Plans (148) I LA
1 API S\ecl `-T
Bulletin MILBRANDT ARCHITECTS
Bulletin#: MA-24 Date: 11-13-2017 ATTACHMENTS: MA-24.1-24.3
Job Name: Polygon at River Terrace East(Area 3)-Plan 7B Job No: 1503
Bulletin issued at request of Nichole Thorpe at Polygon Vancouver and Tom Hochstatter at the City of Tigard.The building was placed
too close to the property line to allow a cantilevered fireplace bump-out with a direct vent condition as shown in original drawings.A
full-height chimney condition will not suffice.The plan has been revised to show a flush side elevation and the fireplace bumped into
the living area on the attached bulletin page:MA-24.1-MA24.3 and any accompanying structural documents.
Distribution
Job Site Paul McColm
Client Chris Walther Angela Grajewski Nichole Thorpe
Struct.Eng. Arne Solomon
City of Tigard Tom Hochstatter
25 CENTRAL WAY SUITE 210 : KIRKLAND,WA 98033 : 425.454.7130 : WWW.MILBRANDTARCH.COM
NII cn r
I UL APPR�VED 36" WIDE FLUSH BEAM C
FACTORY-BUILT DIRECT ABOVE
VENT GAS FIREPLACE
6x6 POST
Lo
-` W/ GWB FINISH Ent
<JD
I,-' I I 5Y2�, N
l I I I < Living 2x6 39" HIGH
WALL W/ FINISH 71-)
TRIM AT TOP �+
SAFETY
r.--
LL � GLAZING
O- l'-11f' \ 12" TILE �__
IA 1
in Y
}-- o HEARTH 1-6 6-0 F 2
M al
cl._ Al0 �* MY -7�'j 2'-SY2 j 4. 2
3'-g?-6 570 SH0
H2-6 -0 S-1 I O1g 2-• 5-0 SH 2,-6 -70 1-1,, Pon
16'-6Y2" 9'-5,
T--
e
v 16
All
-^\
}---------I1 71 t
r , }
20
All g3/41 17'-0" ' 7'-1
II
26'-7"
PLAN 7B FIRST FLOOR
1/4"=1'-0" AMERICAN MODERN
j ^ I 1 I FOOTING W
18
W/ (2
10" FTG.
`, I }_I I (3) #4 EA. W,
(2) #4 EW
I I 6x6 P.T. PC
TYP. U.N.O. T-1 I-----
1
LI1 to m fink
---13/4 x 9)(2" LVL— - - I SIM.S6.0 117SIM.
2x4 I PONY \ r
^7 maxi le WALL
START FRMG. 1SIM.��SIM. -2Y4" - i^ I
� � SIM.I I Eill 6
In r., � I S6.0
s. s'-', ` • \ / I
STHD14 STHD14
Mt I 16' 6Y2" 9'-51
„ i
I 3l CONC. SLAB
in " I THICKENED SLOPE 11/2"Z -61/2' TOP OF SLAB
I SLAB EDGE
•
/!
00 16 ABU44 I I of `
ABU44 I e S6.0 1'-1Y2"
i 6'-i•
I 83/4"
•}'
26'-8Y2"
PLAN 7B FOUNDATION PLAN
1/4"=1'-0" AMERICAN MODERN
PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLE11N
DATE: 11-13-17 SCALE: 1/4" = 1'-0" PAGE:
PREPARED BY: Rae Hauff REF. SHEETS: A3, A6 MA-24.1
This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.
•
D
D
R
RJ RJ
/ /
N c.i < > �-
LOW ROOF /111.- /."RI j /
7
0
DOWNSPOUT 0�
AREA 3
A11 ® '•1 ///////
7
/LJ LJ
18 17
All All
PLAN 7B ROOF PLAN
1/4"=1'-0" AMERICAN MODERN
L. i„,. 6X6 POST
ifi1
S9.0 1 I
_ � r
0i 1T
X
N STHD14 STHD14
4x8 HD� 8 HDR 4x8 HDR 4x8 HDR
i •i SIMr��.LEDGE n rN
1 Lo
®
N S9.0 N
• 2P3 o
¢
8 �
E
S1.2
------ 4x12 HDR --- -- -` --
6x6 POST -
W/ ACE4 AMAX
MDMIV 6x6 '
W/ A
LOWER LEVEL SHEARWALLS
PLAN 7B UPPER LEVEL FLOOR FRAMING
1/4"=1'-0" AMERICAN MODERN
PROJECT NAME River Terrace ARCH. JOB NO.: 1503 BULLETIN
DATE: 11-13-17 SCALE 1/4" = 1'-0" PAGE:
PREPARED BY: Rae Hauff REF. SHEETS: A7, A8 MA-24.2
This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.
•
e
,TOP OF PLATE _ _ __
FIBER—CEMENT LAP SIDING i [I V `
5" EXPOSURE ----= 1 IP+5'-0''— MN Ah1' 12
All 12
2ND FIN, FLOOR °��
GARAGE 2 warkb,,._ 4
TOP PLATE) 4 _ _— 1 _
,.j = 0 - Ill i ,
�, �N1� III
_� ,.o
1S7 FIN._ Ul .� :.i
I I ` t
491
PLAN 7BLIVING SIDE ELEVATION II
1/8"=1'-0" AMERICAN MODERN
PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN
DATE: 11-13-17 SCALE: 1/8" = 1'—0" PAGE:
PREPARED BY: Rae Hauff REF. SHEETS: A9 MA-24.3
This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.