Loading...
Report Carlson Geotechnical Bend Office (541)330-9155 °p•� o00000Py A Division of Carlson Testing, Inc. Eugene Office (541)345-0289 ASalem Office (503)589-1252 GEOTECHNICAL Phone: (503)601-8250 Tigard Office (503)684-3460 Fax: (503)601-8254 Final Summary Letter e C\9-02`Ak. (p October 26, 2018 �'` \ \ tn� Emerick Construction Mr. Bill Judge 7855 SW Mohawk Street Tualatin, Oregon 97062 Final Summary Letter of Geotechnical Construction Observation Services Din Tai Fung Washington Square 9724 SW Washington Square Road Tigard,Oregon 97223 CGT Project Number G1804928 Permit No.: BUP2018-00140 1.0 OVERVIEW Carlson Geotechnical (CGT), a division of Carlson Testing(CTI), served as Geotechnical Engineer of Record (EoR) during development of the Din Tai Fung restaurant at Washington Square Mall in Tigard, Oregon. Prior to construction, we reviewed the geotechnical report for the site entitled "Geotechnical Consultation," dated August 10, 2018, prepared by GRI. We were in general agreement with the recommendations contained within the referenced geotechnical report. 2.0 GEOTECHNICAL CONSTRUCTION OBSERVATION SERVICES We performed geotechnical construction observation services on an on-call, part-time basis between August 24 and September 4, 2018. Our site visits were scheduled by Emerick Construction. Copies of our field reports were forwarded as the work progressed and are available in our office for review. The following is a summary of our observations: • Subarade Soils: The floor slab and foundation subgrade soils we observed were prepared in general accordance with our recommendations. • Structural Fill Compaction: Based on visual observation of compaction, the structural fill placed beneath the new floor slab areas was compacted in general accordance with our recommendations. Based on our observations, as documented in our field reports, and to the best of our knowledge, within our scope of work, the above geotechnical summaries accurately reflect our observations. Our services were provided on an on-call, part-time basis, in which we relied on the contractor to contact our office for the scheduling of our services. We cannot be held contractually responsible for those items, if any, that we did not observe or test. Carlson Geotechnical • P.O. Box 230997,Tigard, Oregon 97281 Din Tai Fung Washington Square CGT Project Number G 1804928 October 26,2018 3.0 CLOSURE Should you have any questions regarding the information presented in this report, please contact us at(503) 601-8250. Sincerely, CARLSON GEOTECHNICAL QED PROs ��G t N FFA, c• 70777 E OREGON 1 . °° t o °c G0 3/40°". \� M EXPIRES: 6,3 6/7045 Jeff Jones, CEG Brad M.Wilcox, P.E., G.E. Project Engineering Geologist Principal Geotechnical Engineer jiones(a)carlsontestinq.com bwilcox(a carlsontestinq.corn Note: The observations of conditions at the times of our site visits were based solely on visual methods. Our reports pertain to the locations observed at the times of our visits only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. The information contained in this report is provided subject to all terms and conditions of CGT's General Conditions in effect at the time this report is prepared. No party other than those to whom CGT has distributed this report shall be entitled to use or rely upon the information contained in this document. Distribution: Emerick Construction-Bill Judge bil j(a)emerick.com Emerick Construction Co-Lindley Bynum Iindleyb a(�emerick.com Emerick Construction Co-Paul Miller paulm aC.emerick.com Chin-Ley Reche Associates-Sergio Chin-Ley sergio at..chinlevreche.com _2inlai Fung-David Wasietewski dauid(adintaifunqusa,Corr—__ Paragon Construction Consulting-Mike Kimmi mikek(aparagoncci.com City of Tigard Building Division—Walter Bamett walter(a�tigard-or.qov Doc ID: G:\GEOTECH\PROJECTS\2018 Projects\G1804928- Din Tai Fung Washington Square\008-Deliverables\Final Letter\Final Summary Letter GI804928.docx Carlson Geotechnical Page 2 of 2