Loading...
PFI2018-00266 99 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12018-00266 . � 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 10/02/2018 Parcel: SEG2444 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: Adjacent to 15974 SW 76th Ave. Install underground service to new 2,500-square-foot home Conduit was installed several years ago across SW 76th Ave. PGE Job M2400632. Owner: FEES Description Date Amount PFI Permit Fee 10/02/2018 $401.00 PHONE: Contractor: PHONE: FAX: Applicant: STEVE HURSH 10800 SW AVERY ST TUALATIN, OR 97062 PHONE: 503-464-7777 Total $401.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12018-00266 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name> at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 18- PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2) persons who have authority to resolve problems, take corrective action and, in general, will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI—Utilities 21 -OTHER Applied Notice RECEIVED City of Tigard O C T 0 12018 PUBLIC WORKS —ENGINEERING CITY OF TIGARD �:. Public Facility 1mprovcmerft "/j)GRftMit TYPE OF WORK DESCRIPTION OF WORK (in the right-of-way) JA TYPE 1—Franchise Utility Work Check one: V Utilities ❑ Sidewalk/driveway approach ❑ Street improvements performed by NW N, PGE Install underground service to 2500 s ft home and/orutiliht agency. Detailed description: 9 g Conduit was installed several years ago across SW 76th Ave. ❑ TYPE 2—Sidewalk/Driveway/Sewer PGE Job M2400632 Work performed for the purpose of: • Sidewalk installation or rep=air. • Driveway approach installation Property address/location(s): 1597 SW 76th Ave � ! and/or repair Tigard, OR 97224 --9 • Sanitary sewer lateral installation and/or main line tap Applicant: Portland General Electric ❑ TYPE 3—Full scale Development PP Work performed with Land use Address: 10800 SW Avery St approval which includes any of City/state: Tualatin, OR Gip: 97062 the following: Phone: 503-464-7777 Email: preregcoord@pgn.com Subdivisions or Partitions Contact name: Steve Hursh Phone: 503-672-5409 • Street widening • Mainline installation for Sanitary Contractor: NSA sewer, Storm sewer, Tigard water and/or Tigard Water Service:area CrCrB#: Expiration: Address: SUBMIT COMPLETED APPLICATION TO: City/state: Zip: City of Tigard Planning. gineemng Phone: Email: 13125 SW Hall Blvd. Contact name: Phone: Tigard,OR 97223 Applications for"miner work in right-4--way" N/A only may be emailed to Engineer: rowpermits(a'.,tigard-or.gov :'address: FOR STAFF IJSE ONLY City/state: Zip: Phone: Email: Case Into.:7 E/ Cie`�� p Contact name: application submittal fee(.007%of Engineer's Estimate) $ Estimated value of work is required(if over$5,000):�4, 5,732.29 Additional fees: $ (within the public right-of-way) Application accepted: Is work related to a LAND-L15E DECISION? ❑ Yes No BST: " Date: If so, please specify (MLP,SDR, SUB,etc.) case #: Application reviewed: By: 8 E Date: d hhe Is work related to a BUILDING PERMIT"? ❑ Yes No Applicant notified:If so,please specify(BUILDING PERMti IT)case#: By: !� Date: w I:\ENG\PermitApplications\pfi_application Rev.10/16/2017 Citv ofTi gard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of APPLICANTS NOTE: Person specified as"Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. :1. With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the. owner. The owncr(s)must sign this application in the space provided or submit a written authorization with this application. Franchised Utilities arc not required to obtain the owners signature on the application BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate an),recorded deed restrictions that may be attached to or unposed upon the subject proper • If the application is granted, the applicant will-exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in anv plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. 5&0Steve Hursh 10/1/2018 ;lpplicant/Authorized Agent's signature Print game I�atc SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 Page 2 of DEVELOPMENT ENGINEERING FEES FOR STAFF USE ONLY Public Facility Improvement(PFI)Permit: DETAILED REQUIREMENTS APPLICATION FEE Part 1: Required submittal fee$300.00 (nninimum) FRANCHISE UTILITY AND SIDEWALK/ DRIVEWAY AND UTILITY PERMIT FEE CONNECTIONS,ETC. Part 2: All non-water systexn improvements (work in the right of way) Engineer's estimate X 5% (less$300.00 minimum Sketch submittal fee) (including information below) Engineer's estimate X 20,%Plan Review ❑ Dimensions WATER SYSTEM FEE ❑ Street Name Part 3: All public water system unprovements ❑ Site Address Engineer's estimate X 12% FULL SCALE DEVELOPMENT PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements) There will be no permit fee charged,or assurance required for the following types of work: Design Plans • Sidewalk repair (less than 20 lineal feet) (6 sets,24x36 or 22x34) • Relocate or replace mailbox ❑ Cover—Site,Vicinity,abbreviation,Legend • Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.) • W'eep hole repair ❑ Street(Plan,Profile) • Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile) • Lawn sprinkler system installation or repair ❑ Water Quality Facilities • Street tree pruning or planting ❑ Grading • Planter strip landscape maintenance ❑ Landscaping/Tree Plan • Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,Sanitary,Water,Signage,Street Lights,etc) ❑ Details Note: A cash/bond assurance maybe ❑ Traffic Sight Distance required per TMC 15.04.140. ❑ Signing and Striping (customer deposit) ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval ❑ Engineers Construction Estimate .. ._.. ": .'^'ua�..`.'`,".iR'A`0.� .'... ':.... .:o. ... .. >. . ,. .w:"aA�i;l�«`"•',,:Yad6,e'EG,A.�:^, a�7i74 PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • uu-w-vtigard-or.gov • 503-718-2421 • Page.3 of4 SAMPLE SKETCH: I Edge of F avement -- Ditch Streetlight ._.,.�.�.�.�.:.�r._. .._ I I Existing House Existing • �+ I >i Driveway CL tet! n >. I 'I Q �A Existing Shop � A • Powerpole I a -lop 7y1 7n � Fire Hydrant(FH) I Scale: 'I"=3Q' � I . I � � I � � I . I � � MINIMUM SKETCH REQUIREMENTS (Put"N/A" if Not Applicable): North arrow Property lines &dimension Slope of property, Street &street name(s) Existing building, structures Utility &street light poles Proposed work Existing curb or edge Trees Existing S/\t'or of pay ement Existing utility locations D/W apron (sewer,water,storm) PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard 13125 SSU Hall Blvd. • Tigard,Oregon 97223 0 wwwtigard-or.gov 503-718-2421 Page 4 of4 77€1 7;'0'i 77,M 683 7635 SINGLE FAMILY LEGEND NEW PGE FACILITIES TO BE INSTALLED (UNLESS OTHERWISE SPECIFIED) .,..,., E SWALDER ST 1730 SECONDARY VAULT PROVIDED&INSTALLED BY CUSTOMER INSTALL 1.4A3 AL•TX SECONf7ARY IN 1-3"PVC CONDUIT WL.1 -...W.r...... ....- PROWDED 3 INSTALLED BY CUSTOMER II1Sf X11!: 1 P 7.2 120/240 MP 25KVA NTLB TRANSFORMER __„____w INSTALL 1"#350 AL-TX SECONDARY IN:-3"PVC caNDul, EXISTING TX HAS BEEN REMOVED PRIOF PROVIDED B INSTALLED BYCUSTOMER 1P 7.2 120/240 MP 15KVATBLB TRANSFORMER LEFT IN DESIGN FOR MAPPING PURPOSE J Q N CONSTRUCTION NOTES: SFEXT A 25 C2 1-12C A 15 43012, __ _.. _ 1. CUSTOMER TO PROVIDE LLTRENCHING AND BACKFILLING.JOINT USE TRENCH n Ce- "" A 350 AL-TX FINAL GRADE. TO BE 48 INCHES DEEP AND 30 INCHES WIDE,MEASURED FROM ,5ecvPD-167 .._— Q w 90 2. CONDUIT(IF NECESSARY)WILL BE GRAY,SCHEDULE 40,ELECTRICAL GRADE. r PVC CONDUIT WITH NYLON PULL STRINGS(MIN.500 LBS.TEST). r PGE TO DETERMINE THE SIZE AND NUMBER OF CONDUITS REQUIRED. r3117p A 350 AL TX I MAINTAIN 12 VERTICAL INCHES AND 24 HORIZONTAL INCHES CLEARANCE BETWEEN GAS AND OTHER UTILITIES.ALL ELBOWS TO BE 36 INCH(MIN)RADIUS. - ! ALL BENDS MUST BE FACTORY MADE.RIGID STEEL OR PGE APPROVED FIBERGLASS BENDS ARE REQUIRED FOR RUNS OF 151 FEET OR LONGER,OR FOR ANY LENGTH VT-185 ! RUN WITH MORE THAN 180 DEGREES IN BENDS.PVC SCHEDULE 40 BENDS ARE 4996 � VT-305 ACCEPTABLE FOR RUNS OF 150 FEET OR LESS,THE MAXIMUM TOTAL BENDS IN ANY X CONDUIT RUN IS 270 DEGREES. 200 AMP 3,CUSTOMER RESPONSIBLE FOR ROAD CROSSINGS.USE ONLY GRAY,SCHEDULE 40, 1 1201240 VOLTSELECTRICAL GRADE,PVC CONDUIT WITH NYLON PULL STRINGS(MIN.500 LBS.TEST). oQ VD-0.754 CP CTICIJrl80RI`aG R. R vTo HD 3; D Pd,li POL E'HE'I Ei C''OR l{f JLE 4 PVC4':IT.A JF- I a di f 7 r�; .F a C:K R t IKF M-CHANICA.Q VF'-3.25CG 'E CN RODUCI; AN 1 E`3NI1€t 10 H llU� H S.L rMEET"-E N- AIC-4,224 REQ—:14"t MEN r )F FGE S.�.".FV ATIt N L :-1,,f VAI..AL.L.:ON-4ED EST FROM.PGE''RO E-­T EXTR„DWD RED STRIPES(WHICH ISA IFICATI,N REQUIREMENT)MA`.DR=_'EST OF V UVI FLP=PIPE;5 REQ..tRED AFTER INS:A: ATIt.N`AITH PGY INSPECTOR FRESPiT -G4 - 5. SINGLE PRIMARY INSTALLATIONS-CONDUIT TO EXTENDA MINIMUM OF 10'FROM TRANSFORMER PAD, Road Side gd'• Spoil 6. ALL PGE TRANSFORMERS TO BE INSTALLED 8 FEET(MIN)FROM ANY COMBUSTIBLE ��Typical BUILDING,WALL OR OVERHANG AND 4 FEET(MIN)FROM ANY FIRE HYDRANT. PGE TRANSFORMERS MUST BE WITHIN 15 FEET OF A DRIVEABLE AREA. �® ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS. LEGEND RIGHT-OF-WAY PERA41T NOTICE: PGE Primary 7 7.CUSTOMER TRENCH AND ELBOW CONFIGURATIONS MUST BE INSPECTED BY PGE PRIOR TO y O A PERM!!1T FROM THEE OL 1URISDICTION(S QUI 6t-FORL-t AlY BACKFILLING.WHEN YOU ARE READY FOR PGE TO INSPECT(AFTER INSTALLATION IS COMPLETE) 38" 30 O Secondary Cable PCALEASE CAL 503.323.6700 OR 503.4634348(SALEM AREA) Min Inside Duct WORK IN THE RIGHT-OF-WAYMAY BE PERFORMEE). ONLY PGE APPROVED Min Cover r ! CONTRACTORS HAVE ALLOW UP TO 2 WORKING DAYS FOR INSPECTION TO OCCUR- Trench o TelcolCATV COT�'f4AC=L3RS'AhD CCiFrTnAC.LRS WHD:,AVE fvtADE OTHER.SPECLRL 4GREEJOENTS WITH PGE;'VILE.BE ALLOWED TO WORK LINDER PGE`S PERMIT 8. DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPMENT.NONSTANDARD � ®Backfill THE CONTRACTOR MUST NOTIFY THE LOCAL o3ISDICTION 44 HOURS UNDERGROUND EQUIPMENT MAY BEAN OPTION AT AN ADDITIONAL COST TO THE CUSTOMER.1 D' BEFORE WORK 1,S TO BE OV. A COPY OF THE PERMIT MUST BE ON SITE, Q D i Selected Backfill PGE CONSTRUCTION DRAWING UndisturbedAS-BUILT VERIFICATION&N LATE NS CORRECTED 12"Min Earth 'r.,n•. .._..,:,=+r ...�._.::�..:.... r;= Foreman: Date: Joint Use Trench W10 Gas CONTACT SERVICE COORDINATOR General Foreman. Date: `R.1 R ti({ DU; P`1�{}Y I. (Signature only required For field construcfion than es.) DEaN � THIS DESIGN MUST Pl T L :F t. SDPMIENG REVIEW. ASBUILT BY DESIGNER: 1-Pr7 DATE. SCALE: ACCOUNT AWD: JOB NO. BE APPROVED BY THEPGE'PROJECT MANAGER_;, SERVICE COORDINATOR 2/6/2018 1 in:33 ft 1070001 1000004594 M2400632 503-323-6700 OR 503-463-4 3 48(SALEM) TrrLE LVI CUSTOM CONSTRUCTION LLC CIRCUIT CALL 811 BEFORE YOU DIG ATTENTION: DURHAM-BRIDGEPORT 11 11 x 17 OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED (j`�� LOCATION BY THE OREGON UTILITY NOTIFICATION CENTER. ■ !'r1 15970 SW 76TH AVE,TIGARD,OR,97224 THINK THOSE RULES ARE SET FORTH IN OAR 951.001.0010 DESCRIPTION THROUGH 952-001-0090 YOU MAY OBTAIN COPIES OF 1201240 1 P SERVICE TO 2500 SO FT HOME SHEET SAFETY THE RULES BY CALLING THE OREGON UTILITY t'' COUNTY ISECTIONS WORK WITH NOTIFICATION CENTER ADMINISTRATION @(502-232-1987) WASHINGTON I C2112C 1 1 OF 1 FIRST TO REQUEST UTILITY LOCATES CALL THE OREGON Knnwwha4'sbetim DESIGNSY PHONE(503)DRAWN BY UTILITY NOTIFICATION CENTER,811 AT LEAST Call befl3re you dig. Chris Jewett 672-5481 Chris Jewett @ 1 2 BUSINESS GAYS PRIOR TO EXCAVATION C,PORTLAND GENERAL ELECTRIC CO-ALL RIGHTS RESERVED ------------------------ U m� I 1 ,♦ o 3 a a Single Flagger Operation CD for Low Volumes "ec I (Optional) o• Q N cn w N N I (ADT<400) I ^_! I I Ca o 0 0 o D 3 = I �cccRI PREPARED ONE LANE W a I ROAD Q � : I TO STOP r AHEAD 0U1 o W W I 4-- i- ,� O O O ,� „ I — —. . .r. ..— — — I • ROAD CD ' I I WORK C Ln n 3 I !CIO KeKA l I AHEAD O O O N N I .•- vlPlt.Wn White I fA les BE V/ ITn 4 I ^ Pii \D//-t N j V C I RPpI O O O O Cn O Cn CD CM CD I „ I • A B B i------------------------i 1 mile _I ?1 /"• I max. • • • •'� �• LQ B B A Buffer Protection Vehicle Tt ROAD w/TMA(both Optional) WORK See Chapter 4 AHEAD Tt, Q BE ONE LANE C7 ROAD PREPARED Two Flagger Operation AHEAD TO STOP 3 -a W CDD U, (Optional) p cco ri VOIDED PFI2018 - 00266 HAMBACH GROV E 3 City of Tigard November 29, 2018 PGE 10800 SW Avery St. Tualatin, OR 97062 Re:Permit No. PF12018-00266 Dear Applicant: The City of Tigard has processed a refund for overpayment of permit fees on the above .referenced permit for the following: Site Address: 15974 SW 76h Ave. Project Name: Hambach Grove job No.: N/A Refund: Z Check#230473 in the amount of$101.00. ❑ Credit card"return"receipt in the amount of$ ❑ Trust account"deposit"receipt in the amount of$ Notes: Refund overcharge of permit fees. If you have any questions please contact me at 503.718.2430. Since3ply, Dianna Howse Building Division Services Coordinator Enc. ,IXA. 9 1jp&4,69fegon 97223 503.639.4171 L\BuAd1ng\RefundAL25.MY,,U e,, - T' R F www.tigard-or.gov Y Relay: 98 .44.2772 9 www.ti ard-or.gov City of Tigard Accela Refund Request This form is used for refund requests of land use,development engineering and building permit application fees. Receipts, documentation and the Request forPenwitAction form (if applicable) must be attached to this request form. Refund requests are due to Accela System Administrator by each Wednesday at 5:00 PM. Please allow up to 3 weeks for processing of refunds. Accounts Payable will route refund checks to Accela System Administrator for distribution to applicant. PAYABLE TO: PGE DATE: 11/16/2018 10800 SW Avery St Tualatin, OR 97062 REQUESTED BY: Dianna Howse TRANSACTION INFORMATION: Receipt#: 419715 Case#: PF12018-00266 Date: 10/02/2018 Address/Parcel: 15974 SW 761h Ave Pay Method: CreditCard Project Name: Hambach Grove EXPLANATION: Refund overcharge of permit fees per Brady Bullinger. 11 & I h Cash Over 100-0000-48001 101.00 TOTAL REFUND: $101.00 APPROVALS: SIGN DAIE. If under$5,000 Professional Staff If under$12,500 Division Manager If under$25,500 Department Manager If under$50,000 City Manager If over$50,000 Local Contract Review Board Case Refund Processed: Date: 1:\Bading\Refunds\RefundRequest.doc x 09/01/2010 City Of Tigard - COMMUNITY DFIVEL.OPMENT DEIPARTMENT Request for Permit Action 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503-718-2439 •www.tigard-or.gov TO: CITY OF TIGARD Building Division 13125 SW Hall Blvd.,Tigard, OR 97223 Phone: 503-718-2439 Fax: 503-598-1960 TigardBuildingI'ermits@tigard-or.gov FROM: ❑ Owner ❑ Applicant ❑ Contractor �City Staff Check(✓)one REFUND OR Name: f"1 1 INVOICE TO: (Business or Individual) P/� (AA11we"y Jv ' Mailing Address: /0800 SW ,4V 6e); -r- City/State/Zip: City/State/Zip: Fu,a 14t _ ! /, 170 (o2- Phone 7Q (o2- Phone No.: Co/ 2. _ 2 ! .✓�� PLEASE TAKE ACTION FOR THE ITEM(S) CHECKED4 (✓): __C.ANCE,L/VOID PERMIT APPLICATION. REFUND�'ERMIT FEES (attach copy of original receipt and provide explanation below). -`�""TNVOICE FOR FEES DUE (attach case fee schedule and provide explanation below). ❑ REMOVE/REPLACE CONTRACTOR ON PERMIT (do not cancel permit). Permit#: {tel'/�Ole - Gid 2 !v 6 Site Address or Parcel #: .SW 76 '~X X ve Project Name: 32- Subdivision Name: j�/�a�j�L' RoVi' Lot#: EXPLANATION: f Signature: $ yQ Date:/j$' Print Name: Refund Policy 1. The city's Community Development Director,Building Official or City Engineer may authorize the refund of: • Any fee which was erroneously paid or collected. • Not more than 80%of the application or plan review fee when an application is withdrawn or canceled before review effort has been expended. • Not more than 80%of the application or permit fee for issued permits prior to any inspection requests. 2. All refunds will be returned to the original payer in the form of a check via US postal service. 3. Please allow 3-4 weeks for processing refund requests. � /) /� �� 7- FOR OFFICE USE ONLY Route to Sys Admin: Date By Route to Records: Date I B Refund Processed: Date f/ /. B Invoice Processed: Date B Permit Canceled: Date B arcel Tag Added: Date B I:\Building\FonnslRegPcrmitAction_Q92314.doc