DAILY FIELD REPORT
PROJECT DATE
Durham Square 3/28/2018
PROJECT NUMBER WEATHER
16-4211 Overcast,50°F
CLIENT CONTRACTOR
Spectrum Development
PERMIT NUMBER PAGE#
1 of 1
Inspection Notes: (Include location,testing data,substitutions/deviations,materials,and methods of construction,conformance statement,etc.)
TYPE OF OBSERVATION:
Building 2 Subgrade
GeoPacific Engineer, Jim Imbrie on site to observe the subgrade on the completed excavation for Building 2. The
cement treated fill was very stiff and the native soils were stiff and are considered suitable for building support to an
allowable bearing pressure of 2,000 psf.
DISTRIBUTION LIST: OBSERVED BY: Jim Imbrie
GeoPacific Engineering, Inc.Signature
Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive
the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information
contained herein should be considered preliminary until review by the project engineer.
GeoP coo
Engineering,Inc.
Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel (503) 598-8445
Investigation •Design•Construction Support Portland, Oregon 97224 Fax(503) 941-9281
DAILY FIELD REPORT
PROJECT DATE
Durham Square 3/26/2018
PROJECT NUMBER WEATHER
16-4211 Overcast,45°F
CLIENT CONTRACTOR
Spectrum Development
PERMIT NUMBER PAGE#
1 of 1
Inspection Notes: (Include location,testing data,substitutions/deviations,materials,and methods of construction,conformance statement,etc.)
TYPE OF OBSERVATION:
Building 2 Subgrade
GeoPacific Engineer, Jim Imbrie on site to observe a portion of[Building 2 subgrade. The cement treated fill was very
stiff and the native soils were stiff and are considered suitable for building support to an allowable bearing pressure of
2,000 psf, subject to review once the grade is achieved throughout the building
DISTRIBUTION LIST: OBSERVED BY: Jim Imbrie
GeoPacific Engineering, Inc. Signature
Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive
the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information
contained herein should be considered preliminary until review by the project engineer.
GeoP MC
Engineering,Inc.
Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel (503)598-8445
Investigation•Design•Construction Support Portland, Oregon 97224 Fax(503)941-9281
DAILY FIELD REPORT
PROJECT DATE
Durham Square 3/26/2018
PROJECT NUMBER WEATHER
16-4211 Overcast,50°F
CLIENT CONTRACTOR
Spectrum Development
PERMIT NUMBER PAGE#
1 of 1
Inspection Notes: (Include location,testing data,substitutions/deviations,materials,and methods of construction,conformance statement,etc.)
TYPE OF OBSERVATION:
Building 2 Subgrade
GeoPacific Engineer, Jim Imbrie on site to observe a portion of Building 2 subgrade that has not been excavated to
grade. The cement treated fill was very stiff and the native soils were stiff and are considered suitable for building
support to an allowable bearing pressure of 2,000 psf, however,we recommended deepening of the west wall by 18
inches to achieve a proper footing to slope setback and embedment.
DISTRIBUTION LIST: OBSERVED BY: Jim Imbrie
GeoPacific Engineering, Inc.Signature
Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive
the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information
contained herein should be considered preliminary until review by the project engineer.