Loading...
Plans (148) I LA 1 API S\ecl `-T Bulletin MILBRANDT ARCHITECTS Bulletin#: MA-24 Date: 11-13-2017 ATTACHMENTS: MA-24.1-24.3 Job Name: Polygon at River Terrace East(Area 3)-Plan 7B Job No: 1503 Bulletin issued at request of Nichole Thorpe at Polygon Vancouver and Tom Hochstatter at the City of Tigard.The building was placed too close to the property line to allow a cantilevered fireplace bump-out with a direct vent condition as shown in original drawings.A full-height chimney condition will not suffice.The plan has been revised to show a flush side elevation and the fireplace bumped into the living area on the attached bulletin page:MA-24.1-MA24.3 and any accompanying structural documents. Distribution Job Site Paul McColm Client Chris Walther Angela Grajewski Nichole Thorpe Struct.Eng. Arne Solomon City of Tigard Tom Hochstatter 25 CENTRAL WAY SUITE 210 : KIRKLAND,WA 98033 : 425.454.7130 : WWW.MILBRANDTARCH.COM NII cn r I UL APPR�VED 36" WIDE FLUSH BEAM C FACTORY-BUILT DIRECT ABOVE VENT GAS FIREPLACE 6x6 POST Lo -` W/ GWB FINISH Ent <JD I,-' I I 5Y2�, N l I I I < Living 2x6 39" HIGH WALL W/ FINISH 71-) TRIM AT TOP �+ SAFETY r.-- LL � GLAZING O- l'-11f' \ 12" TILE �__ IA 1 in Y }-- o HEARTH 1-6 6-0 F 2 M al cl._ Al0 �* MY -7�'j 2'-SY2 j 4. 2 3'-g?-6 570 SH0 H2-6 -0 S-1 I O1g 2-• 5-0 SH 2,-6 -70 1-1,, Pon 16'-6Y2" 9'-5, T-- e v 16 All -^\ }---------I1 71 t r , } 20 All g3/41 17'-0" ' 7'-1 II 26'-7" PLAN 7B FIRST FLOOR 1/4"=1'-0" AMERICAN MODERN j ^ I 1 I FOOTING W 18 W/ (2 10" FTG. `, I }_I I (3) #4 EA. W, (2) #4 EW I I 6x6 P.T. PC TYP. U.N.O. T-1 I----- 1 LI1 to m fink ---13/4 x 9)(2" LVL— - - I SIM.S6.0 117SIM. 2x4 I PONY \ r ^7 maxi le WALL START FRMG. 1SIM.��SIM. -2Y4" - i^ I � � SIM.I I Eill 6 In r., � I S6.0 s. s'-', ` • \ / I STHD14 STHD14 Mt I 16' 6Y2" 9'-51 „ i I 3l CONC. SLAB in " I THICKENED SLOPE 11/2"Z -61/2' TOP OF SLAB I SLAB EDGE • /! 00 16 ABU44 I I of ` ABU44 I e S6.0 1'-1Y2" i 6'-i• I 83/4" •}' 26'-8Y2" PLAN 7B FOUNDATION PLAN 1/4"=1'-0" AMERICAN MODERN PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLE11N DATE: 11-13-17 SCALE: 1/4" = 1'-0" PAGE: PREPARED BY: Rae Hauff REF. SHEETS: A3, A6 MA-24.1 This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically. • D D R RJ RJ / / N c.i < > �- LOW ROOF /111.- /."RI j / 7 0 DOWNSPOUT 0� AREA 3 A11 ® '•1 /////// 7 /LJ LJ 18 17 All All PLAN 7B ROOF PLAN 1/4"=1'-0" AMERICAN MODERN L. i„,. 6X6 POST ifi1 S9.0 1 I _ � r 0i 1T X N STHD14 STHD14 4x8 HD� 8 HDR 4x8 HDR 4x8 HDR i •i SIMr��.LEDGE n rN 1 Lo ® N S9.0 N • 2P3 o ¢ 8 � E S1.2 ------ 4x12 HDR --- -- -` -- 6x6 POST - W/ ACE4 AMAX MDMIV 6x6 ' W/ A LOWER LEVEL SHEARWALLS PLAN 7B UPPER LEVEL FLOOR FRAMING 1/4"=1'-0" AMERICAN MODERN PROJECT NAME River Terrace ARCH. JOB NO.: 1503 BULLETIN DATE: 11-13-17 SCALE 1/4" = 1'-0" PAGE: PREPARED BY: Rae Hauff REF. SHEETS: A7, A8 MA-24.2 This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically. • e ,TOP OF PLATE _ _ __ FIBER—CEMENT LAP SIDING i [I V ` 5" EXPOSURE ----= 1 IP+5'-0''— MN Ah1' 12 All 12 2ND FIN, FLOOR °�� GARAGE 2 warkb,,._ 4 TOP PLATE) 4 _ _— 1 _ ,.j = 0 - Ill i , �, �N1� III _� ,.o 1S7 FIN._ Ul .� :.i I I ` t 491 PLAN 7BLIVING SIDE ELEVATION II 1/8"=1'-0" AMERICAN MODERN PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN DATE: 11-13-17 SCALE: 1/8" = 1'—0" PAGE: PREPARED BY: Rae Hauff REF. SHEETS: A9 MA-24.3 This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.