Permit (95) Branden Taggart
From: #Building Permit Technicians
Sent: Thursday, September 24, 2020 5:54 PM
To: 'Jennifer Fowles'
Subject: RE:Tigard High School - Deferred Submittal - Si Stairs & Rails
Attachments: Invoice.pdf
Hi Jennifer,
The Stairs and Railings Deferred Submittal is ready to issue now. The balance due is$215.33, and I have attached an
invoice above for you to reference. The permit fees can be paid online through our
website: https://aca.accela.com/tigard/Default.aspx. From there, click on the Building tab, enter the permit number
(BUP2018-00188) in the Record Number field, and click Search. Once paid, please notify us at
TigardBuildingPermits@tigard-or.gov, and I will place this permit in the conference room,adjacent to the outer Permit
Center lobby, for pickup between the hours of 8:00 a.m. and 5:00 p.m., Monday through Thursday. We are closed on
Fridays.
Thank you,
Branden Taggart
v City of Tigard
I ill Senior Permit Technician
Community Development
13125 SW Hall Blvd'
Tigard, OR 97223
(503)718-2449
brandent@tigard-or.gov
From: Branden Taggart
Sent:Thursday, September 24, 2020 2:08 PM
To:Jennifer Fowles<jenniferf@pence.net>
Subject: RE:Tigard High School - Deferred Submittal -S1 Stairs& Rails
You are welcome,Jennifer. I'll send you another email when it is done.
Thanks,
Branden Taggart
f q City of Tigard
a °, Senior Permit Technician
IGARD
Community Development
13125 SW Hall Blvd
Tigard, OR 97223
(503)718-2449'
brandent@tigard-or.gov
1
From: Jennifer Fowles<ienniferf@pence.net>
Sent:Thursday,September 24, 2020 2:07 PM
To: Branden Taggart<brandent@tigard-or.gov>
Subject: RE:Tigard High School - Deferred Submittal -S1 Stairs& Rails
Caution!This message was sent from outside your organization. Allow sender I Block sender
Great new Branden and thank you.
JENNIFER FOWLES LEED® Green Associate
Senior Project Engineer
1141
CONS"R UCTiON
T : 503.252.3802 5400 Meadows Road, Suite 400
C : 503.871.4584 Lake Oswego, OR 97035
F : 503.256.3684 www.pence.net
E: jenniferf®pence.net
OR CCBN 153167 I WA PENCECL821 P3
From: Branden Taggart<brandent@tigard-or.gov>
Sent: Thursday, September 24, 2020 2:05 PM
To:Jennifer Fowles<jenniferf@pence.net>
Subject: RE:Tigard High School - Deferred Submittal -S1 Stairs& Rails
Hi Jennifer,
I have this Deferred Submittal on my desk at the moment. I haven't had a chance to complete my final review. I will try
and finish it by the end of today. I would say the soonest you could pick it up would be early next week. I'll let you know
as soon as my review is done.
Thanks,
Branden Taggart
fi ni City of Tigard
■, Senior Permit Technician
Community Development
TIC tiRD
13125 SW Hall Blvd
Tigard,OR 97223
(503)718-2449
brandent@ttgard-or.gov
From:Jennifer Fowles<jenniferf@pence.net>
Sent:Thursday,September 24, 2020 1:24 PM
To: Branden Taggart<brandent@tigard-or.gov>
Subject:Tigard High School - Deferred Submittal -Si Stairs & Rails
2
•
Good Afternoon Branden,
Sorry to bother you I know how extremely busy you are these days. I was hoping you could tell me when the S1 Stair&
Rails Deferred Submittal will be ready for pickup?
Have a great day,
JENNIFER FOWLES LEED® Green Associate
Senior Project Engineer
11.41,
CONSTRUCTION
T : 503.252.3802 5400 Meadows Road, Suite 400
C : 503.871.4584 Lake Oswego, OR 97035
F : 503.256.3684 www.pence.net
E: jenniferf®pence.net
OR CCBM 153167 I WA PENCECL821 P3
From: Branden Taggart<brandent@tgard-or.gov>
Sent:Tuesday, August 11, 2020 7:28 AM
To:Jennifer Fowles<ienniferf@pence.net>
Subject: RE:Tigard High School - Deferred Submittal -S1 Stairs& Rails
Thank you, Jennifer. We received the Deferred Submittal. We will let you know when it is approved and ready to pick
up.
Thanks,
Branden Taggart
City of Tigard
Senior Permit Technician
S 1, = Community Development
13125 SW Hall Blvd
Tigard, OR 97223
(503)718-2449
b rande nt@tigard-or.gov
From:Jennifer Fowles<jenniferf@pence.net>
Sent: Monday, August 10, 2020 1:36 PM
To: Branden Taggart<brandent@tigard-or.gov>
Subject:Tigard High School - Deferred Submittal -S1 Stairs & Rails
Good Afternoon Branden,
I am going to drop off our final deferred submittal for Tigard High School this afternoon, I just wanted to give you a
heads up.
Thank you,
3
JENNIFER FOWLES LEER® Green Associate
Senior Project Engineer
;crag
CONSTRUCTION
T : 503.252.3807 5400 Meadows Road, Suite 400
C : 503.871.4584 Lake Oswego, OR 97035
F : 503.256.3684 www.pence.net
E: jenniferf@pence.net
OR CCB#153167 I WA PENCECLB21 P3
DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail
may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained
by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule."
4
CITY OF TIGARD BUILDING PERMIT
• COMMUNITY DEVELOPMENT Permit#: BUP2018-00188
Date Issued: 10/22/2018
T[ ARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439
Parcel: 2S 114AA00100
Jurisdiction: Tigard
Site address: 9000 SW DURHAM RD
Project: Tigard High School Subdivision: None Lot: None
Project Description: 143,625 sq.ft.superstructure addition to East side of Tigard High School for modernization project. Foundation is
permitted under permit BUP2018-00089. Addition includes new classrooms,administrative offices,gymnasium,
technology wing,kitchen,and commons.
Contractor: LCG PENCE CONSTRUCTION LLC Owner: TIGARD-TUALATIN SCHOOL DISTRICT
2720 SW CORBETT AVENUE 6960 SW SANDBURG ST
PORTLAND, OR 97201 TIGARD, OR 97223
PHONE: 503-252-3802
PHONE:
FAX: 503-256-3684
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ADD Type of Const: Ig Permit Fee-Additions,Alterations, 10/22/2018 $141,877.13
Demolition
Occupancy Grp: E Occupancy Load: 5745 12%State Surcharge-Building 10/22/2018 $17,025.26
Dwelling Units: 0 Plan Review 06/20/2018 $92,220.13
Stories: 2 Height: 35 ft Plan Review-Fire Life Safety 10/22/2018 $56,750.85
Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM New-Bldg 10/22/2018 $194.00
Value: $41,061,374 Info Process/Archiving-Lg$2.00(over 10/22/2018 $2,014.00
11x17)
Info Process/Archiving-Sm$0.50(up to 10/22/2018 $1,750.00
Floor Areas: 11x17)
Metro Const.Excise Tax 10/22/2018 $12,000.00
Total Area: 143625
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $323,831.37
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Yes Parapet: Yes 1 Special Inspection(see plans)
Fire Alarm: Yes Protected Corridors: No
Smoke Detectors: Yes Manual Pull Stations: Yes
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable aw. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspe .ed for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. ose ru-- are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.19: - 143
Issued By: Permittee Signature: PI
5 4639.4175 by 7:00 a.m.for the next available in.17 date.
This permit card shall be kept in a conspicuous place on the job site until completion oft-e project.
Approved plans are required on the job site at the time of each inspection.
11 Building Division
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per-cent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
l
City of Tigard
COMMUNITY DEVELOPMENT DEPARTMENT
■
T I G A RD Building Permit Review — Commercial - With Land Use
Building Permit #: 81-4, s-- t
Site Address: CipOQ SV\) DU 'tnallrf ke401 Suite/Bldg#:
Project Name: T` h SUnw\
(Name t�f commercial busin.s occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: MOGlt°Vh 1 t.oq
Verify site address/suite# exists and active in permit system.
liver Terrace Neighborhood: ❑ Yes 'No
74 Land Use Case#: PD P-201-1 —OCOO
Plans Match Approved Land Use:
,Site Plan . Landscape Plan ❑ Other:
Urban Forestry Plan ' Elevation Plan
Building Height: Maximum Height t4 0(J Actual Height 3tE
,N: Conditions Met: . Prior to Submittal 0' rior to Permit Issuance
.Business License:
Exists: X Yes ❑ No,applicant notified to obtain business license
,Public Facilities Improvement(PFI) Permit:
Required: 3'Yes,applicant was notified ❑ No Applied For: ;l 'Yes ❑ No,stop intake
Notes: C:MALL-h o k Shiva tot, Uyo{-- p -1
Approved by Planning: Date: LO 2 tj
Revisions (after Building Submittal on y) Reviewer Date
Revision 1: El Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: f
Site Plans: # ss7V 7c,C 0M-Se—
Building
N 'Building Plans: # (i/d ; .a 11.=/p„ . i P a M')
Building Permit#: ❑ Enter building permit#above.
Workflow Routing: ❑ Planning ❑ Engineering El Permit Coordinator ❑ Building
Workflow Sign-off: ❑ Sign-off for Planning(include notes from planning review)
Route Application Documents: El Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: Date: CAkti
I:\Building\Forms\BldgPermitRvw COM_WithIandUse_060116.docx
A
Engineering Review
LYK 6-13e '
6-13eL, 5T
e at building pad:
2;7' Permit#: RC/,QO/ _0007 7
[�Y/n 'ons "Met"prior to issuance of building permit
asements (encroachments) per engineering conditions of approval and plat(not typical on SDR/CUP)
Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes ❑ No
Assess Water Quantity Fee in-lieu: ❑ yes ❑ No
LIDA Facility on lot: Yes ❑ No
❑ NOT Approved by Engineering: Date
Notes:
Approved by Engineering: � Date: 7/ 42
Revisions (after B ing Submittal only) Reviewer Date
Revision 1: Approved ❑ Not Approved
Revision 2: 0 Approved ❑ Not Approved
Revision 3: 0 Approved ❑ Not Approved
Permit Coordinator Review
Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes N/A NJ 0 VlaraSt- t
Tigard Trans SDC: ❑ Yes N/A S$A ►€ d- ach.as
Parks SDC: ❑ Yes IN. N/A
MOK to Issue Permit
Approved by Permit Coordinator: AlT(\j°
12 Date: 1 110 l�
I:\Building\Forms\B1dgPermitRvw COM_WithLandUse 070915.docx
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Transmittal Letter
1 c.,,\E:n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: 1O \ VA00.i4STEMJZ. DATE RECEIVED:
DEPT: BUILDING DIVISION RECEIVED
OCT 102018
FROM: H 1 - 3MA � CITY OF TIGARD
COMPANY: BUILDINGIIt DIVISION
PHONE: 503— 24 — q1 c, BY:
RE: -G \ 1\Gt-t0V L Number)‘�-
Permit
(Site Address)
R000 f )
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: Copies: Description:
Additional set(s) of plans. Revisions: jg , L
Cross section(s) and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. 9 Engineer's calculations.
Other(explain):
REMARKS: --mAv,),Nv3 C f u U 6 TOL' 'V!
cis," re, \IJ �N
4)Mi\k.ITE.9 0 \\ GM •
FOR OFFICE USE ONLY
Routed to Permit Technician: Date: Jo- ) ) 1 .4 Initials:
Fees Due: E Yes No Fee Description: Amount Due:
Special
Instructions:
Reprint Permit(per PE): ❑Yes ;:gj
No ❑ Done
Applicant Notified: 01.7, Date: /1S/j ryiy Initials:
,1,
I:\Building\Forms\TransmittalLetter-Revisions_061316.doc
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
Location: Inspection Date:
9000 SW DURHAM RD, TIGARD, OR, 97224
Record Type: Record ID:
Commercial - Building BUP2018-00188
Inspection Type: Inspector:
275 Framing Jeff Grove
Result:
PART
Comments:
1st floor south building
Violation Summary:
Inspector Contractor
Site Address: 9000 SW Durham Rd., Tigard, OR. 97224
1. ■ Building Division
t, , ) Deferred Submittal Transmittal Letter
TO: City of Tigard DATE RECEIVED:
DEPT: BUILDING DIVISION m a .� •�
jUN 2 2 2021
FROM: Jennifer Fowles
zf. Y OF TIGAR
COMPANY: Pence Construction l t llD!�IC� UI'uIS10�
PHONE: (503) 871-4584 By.,/
RE: 9000 SW Durham Rd., Tigard, OR. 97224 BUP 2018-00188
• (Site Address) (Permit/Case Number)
Tigard High School Modernization
(Project name or subdivision name and lot n ber)
Valuation of Deferred Sub h ttal: $ $220,000
ATTACHED IS THE FOLLOWING DEF r 'RED SUBMITTAL ITEM:
Copies: Description:
Aluminum-Framed Storefront - op Drawings
2
Aluminum-Framed Storefron Calcs.
Remarks: r '
-y? 11
,! t 1 j
NOTE:Documents for def- t •1*.coital items shall be submitted to the registered design professional in
responsible charge who sha I' 4 ew them and forward them to the building official with a notation indicating that
the deferred submittal docu 1- have been reviewed and been found to be in general conformance to the design of
the building.The deferred s •mittal items shall not be installed until the design and submittal documents have been
approved by the building r.ficial. Oregon Structural Specialty Code Section 106.3.4.2
FOR OFFICE USE ONLY
Routed to Permit 'echnician: Date: e/ Initials: r-
Fees Due: J es ❑ No Fee Des�ption: Amount Due:
Deferred Submittal Fee: $_176 .314
Additional fee based on valuation: $
Other: ;a f'o $ re --
Total Fees Due: $ C4 I , 3(1
Special
Instructions:
Reprint Permit(per PE): ❑ Yes 7 No 0 Done
Applicant Notified: ` j_ Date: 7/� '1 Initials: -�
The fee for processing at reviewing deferred plan Subfn{ttal shall be an amount equal to 65%of the building based
on the valuation of the particular portion or portions of the project with a minimum$200.00 fee.This fee is in
addition to the project plan review fee based on the total project value.
1:Building\Fomu\TransmittalLetter-DefrdSubmtt.doc 04/04/07
Site Address: 9000 SW Durham Rd., Tigard, OR. 97224
.� Building Division
I , ,,, , , Deferred Submittal Transmittal Letter
TO:
City of Tigard DATE RECEIVED:
DEPT: BUILDING DIVISION
JUN 2 2 Z+'
FROM: Jennifer Fowles CITY OF GARL
BUILDIN'- DIV1SIr.t
COMPANY: Pence Construction
PHONE: (503) 871-4584 By:0 ..
RE: 9000 SW Durham Rd., Tigard, OR. 97224 B 2018-00188
(Site Address) r'ermit/Case Number)
Tigard High School Modernization
(Project name or subdivision name and lot number)
Valuation of Deferred Submittal: $ 15,000
ATTACHED IS THE FOLLOWING DEFERRE6 SUBMITTAL ITEM:
Copies: Description:
Gym/Misc. Railings Shop Drawings'
2
Gym/Misc. Railings Shop Calc . _
Remarks: !
w
4
NOTE: Documents for deferred s 'ttal i ms shall be submitted to the registered design professional in
responsible charge who shall revi them and forward them to the building official with a notation indicating that
the deferred submittal docume have been reviewed and been found to be in general conformance to the design of
the building.The deferred sultfnittal items shall not be installed until the design and submittal documents have been
approved by the building . `icial. Oregon Structural Specialty Code Section 106.3.4.2
FOR OFFICE USE ONLY
Routed to Perm'• echnician: Date: — 2)— .Z O Initials: ---
Fees Due: ,41 Yes 1 [ No Fee Description: Amount Die.
Deferred Submittal Fee: $
Additional fee based on valuation: $ 160 . 3 e
Other: , n $ ' cS
Total Fees Due: $I $ ' . ‘..q 6
,:pecial
Instructions:
Reprint Permit (per PE): ........ Yes
Yes No ❑ Done
Applicant Notified: . Date: .77L3 'PcX Initials: /j i
The fee for processing and reviewing deferred plan submittal shall be an amount equal to 65%of the building based
on the valuation of the particular portion or portions of the project with a minimum$200,00 fee.This fee is in
addition to the project plan review fee based on the total project value.
1:Building\Forms\TransmittalLetter-DefrdSubmtl.doc 04/04/07
Site Address: \ov 5 Q ,c 1,.��, �� �_� __ �f322`'(
• Building Division
T I G A R D Deferred Submittal Transmittal Letter
TO: o� -yC DATE RECEIVED:
DEPT: BUILDING DIVISION
MAR 2 3 2020
FROM: �"\r-\,e CITY OF TIGARD
BUILDING DIVISION
COMPANY: N.a ( 0 r `nv c,Y) c\
PHONE: °OA-q')Do-1:23 e BY 7
RE: et 2 9 4>( „.- Q 'f i coZ-Lt-k 2) i Y Zd f -oo 1
(Site Address) (Permit/Case Number)
(Pro'ect name or Sibdivision name and lot number)
Valuation of Deferred Submittal: $ I ,(o) HI'
ATTACHED IS THE FOLLOWING DEFERRED SUBMITTAL ITEM:
Copies: Description:
Remarks:
NOTE: Documents for deferred submittal items shall be submitted to the registered design professional in
responsible charge who shall review them and forward them to the building official with a notation indicating that
the deferred submittal documents have been reviewed and been found to be in general conformance to the design of
the building.The deferred submittal items shall not be installed until the design and submittal documents have been
approved by the building official. Oregon Structural Specialty Code Section 106.3.4.2
FOR OFFICE USE ONLY
Routed to Permit Technician: Date: 3 - Initials: jr
Fees Due: Yes ❑ No Fee Description: Amount Due:
Deferred Submittal Fee: $ ?J
Additional fee based on valuation: $ J 9 80 Li 7
Other: $ . Cl 0
Total Fees Due: $ J 6 OS. 4 -7
Special
Instructions:
Reprint Permit(per PE): El Yes No ❑ Done
Applicant Notified: Date: Initials:
The fee for processing and reviewing deferred plan submittal shall be an amount equal to 65%of the building based
on the valuation of the particular portion or portions of the project with a minimum$200.00 fee.This fee is in
addition to the project plan review fee based on the total project value.
1:Building\Forms\TransmittalLcttcr-DefrdSubmtl.doe 04/04/07
Site Address: \voo 5k--- Q \r . ,.,. Q-&_ T ,-� off. qq-2��-(
t Building Division
T I G A R I) Deferred Submittal Transmittal Letter
TO: (. �,�R 6 iQ o \ L-gpe- ../\-- DATE RECEIVED:
DEPT: BUILDING DIVISION RECEIVED
FROM: c (c14— �«� MAR 2 3 2020
Qerc1L COMPANY: VE`(\Cz CC)�51yvC.�lcc . CITY OF TIGARD
BUILDING flM If1Al
PHONE: e -°11j012)5\ By:
RE: °' o o i,-> OJC 4,,,-, la 1,,y-a_ ea-q-(1 L 1 5-)Q 20\L..>-001/4.
(Site Address) (Permit/Case Number)
1 .� (& \. -rt kL,_.� (Yicvv\ -e. -r,,4,,—-
(Proj t name or subdivision name and lot number)
Valuation of Deferred Submittal: $ a)c j? ! 5
ATTACHED IS THE FOLLOWING DEFERRED SUBMITTAL ITEM:
Copies: _ Description:
Remarks:
NOTE: Documents for deferred submittal items shall be submitted to the registered design professional in
responsible charge who shall review them and forward them to the building official with a notation indicating that
the deferred submittal documents have been reviewed and been found to be in general conformance to the design of
the building.The deferred submittal items shall not be installed until the design and submittal documents have been
approved by the building official. Oregon Structural Specialty Code Section 106.3.4.2
FOR OFFICE USE ONLY ��
Routed to Permit Technician: Date: atp �,p Initials:
Fees Due: ❑ Yes ❑ No Fee Description: Amount Due:
Deferred Submittal Fee: $ -sa'
Additional fee based on valuation: $ 9 8 I , ) I
Other: ;.v£n it Pro $ 1 SE, • 00
Total Fees Due: $ 113 7. 41
Special
Instructions:
Reprint Permit(per PE): ❑ Yes L.® No ❑ Done
Applicant Notified: Date: Initials:
The fee for processing and reviewing deferred plan submittal shall be an amount equal to 65%of the building based
on the valuation of the particular portion or portions of the project with a minimum$200.00 fee. This fee is in
addition to the project plan review fee based on the total project value.
I:Building\Forms\TransmittalLetter-DefrdSubmtl.doc 04/04/07
9000 SW Durham Rd., Ti
Site Address: and OR. 97224 g
• Building Division
I c,„1_1) Deferred Submittal Transmittal Letter
TO: City of Tigard DATE RECEIVED:
DEPT: BUILDING DIVISION
,j t1 N ). j L O t -
FROM: Jennifer Fowles CM OF 1IGi-Mt::
I t itDING DIMS''.
COMPANY: Pence Construction
PHONE: 503-871-4584 By:
3&t'tb c0i1„15/
RE: 9000 SW Durham Rd. By_17,20-1-8..01-089
(Site Address) rmit/Case Number)
Tigard High School Modernization
(Project name or subdivision name and lot number)
Valuation of Deferred Submittal: $ 35,000
ATTACHED IS THE FOLLOWING DEFERRED SUBMITTAL ITEM:
Copies: Description:
2 Metal Stairs 01 , 02, 05, 17 Shop Drawings
Metal Stairs 01 , 02, 05, 17 Calcs
Remarks:
NOTE:Documents for deferred submittal items shall be submitted to the registered design professional in
responsible charge who shall review them and forward them to the building official with a notation indicating that
the deferred submittal documents have been reviewed and been found to be in general conformance to the design of
the building.The deferred submittal items shall not be installed until the design and submittal documents have been
approved by the building official. Oregon Structural Specialty Code Section 106.3.4.2
FOR OFFICE USE ONLY
Routed to Permit Technician: Date: 6 D..c) Initials: 411
Fees Due: EA Yes 0 No Fee Description: Amount Due:
Deferred Submittal Fee: $
Additional fee based on valuation: $ 7 , 6 9
Other: $ j o O , ,
Total Fees Due: _ $ 3 7 a , C q
Special
Instructions:
Reprint Permit(per PE): C Yes No Done
Applicant Notified: i 7Ji1 /Z-C- •y�y Initials: 4
The fee for processing and reviewing deferred plan stibmitta�shall bean amount equal to 65%of the building based
on the valuation of the particular portion or portions of the project with a minimum$200.00 fee. This fee is in
addition to the project plan review fee based on the total project value.
I:Building\Forms\TransmittalLetter-DefrdSubmtl.doc 04/04/07