Loading...
Report — ov4-CC Bend Office (541) 330-9155 Geotechnical Office (503) 6014250 Carlson Testing Inc. Eugene Office (541) 345-0289 Salem Office (503) 589-1252 Tigard Office (503) 684-3460 Daily Report of Proprietary Anchors Client: PIKE AWNING COMPANY - DAN SPEARING Project: SOLUTIONS YES - NEW AWNING CTI Job#: T1702459. Address: 8300 SW HUNZIKER RD TIGARD OR Jurisdiction: TIGARD CTI representative J. DEMOTTE WABO SI 02043 was on site this date Auq. 23, 2017 to perform Special Inspection for: Permit BUP2017-00200 DFS #(s) PO Number: SCOPE OF INSPECTION Location of proprietary anchors inspected [to include grid 1. Checked in with superintendent or client representative. lines, elevations (floors) and drawing details]: Name: DAN UPPER BRACKETS AND LOWER LEDGER PER DETAILS Company: PIKE AWNING COMPANY D,E/SHEET 4. 0 WEDGE ANCHORS WITH 4" MINIMUM � EMBEDMENT. 2. Inspection was "IBC" n Continuous I X I Periodic (2) ANCHORS AT UPPER BRACKETS WITH 2" AND 2 k" PROPRIETARY ANCHORS EMBEDMENT LOWER LEFT AND LOWER RIGHT. VERIFIED YesNoN/A 40 FT/LBS TORQUE. 1. Reviewed previous inspection reports? 2. Reviewed evaluation report? »»> (CONT'D ON BACK) »»»»»»» Verified following items meet manufacturer's published installation instructions. REPORT SUMMARY 3. Verified minimum embedment depth of the anchors. x 1. Work inspected was: n Completed x l In progress 4.Verified installation of the anchors. x 2. Completed work inspected was not in compliance with 5. Verified anchor diameter. x 6. Verified steel grade. x� Approved plans and specifications n Shop drawings X n RFI 11 Design change E Submittal N/A 7. Verified hole diameter. x 8. Verified type of drill bit used. x Documents #( ) SHEET 4 Dated: 07/2017 9. Verified hole cleaning method. x 3. Noncompliance item(s) were noted this date, details on 10. Verified adhesive application. 11. Verified edge distance. x following page(s). isj Yes n No n N/A x 4. Noncompliancepe 12. Verified spacing. x item(s) were reinspected this date, details 13. Verified installation torque. x on following page(s). n Yes 2 No E N/A Evaluation report number & date: n Conform n Remain in progress ICC ESR-2 818 (05/2017) Report(s) findings were discussed and left with DAN of PIKE AWNING COMPANY Name of product being installed DEWALT POWER STUD 501 Batch Number N/A Expiration Date Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. x See additional report page(s). n Distribute attachments. Page 1 of 2 Daily Report of Proprietary Anchors For: 0s/23/n17 CTI Job#: T1702459. Project: SOLUTIONS YES - NEW AWNING Notes: «««< (CONT'D FROM FRONT PAGE) THE FOLLOWING NON-COMPLIANCE ITEM WAS ADDED: * NCL #1: ANCHORS DRILLED TO 2-4" AND 2-b-4" DEPTH, 4" MINIMUM REQUIRED AT UPPER BRACKETS. In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only.Information contained herein is not to be reproduced,except in full, without prior authorization from this office.Under all circumstances,the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared.No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter,please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING,INC. Doug Loftesness Project Manager JD/CK CC: PIKE AWNING COMPANY - DAN SPEARING DAN@PIKEAWNING.COM CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT FINAL/NCL ONLY 8430 SW HUNZIKER ST,TIGARD OR-PO BOX 230997,TIGARD OR 97281 Page 2 of 2 Carlson Testing, Inc. Incompleted Items List(NCL) Aug 28, 2017 T1702459. Project Name: SOLUTIONS YES - NEW AWNING Project Address: 8300 SW HUNZIKER RD TIGARD OR Permit No: BUP2017-00200 P.O. No: Project Manager: D. LOFTESNESS Item# Insp. Date Item Description Compliance CTI Sign-Off Date Corrected 1 JD 08/23/2017 ANCHORS DRILLED TO 2-4" AND 2-13" DEPTH, 4" MINIMUM REQUIRED AT UPPER BRACKETS. CC: PIKE AWNING COMPANY - DAN SPEARING CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT Page: 1 se' Ci ic;01,itogriizes that construction obscivation and/or testing ser%ices provided by C ore techniques filch may reduce the risk of construction defects,deficiencies, or omissions arisin dujin ri after con- rant ction Servicepctfoi hied h CTI do riot constitute a warranty or guarantee of any type. Itti,en P.ith riiiigont construction monitoring and/or testing by CIL eonstruetion delet:ts,deficiencies,or omissions in the Contractor's work mac eNi:A. In all cases.Client and the( ontractov shall assign the Contractor the ierponsihility Cur the qUArrly Corriplewnes;()I the‘vork and 101-i:1(111C1fIng to plans rind 'ipeciflea- k Int word..or (adult.; poriorm sante shall no a any stay eSerise any contractor,subconlractoit iir supplier Irian pc ornitalee its sm k ri it,:eordanoe with the contract documents, rd I \\till pro'nirt it professional services to Client with thai degree or car...'cud skill iirdirthrily exercised under shnilai eircumstances by members or its profession.This represontation is in lieu or other warran- t or reprcc,cola;ion.,either expressed or implied. It is also understood and cdreeJ that SlarCITICIIrS inode 11 reports are thert a-Lions based ott technical ju(Igements.„and should not he construed to be t.ain- elusive representations or fact. If conditions different from what are indicated in the reports tcite to Ciieiitr attention after receipt of the reports. it is recommended that Client contact (PI imincdititeP, atithorrie ruialier rippropriate evaluation. Cl ut welt, sldtnot include determiningt supervising or inTleinenting the ititeans;methods,techniqiitust sequences.is procedures i.ifeonstruclion C I I shall not be responsible or i',Vd11.1.a1.111g i l'epOr1.11jOh 0011- (linens related to health,:subtly or welfare, ". •c" • • . . ., ,115...,, re.od hot r. Lrued on on rr test inn rein e < fli.i . . str...wl.ior..,,,. Ser',.,L;eS r,d-rovrni.,,....0 Liy f,....-ri !,.io ii01,c,7011:-."11..ii.itie a. mm II -,:It gi..,,!:.11-011.=.c..! 0.•,, ',..P".1',.' if:,117,,,',. ii'..",:-•',1-'1',',2',i,i.1.-1 • dtiligent ctinstrubtion ntonhoniint;.tot,itlult.te.t;it iii,by (TH. 10 ii tieletns,nittlittinnenbt;cn-n.;ntknbnIs in alb ftrontracionns tntort;= antt;tttttst. in ttll tntt.n.;s,l„lllent tntbkin the ttbnutinnntor-..41;;..01 tv:tnntt,',int lnotlitinittnet •, tlt-iltl will rykytnitib lb;pntitntsitnntl sclbtint.n.t to tniticnt',vial ti:tttt iirgrC0 of carc.-.Ent...d n.k.ill ordinntibt uttbrnittcd. . to or nepnbncnnittan,binbtr ttttibrtntstni or inantnntb It Is also ttnotn-Intn.1 and attntcti ntat:n'itt.tonntb;!nts natt-nic '('1 1001 Its 11101 ohs ' 0o " OSOLO.on twdinwnod inidto 01 nOr.urn I,sin. ,InoO me e< rronot'0 bnbnonzn turtner twrnittpltmln ntnitunottnn.