Loading...
Report (70) ' /� 7 d/ 07 7409 SW Tech Center Dr.Ste. 145 Tigard,OR.97223 spur Ph:503-443-3799 Fax:503-620-2748 411="ONCREZE DAILY FIELD REPORT FOR PROPRIETARY ANCHORS OILS TESTING,INC 503.443.3799 Date: Apr 27, 2017 permit#: BUP2017-00077 ENGINEERED PRODUCTS a PAPE' CONSUMER CELLULAR COMPANY Continuous 15605 SW 72ND AVE 9800 40TH AVE S. TIGARD, OR 97224 SEATTLE,WA 98118 Periodic / PO#82907 Inspector/Certification# Tom Snider Cert#OBOA 1075 ACS Job# 17-6956-03 Anchor Embedded in: Concrete Is this a re-inspection?: Yes No Compressive Strength: EXISTING UNKNOWN Approved plans available?: ❑✓ Yes n No HOLE DETAIL/CONDITION Work acceptable per approved Yes [ No plans?: AnchorEmbed Size: 1/2" Hole 0: 1/2" 3-1/4" Installation complies with Depth: manufacturer's evaluation report?: Z Yes No Holes cleaned properly?: J Yes 0 No LOCATION OF ANCHORS Embedment per plans?: Yes D No GRIDLINES INSTALLATION GRIDLINES ESR REPORT# ESR-1917 TZ CARBON&STAINLESS in CONCRETE GRIDLINES ANCHOR TYPE: DROP-IN ANCHOR IS THERE AN RFI? El Yes Q No EPDXY TYPE: N/A RFI ATTACHED? Yes J No EXP. DATE: N/A INSPECTION DETAILS: Image Description: ACS representative arrived at the job site to observe completed drop in anchors,for storage racks located at the Westerly most double row of racking and the single row of wracking at the South wall,as per Plan View sheet 1 of 1,with no revisions noted.Anchor details per Note 5 of page 1 from Engineered Products. Anchors installed Hilti 17,5-1/2". Work has been performed,the materials used and the installation procedures conform to the MMII and the approved contract documents, with the no exceptions. Foreman notified of El Yes E No Q N/A nonconformance items? Foremans Name: Brian Ferrick,Engineered Products Reviewed .ep/.� Date: cc: 1�(/� � 04-28-2017 Brian Ferrick Bob Brown,President BB/TS "u APR 2 8 20 7 ACS-1157 ACCREDITED