Report (- E.it c, ec3 .
Generated by COMcheck-Web Software
Envelope Compliance Certificate
Section 1: Project Informationi 1 . ID
Li F
Energy Code:2014 Oregon Energy Efficiency Specialty Code
Project Title:Tigard High School jUN 2 0 N18
Project Type: New Construction
Envelope Compliance Method:Simplified Trade-Off CITY-$rA `�3
� q' �r� ARZED
Construction Site: Owner/Agent: Desire to
313ILUTIM oIVISION
Building Location(for weather data): Tigard,Oregon
Climate Zone: 4c
Vertical Glazing/Wall Area Pct.: 14%
Building Use:Area Type Floor Area
1-School/University:Nonresidential 160000
Section 2: Envelope Assemblies and Requirements Checklist
Envelope PASSES: Design 5%better than code.
Envelope Assemblies:
Component Name/Description Gross Cavity Cont. Proposed Budget
Area or R-Value R-Value U-Factor U-Factor(a)
Perimeter
North Walls:Steel-Framed, 16in.o.c.,[Bldg. Use 1 - 18652 13.0 12.5 0.049 0.064
School/University]
Window:,Perf.Specs.:Product ID EFCO 403X,SHGC 0.26,[Bldg. 3629 --- --- 0.310 0.450
Use 1 -School/University](b)
Window:Metal Frame, Perf.Specs.:Product ID EFCO PX32,SHGC 446 --- --- 0.310 0.460
0.26,[Bldg. Use 1 -School/University](b)
East Walls:Steel-Framed, 16in.o.c.,[Bldg.Use 1 - 6171 13.0 12.5 0.049 0.064
School/University]
Window:Metal Frame,Perf.Specs.:Product ID EFCO PX32,SHGC 380 --- --- 0.310 0.460
0.26,[Bldg.Use 1 -School/University](b)
South Walls:Steel-Framed, 16in.o.c.,[Bldg. Use 1 - 10443 13.0 12.5 0.049 0.064
School/University]
Window:, Perf.Specs.:Product ID EFCO 403X,SHGC 0.22,[Bldg. 1558 --- --- 0.310 0.450
Use 1 -School/University](b)
Window:Metal Frame,Perf.Specs.:Product ID EFCO PX32,SHGC 51 --- --- 0.310 0.460
0.22,[Bldg.Use 1 -School/University](b)
West Walls:Steel-Framed, 16in.o.c.,[Bldg. Use 1 - 13085 13.0 12.5 0.049 0.064
School/University]
Window:,Perf.Specs.:Product ID EFCO 403X,SHGC 0.22,[Bldg. 376 --- --- 0.310 0.450
Use 1 -School/University](b)
Window:Metal Frame, Perf.Specs.:Product ID EFCO PX32,SHGC 284 --- --- 0.310 0.460
0.22,[Bldg. Use 1 -School/University](b)
West Walls:Wood-Framed, 16in.o.c.,[Bldg. Use 1 - 1934 13.0 12.5 0.040 0.064
School/University]
Window:Metal Frame,Perf.Specs.:Product ID EFCO PX32,SHGC 300 --- --- 0.310 0.460
0.40,[Bldg.Use 1 -School/University](b)
RC-01:Insulation Entirely Above Deck,[Bldg.Use 1 - 64177 --- 38.0 0.026 0.048
School/University]
RC-02:Insulation Entirely Above Deck,[Bldg.Use 1 - 435 --- 0.0 1.282 - 0.048
School/University]
RC-03:Insulation Entirely Above Deck,[Bldg.Use 1 - 18814 --- 38.0 0.026 0.048
School/University]
Project Title: Tigard High School Report date: 06/14/18
Data filename: Page 1 of 3
RC-04:Attic Roof,Wood Joists,[Bldg.Use 1 -School/University] 8837 0.0 38.0 0.025 0.027
RC-05:Insulation Entirely Above Deck,[Bldg.Use 1 - 3407 --- 38.0 0.026 0.048
School/University]
(a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements.
(b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks
identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in
the plans/specs the requirement can be verified as being satisfied.
Fenestration Product Rating:
U-factors of fenestration products(windows,doors and skylights)are determined in accordance with NFRC 100 by an accredited,
independent laboratory,and labeled and certified by the manufacturer or are determined using the commercial size category values
listed in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.4 and shall include the effects of the window frame.
The temporary label afixed to the fenestration products must not be removed prior to inspection.
Exception(s):
Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills,
center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be
maintained on the jobsite and made available to the inspector.
Plans reference page/section: Spec Section 08 43 13 1.2.D.1,08 43 13 2.2.6.5/Section 08 45 00 1.3.D.9 and 10
st2. Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined in
accordance with NFRC 200 by an accredited,independent laboratory,and labeled and certified by the manufacturer or be determined
using the Solar Heat Gain Coefficients(SHGC)in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The
overall values must consider type of frame material and operator for the SHGC at normal incidence.
Exception(s):
lj Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills,
center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be
maintained on the jobsite and made available to the inspector.
Plans reference page/section: Spec Section 08 43 13-1.2.D.2/Section 08 45 00-1.3.D.11
Air Leakage, Insulation, and Component Certification:
it3. Sealing of the building envelope.Openings and penetrations in the building envelope are sealed with caulking materials or closed with
gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped
or covered with a moisture vapor-permeable wrapping material.Sealing materials spanning joints between construction materials allow
for expansion and contraction of the construction materials. Spec Section :01 41 50 AIR BARRIER SYSTEM
Plans reference page/section: Exterior Detail Sheets A5.21 through A5.68, QUALITY CONTROL REQUIREMENTS
V4. Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope
are determined in accordance with AAMA/WDMA/CSA 101/I.S.2/A440,or NFRC 400 by an accredited, independent laboratory,and
labeled and certified by the manufacturer.
Exception(s):
I] Site-constructed windows and doors that are weatherstripped or sealed in accordance with Section 502.4.3.
Plans reference page/section: Spec: 08 43 13 2.3.D.1,Sheet A5.24 Exterior Door Details
vf5. Curtain wall,storefront glazing and commercial-entrance doors.Curtain watt,storefront glazing and commercial-glazed swinging
entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283.For curtain walls and storefront glazing,
he maximum air leakage rateiss 0.3 cubic foot per minute per square foot of fenestration area. For commercial glazed swinging
entrance doors and revolving doors,the maximum air leakage rate is 1.00 cfm/ft2 of door area.
Exception(s):
J Requirement is not applicable.
Plans reference page/section:Spec Section 08 43 13 2.2.6.3
'6. Building thermal envelope insulation.An R-value identification mark is applied(by manufacturer)to each piece of insulation 12
inches or greater in width.Alternately,the insulation installers have provided a signed,dated and posted certification listing the type,
manufacturer and R-value of insulation installed. Refer to code section for blown or sprayed insulation installation/settling depths and
marker requirements.
'7. Insulation mark installation.Insulating materials are installed such that the manufacturer's R-value mark is readily observable upon
inspection.
vt8. Insulation product rating.The thermal resistance(R-value)of insulation has been determined in accordance with the U.S.FTC R-value
rule.
F/9. Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the
International Building Code.
Project Title: Tigard High School Report date: 06/14/18
Data filename: Page 2 of 3
V10.Outdoor air intakes and exhaust openings.Stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral
to the building envelope shall be equipped with not less than a Class I motorized,leakage-rated damper with a maximum leakage rate
of 4 cfm per square foot at 1.0 inch water gauge when tested in accordance with AMCA 500D.Stair and shaft vent dampers shall be
capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection
systems. Specification sections:
Exception(s): 237314 Dedicated Outside Air Handling Units,237333 Make-Up Air
Units,233113 Air Distribution,237413 Packaged HVAC Units up to 25
• Requirement is not applicable. tons,237434 Large Packaged HVAC Units
and,M0.00 series require
Plans reference page/section: No Stair or Elevator Vents. leakage-rated dampers be provided per AMCA 500D.
11.Loading dock weatherseals.Cargo doors and loading dock doors are equipped with weather seals to restrict infiltration when vehicles
are parked in the doorway.
Exception(s):
St Requirement is not applicable.
Plans reference page/section:
u 12.Recessed lighting. Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned
and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are
sealed with a gasket or caulk between the housing and interior wall or ceiling covering.
Exception(s):
10( Requirement is not applicable.
Plans reference page/section:
V13.Vestibules. Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the
vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously.
Exception(s):
Doors not intended to be used as a building entrance door,such as doors to mechanical or electrical equipment rooms.
U Doors opening directly from a sleeping unit or dwelling unit.
U Doors that open directly from a space less than 3000 sq.ft.in area.
U Revolving doors.
I] Doors used primarily to facilitate vehicular movement or material handling and adjacent personnel doors.
U Requirement is not applicable.
Plans reference page/section: Sheet(s) :A2.13,A2.14,A2.25
u 14.'Other'components have supporting documentation for proposed U-Factors.
Exception(s):
Requirement is not applicable.
Plans reference page/section:
Section 3: Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and
other calculations submitted with this permit application.The proposed envelope s stem has been designed to meet the 2014 Oregon Energy
Efficiency Specialty Code requirements in COMcheck-Web and to comply w ndatory requirements in the Requirements Checklist.
�
Joe Echeverri, AIA, LEED AP BD+C ► ,� '
Associate Principal MOM6)19) $
Name-Title 'Mr re Date
Project Title: Tigard High School Report date: 06/14/18
Data filename: Page 3 of 3
Generated by COM check-Web Software
Envelope Compliance Certificate
Section 1: Project Information RECFI%'FJ),
Energy Code:2014 Oregon Energy Efficiency Specialty Code
Project Title:Tigard High School JON � 018
Project Type: New Construction a,
Envelope Compliance Method: Simplified Trade OffOFT',
GAR
Construction Site: Owner/Agent: Design s_. I t r`' visioN
Building Location(for weather data): Tigard,Oregon
Climate Zone: 4c
Vertical Glazing/Wall Area Pct.: 14%
Building Use:Area Type Floor Area
1-School/University:Nonresidential 160000
Section 2: Envelope Assemblies and Requirements Checklist
Envelope PASSES:Design 5%better than code.
Envelope Assemblies:
Component Name/Description Gross Cavity Cont. Proposed Budget
Area or R-Value R-Value U-Factor U-Factor(a)
Perimeter
North Walls:Steel-Framed, 16in.o.c.,[Bldg. Use 1 - 18652 13.0 12.5 0.049 0.064
School/University]
Window:,Perf.Specs.:Product ID EFCO 403X,SHGC 0.26,[Bldg. 3629 --- --- 0.310 0.450
Use 1 -School/University](b)
Window:Metal Frame, Pert Specs.:Product ID EFCO PX32,SHGC 446 --- --- 0.310 0.460
0.26,[Bldg. Use 1 -School/University](b)
East Walls:Steel-Framed, 16in.o.c.,[Bldg.Use 1 - 6171 13.0 12.5 0.049 0.064
School/University]
Window:Metal Frame, Perf.Specs.:Product ID EFCO PX32,SHGC 380 --- --- 0.310 0.460
0.26,[Bldg.Use 1 -School/University](b)
South Walls:Steel-Framed, 16in.o.c.,[Bldg.Use 1 - 10443 13.0 12.5 0.049 0.064
School/University]
Window:,Perf.Specs.:Product ID EFCO 403X,SHGC 0.22,[Bldg. 1558 --- --- 0.310 0.450
Use 1 -School/University](b)
Window:Metal Frame,Pert.Specs.:Product ID EFCO PX32,SHGC 51 --- --- 0.310 0.460
0.22,[Bldg.Use 1 -School/University](b)
West Walls:Steel-Framed, 16in.o.c.,[Bldg. Use 1 - 13085 13.0 12.5 0.049 0.064
School/University]
Window:,Perf.Specs.:Product ID EFCO 403X,SHGC 0.22,[Bldg. 376 --- --- 0.310 0.450
Use 1 -School/University](b)
Window:Metal Frame,Perf.Specs.:Product ID EFCO PX32,SHGC 284 --- --- 0.310 0.460
0.22,[Bldg.Use 1 -School/University](b)
West Walls:Wood-Framed, 16in.o.c.,[Bldg. Use 1 - 1934 13.0 12.5 0.040 0.064
School/University]
Window:Metal Frame, Perf.Specs.: Product ID EFCO PX32,SHGC 300 --- --- 0.310 0.460
0.40,[Bldg.Use 1 -School/University](b)
RC-01:Insulation Entirely Above Deck,[Bldg.Use 1 - 64177 --- 38.0 0.026 0.048
School/University]
RC-02:Insulation Entirely Above Deck,[Bldg. Use 1 - 435 --- 0.0 1.282 0.048
School/University]
RC-03:Insulation Entirely Above Deck,[Bldg.Use 1 - 18814 --- 38.0 0.026 0.048
School/University]
Project Title:Tigard High School Report date: 06/14/18
Data filename: Page 1 of 3
RC-04:Attic Roof,Wood Joists,[Bldg.Use 1 -School/University] 8837 0.0 38.0 0.025 0.027
RC-05:Insulation Entirely Above Deck,[Bldg. Use 1 - 3407 --- 38.0 0.026 0.048
School/University]
(a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements.
(b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks
identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in
the plans/specs the requirement can be verified as being satisfied.
Fenestration Product Rating:
U-factors of fenestration products(windows,doors and skylights)are determined in accordance with NFRC 100 by an accredited,
independent laboratory,and labeled and certified by the manufacturer or are determined using the commercial size category values
listed in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.4 and shall include the effects of the window frame.
The temporary label afixed to the fenestration products must not be removed prior to inspection.
Exception(s):
U Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills,
center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be
maintained on the jobsite and made available to the inspector.
Plans reference page/section: Spec Section 08 43 13 1.2.D.1,08 43 13 2.2.6.5/Section 08 45 00 1.3.D.9 and 10
V2. Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined in
accordance with NFRC 200 by an accredited,independent laboratory,and labeled and certified by the manufacturer or be determined
using the Solar Heat Gain Coefficients(SHGC)in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The
overall values must consider type of frame material and operator for the SHGC at normal incidence.
Exception(s):
❑ Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills,
center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be
maintained on the jobsite and made available to the inspector.
Plans reference page/section: Spec Section 08 43 13-1.2.D.2/Section 08 45 00-1.3.D.11
Air Leakage, Insulation, and Component Certification:
V3. Sealing of the building envelope.Openings and penetrations in the building envelope are sealed with caulking materials or closed with
gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped
or covered with a moisture vapor-permeable wrapping material.Sealing materials spanning joints between construction materials allow
for expansion and contraction of the construction materials. Spec Section:01 41 50 AIR BARRIER SYSTEM
Plans reference page/section: Exterior Detail Sheets A5.21 through A5.68, QUALITY CONTROL REQUIREMENTS
V4. Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope
are determined in accordance with AAMA/WDMA/CSA 101/I.S.2/A440,or NFRC 400 by an accredited,independent laboratory,and
labeled and certified by the manufacturer.
Exception(s):
U Site-constructed windows and doors that are weatherstripped or sealed in accordance with Section 502.4.3.
Plans reference page/section: Spec: 08 43 13 2.3.D.1,Sheet A5.24 Exterior Door Details
10(5. Curtain wall,storefront glazing and commercial entranco3ioors.Curtain wall,Storefront glazing and commercial-glazed swinging
entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283. For curtain walls and storefront glazing,
the maximum airakage rate is 0.3 cubic toot per minute per square foot of fenestration area.For commercial glazed swinging
entrance doors and revolving doors,the maximum air leakage rate is 1.00 cfm/ft2 of door area.
Exception(s):
❑ Requirement is not applicable.
Plans reference page/section:Spec Section 08 43 13 2.2.B.3
'6. Building thermal envelope insulation.An R-value identification mark is applied(by manufacturer)to each piece of insulation 12
inches or greater in width.Alternately,the insulation installers have provided a signed,dated and posted certification listing the type,
manufacturer and R-value of insulation installed. Refer to code section for blown or sprayed insulation installation/settling depths and
marker requirements.
'7. Insulation mark installation. Insulating materials are installed such that the manufacturer's R-value mark is readily observable upon
inspection.
V8. Insulation product rating.The thermal resistance(R-value)of insulation has been determined in accordance with the U.S. FTC R-value
rule.
V9. Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the
International Building Code.
Project Title: Tigard High School Report date: 06/14/18
Data filename: Page 2 of 3
1110.Outdoor air intakes and exhaust openings.Stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral
to the building envelope shall be equipped with not less than a Class I motorized,leakage-rated damper with a maximum leakage rate
of 4 cfm per square foot at 1.0 inch water gauge when tested in accordance with AMCA 500D.Stair and shaft vent dampers shall be
•
capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection
systems. Specification sections:
Exception(s): 237314 Dedicated Outside Air Handling Units,237333 Make-Up Air
Units,233113 Air Distribution,237413 Packaged HVAC Units up to 25
IJ Requirement is not applicable. tons,237434 Large Packaged HVAC Units
and,M0.00 series require
Plans reference page/section: No Stair or Elevator Vents. leakage-rated dampers be provided per AMCA 500D.
u 11.Loading dock weatherseals.Cargo doors and loading dock doors are equipped with weather seals to restrict infiltration when vehicles
are parked in the doorway.
Exception(s):
Si Requirement is not applicable.
Plans reference page/section:
D 12.Recessed lighting.Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned
and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are
sealed with a gasket or caulk between the housing and interior wall or ceiling covering.
Exception(s):
Vit Requirement is not applicable.
Plans reference page/section:
V13.Vestibules. Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the
vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously.
Exception(s):
11 Doors not intended to be used as a building entrance door,such as doors to mechanical or electrical equipment rooms.
I] Doors opening directly from a sleeping unit or dwelling unit.
LI Doors that open directly from a space less than 3000 sq.ft.in area.
D Revolving doors.
U Doors used primarily to facilitate vehicular movement or material handling and adjacent personnel doors.
U Requirement is not applicable.
Plans reference page/section: Sheet(s) :A2.13,A2.14,A2.25
u 14.'Other'components have supporting documentation for proposed U-Factors.
Exception(s):
1 Requirement is not applicable.
Plans reference page/section:
Section 3: Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and
other calculations submitted with this permit application.The proposed envelopes stem has been designed to meet the 2014 Oregon Energy
Efficiency Specialty Code requirements in COMcheck-Web and to comply w ndatory requirements in the Requirements Checklist.
iiii,
Joe Echeverri, AIA, LEED AP BD+C �
4r ,
Associate Principal M 6/19/18
area
Name-Title • . , •re Date
Project Title: Tigard High School Report date: 06/14/18
Data filename: Page 3 of 3