Hearings Officer Packet - 11/14/1985 - Koeber & Nelson ,/ ND 1640 HEARING OFFICER DECISION • 12/85 Koeber & Nelson SL 9-8F.) • A • 10 • I • .r 6 •41. 1 BEFORE THE HEARINGS OFFICER 2 FOR THE CITY OF TIGARD 3 IN THL .BATTER OF THE APPLICATION ) FOR A SENSITIVE LANDS PERMIT TO ) 4 ALLOW FOR THE PLACEMENT OF FILL ) No. AND OVERFLOW CHANNEL IMPROVEMENTS ) 5 WITHIN THE 100-YEAR FLOOD PLAIN; ) SL 9-85 Mr. and Mrs. George Koeber and 6 Mr. and Mrs. Gale Nelson, applicants. 7 8 The above-entitled matter before the Hearings Officer at 9 the regularly scheduled meeting of November 14 , 1985 , at the Durham 10 Waste Treatment Plant, in Tigard, Oregon; and 11 The applicant requests a sensitive lands permit to allow 12 for the placement of fill and overflow channel improvements within 13 the 100-year flood plain of Ball Creek on property zoned I-P 14 (Industrial Park) , and located at 14864 SW 74th Avenue, property 15 more specifically described as Tax Lot 900 and 1200, 2S1 12AC, City 16 of Tigard, County of Washington, State of Oregon; and. 17 The Hearings Officer conducted a public hearing on November 18 14 , 1985, at which time testimony, evidence and the Planning Department 19 Staff Report were received; and 20 The Hearings Officer adopts the findings of fact raid 21 conclusions contained in the Staff Report, a copy of which is attached 22 hereto, marked "Exhibit A" and incorporated by reference herein; 23 NOW THEREFORf1: IT TS HEREBY ORDERED that SL 9 -85 be and 24 hereby is approved subject to the following conditions : 26 1. Construction of the proposed channel and site 26 earthmoving shall not commence until after the Engineering Division Page 1 — SL 9-85 SCRCVGIN&MASON AIt miy.al law 8106 S W.Holl Blvd.,Sv1rs 310 Bsaysr$on,Oi gon 97005 Islsphons 15031 611.7990 e • 1 has issued approved public improvement plans. The Division will require 2 posting of a 100% Performance Bond and the payment of a permit fee. 3 Also, the execution of a street or construction compliance agreement 4 shall occur prior to, or concurrently with the issuance of approved 5 public improvement plans. SEE THE ENCLOSED HANDOUT GIVING MORE 6 SPECIFIC INFORMATION REGARDING FEE SCHEDULES , BONDING, AND AGREEMENTS. 7 2. Right-of-way for construction of the proposed overflow 8 channel shall be secured prior to issuance of any building permits 9 and prior to any site earthwork activity. 10 3. No work shall occur within the flood plain from October 11 1st through April 30th unless approved by the City Engineer. 12 4. Prior to any channel work occurring, U.S.A. shall review 13 and approve the improvement plans. 14 5. Dedication of all land below the 100-year flood plain 15 elevation of 135 feet to the public for greenway purposes is required 16 and shall be executed on City forms. 17 6. A hydrologic study shall be prepared by a registered 18 engineer, including cross-sections and an analysis of the backwater 19 curve at low and high flows. This report shall be submitted to the 20 Engineering Division for review and approval prior to issuance of 21 any permits. 22 7. A geotechnical report by a soils engineer relative to 23 the proposed filling on the site, for development thereof , shall be 24 submitted to the City for review prior to issuance of any permit. 25 8. The area shown on the site grading plan (Cooper 26 Consultants, Inc. , 8/16/85) as "desired buffer area" shall be Page 2 - SL 9-85 SCR0001N&MASON Anomsy,a1 low 8196 S.W.Hall Slyd.SuH1.310 Beaverton,Oregon 97005 Telephone 15031 611 7990 >mp 1 maintained in its natural state. A tree cutting permit must be 2 obtained from the City prior to cutting any trees over 6 inches in 3 diameter which are within this area. 4 9. The necessary permits shall be obtained from the Division 5 of State Lands and the U.S. Army Corps of Engineers prior to the 6 issuance of any permits. 7 10. This approval is valid if exercised within one year 8 of the final decision date noted below, 9 DATED,this December, 1985. 10 HEARIN ; OFFICER 11 APP 'OVED:,/ / 12 13 " Arm. :ETH O 15 16 17 18 1 19 20 21 22 23 24 I 2b 26 Page 3 - SL 9-85 • SCROGGIN&MASON Attoms at tits 310 B196 S. Orogen 9700S telephone IS03)641 7990 STAFF REPORT AGENDA ITEM 2. 1 November 14, 1985 - 7:00 P.M. DURHAM TREATMENT PLANT CORNER OF HALL & DURHAM TIGARD, OREGON 97223 A. FACTS 1. General Information CASE: Sensitive Lands Permit (SL 9-85) REQUEST: To allow for the placement of fill and overflow channel improvements within the 100-year flood plain. COMPREHENSIVE PLAN DESIGNATION: Light Industrial ZONING DESIGNATION: I-P (Industrial Park) APPLICANT: Mr. & Mrs. George Koeber OWNER: same Mr. r, Mrs. Gale Nelson 6700 6tk ;.11th Ave. Beaverton, OR 97005 LOCATION: 14865 SW 74th Ave. (WCTM 2S1 12AC, T.L. 900 and 1200) 2. Background No other land use proposals have been reviewed by the City regarding this property . 3. Vicinity Information The properties to the north and south are also zoned I-P. Seventy-fourth Avenue and the Burlington Northern Railroad tracks lie to the east and residentially zoned parcels (R-7 and R-12) arG directly Ywest. 4. Site Information The property is presently undeveloped and predominantly wooded. Fanny, Creak meanders in and out of the parcel near the western property line and Ball Creek crosses the northern half of the parcel from 74th Avenue to its confluence with Fanno Creek . The 100-year flood plain elevation in the immediate area is 135 feet. STAFF REPORT - Si 9-65 - PAGE 1 1 t The applicant proposes to place fill within the 100-year flood plain to create one building site on each side of Ball Creek. An area of . t approximately 140 feet in width will be left in its natural state on each side of Ball Creek. The channels for both creeks will not be altere ', however, an overflow channel is proposed for Fanno Creek to compensate for the f:ll. 5. Agency and NPO Comments The Engineering Division has the following comments: a, Because a sewer trunk line controlled by U.S.A. is located in the vicinity of the proposed overflow channel, U.S.A. should be given an opportunity to review this proposal prior to construction. • b. Fill and excavation work should not occur between October 1st and April 30th because of potential erosion or flooding problems . c. A hydrologic study prepared by a registered engineer including cross sections and an analysis of the backwater curve at high and low flows should be submitted for review before the issuance of permits. d. A geotechnical report prepared by a soils engineer will be necessary relating to the landfill areas prior to issuing building permits. e. The necessary approvals must be obtained from tie Division of • State Lands and the U.S. Army Corps of Engineers. The Building Inspection Division indicates that a civil engineer should be involved to ensure the suitability of the fill, areas for building construction. Tualatin Rural Fire Protection District has no objection to the proposal but notes that further review will be necessary when specific plans for the warehouse and office building are formulated. NPO #5 has no objection to the application provided that all engineering requirements related to Sensitive Lands approval are followed and that the developer retain as many Douglas fir trees as possible. B. FINDINGS AND CONCLUSIONS Section 18.84.040 of the Community Development Code contains six criteria that must be addressed in order to approve a request within the 100-year flood plain. 1 . Land form alterations shall preserve or enhance the flood plain storage function and maintenance of the zero-foot rise floodway shall not result in any narrowing of the floodway boundary. 2. The land form alteration or development within the 1t3O-year flood plain shall be allowed only in an area designated i cornmerci,sl or industrial on the Comprehensive Plan Land Use Map. STAFF REPORT - SL 9-85 -- PAGE 2 3. The land form alteration or development is not located within the floodway. 4. The land form alteration or development will not result in any increase in the elevation of the zero-foot rise floodway. 5. The land form alteration or development plan includes a pedestrian/bicycle pathway in accordance with the adopted pedestrian/bicycle pathway plan. 6. The plans for the pedestrian/bicycle pathway indicate that no pathway will be below the elevation of an average annual flood. Although some additional information will be necessary, the Engineering division is satisfied that no encroachment or development will occur •• within the zero-foot rise floodway . The property is zoned I-P and this • proposed land form alteration is appropriate. The proposed grading plan will allow for the installation of a bicycle/pedestrian path at a later date. The City has not required the installation of the path when it would represent an isolated segment without any legal access. The City has a policy of requiring the dedication of the Fanno Creek flood plain for open space purposes. In commercial and industrial zones, the City requires the dedication of all land which remains within the 100-year flood plain after a plan for modifying the flood plain boundary is approved. Policy 3 .2.3 of the Tigard Comprehensive Plan supports this greenway dedication requirements. C. RECOMMENDATION Based upon findings and conclusions noted above, the Planning staff recommends approval of SL 9-85 subject to the following conditions: 1 . Construction of the proposed channel and site earthmoving shall not commence until after the Engineering Division has issued approved public improvement plans. The Division will require posting of a 100% Performance Bond and the payment of a permit fee. Also, the execution of a street or construction compliance agreement shall occur prior to, or concurrently with the issuance of approved public improvement plans, SEE THE ENCLOSED HANDOUT GIVING MORE SPECIFIC INFORMATION REGARDING FEE SCHEDULES, BONDING, AND AGREEMENTS. 2. Right-of--way for construction of the proposed overflow channel shall be secured prior to issuance of any building permits and prior to any site earthwork activity. 3 . No work shall occur within the flood plain from October 1st through April 30th unless approved by the City Engineer. 4. Prior to any channel work occurring, U.S.A. shall review and approve the improvement plans. STAFF REPORT - SL 9-85 - PAGE 3 • 5. Dedication of all land below the 100—year flood plain elevation of 135 feet to the public for greenway purposes is required and shall be executed on City forms. 6, A hydrologic study shall be prepared by a registered engineer, including cross—sections and an analysis of the backwater curve at low and high flows. This report shall be submitted to the Engineering Division for review and approval prior to issuance of any permits. 7. A geotechnical report by a soils engineer relative to the proposed filling the site, for development thereof, shall be submitted to the City for review prior to issuance of any permit. 8. The area shown on the site grading plan (Cooper Consultants, Inc. , 8/16/85) as "desired buffer area" shall be maintained in its natural state. A tree cutting permit must be obtained from the City prior to cutting any trees over 6 inches in diameter which are within this area. 9. The necessary permits shall be obtained from the Division of State Lands and the U.S. Army Corps of Engineers prior to the issuance of any permits. 10. This approval is valid if exercised within one year of the final decision date noted below. 41/".•01°‘‘411"1"1/0.5.4 -- PREPA'ED BY: Keith Liden APPROVED BY: William A. Monahan senior Planner Director of Planning & Development (KL:pm/2116P) STAFF REPORT — SL 9-85 — PAGE 4 w ••• N 111I1 .,. -11411°.'"7,1 • • 1640 HEARING OFFICER DECISION • .s -12/85 Koeber & Nelson SL 9-85 . ....:......:......,._,_._.........,..,,....+..wr..:.uw.v,....u..,....w.wi.r,wS r--a-v �+rwan..wwr.e.w .,y. •IYMY�YIn rd' • • • . • • • w E`, • " " I.i. a" 1' • 1 BEFORE THE HEARINGS OFFICER 2 FOR THE CITY OF TIGARD 3 IN TH'L .MATTER OF THE APPLICATION ) FOR A SENSITIVE LANDS PERMIT TO ) 4 ALLOW FOR THE PLACEMENT OF FILL ) No. AND OVERFLOW CHANNEL IMPROVEMENTS ) 5 WITHIN THE 100-YEAR FLOOD PLAIN; ) SL 9-85 Mr. and Mrs. George Koeber and 6 Mr. and Mrs. Gale Nelson, applicants. 7 8 The above-entitled matter before the Hearings Officer at 9 the regularly scheduled meeting of November 14 , 1985 , at the Durham 10 Waste Treatment Plant, in Tigard, Oregon; and 11 The applicant requests a sensitive lands permit to allow 12 for the placement of fill and overflow channel improvements within 13 the 100-year flood plain of Ball Creek on property zoned I-P 14 (Industrial Park) , and located at 14864 SW 74th Avenue, property 15 more specifically described as Tax Lot 900 and 1200, 2S1 12AC, City 16 of Tigard, County of Washington, State of Oregon; and 17 The Hearings Officer conducted a public hearing on November 18 14 , 1985, at which time testimony, evidence and the Planning Department �`\ 19 Staff Report were received; and 20 The Hearings Officer adopts the findings of fact «nd 21 conclusions contained in the Staff Report, a copy of which is attached 22 hereto, marked "Exhibit A" and incorporated by reference herein; 23 NOW THEREFORP; IT TS HEREBY ORDERED that SL 9 -85 be and 24 hereby is approved subject to the following conditions: 26 1. Construction of the proposed channel and site 26 earthmoving shall not commence until after the Engineering Division Page 1 - SL 9-85 SCR:X,GIN&MASON 0.1Mm�a or low B196 S W.Hall Blvd.,Buhr 310 B•ay.non,Orpon 9700$ 7dsphone 15031 8114990 t 1 has issued approved public improvement plans. The Division will require 2 posting of a 100% Performance Bond and the payment of a permit fee. 3 Also, the execution of a street or construction compliance agreement 4 shall occur prior to, or concurrently with the issuance of approved 5 public improvement plans. SEE THE ENCLOSED HANDOUT GIVING MORE 6 SPECIFIC INFORMATION REGARDING FEE SCHEDULES , BONDING, AND AGREEMENTS. 7 2. Right-of-way for construction of the proposed overflow 8 channel shall be secured prior to issuance of any building permits 9 and prior to any site earthwork activity. 10 3. No work shall occur within the flood plain from October 11 1st through April 30th unless approved by the City Engineer. 12 4. Prior to any channel work occurring, U.S.A. shall review 13 and approve the improvement plans. 14 5. Dedication of all land below the 100-year flood plain 15 elevation of 135 feet to the public for greenway purposes is required 16 and shall be executed on City forms. 17 6. A hydrologic study shall be prepared by a registered 18 engineer, including cross-sections and an analysis of the backwater 19 curve at low and high flows. This report shall be submitted to the 20 Engineering Division for review and approval prior to issuance of 21 any permits. 22 7. A geotechnical report by a soils engineer relative to 23 the proposed filling on the site, for development thereof , shall be 24 submitted to the City for review prior to issuance of any permit. 25 8. The area shown on the site grading plan (Cooper 26 Consultants, Inc. , 8/16/85) as "desired buffer area" shall be Page 2 - SL 9-85 SCROOOIN I MASON Attomi tat low 81 96 S,W.Hall Blvd.,Suit.310 B.overton,Omen 97005 telephone(5031 641.7990 zap 1 maintained in its natural state. A tree cutting permit must be 2 obtained from the City prior to cutting any trees over 6 inches in 3 diameter which are within this area. 4 9. The necessary permits shall be obtained from the Division 5 of State Lands and the U.S. Army Corps of Engineers prior to the 6 issuance of any permits. 7 10. This approval is valid if exercised within one year 8 of the final decision date noted below, 9 DAZED this7L2 f December, 1985. i 10 HEARIN ICER 11 APP 'OVED:/ / 12 13 )1FPF1. "— :ETH 0 15 16 17 18 r1 19 20 21 23 24 25 26 Page 3 - SL 9-85 SCROGGIN&MASON Atoms•of law 819 31 0 6 S. a�IOtegon 97Su005 Telephone 15031 641.7990 STAFF REPORT AGENDA ITEM 2. 1 November 14, 1985 - 7:00 P.M. DURHAM TREATMENT PLANT CORNER OF HALL & DURHAM TIGARD, OREGON 97223 A. FACTS 1. General Information CASE: Sensitive Lands Permit (SL 9-85) REQUEST: To allow for the placement of fill and overflow channel improvements within thu 100-year flood plain. COMPREHENSIVE PLAN DESIGNATION: Light Industrial ZONING DESIGNATION: I-P (Industrial Park) APPLICANT: Mr. & Mrs. George Koeber OWNER: same Mr. r. Mrs. Gale Nelson 6700 SW ; 11th Ave. Beaverton, OR 97005 LOCATION: 14865 SW 74th Ave. (WCTM 2S1 12AC, T.L. 900 and 1200) 2. Background No other land use proposals have been reviewed by the City regarding this property . 3. Vicinity Information The properties to the north and south are also zoned I-P. Seventy-fourth Avenue and the Burlington Northern Railroad tracks lie to the east and residentially zoned parcels (R-7 and R-12) arG directly west. 4. Site Information The property is presently undeveloped and predominantly wooded. Fanno Creek meanders in and out of the parcel near the western property line and Ball Creek crosses the northern half of the parcel from 74th Avenue to its confluence with Fanno Creek . The 100-year flood plain elevation in the immediate area is 135 feet. STAFF REPORT — 81. 9-88 — PAGE 1 ammumont The applicant proposes to place fill within the 100-year flood plain to create one building site on each side of Ball Creek. An area of approximately 140 feet in width will be left in its natural state on each side of Bail Creek. The channels for both creeks will not be altere ', however, an overflow channel is proposed for Fanno Creek to compensate for the fill. 5. Agency and NPO Comments • The Engineering Division has the following comments: a. Because a sewer trunk line controlled by U.S.A. is located in the vicinity of the proposed overflow channel, U.S.A. should be given an opportunity to review this proposal prior to construction. • b. Fill and excavation work should not occur between October 1st and April 30th because of potential erosion or flooding problems . c. A hydrologic study prepared by a registered engineer including cross sections and an analysis of the backwater curve at high and low flows should be submitted for review before the issuance of permits. • d. A geotechnical report prepared by a soils engineer will be necessary relating to the landfill areas prior to issuing building permits. e. The necessary approvals must be obtained from t,e Division of • State Lands and the U.S. Army Corps of Engineers. v‘ The Building Inspection Division indicates that a civil engineer should be involved to ensure the suitability of the fill areas for building construction. Tualatin Rural Fire Protection District has no objection to the proposal but notes that further review will be necessary when specific plans for the warehouse and office building are formulated, NPO #5 has no objection to the application provided that all engineering requirements related to Sensitive Lands approval are followed and that the developer retain as many Douglas fir trees as possible. B. FINDINGS AND CONCLUSIONS Section 18.84.040 of the Community Development. Code contains six criteria that must be addressed in order to approve a request within the 100-year flood plain. 1 . Land form alterations shall preserve or enhance the flood plain storage function and maintenance of the zero-foot rise floodway shall not result in any narrowing of the floodway boundary. 2. The land form alteration or development within the 1(�O-year flood plain shall be allowed only in an area designatedcnmmerci�l or industrial on the Comprehensive Plan Land Use Map. STAFF REPORT - SL -- PAGE 2 MMIMMIIMIMi 3. The land form alteration or development is not located within the floodway. 4. The land form alteration or development will not result in any increase in the elevation of the zero-foot rise floodway. 5. The land form alteration or development plan includes a pedestrian/bicycle pathway in accordance with the adopted pedestrian/bicycle pathway plan. 6. The plans for the pedestrian/bicycle pathway indicate that no pathway will be below the elevation of an average annual flood. Although some additional information will be necessary, the Engineering division is satisfied that no encroachment or development will occur within the zero-foot rise floodway. The property is zoned I-P and this proposed land form alteration is appropriate. The proposed grading plan will allow for the installation of a bicycle/pedestrian path at a later date. The City has not required the installation of the path when it would represent an isolated segment without any legal access. • The City has a policy of requiring the dedication of the Fanno Creek flood plain for open space purposes. In commercial and industrial zones, the City requires the dedication of all land which remains within the 100-year flood plain after a plan for modifying the flood plain boundary is approved. Policy 3 .2.3 of the Tigard Comprehensive Plan supports this greenway dedication requirements. C. RECOMMENDATION Based upon findings and conclusions noted above, the Planning staff recommends approval of SL 9-85 subject to the following conditions: 1 . Construction of the proposed channel and site earthmoving shall not commence until after the Engineering Division has issued approved public improvement plans. The Division will require posting of a 100% Performance Bond and the payment of a permit fee. Also, the execution of a street or construction compliance agreement shall occur prior to, or concurrently with the issuance of approved public improvement plans. SEE THE ENCLOSED HANDOUT GIVING MORE SPECIFIC INFORMATION REGARDING FEE SCHEDULES, BONDING, AND AGREEMENTS. 2. Right-of--way for construction of the proposed overflow channel shall be secured prior to issuance of any building permits and prior to any site earthwork activity. 3 . No work shall occur within the flood plain from October 1st through April 30th unless approved by the City Engineer. 4. Prior to any channel work occurring, U.S.A. shall review and approve the improvement plans. STAFF REPORT - SL 9-85 - PAGE 3 • • • 5. Dedication of all land below the 100—year flood plain elevation of 135 feet to the public for greenway purposes is required and shall be executed on City forms. 6. A hydrologic study shall be prepared by a registered engineer, including cross—sections and an analysis of the backwater curve at low and high flows. This report shall be submitted to the Engineering Division for review and approval prior to issuance of any permits. • 7. A geotechnical report by a soils engineer relative to the proposed filling cr, the site, For development thereof, shall be submitted to the City for review prior to issuance of any permit. 8. The area shown on the site grading plan (Cooper Consultants, Inc. , 8/16/85) as "desired buffer area" shall be maintained in its natural state. A tree cutting permit must be obtained from the City prior to cutting any trees over 6 inches in diameter which are within this area. 9. The necessary permits shall be obtained from the Division of State Lands and the U.S. Army Corps of Engineers prior to the issuance of any permits. 10. This approval is valid if exercised within one year of the final decision date noted below. 1/4W 1/X.1.4",1145114 PREPA Keith Liden APPROVED BY: William A. Monahan Senior Planner Director of Planning & Development (KL:pm/2116P) STAFF REPORT — SL 9-85 — PAGE 4