Report (43) f• %g4/15f-0 1r/21 it v1314 tT9-1qt
• TDT Estimate 72nd Ave. Apartments REVISED 9/4/2018
11740 SW 72nd Avenue AMS .*k_ Go
TDT RATES EFFECTIVE 7/1/18 1k
RES:TSDC CITYWIDE&TSDT RT OVERLAY RATES EFFECTIVE 7/1/18 INSIDE RIVER TERRACE C'N-k-,
•
NON-RES:TSDC CITYWIDE EFFECTIVE 10/1/18 0 Yes
Project is in River Terrace ? ® No
Former Use
Rate Type Use# ITE Code # Units Rate TDT Amount Description
TDT 1 210 2.00 $8,706 $17,412 2 SFRs
TSDC-Imp 1 210 2.00 $5,953 $11,906
TSDC-Reim 1 210 2.00 $343 $686
TSDC-RT 1 $0
Total TDT and TSDCs Former Uses $30,004
Proposed Use
Use# ITE Code # Units Rate TDT Amount Description
TDT 1 220 38.00 $5,696 $216,448 38 Apartments
TSDC-Imp 1 220 38.00 $3,472 $131,936
TSDC-Reim 1 220 38.00 $200 $7,600
TSDC-RT 1 $0
TDT 2 814 2.61 $11,553 $30,153 2,610sf Genl Retail
TSDC-Imp 2 $0
TSDC-Reim 2 $0
TSDC-RT 2 $0
Total All TDTs&TSDCs Proposed Uses $386,137
Less: Total All TDTs &TSDCs Former Uses $30,004
Total All TDTs&TSDCs Net Increase $356,133
Total Net County TDT $229,189
Total Net TSDC-Imp $120,030
Total Net TSDC-Reim $6,914
Total Net TSDC RT Overlay $0 $356,133
TDT TSDC Imp+ Reim
Target Recovery Rate 28.0% 30%
Estimated Total Impact $818,533 $423,147
Estimated Unmitigated Impact $589,344 $296,203
All TDT&TDSC TSDC RT Overlay
Target Recovery Rate 29% 30%
Estimated Total Impact $1,241,680 $0
Estimated Unmitigated Impact $885,547 $0
TDT=County Transportation Development Tax
TSDC Citywide=City of Tigard Transportation System Development Tax(TSDC-Imp&TSDC-Reim)
TSDC RT=River Terrace Transportation System Development Tax Overlay
•
Parks Estimate 72nd Ave. Apartments REVISED 9/4/2018
11740 SW 72nd Avenue AMS
ALL PARKS RATES EFFECTIVE 7/1/18
Q Yes
Project is in River Terrace ? ( No
Note:All Neigh-Imp# Units entries=0 if project is in River Terrace;
All Neigh-RT#Units entries=0 if project is elsewhere in the city.
Former Use
Rate Type Use# ITE Code # Units Rate Parks Amount Description
Parks-Imp 1 210 2 $4,914 $9,828 2 SFRs
Parks-Reim 1 210 2 $1,361 $2,722 0
Neigh-Imp 1 210 2 $1,822 $3,644 0
Neigh-RT 1 $0 0
2 $0
Total Parks Former Uses $16,194
Proposed Use
Use# ITE Code # Units Rate Parks Amount Description
Parks-Imp 1 220 38 $3,700 $140,600 38 Apartments
Parks-Reim 1 220 38 $870 $33,060 0
Neigh-Imp 1 220 38 $1,371 $52,098 0
Neigh-RT 1 0
Parks-Imp 2 3.73 $424 $1,582 2,610sf Genl Retail
Parks-Reim 2 3.73 $77 $287 0
Neigh-Imp 2 3.73 $0 $0 0
Neigh-RT 2 0
Total Parks Outside RT Proposed Uses $227,627
Less: Total Parks Outside RT Former Uses $16,194
Total All Parks Outside RT Net Increase $211,433
Total Parks RT Proposed Uses $0
Less: Total Parks RT Former Uses $0
Total All Parks RT Net Increase $0
Total Parks-Imp $132,354
Total Parks-Reim $30,625
Total Neigh-Imp $48,454 $211,433
Total Neigh-RT $0
For Non-Residential Calculations:
Prior Use: =###sf/EE; #####/###=EEs.
Proposed Use: Geni Retail=700sf/EE; 2610/700=3.73EEs.
Parks-Imp=Parks Improvement,Citywide including River Terrace
Parks-Reim=Parks Reimbursement,Citywide including River Terrace
Neigh-Imp=Neighborhood Parks Improvement Outside River Terrace
Neigh-RT=Neighborhood Parks Improvement Inside River Terrace
E6 i I/`'Z13r7"-peg I /j )t,�C, !�pAc(Cranonr
TDT Estimate 72nd Ave. Apts. REV Mixed Use 2/12/2018
11720 & 11750 SW 72nd Ave. AMS
TDT RATES EFFECTIVE 7/1/17
TSDC CITYWIDE&TSDT RT OVERLAY RATES EFFECTIVE 7/1/17 INSIDE RIVER TERRACE
TSDC CITYWIDE EFFECTIVE 7/1/17 0 Yes
Project is in River Terrace ? @ No
Former Use
Rate Type Use# ITE Code #Units Rate TDT Amount Description
TDT 1 210 2.00 $8,458 $16,916 2 SFRs
TSDC-Imp 1 210 2.00 $5,496 $10,992
TSDC-Reim 1 210 2.00 $317 $634
TSDC-RT $0
Total TDT and TSDCs Former Uses $28,542
Proposed Use
Use# ITE Code #Units Rate TDT Amount Description
TDT 1 220 37.00 $5,533 $204,721 37 Apartment Units
TSDC-Imp 1 220 37.00 $3,206 $118,622
TSDC-Reim 1 220 37.00 $185 $6,845
TSDC-RT 1 $0
TDT 2 814 2.35 $11,223 $26,396 2,352sf Genl Retail
TSDC-Imp 2 $0
TSDC-Reim 2 $0
TSDC-RT 2 $0
TDT 3 $0
TSDC-Imp 3 $0
TSDC-Reim 3 $0
TSDC-RT 3 $0
Total All TDTs&TSDCs Proposed Uses $356,584
Less: Total All TDTs&TSDCs Former Uses $28,542
Total All TDTs&TSDCs Net Increase $328,042
Total Net County TDT $214,201
Total Net TSDC-Imp $107,630
Total Net TSDC-Reim $6,211
Total Net TSDC RT Overlay $0 $328,042
TDT TSDC Imp+ Reim
Target Recovery Rate 28.0% 30%
Estimated Total Impact $765,005 $379,470
Estimated Unmitigated Impact $550,804 $265,629
All TDT&TDSC TSDC RT Overlay
Target Recovery Rate 29% 30%
Estimated Total Impact $1,144,475 $0
Estimated Unmitigated Impact $816,433 $0
TDT=County Transportation Development Tax
TSDC Citywide=City of Tigard Transportation System Development Tax(TSDC-Imp&TSDC-Reim)
TSDC RT=River Terrace Transportation System Development Tax Overlay
Parks Estimate 72nd Ave. Apts. REV Mixed Use 2/12/2018
11720 & 11750 SW 72nd Ave. AMS
ALL PARKS RATES EFFECTIVE 7/1/16
Q Yes
Project is in River Terrace ? QQ No
Note:All Neigh-Imp# Units entries=0 if project is in River Terrace;
All Neigh-RT# Units entries=0 if project is elsewhere in the city.
Former Use
Rate Type Use# ITE Code # Units Rate Parks Amount Description
Parks-Imp 1 210 2 $4,877 $9,754 2 SFRs
Parks-Reim 1 210 2 $1,351 $2,702 0
Neigh-Imp 1 210 2 $1,807 $3,614 0
Neigh-RT 1 $0 0
2 $0
Total Parks Former Uses $16,070
Proposed Use
Use# ITE Code # Units Rate Parks Amount Description
Parks-Imp 1 220 37 $3,672 $135,864 37 Apartment Units
Parks-Reim 1 220 37 $864 $31,968 0
Neigh-Imp 1 220 37 $1,361 $50,357 0
Neigh-RT 1 $0 0
Parks-Imp 2 814 3.36 $421 $1,415 2,352sf Genl Retail
Parks-Reim 2 814 3.36 $76 $255 0
Neigh-Imp 2 814 3.36 $0 $0 0
Neigh-RT 2 $0 0
Total Parks Outside RT Proposed Uses $219,859
Less: Total Parks Outside RT Former Uses $16,070
Total All Parks Outside RT Net Increase $203,789
Total Parks RT Proposed Uses $0
Less: Total Parks RT Former Uses $0
Total All Parks RT Net Increase $0
Total Parks-Imp $127,525
Total Parks-Reim $29,521
Total Neigh-Imp $46,743 $203,789
Total Neigh-RT $0
For Non-Residential Calculations:
Prior Use: =###sf/EE;#####/###=EEs.
Proposed Use: General Retail=700sf/EE; 2352/700=3.36EEs.
Parks-Imp=Parks Improvement,Citywide including River Terrace
Parks-Reim=Parks Reimbursement,Citywide including River Terrace
Neigh-Imp=Neighborhood Parks Improvement Outside River Terrace
Neigh-RT=Neighborhood Parks Improvement Inside River Terrace
RE(‘.riVED
CITY OF TIGARD I,LB l 3 2018
COUNTYWIDE TRANSPORTATION
DEVELOPMENT TAX (TDT)
(.3.11‘, 7IcARID
NOTIFICATION OF FEE AND PAYMENT OPTIONS ► 1tr "-'c`+iJFiRA
Please sign and return prior to building permit issuance.
This advises you that the 1DT for this project is as shown below and outlines the payment options
that may be available to you. This form is to be signed and submitted prior to issuance of a building
permit /
v
City of Tigard
Date: Site Address:
ProjectLand Use Case
i
Name: •� A£, //4--A7-5.- or Permit#: 5--4- E2-421 4— C )3(c
TaxTDT Amount:
Lot#: 15 15 lie a 32oa , ,q:r441,.zo J.
This constitutes my request to use the TDT payment option or combination of options I have
selected below. [This selection can be changed up to the time a building permit is issued.] I realize that TDT
charges are due and payable at the time a building permit is issued unless those charges are Deferred
or are financed through Installment Payments. [Please address questions about TDT or Drral or
Installment Payments to Albert Shields,Permit Coordinator,503-718-2426.]
D Cash. Check, or Credit Card,payment due at building permit issuance.
10 Deferral until Occupancy,payment due before issuance of an occupancy permit
Payment of the TDT may be deferred until issuance of the occupancy permit if the TDT is greater than
the amoun for a single family residence.currently$8.458. In requesting this option I understand that
any deferred TDT must be paid prior to issuance of a Certificate of Occupancy.I further understand
that TDT rates may otherwise increase each July 1st and that such increases are not subject to appeal.
For a deferral request to be accepted both the Owner and the Applicant must sign this request.
❑ Credit Voucher(for developer-built required public improvements,subject to approval,
completion,and acceptance of creditable improvements.)
PLEASE NOTE: TDT Credits must be redeemed at the time TDT Payment is due,either at the
time the building permit is issued or,if payment is deferred,prior to issuance of an occupancy permit.
If you expect to claim TDT Credits be sure the improvements,any creditable payments,and your
Request for Credits is complete either before your building permit is to be issued or,if payment is
deferred,before you request an occupancy permit. No refund of TDT Payments will be made if
Credits are submitted more than 30 days after issuance of the relevant building or occupancy permit.
0 "Bancroft" or Installment Payments (separate application required.)
rjef;rriteyz-,
OWNER/APP ICANT OWNER/APPLICANT
DATE: 2 /3 i DATE:
I:\CURPLN\Permit Coordinator\TDT Forms\TDT Payment Option Form 021218AMS
RECEIVED
FEB
CITY OF TIGARD 1 3 2018
TIGARD TRANSPORTATION SYSTEM CiTe OF 1KC3AFI)
DEVELOPMENT CHARGE (TSDC) tit fiEN:MEGRIMS
NOTIFICATION OF FEE AND PAYMENT OPTIONS
Please sign and return prior to building permit issuance.
This advises you that the TSDC for this project is as shown below and outlines the payment options
that may be available to you. This form is to be signed and submitted prior to issuance of a building
permit.
City of Tigard
Date: Site Address:
Project , Land Use Case
Name: 7. 4'I. 14 or Permit#: —1-4- t.202 i q— 000 3,,
Tax TSDC
Lot#: 1 S 13 Z.DC 0 3 2-c9 o Amount: /115, d"At
This constitutes my request to use the TSDC payment option or combination of options I have
selected below. [This selection can be changed up to the time a building permit is issued.] I realize that TSDC
charges are due and payable at the time a building permit is issued unless those charges are Deferred
or are financed through Installment Payments. [Please address questions about TSDC or Deferral or
Installment Payments to Albert Shields,Permit Coordinator,503-718-2426.]
❑ Cash,Check,or Credit Card,payment due at building permit issuance.
Deferral until Occupancy,payment due before issuance of an occupancy permit.
Payment of the TSDC may be deferred until issuance of the occupancy permit if the TSDC is greater
than the amount for a single family residence,currently$5,813. In requesting this option I understand
that any deferred TSDC must be paid prior to issuance of a Certificate of Occupancy. I further
understand that TSDC rates may otherwise increase each July 1st and that such increases are not subject
to appeal. For a deferral request to be accepted both the Owner and the Applicant must sign this
request.
❑ Credit Voucher(for developer-built required public improvements, subject to approval,
completion,and acceptance of creditable improvements.)
PLEASE NOTE: TSDC Credits must be redeemed at the time TSDC Payment is due,either at
the time the building permit is issued or,if payment is deferred,prior to issuance of an occupancy
permit. If you expect to claim TSDC Credits be sure the improvements,any creditable payments,and
your Request for Credits is complete either before your building permit is to be issued or,if payment is
deferred,before you request an occupancy permit. No refund of TSDC Payments will be made if
Credits are submitted more than 30 days after issuance of the relevant building or occupancy permit.
❑ "Bancroft" or Installment Payments (separate application required.)
.././(:::74.a!;-i ......i_____
OWNER/APPLICANT OWNER/APPLICANT
DATE: 2 i DATE:
8
I;\CURPLN\Permit Coo .tor\TDT Forms\TSDCT Payment Option Form 021218AMS
CITY OF TIGARD
PARKS SYSTEM DEVELOPMENT CHARGE (Parks SDC)
NOTIFICATION OF FEE AND PAYMENT OPTIONS
Please sign and return prior to building permit issuance.
This advises you that the Parks SDC charge for this project is as shown below and outlines the
payment options that may be available to you. This form is to sip.ed and„ bmitted prior to
issuance of a building permit.
City of Tigard
Date: Site Address:
3/11/16 1J7zo 3►1l '2,µ ✓E.
Project 7 , Land Use Case
Name: E IJ 7-5 or Permit#: 201 — X 34,
Tax Parks
Lot#: / c7/ 3 Zp)�D 3 2--°12 Amount:
SDC
This constitutes my request to use the Parks SDC payment option or combination of options I have
selected below. [This selection can be changed up to the time a building permit is issued.] I realize that Parks
SDC charges are due and payable at the time a building permit is issued unless those charges are
Deferred until occupancy. [Please address questions about Parks SDCs or Deferral Payments to Albert
Shields, Permit Coordinator,503-718-2426.]
❑ Cash, Check, or Credit Card,payment due at building permit issuance.
0 Deferral until Occupancy,payment due before issuance of an occupancy permit.
Payment of the Parks SDC may be deferred until issuance of the occupancy permit for commercial,
industrial,and multi-family projects. In requesting this option I understand that any deferred Parks
SDC rates may otherwise increase each July Pt and that such increases are not subject to appeal. For a
deferral request to be accepted both the Owner and the Applicant must sign this request.
❑ Credit Voucher(for developer-built required public improvements to the Parks System,
subject to approval, completion,and acceptance of creditable improvements.)
PLEASE NOTE: Parks SDC Credits must be redeemed at the time Parks SDC Payment is due,
either at the time the building permit is issued or,if payment is deferred,prior to issuance of an
occupancy permit. If you expect to claim Parks SDC Credits be sure the improvements to the Parks
System,any creditable payments,and your Request for Credits are complete either before your building
permit is to be issued or,if payment is deferred,before you request an occupancy permit. No refund
of Parks SDC Payments will be made if Credits are submitted more than 30 days after issuance of the
relevant building or occupancy permit.
OWNER/APPLICANT OWNER/APPLICANT
DATE: DATE:
I:\CURPLN\Permit Coordinator\TDT Forms\TDT Payment Option Form 030818AMS