Plans (82) .Arstrp
Cin Latimer HVAC OFFICE Copv
Wr IF
HEATING•VENTILATION•AIR CONDITIONING
Precoa Phase 2
Suite 100 _
13221 SW 68t'' Pkwy +._
Tigard, Or 97223 OCT 1 2018
Scope of Work OiT° !, 7;tx;�RD
BUILGtr`�SO l7111i�la�,+:
Latimer HVAC will perform the following scope of work:
1. Ducting and air distribution mods as drawn.
2. Relocate (2) sensors.
Equipment Schedule
Existing RTU and terminal units.
Mechanical General Notes:
1. Plenum return ceiling. Provide sound boots on return grills.
2. All steel ducting will be 26 ga minimum galvanized. Flex per Mfg.
3. Low pressure ducting to be designed to not exceed 0.5 we positive (suupply}_and-0.5 wen I ee
4. Seal ducting with UL listed mastic or mastic tape. ;THE ACTIVATION V �p �
SMOKE DETECTOR
ACTIVATE A VISIBLE AND
Ventilation Requirements-based on 2014 OMSC table 403.3 AUDIBLE SUPERVISORY
No change SIGNAL AT A CONSTANTLY
ATTENDED LOCATION
OMSC 606.4.1
OFFICE COPY
CITY OF TIGARD
REVIED FOR CODE COMPLIANCE
PP
A roved:
OTC: I I
Permit#: ,np ac__,. . (Z i 0 0 7 $
Address: i,`-4,rJ i ,S,,„). C 8 p j<
Suite#: 100
By: Date: 1 0_j,c-
MO
Latimer HVAC LLC
11230 SW Morgen Ct. (503)290-1085 Oregon CCB 220839
Tigard, OR 97223 info@latimerhvac.com Washington LATIMHL825KQ