Loading...
Report (102) Bend Office (541)330-9155 Geotechnical Office (503)601-8250 Carlson Testing Inc. Eugene Office (541)345-0289 Salem Office (50303)589-1252 Tigard Office (503)684-3460 ��� .c\ - ` gi ck o -\,c 1/4, .YNc—c CO . REPORT OF 4 X 8 CONCRETE CYLINDRICAL TEST SPECIMENS Test Methods: ASTM C39/C172/C1064/C31/C143/C231/C1231 Date Molded: 07/30/2018 Date Received: 07/31/2018 Job Number: T1804460.B Permit#: BUP2018-00089 Client: TIGARD-TUAL SD #23J C/O DAY CPM - BROOKE DE FREVAL Project: TIGARD HIGH SCHOOL - MODERNIZATION - FOUNDATION ONLY Address: 9000 SW DURHAM RD TIGARD OR Jurisdiction: TIGARD Contractor: LCG PENCE CONSTRUCTION LLC - KURT SCHWABAUER Subcontractor: Cast By: E. MORRISON Concrete Supplier: KNIFE RIVER CORPORATION NORTHWEST Truck#: 40155 Load#: 1 Ticket#: 14042387 Weather: SUNNY Test Time: 11:30 Air Temp. at Sampling Time: 74 Cylinders were cast for the following locations: FOOTINGS N7-N12/NORTH OF NA Total Concrete Placement Location: FOOTINGS N7-N12/NORTH OF NA Strength Requirement: 4000 psi f c@ 28 Days Slump: 5.5 0" %Air: 1.5% Mix Number: VIN15300 Concrete Temp: 82 Max Agg: 3/4" Admix/Amt: WRDA64: 44 OZ Cubic Yards: 2 OF 2 Register Number: 00144409 Lab Location: TIGARD Curing: High ** Low ** Set Test @ Test Total Avg. Area Unit Type Of Cap Tested No. Days Date Load Diameter PSI Fracture Type By I 7 08/06/2018 23125 4.00 12.56 1840 2 PAD 60 MBO 28 08/27/2018 32170 4.00 12.56 2560 2 PAD 60 MBO 30 08/29/2018 32915 4.00 12.56 2620 3 PAD 60 MBO 56 09/24/2018 ❑ Distribute attachments. Average fc @ 28 days 2560 * Please see reverse side for additional information. Job Number: T1804460.B Register Number: 00144409 Date Molded: 07/30/2018 Project: TIGARD HIGH SCHOOL - MODERNIZATION - FOUNDATION ONLY <1 in.[25 mm] /i.\\ 1}11( Type 1 Type 2 Type 3 Reasonable well-formed Well-Formed cone on one Columnar vertical cracking cones on both ends,less end,vertical cracks running through both ends,no than 1 in.[25 mm]of through caps,no well-defined well-formed cones cracking through caps cone on other end Type 4 Type 5 Type 6 Diagonal fracture with Side fractures at top or Similar to Type 5 but no cracking through bottom(occur commonly :ad of cylinder is pointed ends;tap with hammer to with unbonded caps) distinguish from Type 1 Asterisked(*)average unit PSI test results did not meet listed acceptance criteria. **Not measured-Departure from ASTM C31 standard Remarks: TIGARD-TUAL SD #23J C/O DAY CPM - BROOKE DE FREVAL TO: CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT NCL/FINAL ONLY CATENA CONSULTING ENGINEERS - AVERY MORRIS AVERY@CATENAENGINEERS.COM BASSETTI ARCHITECTS - GREG VOHS GVOHS@BASSETTIARCH.COM LCG PENCE CONSTRUCTION LLC - KURT SCHWABAUER MAIL/KURTS@LCGP.COM DAY CPM SERVICES - WES WINSHIP WWINSHIP@DAYCPM.COM Project Manager: Steven W Leach Reviewed By: Greg Leeper On 08/30/2018 Our reports pertain to the material tested/inspected only.Information contained herein is not to be reproduced,except in full, without prior authorization from this office.Under all circumstances,the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared.No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. 8430 SW HUNZIKER ST,TIGARD OR-PO BOX 230997,TIGARD OR 97281 Carlson Testing, Inc. Incompleted Items List (NCL) Aug 31,2018 T1804460.B Project Name: TIGARD HIGH SCHOOL - MODERNIZATION - FOUNDATION ONLY Project Address: 9000 SW DURHAM RD TIGARD OR Permit No: BUP2018-00089 P.O.No: Project Manager: STEVEN W. LEACH Item# Insp. Date Item Description Compliance CTI Sign-Off Date Corrected 1 EM 07/30/2018 CONCRETE Reg #: 144409 Str Req: 4000 Date Tested Days PSI 08/27/2018 28 2560 Avg f'c @ 28 days 2560 08/29/2018 30 2620 09/24/2018 56 Location: FOOTINGS N7-N12/NORTH OF NA TIGARD-TUAL SD #23J C/O DAY CPM - BROOKE DE FREVAL TO:CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT CATENA CONSULTING ENGINEERS - AVERY MORRIS BASSETTI ARCHITECTS - GREG VOHS LCG PENCE CONSTRUCTION LLC - KURT SCHWABAUER DAY CPM SERVICES - WES WINSHIP Page: 1 Carlson Testing, Inc. Incompleted Items List (NCL) Aug 31,2018 ' T1804460.B Project Name: TIGARD HIGH SCHOOL - MODERNIZATION - FOUNDATION ONLY Project Address: 9000 SW DURHAM RD TIGARD OR Permit No: BUP2018-00089 P.O.No: Project Manager: STEVEN W. LEACH Item# Insp. Date Item Description Compliance CTI Sign-Off Date Corrected 1 EM 07/30/2018 CONCRETE Reg #: 144409 Str Req: 4000 Date Tested Days PSI 08/27/2018 28 2560 Avg f'c @ 28 days 2560 08/29/2018 30 2620 09/24/2018 56 Location: FOOTINGS N7-N12/NORTH OF NA TIGARD-TUAL SD #23J C/O DAY CPM - BROOKE DE FREVAL TO:CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT r' CATENA CONSULTING ENGINEERS - AVERY MORRIS BASSETTI ARCHITECTS - GREG VOHS LCG PENCE CONSTRUCTION LLC - KURT SCHWABAUER DAY CPM SERVICES - WES WINSHIP Page: 1