Loading...
Hearings Officer Packet - 08/22/1985 - Krueger • • ..� .� 1640 HEARING OFFICER DECISION 71/85 KLueger, Russ SL 8-85 _•....,. W ,,» �,� w:� ......w........w� t«rr+rrwwrrr.�w�+rrrrwwwwww. • • t d BEFORE THE HEARINGS OFFICER FOR THE CITY OF TIGARD 1 IN 7- 7 MATTER OF THE APPLICATION ) FOR .^ SENSITIVE LANDS PERMIT TO ) No. GRADE A DRAINAGEWAY AND INSTALL ) A STORM DRAINAGE LINE ON PROPERTY ) SL 8-85 ZONED R-12 (Residential, 12 units./) acre) ; Russ Krueger, applicant. ) The above-entitled matter came before the Hearings Officer at the regularly scheduled meeting of August 22 , 1985, at the Durham Waste Treatment Plan, in Tigard, Oregon; and The applicant requests a sensitive lands permit to grade a drainageway and to install a storm drainage line on property zoned R-12 (Residential , 12 units/acre) , and located on the east side of 135th Avenue and north of Morning Hill subdivision, property more specifically described as Tax Lot 500 , Map 1S1-33DC, City of Tigard, County of Washington, State of Oregon; and The Hearings Officer conducted a public hearing on August 22, 1985, at whic‘i time testimony, evidence and the Manning Department Staff Report were received; and The Hearings Officer adopted the findings of fact and conclusions contained in the Staff Report, a copy of which is attached hereto, marked "Exhibit A" aNd incorporated by reference herein; NOW THEREFORE IT IS HEREBY ORDERED that SL 8-85 be and hereby is approved subject to the following conditions: U Page 1 - SL 8-85 111111151011111111111110 1. Ditch or closed conduit construction shall not commence until after the Engineering Division has issued approved improvement plans. The Division will require posting of a 100% performance bond, a 4% permit fee, and the execution of a Compliance Agreement. 2. Three (3) sets of plan-profile public improveme:n. construction plans and one (1) itemized construction cost extimate, stamped by a Registered Professional Civil Engineer, detailing the proposed improvements shall be submitted to the Engineering Section for approval. 3. Any necessary storm drainageway easements shall be executed by the applicant on forms provided by the City. 4 . No work within Phase I of Ari Green shall cause a restriction of the stormwater carrying capacity of the drainageway. No work within Phare II of Ari Green shall proceed without having first been approvcId by the City and bonded by the applicant. 5. This approval is valid if exercised within one year of the final decision date ted below. s SATED this day of August, 1985. HEARING A' ROVED: L 44100%77 - BETH '.MASON Page 2 - SL 8-85 • F-7eA " STAFF REPORT AGENDA ITEM 2. 1 THURSDAY, AUGUST 2.8, 1985 -- 7:00 P.M. DURHAM WASTE. TREATMENT PI._AN1 • Corner of SW Hall and Durham Tigard, Oregon 97223 A. FACTS 1 . General Information • CASE: Sensitive Lands Permit SL 8-85 REQUEST: To grade a drainageway and to install a storm drainage line. COMPREHENSIVE °LAN DESIGNATION: Medium Density Residential • ZONING DESIGNATION: R-12 (Residential, 12 units/acre) APPLICANT: Russ Krueger OWNER: same 3515 SW Barbur Blvd. , #Y--1 • Portland, OR 97201 LOCATION: East of 135th Ave. and north of Morning Hill subdivision (WCTM 1S1 33DC T.L. 500) 2 . Background On August 1, 1984, the Planning Commission granted approval of a 150 unit apartment complex (SDR 9-84) on the subject property . This project failed to materialize and on July 9, 1985, the Commission approved a preliminary plat for an 86-lot subdivision (Ari Green, S 9-85) , One of the conditions of approval required that a Sensitive Lands permit be obtained before final plats aro recorded. 3 . Vicinity Information Morning Hill subdivision lies to the south with an R-4.5 (Residential , 4.5 units/acre) zone applying to the lots west of Shore Drive and an R-7 (Residential, 7 units/acre) zone applying to the area east of this street . Undeveloped property zoned R-25 (Residential, 25 units/acre) is situated on the west side of 135th Avenue. The property is bordered on the east by a 10-foot wide public right-of-way, a 40-foot wide tax lot, and a large vacant tract zoned R-4 .5. Two homesites and the Brittany Square development are on the northwest side of Shore Drive. Shore Drive and Winter Lake Drive, a short segment of which will cross the northeast corner of this project, are designated as minor collector streets. The area north of Winter Lake Drive is designated by the City to become a portion of Summer lake Park STAFF REPORT - SL 8-85 - PAGF I 4. Site Information The property is a vacant parcel which slopes downhill towards the northeast. The applicant proposes to develop the 86-lot subdivision in two phases. The drainage area that requires the Sensitive Lands , view is contained within the second hase. A water storage pond was constructed within the drainageway when the property was in agricultural use. rhe pond has been drained and the property is to be graded to resemble the topography before the pond was constructed. A drainage ditch is proposed as an interim measure with a 36-inch storm drain to be installed in conjunction with the development of the second phase 5. Agency and NPO Comments The Engineering Division has the following comments: a. No work within Phase I of Ari Green should encroach upon the drainageway. b. 'Mork within Phase II of Ari Green should not proceed until approval has been granted by the Engineering Division. The Building Inspection Division has no objection to the proposal . No other comments have been received. B. ANALYSIS AND CONCLUSIONS In order to approve a proposal that involves a drainageway, the following criteria contained in Section 18.84.040(c) of the Code must be satisfied. 1 . The extent and nature of the proposed land form alteration or development will not create site disturbances to the extent greater than that required for the use; 2. The proposed land form alteration or development will not result in erosion, stream sedimentation, ground stability or other adverse on-site and off-site of ect ; or hazards to life or property; 3 . The water flow capacity of the drainageway is not decreased; and 1 4. Where natural vegetation has been removed due to land form alteration or the development, the areas not covered by structures or impervious surfaces will be replanted to prevent erosion in accordance with Section 18. 100 (LfiNDSCAP:NG AND SCREENING) . The applicant' s narrative addresses the above t:r iter iai ai'd the Planning and Engineering staff concur with the analjsis as presented. It is understood by the staff that the work relatad to the drainageway will occur in two phases with the creation of a new drainage ditch followed by the installation of a storm sewer line . STAFF REPORT - SL 8-A5 - PAGE 2 1 C. RECOMMENDATION Based upon the information presented above, the Planning staff recommends approval of SL 8-85 subject to the following conditions: 1. Ditch or ciosed conduit construction shall not commence until after the Engineering Division has issued approved improvement E plans. The Division will require posting of a 100% performance bond, a 4% permit fee, and the execution of a Compliance Agreement. % 2. Three (3) sets of plan-profile public improvement construction plans and one (1) itemized construction cost estimate, stamped by a Registered Professional Civil. Engineer, detailing the proposed improvements shall be submitted to the Engineering Section for approval.. 3 . Any necessary storm drainageway easements shall be executed by the applicant on forms provided by ;.he City . . • 4 . No work within Phase I of Ari Green shall cause a restriction of the stormwater carrying capacity of the drainageway. No work within Phase II of Ari Green shall proceed without having first been approved by the City and bonded by the applicant. 5. ThfR approval is valid if exercised within one year of the final dc ...,ion date noted below. _171, i./../ __-- PREPARED BY: Keith Lien AP` VED BY: William A. Monahan Senior Planner Director of Community Development i (KSL:pm/1746P) I . 14 1 't STAFF REPORT - SL 8-85 -- PAGE 3