Plans (96) P�OJECT NOTES: , ',ISM, ....
TABLE OF CONTENTS
1. 5.800 KW DC, 4.300 KW AC SOLAR PHOTOVOLTAIC PAGE
SYSTEM SYSTEM TILT AND ORIENTATION 0SC 3111 DESCRIPTION
2: 1 STORY ASPHAULT SHINGLE ROOF AT 20° PITCH. _ __
PV-01 SITE PLAN
3. CONSTRUCTION FOREMAN TO CONFIRM FINAL ARRAY PITCH ORIENTATION TOTAL PV ARRAY AREA: 360.800000 FT2 Pv 02 RACKING LAYOUT
CONDUIT RUN PLACEMENT WITH CUSTOMER. AR-01 20 100° ROOF AREA MEASURED IN PLAN VIEW: Pv-o3 RACKING DETAIL
4. CONTACT: JOHN GRIESER PHONE: 503-967-5786 2418FT2 `--
5. DESIGN CRITERIA: PV ARRAY/ROOF AREA: 14.92 % PV-84 SINGLE LINE DIAGRAM
5.1. SYSTEM WEIGHT: 3LBS/SQFT. PV-05 SYSTEM PLACARDS
Plan view from aboveI \ SOUTH -Facing Elevation
S ale 1/16"= 1'-0" ' \ \ Scale:1/8"= 1'-0" RECEIVEJ
I \
\ o
r., I (i I Vis'
/ s7 BUILDING WVI,S.10N
/ / ITY OF TIGARD - OFFICE COPY
REVIEWED/ C
FOR ODE COMPLIANCE
/ ;II /
Approved:
/ / PcrOTC: [ I 1/ 412:21--
mit#: <'�yl`3-/ / Address: , Com• • ��
Suite #: �_� ,.,_..,
//11;11,4_,
By: Date: �,� t 5
I
/ ' ,, \,.
I apippv/ /
(E) SERVICE ENTRANCE
&UTILITY METER/ Vii' 2
(N)RSD INITIATION DEVICE
(EXTERIOR WALL)
/ '
(E) MAIN PANEL/MAIN
/ I
DISCONNECT
(INTERIOR WALL)
/ / SIJNEYE \
I I
_
-_,-
INDICATES LOCATION WHERE SUN-EYE WAS TAR NJ
,, .'1464LEMENTAL ENERGYDESIGNED BY:N. VAN ALMELO ELEMENTAL ENERGY DON MANGHELLI REV; #
. . CHECKED BY: G: KAMPS CB 195141 16250 SW COPPER CREEK DR, TIGARD OR 97224 SITE PLAN PV-01 10/9/2018
RACKING AND ATTACHMENT LAYOUT
Scale:3/16"= 11-0"
4'-0" 1'-0" RIDGE
SETBACK
♦ r
i r^
f�r 1 -0
x I
I -t
-4L- ' -t $: -t I
I Ii I I
i
}
LIJ
I -`
I g 1 C I i h 1 1 I I I I I 1 l I I I ! I , 1 1 I I y
f 3'_0" '
---- "
2'-0" SPACING
PORTRAIT
- -
F---- STRUCTURAL CROSS-SECTION
r,,,,L,„,,,,
Scale:1/8"= 1'-0'«
6595
! Between 4.2in and 11.32inr 4
I
--
,i'-----\------kMANUFACTUREL
TRUSSES
..,\Ip ,
39A" \ 2X424"0. .
LANDSCAPE -
/,, S1 °/'hili
:etween r----in and---in
' ELEMENTA1 ENERCDESIGNED BY:N.VAN ALMELO ELEMENTAL ENERGY DON MANGI-tELLI RACKING REV; #
PV-02
r CHECKED BY: G. KAMPS CB 195141 16250 SW COPPER CREEK DR,TIGARD OR 97224 LAYOUT 10/9/2018
RACKING
.....
. .
1 ■ . _
, 1 ____---,
• __,
10,0000000000•, _________-
._
, .
_,,, ____----7.,._
_.....„_. ,..,. _____„_• ___, ..,
, :, :, : ... „_,, , ,-, . ,_________----- vi.
• ____ 1
. • . , ,
_ ,• _,
0 VIEWNAME
C VALE
•
49 .- ..ft. .",--- :
0 :'
. PV MODULE
pO IRONRIDGE RAIL
11 m INEEMIllilli Jim^ diIMMY ►
4 N ,, N N
OG' FRONT VIEW, FLUSH MOUNT ON PITCHED ROOF
Scts.1"=1;0"
PV MODULE,
BY OTHERS
IRONRIDGE IRONRIDGE IG MID CLAMP IRONRIDGE RAIL IRONRIDGE END CLAMP
�I RAIL P'V MODULE FRAME PV MODULEFRAME
pip IRONRIDGE IG MID CLAMPAlIPPII* PV MODULE FRAME PV(+1CIDULE FRAME
(E)ROOF
IRONRIDGE END CLAMP
_`�� .M MEMBRANE I �. IRONRIDGE RAIL iR£)NRIDGE RAIL
0
�1 ®... 0.250 ■
_
IRONRIDGE iI
� I�
0
FLASNFOOT
ASSEM6LY ki
(E)BUILDING
,, w
__
STRUCTURE
o„ LAN DETAIL END CLAMP FRONT
O STANDOFF CIETAIL //��\ DETAIL, MID CLAMP P„
L./" Scale.6" 1-0" O DETAIL, MID CLAMP FRONT O ,DETAIL„END CLAMP PLAN H ' Scale:6"=1'-0"
\./ Stale: Scale;6" 1'-0"
''' _ DESIGNED BY:N. VAN ALMELO ELEMENTAL ENERGY DON MANUHELLI REV: #
� RACKING PV-03,. I J - A CHECKED BY: G. KAMPS CB 195141 16250 SW COPPER CREEK DR, 1 IGARD OR 97224 DETAILS 10/9/2018
,.fes .i.-�. . y �—
120/240 VAC
SINGLE PHASE SERVICE
0
UTILITY
GRID
1 EXISTING
C150A MAIN
1 BREAKER
ENPHASE: M215-60-2LL-S22
SOME PAIRS MICROINVERTER
_
EXISTING4 NOT SHOWN PV MODULES
-: 150A MAIN FOR CLARITY
- PANEL NON-FUSIBLE (N) SOLADECK —
FACILITY JUNCTION BOX 1 / S 0)MODULE/INVERTER
SW290ULK
DISCONNECT
LOADS 3 2 +Ol/ (20) MODULE/INVERTER PAIRS
Cr
9A - (2) BRANCHES OF(10) MODULES
0— — ole----o 1$A ,,{ owe--s — / o
V INVERTER OUTPUTS CONNECT ENPHA i ENGAGE CABLE
CONNECTED TO OUTPUT CABLE TO END TRUNK
30A PV BREAKER RAPID SHUTDOWN 20A BREAKER ON ENGAGE CABLE ENGAGE CABLE TERMINATION KIT
OPPOSITE SIDE OF INITIATION DEVICE EACH BRANCH
BUSBAR FROM UTILITY 30A,2P, 240V
FEED
— — 1 VOLTAGE DROP CALCULATIONS
I CONDUIT SCHEDULE
# CONDUIT CONDUCTOR NEUTRAL EGC T VD FORMULA: VD=((2KLI)/CMA)
1 NONE (2) 10 AWG PV WIRE NONE N/A
MODULES TO SOLADECK:
2 NONE ENPHASE ENGAGE CABLE ENPHASE ENGAGE CABLE ENPHASE ENGAGE CABLE WORST CASE VOLTAGE DROP FOR INVERTER
3 3/4"EMT OR EQUIV. IF EXT; (2)1Q AWG:THHN/THWN-2 IN (1) 10 AWG:THHN/THWN-2 IN (1)#10 GND MANUFACTURER WIRING IS .29%.
NONE IF INTERIOR CONDUIT OR NM-B IF NO CONbUIT CONDUIT OR NM-B IF NO CONDUIT J
SOLADECK TO MAIN PANEL, 30 ft. MAX:
%VD= ((2KLI)/CMA)= .56%
TOTAL V.D. _ .29% + .56% _ .85%
POINT OF INTERCONNECTION:
BACKFED BREAKER ON MAIN PANEL NOTE:K=12 9 circular mil ahma per foot for copper,21.2 for aluminum(assumes 75 deg C)
The multiplier is 1 0 for Ingle phase and DC,.5 for 3-phaie 4-Wire end.866 for 3-phase 3-wife
1. ADD 30 AMP PV BREAKER TO MAIN PANEL
2. MAIN PANEL RATING:150 A
3, MAIN PANEL MAIN BREAKER RATING: 150 A MODULE CHARACTERISTICS SYSTEM CHARACTERISTICS
SW290BLK: 290 W NOMINAL OPERATING AC VOLTAGE 240 V
OPEN CIRCUIT VOLTAGE 39.50 V NOMINAL OPERATING AC 60 HZ
ELECTRICAL NOTES: MAX POWER VOLTAGE 32.20 V FREQUENCY
1. PHOTOVOLTAIC SYSTEM WILL COMPLY WITH 2017 NEC SHORT CIRCUIT CURRENT 9.60 A MAXIMUM DC POWER 5800 W
2; ELECTRICAL SYSTEM GROUNDING WILL COMPLY WITH 2017 SHORT CIRCUIT CURRENT MAXIMUM AC POWER 4300 W
NEC. 12.00 A
3, MODULES CONFORM TO AND ARE LISTED UNDER UL 1703. (690.8(A}{1))
4. INVERTER CONFORMS TO AND IS LISTED UNDER UL 1741. MAXIMUM AC CURRENT 18 A
5. ARRAY DC CONDUCTORS ARE SLED FOR DERATED CURRENT. MAXIMUM OVERCURRENT DEVICE
9.75 AMPS MODULE SHORT CIRCUIT CURRENT. RATING FOR AC MODULE 30 A
15.21 AMPS AERATED SHORT CIRCUIT CIRCUIT(690.8 (a) &690.8 PROTECTION
(b)).
' s DESIGNED BY:N VAN ALMELO ELEMENTAL ENERGY DON MANGHELLI SINGLE LINE t REV: #
,sELFMENTAI ENEFiuY PV-04
b , . CHECKED S' . KAMPS CB 195141 16250 SW COPPER CREEK DR, TIGARD OR 97224 E�IAGRAM 10/9/2018
0
4" _^ 2„
POWER SOURCES PRESENT. 5800 WATT
}
T R
TWO
PHOTOVOLTAIC ARRAY LOCATED ON ROOF. AC
DISCONNECT LOCATED INSIDE IN HOUSE PANEL. RAPID 1" SOLAR AG DISCONNECT
SHUTDOWN INITIATION DEVICE LOCATED OUTSIDE NEXT TO240VAC 18 MC 1
THIS METER.
LOCATION: AT METER QUANTITY:1 LOCATION: AC DISCONNECT QUANTITY:1
TWO POWER SOURCES PRESENT. SECOND
SOURCE Is A PV ARRAY, AC DISCONNECT 2"
LOCATED IN THIS PANEL. RAPID SHUTDOWN 1,1
INITIATION DEVICE LOCATED OUTSIDE NEXT 100 NOTRELOCATE NS �
i
TO METER. O4'ERCURR t Tp�"', SOLAR AC DISCONNECT
1/2 '
WD/01/4
2"X 112'` 240VAC 18 MC7
_44 1 u
I- 3
LOCATION: MAIN DISCONNECT QUANTITY:1 LOCATION', BREAKER QUANTITY:1LOCATION: BREAKER QUANTITY:1 AlliblihiLactm. pv,pAunazort
I
r
1 TURN RAD SHUTDOWN SWITCH TO
THE'OFF'POSITION TO SHUT DOWN
' i PV SYSTEM AND REDS
‘ Lit r) r , to �Y - SHOCK HAZARD IN THE ARRAY A
525 X 1 .8 ,, „33.it X 4 51/4
LOCATION: RSD INITIATION DEVICE QUANTITY:1 LOCATION: MAIN DISCONNECT QUANTITY:1
DESIGNED B N. VAN ALMELQ ELEMENTAL ENERGY DON MANOHELLI PLACARDS REV:
-:'-'31. LLE.:Mc"NTAL ENERC:;1/4YCHECKED BY: G. KAMPS CB 195141 16250 SW COPPER CREEK DFS, TIGARD OR 97224 PV 05 10/9/2018