Report (73) f-&-k?--,-( -1 - ��1A Q
cA19.3 SV , LC�Sh.Wil. Cl 0i
„tl I' 7409 SW Tech Center Dr,Ste.145
Tigard,OR 97223
em N
Ph:503-443-3799 Fax:503-620-2748
II%I,Mt. ,,,
503.443.3799 Special Inspection
Final Report
Date: September 28,2017 Job#17-7369-01
Permit#BUP2017-00112
Mail To: Project
GRAY CONSTRUCTION BATH&BODY WORKS#0856
5410 SW MACADAM AVE STE 150 9632 SW WASHINGTON SQ RD-#609
PORTLAND,OR 97239 PORTLAND,OR 97223
JOB#17-5444
To Whom It May Concern:
ACS Testing, Inc.attests that their inspectors performed special inspection(s)on a continuous and/or
Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed
for the following:
Anchors-Expansion
Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf
of ACS that work was performed to the best of my knowledge, in accordance with approved plans,
specifications,and the applicable codes and standards for the jurisdiction.
tAtd,i,euk....-
Approved by:
Bob Brown/President
BB/KP
ATAIS
ACCREDITED