Loading...
Report (87) WO\�Q RECEIVEP DEC 16 2015 CITY Of"MAR IIILDINC DIM(' GEOTECHNICAL REPORT SW Hawk's Beard Apartments SW Scholls Ferry Road and SW 135th Avenue Tigard, Oregon Project No. T-7184 Terra Associates, Inc. Prepared for: Holland Development Vancouver, Washington March 13, 2015 I TERRA ASSOCIATES, Inc. Consultants in Geotechnical Engineering, Geology and Environmental Earth Sciences March 13,2015 Project No.T-7184 Mr.Brenner Daniels Holland Development 1111 Main Street, Suite 700 Vancouver,Washington 98660 Subject: Geotechnical Report SW Hawk's Beard Apartments SW Scholls Ferry Road and SW 135th Avenue Tigard,Oregon Dear Mr.Daniels: As requested,we conducted a geotechnical engineering study for the subject project. The attached report presents our findings and recommendations for the geotechnical aspects of project design and construction. Our field exploration indicates the site is underlain primarily by medium dense silt deposits. We observed localized,light groundwater seepage at a depth of about 7.5 feet in one of the 12 test pits. In our opinion,there are no geotechnical conditions that would preclude the planned development. Structures can be supported by conventional spread footings bearing on competent native soils underlying the surface organic soils or on structural fill placed on the competent native soils. Floor slabs and pavements can be similarly supported. The native silt soils are very sensitive to moisture and will require careful control of moisture during construction to facilitate adequate compaction, and measures to protect finished subgrades from disturbance during periods of wet weather. Detailed recommendations addressing these issues and other geotechnical design considerations are presented in the attached report. We trust the information presented is sufficient for your current needs. If you have any questions or require additional information,please call. Sincerely yours, TERRA ASSOCIATES,INC. John . "4 ft-1 .� .' 74os:. Proj: � 7 ger V / 3-,13 -/ ( Theodor. • * r0'' Principal °GORE SC' EXPIRATION DATE: /sQ)1 c, 12525 Willows Road NE,Suite 101, Kirkland,Washington 98034 Phone(425)821-7777 • Fax(425)821-4334 1 TABLE OF CONTENTS Page No. 1.0 Project Description 1 2.0 Scope of Work 1 3.0 Site Conditions 2 3.1 Surface 2 3.2 Soils 2 3.3 Groundwater 2 3.4 Seismic Design Parameters 2 4.0 Discussion and Recommendations 3 4.1 General 3 4.2 Site Preparation and Grading 3 4.3 Excavations 5 4.4 Foundations 5 4.5 Slab-on-Grade Floors 6 4.6 Lateral Earth Pressures for Below-Grade Walls 6 4.7 Drainage 6 4.8 Utilities 7 4.9 Pavements 7 5.0 Additional Services 8 6.0 Limitations 8 Figures Vicinity Map Figure 1 Exploration Location Plan Figure 2 Typical Wall Drainage Detail Figure 3 Appendices Field Exploration and Laboratory Testing Appendix A Geotechnical Report SW Hawk's Beard Apartments SW Scholls Ferry Road and SW 135th Avenue Tigard, Oregon 1.0 PROJECT DESCRIPTION The proposed project is a residential development. Site development and building plans are currently unavailable; however, it is our understanding that the buildings will be three-story, wood-frame structures with their main floors constructed at grade. Associated site improvements will include site utilities and paved access and parking areas. The recommendations contained in the following sections of this report are based on our understanding of the above design features. We should review design drawings as they become available to verify that our recommendations have been properly interpreted and incorporated into project design and to amend or supplement our recommendations, if required. 2.0 SCOPE OF WORK We explored subsurface conditions at the site by observing soil conditions in 12 test pits excavated to maximum depths ranging from about 9 to 10 feet below existing surface grades using a track-mounted excavator. Using the results of our field study and laboratory testing, analyses were undertaken to develop geotechnical recommendations for project design and construction. Specifically,this report addresses the following: • Soil and groundwater conditions • Seismic design parameters per the current International Building Code(IBC) • Site preparation and grading • Excavations • Foundations • Lateral earth pressures for design of below-grade walls • Slab-on-grade floors • Subsurface drainage • Utilities • Pavements It should be noted that recommendations outlined in this report regarding drainage are associated with soil strength, design earth pressures, erosion,and stability. Design and performance issues with respect to moisture as it relates to the structure environment (i.e., humidity, mildew, mold) is beyond Terra Associates' purview. A building envelope specialist or contactor should be consulted to address these issues,as needed. March 13,2015 Project No.T-7184 3.0 SITE CONDITIONS 3.1 Surface The site is an approximately 10.5-acre parcel located southeast of and adjacent to the intersection of SW Scholls Ferry Road and SW 135th Avenue in Tigard,Oregon. The approximate location of the site is shown on Figure 1. Site topography is relatively flat with a gentle grade down to the south and west. Site vegetation consists primarily of mature deciduous trees with grass and brush undergrowth. The trees at the site are planted in a grid pattern approximately ten feet on center. Two localized areas in the northeastern portion of the site have not been planted with trees and are vegetated only with grasses and brush. 3.2 Soils The soils observed in our test pits generally consist of about one inch of sod or forest duff and topsoil overlying native,brown,silt to silt with sand that is interpreted to be Pleistocene catastrophic flood deposits. The native silt deposits are generally medium dense, moist, and mottled in the upper seven feet, and become medium dense to dense and moist with localized wet zones below that depth. The Generalized geologic map of the Willamette lowland by M. W. Gannett and R. R. Caldwell (1998) shows the site soils consisting of alluvium and glacial-outburst flood sediments (Qs). The silt deposits observed in the test pits are generally consistent with glacial-outburst flood deposits. Detailed descriptions of the subsurface conditions observed in our site explorations are presented on the Test Pit Logs in Appendix A. The approximate test pit locations are shown on Figure 2. 3.3 Groundwater We observed light groundwater seepage approximately 7.5 feet below the ground surface in Test Pit TP-1. The seepage appeared temporarily as a stream squirting from a localized point source on the side of the test pit before dying out after about ten seconds of flow. 3.4 Seismic Design Parameters Based on the site soil conditions and our knowledge of the area geology, per Chapter 16 of the 2012 International Building Code (IBC), site class "D" should be used in structural design. Based on this site class, in accordance with the 2012 IBC,the following parameters should be used in computing seismic forces: Seismic Design Parameters(IBC 2012) Spectral response acceleration(Short Period), SMS 1.075 g Spectral response acceleration(1 —Second Period),SM, 0.668 g Five percent damped.2 second period, SDS 0.717 g Five percent damped 1.0 second period, SDI 0.445 g Values determined using the United States Geological Survey (USGS) Ground Motion Parameter Calculator accessed on March 9, 2015 at the web site http://earthquake.usgs.gov/designmaps/us/application.php. Page No. 2 March 13,2015 Project No.T-7184 4.0 DISCUSSION AND RECOMMENDATIONS 4.1 General Based on our study, there are no geotechnical conditions that would preclude the planned development. The buildings associated with the project can be supported on conventional spread footings bearing on competent native soils underlying the surficial organic soils or on structural fill placed on a competent native soil subgrade. Floor slabs and pavements can be similarly supported. The site soils consist predominantly of silt and will require careful control of the soil moisture content to adequately compact as structural fill. As such, the ability to use soils from site excavations as structural fill will depend on the natural soil moisture content, the prevailing weather conditions at the time of construction, and the ability of the contractor to properly moisture condition the soil. During the normally dry summer months, the contractor should be prepared to dry soils that are wet of optimum by aeration. Alternatively, stabilizing the moisture in the native soil with cement or lime can be considered. Moisture conditioning of soils that are dry of optimum would require the addition of water to the soils and thoroughly blending the material prior to compaction. If grading activities will take place during the winter season, the contractor should be prepared to import clean granular material for use as structural fill and backfill. Undisturbed bearing surfaces composed of native soil or structural fill derived from the fine-grained native soils would provide suitable support for conventional spread footing foundations,floor slabs, and pavements; however, the soils will be easily disturbed by normal construction activity,particularly when wet. If disturbed,the soil will not be suitable for support, and the affected material would need to be removed with the foundations lowered to obtain support on an undisturbed soil subgrade. Alternatively, the soils can be removed and grade restored with structural fill. To reduce the potential for subgrade disturbance, particularly during wet weather, consideration should be given to placing a six-inch layer of one- to two-inch sized crushed rock or a four-inch layer of lean concrete on completed subgrades to serve as a working surface. Detailed recommendations regarding these issues and other geotechnical design considerations are provided in the following sections of this report. These recommendations should be incorporated into the final design drawings and construction specifications. 4.2 Site Preparation and Grading To prepare the site for construction, all vegetation,organic surface soils, and other deleterious materials should be stripped and removed from the site. We expect surface stripping depths of about two to three inches will be required to remove the organic surficial soils. Stripped vegetation debris should be removed from the site. Organic soils will not be suitable for use as structural fill, but may be used for limited depths in nonstructural areas or for landscaping purposes. Page No. 3 March 13, 2015 Project No.T-7184 Once clearing and stripping operations are complete, cut and fill operations can be initiated to establish desired grades. Prior to placing fill, all exposed bearing surfaces should be observed by a representative of Terra Associates to verify soil conditions are as expected and suitable for support of new fill. Our representative may request a proofroll using heavy rubber-tired equipment to determine if any isolated soft and yielding areas are present. If excessively yielding areas are observed, and they cannot be stabilized in place by compaction, the affected soils should be excavated and removed to firm bearing and grade restored with new structural fill. Beneath embankment fills and pavement subgrades, if the depth of excavation to remove unstable soils is excessive, we recommend placing a geotextile fabric such as Mirafi 500X, or equivalent, beneath the fill. Our experience has shown that, in general, a minimum of 18 inches of a clean, granular structural fill placed and compacted over the geotextile fabric should establish a stable bearing surface. Our study indicates that the native soils consist predominantly of silt and will be difficult to compact as structural fill when too wet or too dry. Accordingly, the ability to use these native soils from site excavations as structural fill will depend on their moisture content and the prevailing weather conditions when site grading activities take place. Native soils that are too wet to properly compact could be dried by aeration during dry weather conditions or mixed with an additive such as lime or Portland cement to reduce and stabilize the soil's moisture content. If soil amendment products are used, additional Temporary Erosion and Sedimentation Control (TESC) BMPs will need to be implemented to mitigate potential impacts to stormwater runoff associated with possible elevated pH levels. If grading activities are planned during the wet winter months, or if they extend into fall and winter, the owner should be prepared to import wet weather structural fill. For this purpose, we recommend importing a granular soil that meets the following grading requirements: U.S. Sieve Size Percent Passing 6 inches 100 No.4 75 maximum No. 200 5 maximum* *Based on the 3/4-inch fraction. Prior to use,Terra Associates, Inc.should examine and test all materials planned to be imported to the site for use as structural fill. Structural fill should be placed in uniform loose layers not exceeding 12 inches and compacted to a minimum of 95 percent of the soil's maximum dry density, as determined by American Society for Testing and Materials (ASTM)Test Designation D-698 (Standard Proctor). The moisture content of the soil at the time of compaction should be within two percent of its optimum, as determined by this ASTM standard. In nonstructural areas, the degree of compaction can be reduced to 90 percent. Page No.4 March 13,2015 Project No.T-7184 4.3 Excavations All excavations at the site associated with confined spaces, such as lower building level retaining walls, must be completed in accordance with local, state, and federal requirements. Based on regulations outlined by the Occupational Safety and Health Administration (OSHA), the site soils would be classified as Type C soils. Accordingly, temporary excavation slopes in Type C soils should be graded to an inclination of 1.5:1 (Horizontal:Vertical) or flatter. All exposed slope faces should be covered with a durable reinforced plastic membrane during construction to prevent slope raveling and rutting during periods of precipitation. Properly designed and installed shoring trench boxes can be used to support utility trench excavations where required. Based on our field observations, groundwater seepage may be encountered in excavations extending below a depth of approximately seven feet, especially during the winter and spring months. We expect that the volume of water and rate of flow of any seepage into site excavations will be relatively minor and would not be expected to adversely impact the stability of the excavation when completed, as described above. We anticipate that conventional sump pumping procedures along with a system of collection trenches should be capable of maintaining a relatively dry excavation for construction purposes. This information is provided solely for the benefit of the owner and other design consultants, and should not be construed to imply that Terra Associates, Inc. assumes responsibility for job site safety. It is understood that job site safety is the sole responsibility of the project contractor. 4.4 Foundations Structures may be supported on conventional spread footing foundations bearing on competent native soils or on structural fills placed above these native soils. Foundation subgrades should be prepared, as recommended in Section 4.2 of this report. Perimeter foundations exposed to the weather should bear at a minimum depth of 1.5 feet below final exterior grades for frost protection. Interior foundations can be constructed at any convenient depth below the floor slab. We recommend designing foundations for a net allowable bearing capacity of 2,500 pounds per square foot (psf). For short-term loads, such as wind and seismic, a one-third increase in this allowable capacity can be used in design. With the anticipated loads and this bearing stress applied, building settlements should be less than one inch total and one-half inch differential. For designing foundations to resist lateral loads, a base friction coefficient of .3 can be used. Passive earth pressure acting on the sides of the footings may also be considered. We recommend calculating this lateral resistance using an equivalent fluid weight of 300 pounds per cubic foot (pcf). We recommend not including the upper 12 inches of soil in this computation because they can be affected by weather or disturbed by future grading activity. This value assumes the foundations will be constructed neat against competent native soil or the excavations are backfilled with structural fill, as described in Section 4.2 of this report. The recommended passive and friction values include a safety factor of 1.5. Page No. 5 March 13, 2015 Project No.T-7184 4.5 Slab-on-Grade Floors Slab-on-grade floors may be supported on a subgrade prepared as recommended in Section 4.2 of this report. Immediately below the floor slab, we recommend placing a four-inch thick capillary break layer composed of clean, coarse sand or fine gravel that has less than three percent passing the No. 200 sieve. This material will reduce the potential for upward capillary movement of water through the underlying soil and subsequent wetting of the floor slab. The capillary break layer will not prevent moisture intrusion through the slab caused by water vapor transmission. Where moisture by vapor transmission is undesirable, such as covered floor areas,a common practice is to place a durable plastic membrane on the capillary break layer and then cover the membrane with a layer of clean sand or fine gravel to protect it from damage during construction, and aid in uniform curing of the concrete slab. It should be noted that if the sand or gravel layer overlying the membrane is saturated prior to pouring the slab, it will be ineffective in assisting uniform curing of the slab and can actually serve as a water supply for moisture seeping through the slab and affecting floor coverings. Therefore, in our opinion, covering the membrane with a layer of sand or gravel should be avoided if floor slab construction occurs during the wet winter months and the layer cannot be effectively drained. 4.6 Lateral Earth Pressures for Below-Grade Walls The magnitude of earth pressures developing on below-grade walls will depend on the quality and compaction of the wall backfill. We recommend placing and compacting wall backfill as structural fill, as described in Section 4.2 of this report. To prevent overstressing the walls during backfilling, heavy construction machinery should not be operated within five feet of the wall. Wall backfill in this zone should be compacted with hand-operated equipment. To prevent hydrostatic pressure development, wall drainage must also be installed. A typical wall drainage detail is shown on Figure 3. With wall backfill placed and compacted as recommended, and drainage properly installed, we recommend designing unrestrained walls for an active earth pressure equivalent to a fluid weighing 35 pounds per cubic foot (pcf). For restrained walls, an additional uniform load of 100 psf should be added to the 35 pcf. To account for typical traffic surcharge loading, the walls can be designed for an additional imaginary height of two feet (two- foot soil surcharge). For evaluation of wall performance under seismic loading, a uniform pressure equivalent to 8H psf, where H is the height of the below-grade portion of the wall should be applied in addition to the static lateral earth pressure. These values assume a horizontal backfill condition and that no other surcharge loading, sloping embankments, or adjacent buildings will act on the wall. If such conditions exist, then the imposed loading must be included in the wall design. Friction at the base of foundations and passive earth pressure will provide resistance to these lateral loads. Values for these parameters are provided in Section 4.4 of this report. 4.7 Drainage Surface Final exterior grades should promote free and positive drainage away from the building areas. We recommend providing a positive drainage gradient away from the building perimeter. If a positive gradient cannot be provided provisions for collection and disposal of surface water adjacent to the structure should be made. Page No. 6 March 13, 2015 Project No.T-7184 Surface water from developed areas must not be allowed to flow in an uncontrolled and concentrated manner over the crests of site slopes and embankments. Surface water should be directed away from the slope crests to a point of collection and controlled discharge. If site grades do not allow for directing surface water away from the slopes,then the water should be collected and tightlined to an approved point of controlled discharge. Subsurface We recommend installing a continuous drain along the outside lower edge of the perimeter building foundations. The drains can be laid to grade at an invert elevation equivalent to the bottom of footing grade. The drains can consist of four-inch diameter perforated PVC pipe that is enveloped in washed 'A-to 3%-inch gravel-sized drainage aggregate. The aggregate should extend six inches above and to the sides of the pipe. The foundation drains and roof downspouts should be tightlined separately to an approved point of controlled discharge. All drains should be provided with cleanouts at easily accessible locations. These cleanouts should be serviced at least once each year. 4.8 Utilities Utility pipes should be bedded and backfilled in accordance with American Public Works Association(APWA)or local jurisdictional requirements. At minimum, trench backfill should be placed and compacted as structural fill, as described in Section 4.2 of this report. As noted,the native soils are moisture sensitive and will require careful control of moisture to facilitate proper compaction. If utility construction takes place during the winter or if it is not feasible to properly moisture condition the excavated soil at the time of construction, it may be necessary to import suitable wet weather fill for utility trench backfilling. 4.9 Pavements Pavement subgrades should be prepared as described in the Section 4.2 of this report. Regardless of the degree of relative compaction achieved, the subgrade must be firm and relatively unyielding before paving. The subgrade should be proofrolled with heavy rubber-tire construction equipment such as a loaded 10-yard dump truck to verify this condition. The pavement design section is dependent upon the supporting capability of the subgrade soils and the traffic conditions to which it will be subjected. For traffic consisting mainly of light passenger vehicles with only occasional heavy traffic, and with a stable subgrade prepared as recommended, we recommend the following pavement sections: • Two inches of hot mix asphalt concrete(HMAC)over six inches of aggregate base(AB) • Four inches full depth HMAC over prepared subgrade The paving materials used should conform to the current Oregon Department of Transportation (ODOT) specifications for HMAC and AB. Page No. 7 March 13,2015 Project No.T-7184 Long-term pavement performance will depend on surface drainage. A poorly-drained pavement section will be subject to premature failure as a result of surface water infiltrating into the subgrade soils and reducing their supporting capability. For optimum pavement performance, we recommend surface drainage gradients of at least two percent. Some degree of longitudinal and transverse cracking of the pavement surface should be expected over time. Regular maintenance should be planned to seal cracks when they occur. 5.0 ADDITIONAL SERVICES Terra Associates, Inc. should review the final designs and specifications in order to verifythat earthwork and � p foundation recommendations have been properly interpreted and implemented in project design. We should also provide geotechnical services during construction in order to observe compliance with our design concepts, specifications, and recommendations. This will allow for design changes if subsurface conditions differ from those anticipated prior to the start of construction. 6.0 LIMITATIONS We prepared this report in accordance with generally accepted geotechnical engineering practices. This report is the copyrighted property of Terra Associates, Inc. and is intended for specific application to the SW Hawk's Beard Apartments project in Tigard, Oregon. This report is for the exclusive use of Holland Development and their authorized representatives. No other warranty, expressed or implied, is made. The analyses and recommendations presented in this report are based on data obtained from our on-site test pits. Variations in soil conditions can occur, the nature and extent of which may not become evident until construction. If variations appear evident, Terra Associates, Inc. should be requested to reevaluate the recommendations in this report prior to proceeding with construction. Page No. 8 ,„. in Greettivay- • •,,.. • (...,,t sw Tolneret Elementary School ...r• SWro SW Singletree Dr tp e.31. Il -e'c''I 1. SW Harness tn. --• ..‹ > ocg' 03 5- 4 45 ' re i Z R o a CL il I Conestog1 k k x a, Recreation Center .'i ic , n. * 't — E Weir Fid _ 0. dt .6. ii- SW Cone s toga C:" al tof SW Thatcher '• .1r U. A r ' ,,.... , SW Haystack Dr a; * ' -_ ,••• SW Pioneer 1-11 -... = -•.,is. z- SITE/ < 3. -c ro „of, , ,edontall In 1 cc ;El -"r svi schdAs Cert/M . V, -i„,Greenway !--. \ - !i Mew- ''" • '''''M 4' _. Safeway .-n, i , Mea•• I at*t,* , -•-• ._, 1 , i ..-:-.:•:•:•:•:•:•:-. - ' . , ,, .•••:•••••!•••:•:••••%•:-.•:•: cn V , 7 ••%•;••••...:.,,x.x•x•te ' * ....-...........•••••••• at,stt a ••• •i — -4:,„ a. , . 2,c.,,, I - • ,, ,„.: .... if .,Q— Meadow PI c.e" t • x" SW Anton Or / , \No 4,. , , s„, 1 4alke 0% ' -• 4 • " ' 44.--i-""`' ""'''''''"""4 I),•= er s v 1o) t 6, .0 i r *,.,_0'-'-•,-/— 41 :0; z"--/,,:' ' "X... , , ._ g ( , ,,,,,,..01,-..0 c, ,..f / * . 4 SW Sium-Mer St -, X , Summetkake City Park i - ..,. svi Winter Lake . ,•& •-• 41-• 0" 7•' -4- „,..k. g fp ,,:4Zr i „lest Ta. i 17 ...r rn. 0 et A A 3 SW FalocaSGe'4' •, •‘, .;* t 4-1V Walnut St .47- I' slY Kamenne 3t 4. -.r sw , c.: > 4' .., f ; F & 'R' 4- 0 , ,, \ cl 4.4 kJeen Dr '\A I: i a - h. ,,, , . , , F,- g'1 ' a ..! ' 1000., : 'I 4'.,. ' 2to 1, exi9.Yb' '4't t Pt r 1 cn ...i I a r lIA 5 t li ' 4v Norre40'6%4 w .1., PAPPROIMATE scpte IN FEET REFERENCE: GOOGLE MAPS 2015 ages Terra VICINITY MAP SW HAWK'S BEARD APARTMENTS koseasas Associates, Inc. TIGARD, OREGON - Consultants in Geotechnical Engineering Geology and Environmental Earth Sciences Proj. No.T-7184 Date MAR 2015 Figure 1 12"MINIMUM 3/4" MINUS WASHED GRAVEL I '1 SLOPE TO DRAIN , I I )••/. ..•. • f� +f .` COMPACTED + STRUCTURAL FILL ( SEE NOTE 4�: . / • =/ EXCAVATED SLOPE ;�% ; (SEE REPORT TEXT _ �t 4, /, FOR APPROPRIATE 6"(MIN.)� + ::::.::-:::_;:•.;...:..::;.; :;::;_... INCLINATIONS) �s• • r • r}f • G. r f r+ f �±+ar1•, !;0!0.,10+• *it/, 12"OVER PIPE • ' ' '* *f,t4.1 *'4"a+'ti*,+'�! ' '�'4" %\//' %<//<//.<//\/c �r•� , . \r .V r . \'AN . '/ l L 3"BELOW PIPE 4"DIAMETER PERFORATED PVC PIPE TAKEN TO APPROVED POINT OF DISCHARGE NOT TO SCALE NOTE: MIRADRAIN G100N PREFABRICATED DRAINAGE PANELS OR SIMILAR PRODUCT CAN BE SUBSTITUTED FOR THE 12-INCH WIDE GRAVEL DRAIN BEHIND WALL. DRAINAGE PANELS SHOULD EXTEND A MINIMUM OF SIX INCHES INTO 12-INCH THICK DRAINAGE GRAVEL LAYER OVER PERFORATED DRAIN PIPE. MTerra TYPICAL WALL DRAINAGE DETAIL SW HAWK'S BEARD APARTMENTS tissoptsis Associates, Inc. TIGARD, OREGON - Consultants in Geotechnical Engineering Geology Earthad Pro No. T-7184 Date MAR 2015 Figure Environmental Sciences 1• 9 3 APPENDIX A FIELD EXPLORATION AND LABORATORY TESTING SW Hawk's Beard Apartments Tigard,Oregon On March 3, 2015, we investigated subsurface conditions at the site by excavating 12 test pits to depths ranging from about 9 to 10 feet below existing surface grades using a track-mounted excavator. The test pit locations are shown on Figure 2. The test pit locations were approximately determined in the field by measuring and pacing from existing surface features. The Test Pit Logs are presented on Figures A-2 through A-13. An engineering geologist from our office maintained a log of each test pit as it was excavated, classified the soil conditions encountered, and obtained representative soil samples. All soil samples were visually classified in the field in accordance with the Unified Soil Classification System. A copy of this classification is presented as Figure A-1. Representative soil samples obtained from the test pits were placed in sealed plastic bags and taken to our laboratory for further examination and testing. The moisture content of each sample was measured and is reported on the Test Pit Logs. Grain size analysis was performed on one of the soil samples. The test results are shown on Figure A-14. Project No.T-7184 MAJOR DIVISIONS LETTER TYPICAL DESCRIPTION y SYMBOL Clean GW Well-graded gravels,gravel-sand mixtures, little or no fines. GRAVELS Gravels(less More than 50% fines) GP Poorly-graded gravels,gravel-sand mixtures,little or no fines. J than 5% 0 m N of coarse fraction m Ta is larger than No. GM Silty gravels,gravel-sand-silt mixtures,non-plastic fines. w a? c 4 sieve Gravels with Z m •N fines 1= o GC Clayey gravels,gravel-sand-clay mixtures,plastic fines. o N O 0 o Clean Sands SW Well-graded sands,sands with gravel,little or no fines. toc Z SANDS (less than Q E r More than 50% 5%fines) Sp Poorly-graded sands,sands with gravel, little or no fines. O o " of coarse fraction 0 is smaller than SM Silty sands,sand-silt mixtures,non-plastic fines. No. 4 sieve Sands with fines Sc Clayey sands,sand-clay mixtures,plastic fines. ML Inorganic silts, rock flour,clayey silts with slight plasticity. T J E. •N SILTS AND CLAYS p Liquid Limit is less than 50% CL Inorganic clays of low to medium plasticity.(Lean clay) co I; ati CI rd *rri OL Organic silts and organic clays of low plasticity. z E o Rre g o MH Inorganic silts,elastic. O c Z SILTS AND CLAYS z co c Liquid Limit is greater than 50% CH Inorganic clays of high plasticity.(Fat clay) rz. m - o OH Organic clays of high plasticity. 2 HIGHLY ORGANIC SOILS PT Peat. DEFINITION OF TERMS AND SYMBOLS en Standard Penetration 2"OUTSIDE DIAMETER SPILT SPOON SAMPLER w Density Resistance in Blows/Foot — J Z2.4"INSIDE DIAMETER RING SAMPLER OR II O Very Loose 0-4 SHELBY TUBE SAMPLER Ili Loose 4-10 = Medium Dense 10-30 y WATER LEVEL(Date) O Dense 30-50 V Very Dense >50 Tr TORVANE READINGS,tsf Standard Penetration Pp PENETROMETER READING,tsf Consistancy Resistance in Blows/Foot w DD DRY DENSITY, pounds per cubic foot W oftt• VerySoft 0-2 4 LL LIQUID LIMIT,percent O Medium Stiff 4-8 U Stiff 8-16 PI PLASTIC INDEX Very Stiff 16-32 Hard >32 N STANDARD PENETRATION,blows per foot Terra UNIFIED SOIL CLASSIFICATION SYSTEM 0101"11SW HAWK'S BEARD APARTMENTS karma Associates Inc. TIGARD, OREGON - Consultants in Geotechnical engineering Geology and 1• Environmental Earth Sciences Pro No.T-7184 Date MAR 2015 Figure A-1 LOG OF TEST PIT NO. 1 FIGURE A-2 PROJECT NAME: SW Hawk's Beard Apartments PROJ.NO: T-7184 LOGGED BY: JCS LOCATION: Tigard.Oregon SURFACE CONDS: Flat APPROX.ELEV: N/A DATE LOGGED: March 3.2015 DEPTH TO GROUNDWATER: 7.5 Feet DEPTH TO CAVING: N/A U. w — a b z X J DESCRIPTION CONSISTENCY/ e a a RELATIVE DENSITY F REMARKS o fn 3 x U O a. (1-inch SOD and TOPSOIL) Brown SILT to SILT with sand,moist,low plasticity to 1— nonplastic,scattered mottling,trace of fine roots. (ML) 24.2 2- 3— Medium Dense 4- 5- 6- 36.8 7- 8— Brown SILT with sand,moist(locally wet),low plasticity to nonplastic,scattered dark brown stained fractures,trace Medium Dense of fine roots and root casts. (ML) to Dense 9- 10— Test pit terminated at 10 feet. Light temporary groundwater seepage from localized point 11— source at 7.5 feet. 12- 13- 14- 15— Terra Associates, Inc. NOTE: This subsurface information pertains only to this test pit location and should Consultants in Geotechnical Engineering not be interpreted as being indicative of other locations at the site. Geology and Environmental Earth Sciences LOG OF TEST PIT NO. 2 FIGURE A-3 PROJECT NAME: SW Hawk's Beard Apartments PROJ.NO: T-7184 LOGGED BY: JCS LOCATION: Tigard.Oregon SURFACE CONDS: Flat APPROX.ELEV: N/A DATE LOGGED: March 3.2015 DEPTH TO GROUNDWATER: N/A DEPTH TO CAVING: N/A U- N Z DESCRIPTION CONSISTENCY/ e a REMARKS RELATIVE DENSITY LLI 0 N 3 Y (1-inch SOD and TOPSOIL) Brown SILT to SILT with sand,moist,low plasticity to 1— nonplastic,scattered mottling,trace of fine roots. (ML) 2- 3— Medium Dense 4- 5- 6- 7- 8- - 5- 6-7-8— Brown SILT with sand,moist,low plasticity to nonplastic, scattered dark brown stained fractures,trace of fine roots Medium Dense and root casts. (ML) to Dense 9- 10— Test pit terminated at 10 feet. No groundwater seepage. 11- 12- 13- 14- 15— Terra Associates, Inc. NOTE: This subsurface information pertains only to this test pit location and should , Consultants in Geotechnical Engineering not be interpreted as being indicative of other locations at the site. Geology and Environmental Earth Sciences LOG OF TEST PIT NO. 3 FIGURE A-4 PROJECT NAME: SW Hawk's Beard Apartments PROJ.NO: T-7184 LOGGED BY: JCS LOCATION: Tigard,Oregon SURFACE CONDS: Flat APPROX.ELEV: N/A DATE LOGGED: March 3.2015 DEPTH TO GROUNDWATER: N/A DEPTH TO CAVING: N/A LL Cl) 2 uj a DESCRIPTION CONRELATIVE EN DENSITY o a REMARKS VEF 111 O m U O (1-inch SOD and TOPSOIL) Brown SILT to SILT with sand,moist,low plasticity to 1— nonplastic,scattered mottling,trace of fine roots. (ML) 2- 3— Medium Dense 4— 33.8 5- 6- 7- 8— Brown SILT with sand,moist,low plasticity to nonplastic, scattered dark brown stained fractures,trace of fine roots Medium Dense and root casts. (ML) to Dense 9- 10— Test pit terminated at 10 feet. No groundwater seepage. 11- 12- 13- 14- 15— i Terra Associates, Inc. NOTE: This subsurface information pertains only to this test pit location and should Consultants in Geotechnical Engineering not be interpreted as being indicative of other locations at the site. Geology and Environmental Earth Sciences LOG OF TEST PIT NO. 4 FIGURER-5 PROJECT NAME: SW Hawk's Beard Apartments PROJ.NO: T-7184 LOGGED BY: JCS LOCATION: Tigard.Oregon SURFACE CONDS: Flat APPROX.ELEV: N/A DATE LOGGED: March 3.2015 DEPTH TO GROUNDWATER: N/A DEPTH TO CAVING: N/A LL LL w DESCRIPTION CONSISTENCY/ oa a g RELATIVE DENSITY r REMARKS 111 O ai �' Y O a (1-inch SOD and TOPSOIL) Brown SILT to SILT with sand,moist,low plasticity to 1— nonplastic,scattered mottling,trace of fine roots. (ML) 2- 3— Medium Dense 4—I 5- 6 7— 8— Brown SILT with sand,moist,low plasticity to nonplastic, scattered dark brown stained fractures,trace of fine roots Medium Dense and root casts. (ML) to Dense 9- 10— Test pit terminated at 10 feet. No groundwater seepage. 11- 12- 13- 14- 15— 7,31 Terra Associates, Inc. NOTE This subsurface information pertains only to this test pit location and should r Consultants in Geotechnical Engineeringnot be interpreted as being indicative of other locations at the site. Geology and Environmental Earth Sciences LOG OF TEST PIT NO. 5 FIGURE A-6 PROJECT NAME: SW Hawk's Beard Apartments PROJ.NO: T-7184 LOGGED BY: JCS LOCATION: Tigard.Oregon SURFACE CONDS: Flat APPROX.ELEV: N/A DATE LOGGED: March 3.2015 DEPTH TO GROUNDWATER: N/A DEPTH TO CAVING: N/A cnLL F z z W CONSISTENCY/ w aeL DESCRIPTION RELATIVE DENSITY e F REMARKS Q O CA O 0- (1-inch (1-inch FOREST DUFF) Brown SILT to SILT with sand,moist,low plasticity to 1— nonplastic,scattered mottling,trace of fine roots. (ML) 2— 27.3 3— Medium Dense 4- 5— 6 7— Brown SILT with sand,moist(locally wet),low plasticity to 8— nonplastic,scattered dark brown stained fractures,trace of fine roots and root casts. (ML) Medium Dense to Dense 9- 10— Test pit terminated at 10 feet. No groundwater seepage. 11- 12- 13- 14- 15— Terra Associates, Inc. NOTE: This subsurface information pertains only to this test pit location and should >. Consultants in Geotechnical Engineering not be interpreted as being indicative of other locations at the site. m Geology and Environmental Earth Sciences LOG OF TEST PIT NO. 6 FIGURE A-7 PROJECT NAME: SW Hawk's Beard Apartments PROJ.NO: T-7184 LOGGED BY: JCS LOCATION: Tigard. Oregon SURFACE CONDS: Flat APPROX.ELEV: N/A DATE LOGGED: March 3.2015 DEPTH TO GROUNDWATER: N/A DEPTH TO CAVING: N/A LL - d F LL zuj X a DESCRIPTION CONSISTENCY/ e a REMARKS 111 RELATIVE DENSITY Y U 0 a. (1-inch SOD and TOPSOIL) Brown SILT to SILT with sand,moist,low plasticity to 1— nonplastic,scattered mottling,trace of fine roots. (ML) 2- 3— Medium Dense 4- 5- 6- 8— 7—' Brown SILT with sand,moist,low plasticity to nonplastic, scattered dark brown stained fractures,trace of fine roots Medium Dense and root casts. (ML) to Dense 9- 10- Test pit terminated at 10 feet. No groundwater seepage. 11— 12— 13— 14— 15— ,. Terra Associates, Inc. NOTE: This subsurface information pertains only to this test pit location and should mir,F7t3 Consultants in Geotechnical Engineering not be interpreted as being indicative of other locations at the site. "" ` Geology and Environmental Earth Sciences LOG OF TEST PIT NO. 7 FIGURE A-8 PROJECT NAME: SW Hawk's Beard Apartments PROJ.NO: T-7184 LOGGED BY: JCS LOCATION: Tgard.Oregon SURFACE CONDS: Flat APPROX.ELEV: N/A DATE LOGGED: March 3.2015 DEPTH TO GROUNDWATER: N/A DEPTH TO CAVING: N/A U- — d) O z F d DESCRIPTION CONSISTENCY/ o a REMARKS a 0- RELATIVE DENSITY O vdi 3 Y U 0 a (1-inch SOD and TOPSOIL) Brown SILT to SILT with sand,moist,low plasticity to 1— nonplastic,scattered mottling,trace of fine roots. (ML) 2- 3— Medium Dense 4- 5- 6— 35.2 7— Brown SILT with sand,moist,low plasticity to nonplastic, 8— scattered dark brown stained fractures,trace of fine roots Medium Dense and root casts. (ML) to Dense 9- 10— Test pit terminated at 9.5 feet. No groundwater seepage. 11- 12- 13- 14- 15— Terra Associates, Inc. NOTE: This subsurface information pertains only to this test pit location and should Consultants in Geotechnical Engineering not be interpreted as being indicative of other locations at the site. Geology and Environmental Earth Sciences L LOG OF TEST PIT NO. 8 FIGURE A-9 PROJECT NAME: SW Hawk's Beard Apartments PROJ.NO: T-7184 LOGGED BY: JCS LOCATION: Tigard.Oregon SURFACE CONDS: Flat APPROX.ELEV: N/A DATE LOGGED: March 3.2015 DEPTH TO GROUNDWATER: N/A DEPTH TO CAVING: N/A LL Z ~ w DESCRIPTION CONSISTENCY/ a a RELATIVE DENSITY t REMARKS LU pal 3 Y U O (1-inch SOD and TOPSOIL) Brown SILT to SILT with sand,moist,low plasticity to 1— nonplastic,scattered mottling,trace of fine roots. (ML) 2- 3— Medium Dense 4- 5- 6- 7— Brown SILT with sand,moist,low plasticity to nonplastic, scattered dark brown stained fractures,trace of fine roots Medium Dense 8— and root casts. (ML) to Dense 9— Test pit terminated at 9 feet. No groundwater seepage. 10- 11- 12- 13- 14- 15— ,,47Terra Associates, Inc. NOTE: This subsurface information pertains only to this test pit location and should Consultants in Geotechnical Engineering not be interpreted as being indicative of other locations at the site. Geology and - Environmental Earth Sciences 1 LOG OF TEST PIT NO. 9 FIGURE A-10 PROJECT NAME: SW Hawk's Beard Apartments PROJ.NO: T-7184 LOGGED BY: JCS LOCATION: Tigard. Oregon SURFACE CONDS: Flat APPROX.ELEV: N/A DATE LOGGED: March 3.2015 DEPTH TO GROUNDWATER: N/A DEPTH TO CAVING: N/A LL N - z v w _ DESCRIPTION CONSISTENCY! a a Z.- o. g RELATIVE DENSITY REMARKS 3 Ili 0 41O 0- (1-inch (1-inch SOD and TOPSOIL) Brown SILT to SILT with sand,moist,low plasticity to nonplastic,scattered mottling,trace of fine roots. (ML) 1- 2- 3— Medium Dense 4— 6- 7- 8— Brown SILT with sand,moist,low plasticity to nonplastic, Medium Dense scattered dark brown stained fractures,trace of fine roots and root casts. (ML) to Dense 9— Test pit terminated at 9.5 feet. 10— No groundwater seepage. 11— Terra Associates, Inc. NOTE: This subsurface information pertains only to this test pit location and should ? # Consultants in Geotechnical Engineering " not be interpreted as being indicative of other locations at the site. `" Geology and Environmental Earth Sciences LOG OF TEST PIT NO. 10 FIGURE A-11 PROJECT NAME: SW Hawk's Beard Apartments PROJ.NO: T-7184 LOGGED BY: JCS LOCATION: Tigard.Oregon SURFACE CONDS: Flat APPROX.ELEV: N/A DATE LOGGED: March 3.2015 DEPTH TO GROUNDWATER: N/A DEPTH TO CAVING: N/A LL N LL z uj CONSISTENCY/ w e DESCRIPTION RELATIVE DENSITY F REMARKS O y O (1-inch SOD and TOPSOIL) Brown SILT to SILT with sand,moist,low plasticity to 1— nonplastic,scattered mottling,trace of fine roots. (ML) 2- 3— Medium Dense 4- 5- 6- 7— Brown SILT with sand,moist,low plasticity to nonplastic, 8— scattered dark brown stained fractures,trace of fine roots Medium Dense and root casts. (ML) to Dense 9- 34.6 10— Test pit terminated at 9.5 feet. No groundwater seepage. 11- 12- 13- 14- 15— Terra Associates, Inc. NOTE This subsurface information pertains only to this test pit location and should ? f:: Consultants in Geotechnical Engineering not be interpreted as being indicative of other locations at the site. Geology and Environmental Earth Sciences LOG OF TEST PIT NO. 11 FIGURER-12 PROJECT NAME: SW Hawk's Beard Apartments PROJ.NO: T-7184 LOGGED BY: JCS LOCATION: Tigard. Oregon SURFACE CONDS: Flat APPROX.ELEV: N/A DATE LOGGED: March 3,2015 DEPTH TO GROUNDWATER: N/A DEPTH TO CAVING: N/A LL H Z `~' CONSISTENCY/ ea DESCRIPTION REMARKSF RELATIVE DENSITY a 0-CI CO O o. (1-inch SOD and TOPSOIL) Brown SILT to SILT with sand,moist,low plasticity to 1— nonplastic,scattered mottling,trace of fine roots. (ML) 2- 3- 31.7 Medium Dense 4- 5- 6- 7— Brown SILT with sand,moist,low plasticity to nonplastic, 8— scattered dark brown stained fractures,trace of fine roots Medium Dense and root casts. (ML) to Dense 9- 10— Test pit terminated at 9.5 feet. No groundwater seepage. 11- 12- 13- 14- 15— Terra Associates, Inc. NOTE This subsurface information pertains only to this test pit location and should +" <F" Consultants in Geotechnical Engineering not be interpreted as being indicative of other locations at the site. Geology and Environmental Earth Sciences LOG OF TEST PIT NO. 12 FIGURE A-13 PROJECT NAME: SW Hawk's Beard Apartments PROJ.NO: T-7184 LOGGED BY: JCS LOCATION: Tigard.Oregon SURFACE CONDS: Flat APPROX.ELEV: N/A DATE LOGGED: March 3.2015 DEPTH TO GROUNDWATER: N/A DEPTH TO CAVING: N/A LL F Z LL Z a DESCRIPTION CONSISTENCY/ o i REMARKS RELATIVE DENSITY r w < 3 w O V) 0 v 0 a. (1-inch SOD and TOPSOIL) Brown SILT to SILT with sand,moist,low plasticity to 1— nonplastic,scattered mottling,trace of fine roots. (ML) 2- 3— Medium Dense 4- 5- 6- 7— Brown SILT with sand,moist,low plasticity to nonplastic, 8— scattered dark brown stained fractures,trace of fine roots Medium Dense and root casts. (ML) to Dense 9- 10— Test pit terminated at 9.5 feet. No groundwater seepage. 11- 12- 13- 14- 15— Terra Associates, Inc. NOTE: This subsurface information pertains only to this test pit location and should Consultants in Geotechnical Engineering not be interpreted as being indicative of other locations at the site. Geology and Environmental Earth Sciences Particle Size Distribution Report G C C C C OO O O O N (0 _O _Q f0 0 N e- \ C7 # # i A # # 100 M 80 70 W 60 Z 50 CL 40 30 20 10 0 I I I I I I I L 100 10 1 0.1 0.01 0.001 GRAIN SIZE-mm. "/,+3" %Gravel %Sand _ %Fines Coarse Fine Coarse Medium Fine Silt Clay o 0.0 0.0 0.0 0.2 6.5 11.4 81.9 X LL PL D85 D60 D50 D30 D15 D10 Cc Cu o 0.1059 Material Description USCS AASHTO o SILT with sand ML Project No. T-7184 Client: Holland Development Remarks: Project: SW Hawk's Beard Apartments o Tested 3-4-15 o Location:TP-5 Depth:2' Terra Associates, Inc. Kirkland, WA Figure A-14 Tested By: FQ