Loading...
Report (69) ci,2° 7409 SW Tech Center Dr.Ste. 145 q; 'e..• Tigard,OR.97223 sru"L' Ph:503-443-3799 Fax:503-620-2748 411=n 'E1E DAILY FIELD REPORT FOR PROPRIETARY ANCHORS 0113 TESTING, INC 503.413.3799 Date: 5/1/17 Permit#: BUP2017-00076 ENGINEERED PRODUCTS a PAPE TYREE OIL INC COMPANY Continuous ► I 16200 SW 72ND AVE 9800 40TH AVE S. TIGARD,OR 97224 SEATTLE,WA 98118 Periodic / PO#82397 Inspector/Certification# Chris Brown Cert#WABO SI 02203 ACS Job# 17-6956-14 Anchor Embedded in: Concrete Is this a re-inspection?: J Yes 0 No Compressive Strength: EXISTING UNKNOWN Approved plans available?: 0 Yes D No HOLE DETAIL/CONDFT1ON Work acceptable per approved Yes D No plans?: AnchorEmbed Size: 1/2" Hole 0: 1/2" 3 Y." Installation complies with Depth: manufacturer's evaluation report?: Z Yes No Holes cleaned properly?: 0 Yes 0 No LOCATION OF ANCHORS Embedment per plans?: n Yes 0 No GRIDLINES Footing connection for baseplate to existing concrete INSTALLATION GRIDLINES ESR REPORT# ESR-1917 TZ CARBON&STAINLESS in CONCRETE GRIDLINES ANCHOR TYPE: WEDGE ANCHOR IS THERE AN RFI? LI Yes No EPDXY TYPE: N/A RFI ATTACHED? LI Yes 0 No EXP. DATE: NA INSPECTION DETAILS: Image Description: ACS representative arrived on site to inspect installation of%"Hilti Kwik Bolt TZ wedge anchors into existing concrete slab with 3-'/e"minimum embedment using(2)two anchors per base plate per notes and drawings on page 1 of the approved plans. A torque test was performed at 40 ft/lbs per ICC-ESR 1917. The work performed appears to be in conformance with notes on page 1 of the approved plans and the manufactures installation procedures. No known revisions. Foreman notified of ❑ Yes 0 No Q N/A nonconformance items? Foremans Name: Reviewed eb Date: cc: 05-02-2017 Brian Ferrick Bob Brown,President BB/CB ,'; NY 0 2 2017 ACS-1157 ACCREDITED