Loading...
Report (97) ,,u, / 7 - GeoP 11110 c2d, Engineering,Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503) 598-8445 Investigation •Design•Construction Support Portland,Oregon 97224 Fax(503) 941-9281 DAILY FIELD REPORT PROJECT DATE Durham Square 4/10/2018 PROJECT NUMBER WEATHER 16-4211 Overcast,50°F CLIENT CONTRACTOR Spectrum Development PERMIT NUMBER PAGE# 1 of 1 Inspection Notes: (Include location,testing data,substitutions/deviationsrFrrateials,and methods of construction,conformance statement,etc.) TYPE OF OBSERVATION: Building 1 S bgrade GeoPacific Engineer, Jim Imbrie on site to observe the subgrade on the completed excavation for Building 1.The cement treated fill was very stiff and the native soils were medium stiff to stiff and are considered suitable for building support to an allowable bearing pressure of 2,000 psf. The northwest corner had 2 inches of muck that needs to be removed before the compacted gravel layer is placed. I9 DISTRIBUTION LIST: OBSERVED BY: Jim Imbrie mgriffy@jhc-companies.com GeoPacific Engineering, Inc. Signature Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer.