Specifications (51) `(`c1STO\ — i"0
\c\CW gLr--V( ee pi:olvED
GREEN MOUMTnIN
D E C 13 2017
lir structural engineering CITY i CAD
UMG DIVISION
Lateral Analysis
For
Riverside Homes — Plan 2626 Elevation A
Progress Landing Lot 9
11990 SW Redberry Court
Tigard, OR
Dec 6, 2017
���p PROpS
" ,�G N,t; 'Q��O
tu
49 8PE ,
•OREGON
9iNA
MIPP
Expires: ‘2• 1•18
Job No:17486
' LIMITATIONS * "
ENGINEER WAS RETAINED IN A LIMITED CAPACITY FOR THIS PROJECT.
DESIGN IS BASED UPON INFORMATION PROVIDED BY THE CLIENT, WHO IS SOLELY
RESPONSIBLE FOR ACCURACY OF SAME. NO RESPONSIBILITY AND/OR
LIABILITY IS ASSUMED BY,OR IS TO BE ASSIGNED TO THE ENGINEER
FOR ITEMS BEYOND THAT SHOWN ON THESE SHEETS.
Table of Contents
Design Criteria
Lateral Analysis L-1 — L-15
greenmountainse.com-info@greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607
GREEN MOUNTMIIN
torstructural engineering
STRUCTURAL DESIGN CRITERIA
Governing Code: 2012 International Residential Code (IRC)
2012 International Building Code (IBC)
Dead Load:
A. Roof 15 psf
B. Floor ...10 psf
C. Exterior walls .10 psf
D. Interior walls with gypboard each side 5 psf
Snow Load:
A. Uniformly distributed snow load .25 psf
Floor Live Load:. 40 psf
Wind Load:based on ASCE 7-10 CH27 MWFRS Directional Procedure
A. 3 Second Gust Wind Speed V=126 mph
B. Importance Factor .. 1=1.0
C. Exposure
D. Topographical Factor ..Kzt=1.0
E. Wind Directional Factor Kd=0.85
F. Structure classified as enclosed
Seismic Load—based on ASCE 7-10 Section 12.14
A. Mapped Spectral Acceleration for short periods.....Ss=1.0
B. Mapped Spectral Acceleration for 1 sec. period S1=0.34
C. Ductility Factor ....R=6.5
D. Seismic Design Category D
Foundation Soil Properties:
A. Undisturbed sandy silt per IBC 20012 Table 1806.2....Soil Class#5
B. Maximum vertical bearing pressure 1500 psf
Concrete:
A. 28 days design strength F'c 3000 psi
B. Reinforcing bars ASTM A615, Grade 60
II
r .` GREEN MOUNTIIIN
PROJECT: Riverside - Plan 2626
Mr structural engineering DATE: Dec. 2017 BY: CM
Joe NO: 17486 SHEET: L-1
LATERAL
SEISMIC DESIGN BASED ON ASCE-7-10
1617.5 Simplified analysis procedure for seismic design of buildings
1.2-S05
SEISMIC BASE SHEAR V:= •W (EQ.12.14-11 with F=12)
S5 mapped spectral acceleration for 55:= 1.00
short periods(Sea 11.4.1) from USGS web site
SS mapped spectral acceleration for :- 0.34
1 second period(Sec.11.4.1)
Fa Site coefficient(Table 11.4-1) Fa'_ 1'1 Based on Soil
F„ Site coefficient(Table 114-2)
Site Class D
F�:= 1.8
SMS:= Fa•Ss SMS=1.1 (Eq.11.4-1)
SMi:= F„-Si SMi= 0.61 (Eq.11.4-2)
11.4.43 Design spectrum response acceleration parameters
2
SDS:= —3'SMS SOS= 0.73 > 0.509
SEISMIC
2 CATEGORY
SDI:= 3•SM1 SDI= 0.41 > 0.20g D per Table 11.6-1
WOOD SHEAR PANELS
1.2 SpS R:= 65 Table 9.52.2
V:_ W
R
1.2.0.73
V:= 6.5 •W V:= 0.135-W
12.4 Seismic Load Combinations
E:= 1.3-V (Eq.12.4-3 with redundancy factor=t3 per 12.3.42)
WSD:= 0.7-E O.7.1.3.0.135•W 0.123-W WOOD SHEAR PANELS
II
GREEN MOUNThIN
PROJECT: Riverside - Plan 2626
•
structural engineering DATE: Dec. 2017 BY: CM
JOB NO 17486 SHEET: ..._., L-2
LATE RAL
SIMPLIFIED WIND AND SEISMIC COMPARISON
WIND
.SIM' -4
11 - 7.4
psf psf
-4
_yWind ease
Shear
Length L:= 50•ft
Height Ht:= 24•ft WIND:= L•Ht-(11•psf+ 7.4•psf)
SEISMIC WIND= 22080 lb
Fr Wroof
F2 -> — Wfloor Seismic
Wwal I
ease Shear
Aroof:= 5O•ft•46•ft Aroof= 2300ft2
AFloor 42.ft-54"ft Arloor=1428ft2
Wwalls4 50 ft 20 ft Wwalls =4000 ft2
SEISMIC:_ (Aroo 15•psf+ Aryoor•15•psf+ Wwalls'10•psf)•0.123 SEISMIC= 11798.16 lb
WIND GOVERNS DESIGN
II
GREEN M0UNThIN PROJECT: Riverside — Plan 2626
structural engineering DATE: Dec. 2017 BY: CM
JOB 17 4 8 6 SHEET
LATERAL ....� N��s�.,. _ . �A. L-3
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE
VELOCITY PRESSURE qz:= .00256•Kz•Kt•Kd•V2•I (Eq.6-15)
EXPOSURE B
WIND SPEED(3 second gust) Vas:= 126 mph
IMPORTANCE FACTOR I := 1.0
TOPOGRAPHICAL FACTOR Kit:= 1.0
WIND DIRECTIONAL FACTOR Kd:= 0.85
(Table 6-4)
EXPOSURE COEFFICIENT 0'-15' Kz:= 0.57 qz:= .00256•Kt-Kzt•Kd•V2•I qz=19.69
(varies/height)
15'-20' Kz:= 0.62 qz:= .00256•Kz•Kzt•Kd•V3s2•I qz= 21.42
20'-25' K := 0.66 qz:= .00256•Kz•Kzt•Kd-V5,2-I qz= 22.8
25'-30' Kz:= 0.70 qz:= .00256•lc.Kit•Kd-1/352-I qz= 24.18
II
GREEN MOUNT�RIN PROJECT: Riverside — Plan 2626
jT v 1
1111111, structural engineering
DATE: Dec. 2017 BY: CM
JOB NO: 17486 SHEET: L-4
LATERAL
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont.
WIND PRESSURE P:= cZ•G•CP G:= 0.85 Gust factor
C, pressure coefficient
AT WALLS For Working Stress Design Multiply WIND PRESSURE by 0.6 per IBC 1605.3.1
0'-•s' WINDWARD P,„,:= 12.4-psf•0.85.0.8 P,,,= 8.43 psf
LEEWARD PL:= 12.4•psf•0.85.0.5 PL= 5.27 psf
15'-20' WINDWARD PM := 13.49•psf•0.85.0.8 P,,,= 9.17 psf
LEEWARD PL:= 13.49•psf•0.85.0.5 PL= 5.73 psf
20'-25 WINDWARD PN,:= 14.36•psf•0.85.0.8 P,�= 9.76 psf
LEEWARD PL:= 14.36•psf•0.85.0.5 PL= 6.1 psf
AT ROOF
0'-15' WINDWARD P,w:= 12.4•psf•0.85.0.3 PW= 3.16 psf
LEEWARD PL:= 12.4•psf•0.85.0.6 PL= 6.32 psf
15'-20' WINDWARD Pw:= 13.49•psf•0.85.0.3 P„,= 3.44 psf
LEEWARD PL:= 13.49•psf•0.85.0.6 PL= 6.88psf
20'-25' WINDWARD Pw:= 14.36•psf•0.85.0.3 P,y= 3.66 psf
LEEWARD PL:= 14.36•psf•0.85.0.6 PL= 7.32 psf
25'-30' WINDWARD PV,:= 15.23•psf•0.85.0.3 Pw= 3.88 psf
LEEWARD PL:= 15.23•psf•0.85.0.6 PL= 7.77 psf
II
GREEN MOUNTVIIN PROJECT: Riverside - Plan 2626
structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 17 4 8 6 SHEET: L-5
LATERAL
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont.
q 6 88 Assume
Cp-0.5 psf PO A := 35
...**4 14‘. 171Cp--0 6
8.5ft
I
IIII 8 ft
9.17
psf 111111111111111111111 6.1
psf
Mean Roof Height
18+ 25
= 21.5
2
Loads at Roof roof-max roof-ave
Windward 3.44•psf.8.5•ft=29.24 plf 3,44•psf.5.ft=17.2 plf
Leeward 6.88•psf.8.5.ft= 58.48 plf 6.88 psf.5.ft= 34.4 plf
Wall loads at upper level at main level
Windward 8.43psf•4•ft= 33.72plf 8.43•psf•8.5•ft= 71.66plf
Leeward 5.73.psf•4•ft= 22.92pIf 5.73•psf•8.5•ft=48.71 plf
It
C GREEN MOUNThIN PROJECT: Riverside - Plan 2626
structural engineering DATE: Dec. 2017 BY: CM
Jae NO: 17486 SHEET: L-6
LATERAL
114C1 r + H
Ilii �j II
11 11
IIII
11
11
II
II II
II
II
II
ii 1-r 4 (.01;eliVNIITIS II
114.• I
I ( II II `' �
0 0 Cr= EP .
O
,f-- o
I o
F7 �
P . r
1 t
I MI
093
tA
I
I--- -- :—/ Iti
r� 1
te
❑ -
[ ki,„a; .
. .---------------I
, .
, _-_____ r- Zw,,4 e ref t e„•,:ip.,r --
isl
••4
4 IDA
iP
3---3 0 0
iter
p II
g6
GREEN� PROJECT:
MOUMT�1� 1`I Riverside - Plan 2626
..,
structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 17486 SHEET.>. L-7
LATERAL
- S9
V.
a:1e I r 1 V'
1------�� 1 l`� O [� `d'_
II ii i o
II _r'm' �,'
II
IIt
o II
7,4__,,j
I
4 .C.
NI -4-
� . i.
i NI a J
7J ,
im
Mgl
-_ M emwoo►1
I ng
Pa
E3s;
—J
I I i,
IN a—.is
N —
MI
NI smowoom
M 'Nomt
4---nE
464.1.1 iil
I I j_^
I I
-u , • V
L-J , 4
P MIAL Q.LVAMIN Met'll 0 O' t". ..
If.
t 63� t t
1115 t-pie.
ph
GREEN MOVNThIN PROJECT: Riverside - Plan 2626
structural engineering DATE: Dec. 2017 BY CM
JOG NO:w 17 4 8 6 SHEET: ....,_ L70
LATERAL
NIti.►v Lavas lea
O1µ > Ls
.� 16
„�.
i
mom
omw
ire ) ROOM
1
! e
Nicr 7ii
.3"" LH s n
t it
i It
r i r 1,
I I till , '' ^
1 H U 1 `yj?
_�
000,10
1229
1 1 ..
I '" "'. _Q_Je v
i ceow . mama, „ail.
t...1>
ell 61612)— I.'
1.... Clamtitighi
2013°i
$D"'1> 7'
ti loi 1
t1coV" Illevt'''
11
r GREEN MOUNThIN PROJECT: Riverside - Plan 2626
giorstructural engineering DATE: Dec. 2017 BY: CM
JOB NO. 17486 SHEET: 1,-9 _
LATERAL .
SHEAR WALL DESIGN
Pa Pd
4 WdI
4,
F ' — P (V) P:= wind
V:= seismic
h
r
1
L R=Holdown
Force
Based on IBC Basic Load Combinations
0.6D+ W (Equation 16-11)
0.6•D+ 0.7•E (Equation 16-12)
Overturning Moment: Mat:= P•h
(L2
Resisting Moment: Mr:= 0.6•(Wdi + Wwall)• 2 + O.6•Pdi•L
Mot— Mr
Holdown Force R:—
L
II
GREEN MOUNTnIN PROJECT: Riverside - Plan 2626
tie14,
structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 17486
......, SHEET: ., L-1 Q
LATERAL
Left Elevation Exterior Wal lS
Second Level
Wind Force P:= 1700•1b P= 1700 lb
Length of wall L:= 3.5•ft+ 6•ft+11•ft L= 20.5ft
P
Shear v:= — v= 82.93p1f A
L
3.5
Overturning Mot:= P•8-ftMot= 2321.95Ib•ft
Moment 205
(3.5•ft)2
Resisting Mi.:= 0.6•(15psf.17.ft+10.psf.8•ft)• 2 + 0.6.600•Ib•3.5•ft
Moment
Mr= 2491.13lb•ft
Mot— Mr
Holdown = —48.34 lb
Force 3.5ft
Main Level
Wind Force P:= 4400•lb P=4400 lb
Length of wall L:= 4•ft+4•ft+ 6•ft+ 13•ft L= 27ft
P
Shear v:= L v=162.96plf B
4
Overturning Mot:= P.9.ft. Mot= 5866.67lb•ft
27
Moment
(4•ft)2
Resisting Mr:= 0.6•(15psf.17•ft+10•psf•17•ft)• 2 + 0.6.800•lb•4•ft
Moment
Mr= 3960lb•ft
Mot— Mr
Holdown =476.67 Ib
Force 4.ft
PI
A
GREEN MOUNTnIN PROJECT: Riverside - Plan 2626
a
lr,,w_
lip
structural engineering DATE: Dec' 2017 BY. CM
JOB NO: 17 4 8 6 SHEET: L-11
LATERAL
Front Elevation Exterior Walls
Second Level-Ele v Gov desn
Wind Force P:= 2859-lb P= 2859 lb
Length of wall L:= 5•ft•2+3.5•ft•2 L=17ft
P
Shear v:= - v=168.18plf B
3.5
Overturning Mot:= P•8•ft• 17 Mot=4708.94lb-ft
Moment
(3.5•ft)2
Resisting Mr:= 0.6•(15•psf•4•ft+ 10•psf•8•ft)• 2 + 0.6.600•Ib•3.5-ft
Moment
Mr=1774.5lb•ft
Mot— Mr
Holdown = 838.41 Ib
Force 3.5-ft
Main Level -not considering the.3rd ca-garage
Wind Force P:= 3680-lb P= 3680 lb
Length of wall L:= 2.25•ft+ 2.25•ft+ 2.25•ft L=6.75ft
2.25.3.5= 7.88
P
Shear Wind v:= L v= 545.19plf E
2.25
Overturning Mot:= P•7.88•ft•675 Mot= 9666.13lb•ft
Moment
(2.25•ft)2
Resisting Mr:= 0.6•(15•psf•4•ft+10•psf•8•ft)• 2 + 0.6.800•lb•2.25•ft
Moment
Mot— Mr Mr=1292.63lb•ft
Holdown = 3721.56 lb
Force 2.25•ft
HTT5
1
IA
GREEN MOUNTIMIN PROJECT: Riverside - Plan 2626
Milf,
structural engineering DATE: Dec. 2017 BY:w cM
JOB MO: 17 4 8 6 SHEET: L-12
LATERAL �r �.�.,
Right Elevation Exterior Walls
Second Level
Wind Force P:= 1700.1b P=1700 lb
Length of wall L:= 3•ft+ 6•ft+10•ft L=19ft
P
Shear v:= L v= 89.47plf A
6
Overturning Mat:= P•8•ft•19 Mot=4294.74 lb•ft
Moment
(6•ft•)2
Resisting Mr:= 0.6•(15•psf•17•ft+10•psf•5-ft)• 2 + 0.6.600•Ib•6•ft
Moment
Mr= 5778lb•ft
Mot— Mr
Holdown = 247.211b
Force Eft
Main Level
Wind Force P:= 4400 lb P=4400 lb
Length of wall L:= 15•ft+ 7.ft+4.ft L= 26ft
P
Shear v:= - v= 169.23plf S
4
OverturningMot:= •P 9 ft26 Mot= 6092.31 I b•ft
Moment
(7•ft•)2
Resisting Mr:= 0.6•(15•psf.17•ft+ 10.psf•17•ft)• 2 + 0.6.800•Ib•4•ft
Moment
Mr= 8167.5lb•ft
Mot— Mr
Holdown = —518.8 lb
Oft
Force
GREEN MOUNTRIN PROJECT: Riverside - Plan 2626
structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 17486 SHEET: L-13
LATE RAL
Rear Elevation Exterior Walls
Second Level
Wind Force P:= 3043•Ib P= 3043 lb
Length of wall L:= 8-ft+ 7•ft L=15ft
P
Shear v:= — v= 202.87plf B
7
Overturning Mot:= P•8•ft15 Mot=11360.53lb•ft
Moment
(7•ft)2
Resisting Mr:= 0.6.(15.psf.2.ft+ 10•psf•12•ft)• 2 + 0.6.600•lb•7•ft
Moment
Mr=4725lb•ft
Mot— Mr
Holdown — 947.93 lb
7 ft MSTC40
Force
Main Level
Wind Force P:= 4303•Ib P=4303 lb
Length of wall L:= 3.ft+ 4•ft+ 3.5•ft L=10.5ft
P
Shear Wind v:= r v=409.81 plf D
3
Overturning Mot:= P•9•ft•— Mot=11064.86Ib•ft
Moment 105
(3•ft)2
Resisting Mr:= 0.6•(15•psf•4•ft+ 10•psf•8•ft)• 2 + 0.6.800•Ib•3•ft
Moment
Mo— Mr Mr=18181b•ft
Holdown = 3082.29 lb
Force aft
HITS
II
GREEN MOUNTVIIN
PROJECT: Riverside - Plan 2626
%it structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 17486 SHEET: 1,,,,-14
LATERAL
Interior Shear Walls at Garage
Main Level
Wind Force P:= 3797•lb F'= 3797 lb
Length of wall L:= 12-ft L= 12ft
P
Shear Wind v:= — v= 316.42plf C
L
Overturning Mot:= P•9•ft Mot= 341731b•ft
Moment
(12•ft)2
Resisting Mr:= 0.6•(10•psf•12•ft+10.psf•9•ft)• 2 + 0.6•1200.1b12-ft
Moment
Mot— Mr Mr=17712lb•ft
Holdown =1371.75 lb
Force 12•ft
HTTS
11
GREET 7 MQV�'i'�� � PROJECT: Riverside - Plan 2626
.iiiir
structural engineering DATE: Dec 2017 BY: CM
JOB NO: 4 17486$6 SHEET: L-15
LATERAL
WIND ON PORCH ROOF
126 MPH,EXP B w:= 6•ft•(4.43•psf+ 8.86•psf) w= 79.7 plf
,•I D
I
fl
11 I
II
II
II
M II L
1114,
II G II
II II
w 1
1 lib 1111111Ai
DESIGN ROOF TO CANTILEVER FROM HOUSE L:= 10-ft D:= 12-ft
w•L2
M:= 2 M= 3987 lb ft
support beam on post in wall at house with
M Simpson HUCQ-SDS
C:= — T:= C C= 398.71b
L 12 SDS 1/4x21/4 screws(min)x172 lbs=2064
in combined withdraw
w.L Nail top and bottom chord of first truss to wall with
v p v= 66.45 plf (2)16d nails at 16"o.c.(web to studs)
II