COMcheck Software Version 4.0.8.1
Mechanical Compliance Certificate
RECEIVED
Section 1: Project Information OCT - T 2018
Energy Code:2014 Oregon Energy Efficiency Specialty Code CITY OF TIG�IRD
Project Title: New Self-Storage Facility
Project Type: New Construction BUILDING DIVISION
Construction Site: Owner/Agent: Designer/Contractor:
StorQuest Self Storage Clifford Hood
12800 SW Pacific Highway Hood-McNees, Inc.
Tigard,OR 1923 SE Stark St.
Portland,OR 97214
(503)231-7825
Section 2: General Information
Building Location(for weather data): Tigard,Oregon
Climate Zone: 4c
Section 3: Mechanical Systems List
Quantity System Type&Description
4 F/AC-1 Leasing Office(Single Zone):
Heating: 1 each-Duct Furnace,Gas,Capacity=100 kBtu/h
Proposed Efficiency=95.00%Ec,Required Efficiency=80.00%Ec
Cooling: 1 each-Split System,Capacity=60 kBtu/h,Air-Cooled Condenser,Air Economizer
Proposed Efficiency=13.00 SEER,Required Efficiency: 13.00 SEER
Fan System: FAN SYSTEM 3 I Second Floor 2-Position Damper--Compliance(Motor nameplate HP method):
Passes
Fans:
FAN 5 Supply,Constant Volume, 1200 CFM,0.5 motor nameplate hp
FAN 6 Exhaust,Constant Volume,600 CFM,0.4 motor nameplate hp
16 UH-1 (Single Zone):
Heating: 1 each-Central Furnace,Gas,Capacity=55 kBtu/h
Proposed Efficiency=93.00%Et, Required Efficiency=80.00%Et
Fan System: None
3 UH-2(Single Zone):
Heating: 1 each-Central Furnace,Gas,Capacity=80 kBtu/h
Proposed Efficiency=93.00%Et, Required Efficiency=80.00%Et
Fan System: None
2 AC-1 (Single Zone):
Cooling: 1 each-Split System,Capacity=12 kBtu/h,Air-Cooled Condenser,No Economizer,Economizer
exception:Low Capacity Residential
Proposed Efficiency= 13.00 SEER,Required Efficiency: 13.00 SEER
Fan System: None
Section 4: Requirements Checklist
In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks
identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in
the plans/specs the requirement can be verified as being satisfied.
Requirements Specific To: F/AC-1 Leasing Office :
1. Equipment meets minimum efficiency: Duct Furnace(Gas): 80.00%Ec
Project Title: New Self-Storage Facility Report date: 09/27/18
Data filename:J:\proj\2132 Tigard U-Store\Mechanical_2018.cck Page 1 of 4
w n
• 2. Equipment meets minimum efficiency: Split System: 13.00 SEER
• 3. Energy recovery ventilation systems. Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a
minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system.
Plans reference page/section: N/A
• 4. Supply air economizers shall be provided on each cooling system and are capable of providing 100-percent outdoor air,even if
additional mechanical cooling is required to meet the cooling load of the building.Systems provide a means to relieve excess outdoor
air during economizer operation to prevent overpressurizing the building.
Plans reference page/section: M10
Requirements Specific To: UH-1 :
• 1. Equipment meets minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE)
2. Energy recovery ventilation systems. Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a
minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system.
Plans reference page/section: N/A
Requirements Specific To: UH-2 :
• 1. Equipment meets minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE)
• 2. Energy recovery ventilation systems.Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a
minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system.
Plans reference page/section: N/A
Requirements Specific To: AC-1 :
• 1. Equipment meets minimum efficiency: Split System: 13.00 SEER
• 2. Energy recovery ventilation systems.Individual fan systems that have both a design supply air capacity of 5,000 cfm or greater and a
minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system.
Plans reference page/section: N/A
Generic Requirements: Must be met by all systems to which the requirement is applicable:
• 1. Calculation of heating and cooling loads.Design loads are determined in accordance with the procedures described in the
ASHRAE/ACCA Standard 183.Alternatively,design loads have been determined by an approved equivalent computation procedure.
✓ 2. Packaged Electric Equipment.Specified packaged electrical equipment has a heat pump as the primary heating source.
Requirement is not applicable.
Plans reference page/section:
• 3. Equipment and system sizing.Heating and cooling equipment and systems capacity do not exceed the loads calculated in accordance
with Section 503.2.1.
Plans reference page/section:
• 4. HVAC Equipment Performance Requirements.Reported efficiencies have been tested and rated in accordance with the applicable test
procedure.The efficiency has been verified through certification under an approved certification program or,if no certification program
exists,the equipment efficiency ratings are supported by data furnished by the manufacturer.
• 5. Thermostatic Controls.The supply of heating and cooling energy to each zone is controlled by individual thermostatic controls that
respond to temperature within the zone.
Plans reference page/section: M10
• 6. Heat pump supplementary heat.Heat pumps having supplementary electric resistance heat have controls that,except during defrost,
prevent supplementary heat operation when the heat pump can meet the heating load.
Plans reference page/section: N/A
✓ 7. Set point overlap restriction.Where used to control both heating and cooling,zone thermostatic controls provide a temperature range
or deadband of at least 5°F(2.8°C)within which the supply of heating and cooling energy to the zone is capable of being shut off or
reduced to a minimum.
Plans reference page/section: M10
• 8. Optimum Start Controls.Each HVAC system has controls that vary the start-up time of the system to just meet the temperature set
point at time of occupancy.
Plans reference page/section: M10
Project Title: New Self-Storage Facility Report date: 09/27/18
Data filename: J:\proj\2132 Tigard U-Store\Mechanical_2018.cck Page 2 of 4
• 9. Off-hour controls. Each zone is provided with thermostatic setback controls that are controlled by either an automatic time clock or
programmable control system.
Plans reference page/section: M10
• 10.Shutoff damper controls.Both outdoor air supply and exhaust are equipped with not less than Class I motorized dampers.
Plans reference page/section: M10
• 11.Freeze Protection and Snow melt system controls.Freeze protection systems,such as heat tracing of outdoor piping and heat
exchangers,including self-regulating heat tracing,include automatic controls capable of shutting off the systems when outdoor air
temperatures meet code criteria.
Plans reference page/section: N/A
✓ 12.Separate air distribution systems.Zones with special process temperature requirements and/or humidity requirements are served by
separate air distribution systems from those serving zones requiring only comfort conditions;or shall include supplementary control
provisions so that the primary systems may be specifically controlled for comfort purposes only.
Plans reference page/section:
✓ 13.Humidity control. If a system is equipped with a means to add or remove moisture to maintain specific humidity levels in a zone or
zones,a humidity control device is provided.
Plans reference page/section: N/A
✓ 14.Humidity control.Where a humidity control device exists it is set to prevent the use of fossil fuel or electricity to produce relative
humidity in excess of 30 percent.Where a humidity control device is used for dehumidification,it is set to prevent the use of fossil fuel
or electricity to reduce relative humidity below 60 percent.
Plans reference page/section: N/A
15.Humidity control.Where a humidity control device exists it is set to maintain a deadband of at least 10%relative humidity where no
active humidification or dehumidification takes place.
Plans reference page/section: N/A
✓ 16.Ventilation.Ventilation,either natural or mechanical,is provided in accordance with Chapter 4 of the International Mechanical Code.
Where mechanical ventilation is provided,the system has the capability to reduce the outdoor air supply to the minimum required by
Chapter 4 of the International Mechanical Code.
Plans reference page/section: M10
✓ 17.Demand controlled ventilation(DCV).DCV is required for spaces larger than 500 ft2 for simple systems and spaces larger than 150 ft2
for multiple zone systems.
Plans reference page/section: N/A
✓ 18.Kitchen hoods.Kitchen makeup is provided as required by the Oregon Mechanical Specialty Code.
Plans reference page/section: N/A
• 19.Enclosed parking garage ventilation controls. In Group S-2,enclosed parking garages used for storing or handling automobiles employs
automatic carbon monoxide sensing devices.
Plans reference page/section: N/A
• 20.Duct and plenum insulation and sealing.All supply and return air ducts and plenums are insulated with the specified insulation.When
located within a building envelope assembly,the duct or plenum is separated from the building exterior or unconditioned or exempt
spaces by a minimum of R-8 insulation.All ducts,air handlers and filter boxes are sealed.Joints and seams comply with Section 603.9
of the International Mechanical Code.
21.Low-pressure duct systems.All longitudinal and transverse joints,seams and connections of low-pressure supply and return ducts are
securely fastened and sealed with welds,gaskets,mastics(adhesives),mastic-plus-embedded-fabric systems or tapes installed in
accordance with the manufacturer's installation instructions.
Plans reference page/section: M10
22.Medium-pressure duct systems.All ducts and plenums designed to operate medium-pressure are insulated and sealed in accordance
with Section 503.2.7.Pressure classifications specific to the duct system are clearly indicated on the construction documents.
Plans reference page/section: N/A
✓ 23.High-pressure duct systems.Ducts designed to operate at high-pressure are insulated and sealed in accordance with Section 503.2.7.
In addition,ducts and plenums are leak-tested in accordance with the SMACNA HVAC Air Duct Leakage Test Manual.
Plans reference page/section: N/A
• 24.Air system balancing.Each supply air outlet and zone terminal device is equipped with means for air balancing in accordance with the
requirements of IMC 603.17.Discharge dampers intended to modulate airflow are prohibited on constant volume fans and variable
volume fans with motors 10 horsepower.
Project Title: New Self-Storage Facility Report date: 09/27/18
Data filename: J:\proj\2132 Tigard U-Store\Mechanical_2018.cck Page 3 of 4
Plans reference page/section:M10
y/ 25.Manuals.The construction documents require that an operating and maintenance manual be provided to the building owner by the
mechanical contractor.See long description for specifications.
Plans reference page/section:M10
✓ 26.Air System Design and Control.Each HVAC system having a total fan system motor nameplate hp exceeding 5 hp meets the provisions
of Sections 503.2.10.1 through 503.2.10.2.
Plans reference page/section:N/A
v 27.Allowable fan floor horsepower.Each HVAC system at fan system design conditions does not exceed the allowable fan system motor
nameplate hp(Option 1)or fan system bhp(Option 2)as shown and calulated in requirement details.
Plans reference page/section:N/A
ii/ 28.Motor nameplate horsepower.For each fan,the selected fan motor is no larger than the first available motor size greater than the brake
horsepower(bhp).
Plans reference page/section: N/A
V 29.Large Volume Fan Systems.Fan systems over 8,000(7 m3/s)cfm without direct expansion cooling coils that serve single zones reduce
airflow based on space thermostat heating and cooling demand.A two-speed motor or variable frequency drive reduces airflow to a
maximum 60 percent of peak airflow or minimum ventilation air requirement as required by Chapter 4 of the International Mechanical
Code,whichever is greater.
Plans reference page/section: NIA
✓ 30.AII air-conditioning equipment and air-handling units with direct expansion cooling and a cooling capacity at ARI conditions greater than
or equal to 110,000 Btu/h that serve single zones have their supply fan operation controlled according to code specific requirements.
Plans reference page/section:
✓ 31.Series fan-powered terminal unit fan motors.Fan motors for series fan-powered terminal units are electronically-commutated motors
and have a minimum motor efficiency of 70 percent when rated in accordance with NEMA Standard MG 1-2006 at full load rating
conditions.
Plans reference page/section: NIA
v 32.Hot Gas Bypass Limitation. For cooling systems<=240 kBtu/h,maximum hot gas bypass capacity is no more than 50%total cooling
capacity.
Plans reference page/section: M10
Section 5: Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,specifications
and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2014
Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 4.0.8.1 and to comply ' the mandatory requirements in the
Requirements C1iecklist. o
Name-Title Signature ! Date
Section 6: Post Construction Compliance Statement
D HVAC record drawings of the actual installation,system capacities,calibration information,and performance data for each equipment
provided to the owner.
❑ HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor.
O Written HVAC balancing and operations report provided to the owner.
The above post construction requirements have been completed.
Principal Mechanical Designer-Name Signature Date
Project Title: New Self-Storage Facility Report date: 09/27/18
Data filename: J:\proj\2132 Tigard U-Store\Mechanical_2018.cck Page 4 of 4