Loading...
Hearings Officer Packet - 08/23/1984 - Fanno Creek Park • • • • • dustoftwaik Ammo IMIUMMINIIISIMII� 1640 HEARING OFFICER DECISION W84 Fanno Creek Downtown pack • • SL 8-84 I , M1 t , . Ir • • BEFORE THE HEARINGS OFFICER FOR THE CITY OF TIGARD IN THE MATTER OF THE APPLICATION ) FOR A SENSITIVE LANDS PERMIT TO ) ALLOW THE CONSTRUCTION OF PARK ) No. FACILITIES, INCLUDING TRAILS , PICNIC TABLES, FOOTBRIDGE AND ) SL 8-84 OVERFLOW CHANNEL WITHIN THE 100-YEAR FLOOD PLAIN OF FANNO CREEK; City of Tigard, applicant. ) The above-entitled matter came before the Hearings Officer at the regularly scheduled meeting of August 23 , 1984 , at the Durham Waste Treatment Plant, in Tigard, Oregon; and The applicant requests a sensitive land permit to allow the de- velopment of a portion of the Fanno Creek Downtown Park between Hall Blvd. and Ash Street within the 100-year flood plain on ol-operty zoned CBD (Central Business District) , property more specifically described 0 as Tax Map 251 2DB, Tax Lot 400 and 500 and 2S1 2DA, Tax Lot 702 , City of Tigard, County of Washington, State of Oregon; and The Hearings Officer conducted a public hearing on August 23, 1984 , at which time testimony, evidence, and the Planning Department Staff Report were received; and The Hearings Officer adopted the findings , the facts and conclusions contained in the Staff Report, a copy of which is attached hereto, marked "Exhibit A" and incorporated by reference herein; NOW THEREFORE IT IS HEREBY ORDERED THAT SL 8-84 is approved subject to the following conditions : Page 1 - SL 8-84 Amsraimp 1. The City shall comply with all conditions of the permit issued by the Division of State Lands. 2. The City shall follow the "Management Practices" described in the April 19, 1984 , letter received from G.A. Newgard of the U.S. Army Corps of Engineers. 3. This approval is valid if exercised within one year of the fnal decision date. //, 4( DATED this day of September, 1984 . HEARINGS OFFICER APPROVED: ,BETH MASON /// J Page 2 - SL 8-84 • A STAFF REPORT AGENDA ITEM 5.1 • THURSDAY, AUGUST 23, 1984 - 7:00 P.M. TIGARD HEARIN,AS OFFICER DURHAM WASTE TREATMENT PLANT CORNER OF SW HALL AND SW DURHAM RD. TIGARD, OREGON 97223 A. FINDING OF FACT 1. General Information CASE: Sensitive Lands Fermi', SL 8-84 REQUEST: Permit to develop a protion of the Fanno Creek Downtown Park between Hall Blvd. and Ash St. within :h, 100 year flood plain. The property is zoned CBD (Central Business District) and is located on both side of Fanno Creek ( Wash. Co. Tax Map 2S1 2DB, Tax Lot 400 and 500 and 251 2DA, Tax • Lot 702). APPLICANT: City of Tigard OWNER: City of Tigard PO Box 23397 Tigard, Oregon 97223 2. Background The property has been identified in the Tigard Comprehensive Plan as a downtown park. A park master plan for this segment of Fanno Creek vas prepared in 1980 (see enclosed site plan). 3. Vicinity Information The properties to the north and west are zoned CBD including the future City Hall site adjacent to Hall Blvd. The land to the south is zoned CBD and R-12(PD) Residential, 12 units/acre,plann.ed development) and it includes the Tigard Senior Center. 4. Site Information The property is owned by the City and it is almost exclusively within the 100 year flood plain of kenno Creek. The property is undeveloped and the City proposes to open the area for recreational use. A trail from Hall Blvd. to Ash Street Is proposed along the north side of the creek with a foot bridge to provide access to the Senior Center south of the creek. Several benches and picnic tables will be located along the trail. An interpretive center is to be built south of the creek with exhibits that will explain the natural features of the area. STAFF REPORT - SL 8-84 - PAGE 1 • In addition to the recreational facilities, a flood overflow channel is intended to improve water carrying capacity during high water. This improvement will extend through most of the property. 5. Agency and NPO Comments The Building Inspection Office, US Army Corps of Engireers, and the State Highway Division have no objection to the proposal. \17)O Number 1 and the Tualatin Rural Fire Protection District have not ra+ponded at this time. ".he Division of State Land has issued a permit subject to conditions. B. ANALYSIS AND CONCLUSION The proposal is consistent with the park master plan which envisioned the proposed trail system, interpretive center, and other improvements. The US Army Corps of Engineers and the Division of state Lands have no objections to the request, provided certain conditions are met . C. RECOMMENDATION The Planning staff recommends approval of SL 8-84 subject to the following conditions: 1. The City ,hall comply with all conditions of the permit issued by the Division of state Lands. 2. The City shall follow the "Management Practices" described in the April 19, 1984, letter received from G.A. Newgard of the U.S. Army Corps of Engineers. 3. This approval is valid if exercised within one year of the final decision date. PREPARED BY: Keith Liden APD BY: William A. Monahan Associate Planner Director of Planning & Development (0589P dmj) STAFF REPORT - SL 8-84 •- PAGE 2