried to enter his property.
Wolf said he didn't know the circumstances of the shooting, whether it happened inside or outside the home,
whether Gonzalez went inside at any point or if he was armed.
Wolf also didn't know how many times Gonzalez was shot.
Police haven't publicly identified the homeowner. He's cooperating with investigators and has not been arrested,
Wolf said about 10:30 a.m.
The incident remains under investigation.
Man shot, killed in Tigard
The Times Thursday, November 15, 2018
Police say Jose Luis Gonzalez Jr. was shot attempting to enter a home on Southwest Sage Terrace on
Wednesday.
Tigard Police say a homeowner shot and killed a man who attempted entry into a home on Wednesday.
Jose Luis Gonzalez Jr. was killed, police say. They have no known address for him. He did know the
homeowner,police say, but they don't yet know why he attempted to enter the property on the 11000 block of
Southwest Sage Terrace.
Police got the call at 7:15 a.m. Wednesday, Nov. 14, from the homeowner, who said he confronted Gonzalez
and fired a gun. Upon arriving, officers located two teen occupants in the three-story townhouse and escorted
them to a safe place.
"We are going door-to-door in the neighborhood to see if anybody had any information,had any known history
of the property, things of that nature," Jim Wolf,police public information officer,told KOIN 6 news. "Also
looking at the evidence and collection that around the scene itself. Outside the property we're looking to see if
there's any availability of home surveillance."
KOIN 6 is news partner of the Times.
Cheryl Law-head,the president of the HOA at Village at Summer Creek, said she is a bit shocked. "This is a 6
year old neighborhood and it's been peaceful and quiet and we all thought pretty safe," she told KOIN 6 News.
"We walked the neighborhood at night."
The Washington County Major Crimes Team was called to investigate the shooting death.
Investigators are continuing to gather evidence and probe further into the shooting.
Tigard council approves Southwest Corridor light rail preferred
alternative route
Ray Pitz Tuesday,November 13, 2018
Despite some concerns,the council approves two measures that support the Southwest Corridor's preferred
alternative route.
Despite some reservations,the Tigard City Council has signed off on two measures of support for the preferred
alternative alignment of the Southwest Corridor light rail as it makes its way through Tigard.
In a 4-1 vote Tuesday night,the council approved both a resolution of support for the alignment and a
memorandum of understanding between several government agencies regarding the light rail route and
affordable housing in its path.
Councilor Marc Woodard was the lone "no" vote on both measures.
"It's not a perfect alignment ..." Kenny Asher,the city's director of community development, told councilors
before their vote. "That's because there is no perfect alignment."
Still,the majority of those testifying during a public hearing supported the plan that will result in five TriMet
light rail stations within Tigard city limits.
Michelle Cheney, a branch manager with the Portland Clinic, and also on the board of directors for the Tigard
Chamber of Commerce, said she supported the alignment, noting that a steering committee listened to their
recommendations of not displacing their Tigard clinic along the route, a possibility earlier on.
The preferred alignment also had the support of local politicos, including Washington County Commissioner
Roy Rogers, Metro Councilor(and former Tigard mayor) Craig Dirksen and Oregon House District 35 Rep.
Margaret Doherty,who all spoke in favor of the alignment that would have trains enter the city along Barbur
Boulevard before crossing Highway 217.
The end of the line would be at Bridgeport Village in Tualatin.
A proposed Park and Ride there would mean relocation of a Village Inn restaurant, although TriMet officials
have said they are working through extensive public outcry that a different location be found.
Rogers said the council was making a major decision about the future of transportation—some of which won't
be realized until years to come—as well as creating a huge economic opportunity.
But there were detractors and concerns voiced as well.
James Caster, a nine-year Tigard resident, said the light rail line would not solve traffic congestion, and he
expressed concerns about the number of homes and businesses that would be demolished along the way. He told
the councilors that, if they approved the alignment, it would prove they were beholden to special interests and
the "Metro dictatorship."
Likewise, Mike Strand, founder and CEO of Apex Industries, a precision machining and fabrication company at
12670 Hall Boulevard, said he heard several weeks ago that his business "is going to have to go away" to make
way for what rill likely house a light rail station, park and ride and the Tigard Transit Center,which have all
been studied for that area, along with a TriMet operations and maintenance facility.
It was the operations and maintenance facility, Woodard said,that irritated him the most, saying the first time
he heard about it was only April or May of this year.
"It was a shock to me when I heard about it," he said. He also called the route a "risky business deal."
Council President Jason Snider said he wasn't aware of the facility until recently as well, although city staff has
said it's been discussed for some time.
Meanwhile, several councilors also have expressed concerns about their hope that the Hall Street station, now
planned for the east side of Hall Boulevard, should have been on the west side of Hall and closer to the
downtown core of Tigard.
Snider asked TriMet officials what it would take to move the route west of Hall and the impact on travel time.
They responded it would be an extra$80 million to $100 million and add an estimated six minutes to travel
time.
Councilor Tom Anderson, who was on a committee that helped draft the memorandum of understanding, was
that he felt TriMet and the city came up with a very good compromise and believes the Hall station will be very
close to downtown Tigard.
While Mayor John Cook said he didn't love the preferred route,the issue at hand was whether to approve the
preferred option and not a vote on whether the council wanted light rail or not.
"It's not the best alignment; it's the best one we could come up with," said Cook, who was also on the Southwest
Corridor Steering Committee.
He reiterated what he's said before, "This doesn't solve the congestion. It just solves the future congestion."
Already approved by the Portland City Council and the Washington County Commission,the final step in the
process comes Thursday when Metro takes a vote on the preferred alternative alignment.
Tigard police seek suspect who robbed Key Bank
Times staff Tuesday, November 13,2018
The robbery occurred Tuesday at 2:30 p.m. on Pacific Highway; no weapon was shown,only a demand note.
Tigard Police are asking for help to identify and locate a suspect who allegedly robbed the Tigard Key Bank11665 S.W.
Pacific Highway,on Tuesday.
A 9-1-1 call at approximately 2:20 p.m. alerted police of the robbery who quickly set up containment and searched the
area.The suspect remains at large.
According to witness statements,the suspect, described as a white male in his 50s,entered the bank and presented a
demand note for money to an employee.
No weapon was seen or implied.The suspect then fled the bank on foot with an undisclosed amount of money. It is
unknown if the suspect departed the area in a vehicle.
Tigard Police were able to obtain surveillance photos of the suspect. If anyone has information regarding the suspect,
they are urged to contact Detective Hockin at 503-718-2553 or email at David.hockin@tigard-or.gov
Tigard council to mull Southwest Corridor resolution Tuesday
Ray Pitz, Tigard Times Thursday,November 08, 2018
With a few conditions added, a Tigard City Council resolution approving light rail in city is expected to pass.
Preferred Alternative: Steering
Cornmittee Reearnme-nd-atian
k
.v.s
k
.h
p� Li�liT flrH=-tn�[:t
•. .; �i,i.SdNdR �:�U71f1�TI'.'y't5!1
PHOTO COURTESY OF TRIMET- This map shows how the Southwest Corridor light rail will come down
Barbur Boulevard into Tigard before ending in Tualatin.
Despite concerns by some members of the Tigard City Council about the planned location of a downtown light
rail station,the council likely will sign off with conditions on a resolution next Tuesday supporting a preferred
alternative for a Southwest Corridor light rail system that will run through the city.
On Oct. 30,the council met in a work session with city staff along with Metro and TriMet representatives to
discuss the preferred alternative route that begins in Portland and makes its way into the city along Barbur
Boulevard before crossing Interstate 5 into the city.
During the meeting, Kenny Asher, the city's director of community development, told the council although they
would hear a staff report that might sound negative it's not because the city feels negative about the project. The
applicant for the project is TriMet with Metro being the ultimate decision-maker involving the project.
City staff said among the issues it has with the preferred alternative is the economic impact of running the light
rail into the Hunziker Industrial Core area, which could potentially displace 594 employees and affect 21
businesses. TriMet would be responsible for relocating those businesses at its expense.
The five TriMet light rail stations earmarked for the city include those at 68th Avenue and Highway 99W,
Elmhurst Street, Hall Boulevard, Bonita Road and Upper Boones Ferry.
However, some council members are concerned that the location of a planned downtown Tigard station is east
of Hall Boulevard and not in downtown Tigard's geographical area.
Councilor John Goodhouse said residents he's talked to are concerned there's no downtown light rail stop
planned; or, specifically, no stop on the west side of Hall Boulevard.
While that location isn't expected to change, Asher told the council that the city, TriMet and Metro are expected
to resolve other issues through a memorandum of understanding between the parties.
Still,the exact location of the Hall Boulevard station hasn't been determined, only that it would be east of Hall
and south of Hunziker Street in the general area of where Archers Precision, a metal fabrication facility, is now
located.
A light rail station, park and ride and the Tigard Transit Center also were studied for location in that area as well
as a TriMet operations and maintenance facility. That latter facility could employ as many as 150 people.
City officials have said a steering committee looked at a dozen alternative routes coming up with a preferred
choice, which is a modification to an original Ash Street alignment. That modification, now part of the preferred
alternative, was an effort to avoid taking out businesses along Beveland Street by moving the alignment up to
Elmhurst Street.
The rail line ultimately would end at Bridgeport Village with a park-and-ride station being discussed for a site
currently occupied by a Village Inn restaurant in Tualatin. That proposal has drawn the ire of many area
residents, as well as the Tualatin City Council. However, TriMet officials have said additional studies are
underway to avoid having to relocate the popular eating place.
Meanwhile, Tigard Mayor John Cook praised TriMet and Metro for coming up with the route and negotiating
with the respective jurisdictions involved.
"They were the white knight in this and played referee," he pointed out. "I think Metro deserves a lot more
credit than they get."