Loading...
Report (73) f-&-k?--,-( -1 - ��1A Q cA19.3 SV , LC�Sh.Wil. Cl 0i „tl I' 7409 SW Tech Center Dr,Ste.145 Tigard,OR 97223 em N Ph:503-443-3799 Fax:503-620-2748 II%I,Mt. ,,, 503.443.3799 Special Inspection Final Report Date: September 28,2017 Job#17-7369-01 Permit#BUP2017-00112 Mail To: Project GRAY CONSTRUCTION BATH&BODY WORKS#0856 5410 SW MACADAM AVE STE 150 9632 SW WASHINGTON SQ RD-#609 PORTLAND,OR 97239 PORTLAND,OR 97223 JOB#17-5444 To Whom It May Concern: ACS Testing, Inc.attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed for the following: Anchors-Expansion Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications,and the applicable codes and standards for the jurisdiction. tAtd,i,euk....- Approved by: Bob Brown/President BB/KP ATAIS ACCREDITED