Loading...
Report a.\ Al 1A14)-1- rfilll 1111\ 11,11,4.1,4 111 . 7409 SW Tech Center Dr,Ste.145 Tigard,OR 97223 Ph:503-443-3799 Fax:503-620-2748 503.4413799 Special Inspection Final Report Date:June 05,2017 Job#17-7240 Permit#BUP2016-0035-1 Mail To: Project GRAY CONSTRUCTION PINK#1806 5410 SW MACADAM AVE STE 150 9585 SW WASHINGTON SQ RD- PORTLAND,OR 97239 SPACE H07 PORTLAND,OR 97223 JOB#17-5150 To Whom it May Concern: ACS Testing, Inc.attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed for the following: Anchors-Expansion it Based on personal observation,inspection and reports reviewed by me for the above project I attest on behalf of ACS that work was performed to the best of my knowledge,in accordance with approved plans, specifications,and the applicable codes and standards for the jurisdiction. Approved by: Bob Brown/President BB/KP •rc ugs ACCREDITED