Loading...
PFI2018-00265 CITY OF TI GA RD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12018-00265 13125 SW Hall Blvd., Tigard OR 97223 503.718.2421 Date Issued: 10/01/2018 Parcel: SEG645 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Job M2476034 and M2398137 Project Description: SEG645, associated with 11123 SW 68th Parkway. Converting existing overhead facilities to underground. Install new underground service to new storage business (CUP2016-00002) Owner: FEES Description Date Amount PHONE: Contractor: PHONE: FAX: Applicant: TOD SHATTUCK 10800 SW AVERY ST TUALATIN, OR 97062 PHONE: 503-464-7777 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant r - Hk�-CA-uoo Signature: wE Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12018-00265 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue) and to 503-962-8140 (Tri-Met) and 503-431-2345 (Tigard School District) and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12 - UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13- UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work (pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work. Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15- REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities (roads, ditches, etc.) as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16- PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name> at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17- NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 18 - PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19- MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20- EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two (2) persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice RECEIVED City of Tigard SEP 2 7 2018 CITY 0 T1GA1F a PUBLIC WORKS — ENGINEERING PLANNING,EN'"31NE"D;ING tYImprovementPublic Faces (PFI) Permit TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) TYPE 1—Franchise Utility Work Check one: V Utilities ❑ Sidewalk/driveway approach ❑Street improvements performed by NWN, PGE Detailed description: Converting existing overhead facilities to underground and/or utility agency. Install new undergroung service to new storage business ❑ TYPE 2–Sidewalk/Driveway/Sewer PGE Job M2476034 and PGE Job M2398137 Work performed for the purpose of: • Sidewalk installation or repair. Property address/location(s): 11123 SW 68th Pkwy ���64 • Driveway approach installation and/or repair Tigard, OR 97223 • Sanitary sewer lateral installation and/or main line tap Portland General Electric ❑ TYPE 3—Full scale Development Applicant: Work performed with Land use Address: 10800 SW Avery St approval which includes any of City/state: Tualatin, OR Zip: 97062 the following: Phone: 503-464-7777 Email: preregcoord@pgn.com • Subdivisions or Partitions Contact name: Tod Shattuck Phone: 503-672-5466 • Street widening • Mainline installation for Sanitary Nutter Corporation sewer, Storm sewer, Tigard water Contractor: P and/or Tigard Water Service Area CCB#: 87697 Expiration: Address: 7211 NE 43rd Ave SUBMIT COMPLETED APPLICATION TO: City/state. Vancouver, Wa Zip: 98661 City of Tigard Phone: 360-573-2000 Email: shannonb@nuftercorp.com PlammnglEnginecn4 13125 SW Hall Blvd. Contact name: Shannon Phone: 360-907-9405 Tigard,OR 97223 Applications for"minor work in right-of-way" Engineer: AKS Engineering only may be emailed to: g ro ermits_,tjgard-or.gov Address: City/state: Zip: Phone: 503-563-5161 Email: DragelinJ@aks-eng.com Case No.: PFLYILOOL6's Contact name: John Dragelin Application submittal fee(.007%of Engineer's Estimate) $ Estimated value of work is required(if over$5,000):$ 22,686.35 additional fees: $_ (within the public right-of-way) Application accepted: Date: Is work related to a LAND-USE DECISION? El Yes No By: If so please specify (MLP SDR SUB etc.) case #: Application reviewed: By: 613 Date: 10 • � Is work related to a BUILDING PERMIT? ❑ Yes No Applicant notified: If so,please specify(BUILDING PERMIT)case#: By: SC Date: 10 I:\ENG\PermitApplications\pfi—application Rev.10/16/2017 City ofTigard 13125 SW Hall Blvd. Tigard,Oregon 97223 wwwtigard-or.gov 503-718-2421 • Page 1 of4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. * With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised Utilities are not required to obtain the owner's signature on the application BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT: • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject ro e • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and sub)ect to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. Vinh D Nguyen, EnsignedbyVinhD Nguyen, PE Date:2018.09.26 18:12:14 0r00' Applicant/Authorized Agent's signature Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date �p •. ...:' M <r _-. K•h"s.A`iL88u.3-N'_ai"?.al'.ir 1G��a6�X':°S�Y2NtlIbLPr"dl'n3SR3Mih. L4'$".t- . .. ... ..- '.[-•u ir4...fAC1:wix'-0Y�+RNYFx:- .i4bCfYiid3W;:354-$:N+' PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 • Page 2 of4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: DETAILED _ MITTAL APPLICATION FEE REQUIREMENTS Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/ DRIVEWAY AND UTILITY PERMIT FEE CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the right of way) Engineer's estimate X 5%(less$300.00 minimum submittal fee) Sketch m Engineer's estimate X 2%Plan Review {including information below) ❑ Dimensions WATER SYSTEM FEE ❑ Street Name Part 3: All public water system improvements ❑ Site Address Engineer's estimate X 12% FULL SCALE DEVELOPMENT PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements) There will be no permit fee charged,or assurance required for the following types of work: Design Plans • Sidewalk repair (less than 20 lineal feet) (6 sets,24x36 or 22x34) • Relocate or replace mailbox ❑ Cover—Site,'Vicinity,Abbreviation,Legend • Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.) • Weep hole repair ❑ Street(Plan,Profile) • Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile) • Lawn sprinkler system installation or repair ❑ Water Quality Facilities • Street tree pruning or planting ❑ Grading • Planter strip landscape maintenance ❑ Landscaping/Tree Plan • Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,Sanitary,Water,Signage,Street Lights,etc) ❑ Details Note: A cash/bond assurance may be ❑ Traffic Sight Distance required per TMC 15.04.140. ❑ Signing and Striping (customer deposit) ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval ❑ Engineer's Construction Estimate � ,. '..._ ..,t<,,, .r!-�.2 .�.,, ,.:: ,a'.+^k.e.,., .,.-.. -o. .. .__.. ..Mr.s• ,v.;r:,*-•x� ,-,.-. �wuay.:.,, ... _ ,,.::,�„ - �a..r.-.�.^�">'.:l't�-. _ _ -r PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of4 SAMPLE SKETCH: Edge of Pavement I Ditch — Streetlight I .—.—•—.—.—.—.—•—r—.— I r __ Rain Drikin I I ' ' T fro os d�5ewerTine . I � I N� I N Existing House IN Existi n Z Driveway . C 1 .L01 I • C WI �I I I i ' W L `w� I 1 'I a. I Existing Shop Powerpole I I a C G • I I95 -------" ' I ' ------ --- . I property t_ni e" — i I Fire Hydrant(FH) I I + I Scale: 'I"=30' � I I I I I ' I I I I I � I MINIMUM SKETCH REQUIREMENTS(Put"N/A"if Not Applicable): North arrow Property lines &dimension Slope of property Street &street name(s) Existing building, structures Utility&street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water,storm) !rx,.:.:>;�a,.#:9aC4!':::�'.0...s>^}-...',.;S+f7u''.r;.`G:'.}Ali�'-Y wiY-'K��Yk::±"'m4Yxs....n,#i,.r."4M:&+'Mititt�fnd.'1.:'. ':.._ :•:sPy'�p4oe�8c�2'L.%.`i.«?�`r;}; '4:Y'an'T,35"�`€(x :':i�.aeiR�:.33�"bc Y-�"�S!.ss� ';:mXMY^i.�A�Y"••"•"'n7al�':ixleM:FA' R' .Eb'dif. �NiGt:ii1i,.. PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard - 13125 SW Hall Blvd. - Tigard,Oregon 97223 - www.tigard-or.gov - 503-718-2421 - Page 4 of4 Page 52 2011 Edition Bicycle and Pedestrian Accommodation Diagrams The following practices and details address the accommodation of bicycles and pedestrians within work zones. The following detail drawings should be incorporated, where appropriate, into the traffic control plan for any short term work. 1. See Section 1.6—Bicycle and Pedestrian Considerations for additional guidance. 2. Stay alert for pedestrians and bicycle traffic and accommodate safe passage for them, as needed. 3. The work space should be protected from bicycle and pedestrian intrusion by using barricades or closely-spaced channelizing devices. 4. Maintain access to transit stops or clearly close a transit stop using barricades or channelizing devices. Bicycle Accommodation Diagram 5-6 Bicycle Accommodation Principles: 1. If a significant volume of bicycles can be expected and work closes a marked bicycle facility, or requires bicycles to share a travel lane, install a "(Bicycle) ON ROADWAY" sign (CW11-1) or the Bicycle symbol (W11-1) sign with an "ON ROADWAY" (OBW1-5) rider, in advance of the work area. 2. Install temporary signing off the paved shoulder, within the planter (buffer)strip, or share the width needed between the shoulder and the sidewalk, as available. 3. Signs are to remain in place until the surface is restored and the width made available for bicycle use. See Diagram 5-6 for typical bicycle ' signing placement. Sign Spacing and Buffer Lengths(feet) Posted Spading Between Suns "Buffer" Speed A B C Space 20 50 25 100 100 100 75 30 100 35 350 350 350 125 40 150 45 180 50 500 500 500 210 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 2011 Edition Page 53 Bicycle Accommodation Diagram 5-6 I I I NOTES: • Bicycles on Roadway(CW11-1)sign should not interrupt standard sequences. For example: o BE PREPARED TO STOP/Flagger Symbol o LANE CLOSED AHEAD/Lane Ends I Symbol • Bicycles on Roadway sign typically follows ROAD I WORK AHEAD sign and used as general warning. I I I I I I � I I I A I I I I I I I�I I I I I I I I A I I I I I I I I I� I I I I I I I I B • I I ' I I It I ROADWAY I I I I I C I I ROAD I� WORK AHEAD September 2016 Chapter 5 IABC2A_ ABC 150970 COMMERCIAL LEGEND H ?12254 NEW PGE FACILITIES TO BE INSTALLED (j (UNLESS OTHERWISE SPECIFIED) Lz�a f� FACILITIES IN GREEN ARE TO BE REMOVED 444-PGE VAULT,WITH 44-2125-PGE TOP, PROVIDED&INSTALLED BY CUSTOMER 'o Q FAULT INDICATOR i� INSTALL 1-#2 AL-EPR JKT PRIMARY IN 1-2"PVC CONDUIT •F PROVIDED d INSTALLED BY CUSTOMER Cl i-36A ---------INSTALL 1-#350 AL-TX SECONDARY IN 1-3"PVC CONDUIT PL-6137 N� EnsnNc 12G240PROVIDED&INSTALLED BY CUSTOMER POE 0VINED ROLE SINGLE MASE SVC PGF TO PUL( • A Ts 5521 � I p 1 B 100 C 75 5522 IA 10 20833 425' C 25 37842 AI2ACSR BC6CJ 5136 45 O} 50'-3 1w, A 25KVA 5 M 1 I \ PD-!33 L Y L1 Z PL-6138 I Y 240 °F 25;8.2 CONSTRUCTION NOTES: CMDEV 1 X i ANCHOR TO BE REMOVED 1.CUSTOMER IS RESPONSIBLE FOR ALL TRENCH,CCNDUTT,VAULTS,PAOS AND L ROAD CROSSINGS. n 1 PW�4fl'PW 2.AME STANDBY CREW IS REOURED FOR OPENING ALL ENERGIZED POE VAULTS / JUNCTION BOXES AID EOUIPMENTIFACILITIES NCLUOING CONNECTION OR MStALLATION L OF CONDUITS ANS PULL STRINGS CALL SERVICE COORDINATION AT 50132}6700 1 TO SCHEDULE A POE STANDBY CREW. Cl 1-36D PGE TO INTERCEPT F3 PVC 6 3 ALRLCO DUT TO BE E INSTALLED MTH 30 INCHES(MN COVER AT TOP OF CONDUIT L PIVMB 10 NEW CONDUIT A INSTAL I 4 ALL pC,E CONDUCTORS TO BE INSTALLED N GRAY.SCHEDULE 40,ELECTRICAL GRADE, 1 1-350 1X FROM PD-123 TO METER BASE PVC CONDUIT WITH NYLON PULL STRINGS((MN.500 LBS.TEST) POE TO DETFRMNE 1 CUSTOMER 70 SNB 1-3"PVC THE SIZE AND NUMBER O COH(MI S REOlI1RED.MAINTAIN 12 VERTICAL INCHES AND 1 BASE OF EXISTING POLE 4 MGIR6 SMi LLER TO BE 36 WCHES HVCRADRI ALL.BENDS M15T EN GAS AND OTBE FAT RYSAI DEELBOWS / J ALL ELBOWS URGER TIYBN�4pNCN TO E 60 NCH RAORIS.RIGR)STEEL OR PGE 1 FOR ANV LEHEHGT1 R�llll YIIMBG�ORE TNW,b DEG SE IN BEFORS/OSEw Sd1E0I1LE L 40 SENOS ARE ACCEPTABLE FOR RIR OR 160 FEET OR LESS THE MAXRAIIM TO-AL BENDS IN Al CONDUT RIM 3 ZT0 DEGREES. 15394% ,ITHA.�COWREMEWS.BIJ,CKNDPE IHIGHDETA-LOKORLIKE LECH DUC" 1rt 160716 IT AS AN ALTERNATIVE TO HOVE DUCT HOPE SMALL(MEET THE ICM PD-1B02d KPOUIREMENTS•CF PGE SPECIFICATION LC2M 15/AVMUBLE ON REQUEST FROM PGE PRO.". MANAGER FOR SAFETY REASONS THE DUCT SHALL BE BLACK WITH NREE EOLULLV SPA,' tiTRUFLFO RFf STRR•F[TWHICH ISASPECIFICATION REQUIREMENT MANDREL TEST OF .I III rt.1,41 i P INSTALLATION WITH PGE IN P`rl TOR bRESE NT. Q < 6 BUILDINGT WALL OVER toBEAM14 fBTS�yR�R FROM MIY RPROMOE HYAMY DRANT COMBUSTIBLE PGE TRANSFORMERS MOST BE WITHIN 15 6 OFA ORMEABLE AREA ALWAYS MAINTAIN 10 FEET CLEARANCE N FROM OF ALL TRANSFORMERS. T TRANSFORMFR PADS ARL.TOM SET SO THAT THE TOP IS 2 MCW S ABOVE FMK GRADE CONDUIT 19 TO BE INSTALLED N PAD AS INDICATED N DETAIL AND TO EXTEND 1 NCH ABOVE THE PAD. 9.STEEL BARPoER POSTS ME REOIRRED AROUND TRANSFORMERS THAT ARE EXIMSED TO VEHICLES. 9.ALL SWITCH VAULTS TO BE SET AT FKAL GRADE WITH 6 NCH GRAVEL BARE AND CONDUITS ALIGNED TO EWER THE VAULT END LOWER KNOCKOUTS(TER—DUCTS (SEE DETAILS ON SKETCH NOTE: 10.PGE TO BE NOTIFRiD AIG ASPECT AJ-CONDUIT,VAULT AND PAD INSTALLATIONS BEFORE BACK IU41.1 NEW VAULT 6 PAD LOCATIONS TO BE FIFLO VERIFIED IF EXISTING CONDUIT IS UNUSABLE FOR ANY REASON -..FUSTOMERRE R_,_ATIVE IT IS THE CUSTOMER'S RESPONSIBILITY TO 11.REFER TO PGE ELECTRICAL SERVICE REOJOEMEVTS BOOK FOR FURTHER DETAILS 6 SPECIFIC REQUIREMENTS.LINK TO wv�nu PnRTI unruucR PROVIDE 8 INSTALL A REPLACEMENT 4II41GE VAULT 12.DESIGN IS BASED CU STANDARD SEAN EOUIPMETI AOI-STANDARD UNDERGROUND EQUIPMENT WV OE M OPTION AT AN ADDITKJNK COST TO W/PAD MOUNT LID THE cus.oMER NOTES -1'C F'.".,' -L- +W AND DNISION OF OWMEP.SHIF EI",vrEN THE CUSTOMER AND w•nc PD-'13 3 1.RAIUs TO RL �GE'NIL(RE Al r�F LINE SIDE OFTHF NFW CUSTOMEP^PCI'/IDED SWITCH GEAR. 2 r PVC W At LOCATPOW rFRM-A-DUCTS APPROVED 9Y PGE ANY DEVIATION FROM THIS DESIGN MUST ON ALL WALLS 2.TOP OF LD To BE APPROVED 8Y PGE PROJECT MANAGER G SET AT FINALTHINK U7 . APPROVID r PCrE. 3 AAD DO HOT� SAFETY 3-PVC Y urs FII�S,I,I AS-BUILT VERIFICATION& NESC VIOLATIONS CORRECTED 10 SK 4�A1INR�STALL Soo V Th;s d«umenr RR«RTey reprrcenls FIELD CRnsku<non. STRR+G� - FDTBman: Daft: M EACH NC. O ¢� Gefl I Foreman: Real 91de 24' Sprit i/ A S1 nafum On required IGF Field const UCi On cha B S. --rTPIRAI �� CONTACT SERVICE COORDINATOR SDPlWENG REVIEW: ASBUILT BY DESIGNER: LEGEND �• •� a TRENc.AHP c +r Pn.E�Tu wMEOII DATE.916'1018 SCALE N75 ACCOUNT 1070001 AWG.1000004592 os No M2476034 0B'• PGE PT RT, CtutRRLo ROCK TO c.•',e�"I' _L,•••....4••,"NFeI[IFO TITLE ,i6•• Mie O 3—d.rr C.hLr 4..oEEP IAUF4 SERVICE CODA w, RPC TIGARD 649,LIC Miw Co �� �� 503-323.6100 OR 800542-8018(SALEM) CIRCUIT SIZE T'r"rh o T.1—%GTI' WEST PORTLAND-72ND 17x22 ® CALL 811 BEFORE YOU DIG PGE L123 S NI., .—II l7E"TION: � 111123 w 68TH PKWY.,TIGARD,OR 97223 8.1— RIGHT-OF-WAY PERMIT NOTICE: OREGON LAW REWIRES YOU TO FOLLOW RULES ADOPTED `./ 8.IB.Tkflll THE OREGON UTILITY NOTIFICATION CENTER. DESCRIPTION A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY THOSE RULES ME SET FORTH IN OAR 952-001-0010 , OVERHEAD TO UNDERGROUND CONVERSION OF EXISTING FACILITIES L'ndinurfira WORK IN THE RIGHT-OF-WAV MAY BE PERFORMED.ONLY PGE APPROVED 12"Mie E.rlh I/GN BY CA -OD90.HE ANY UTILITY COMES Of COUNTY ECTION(5J HORX WITH SHEER CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL RULES BY CALLING THE OREGON UTIITTY .AVFRiar+ WASHINGTON Cll-36A I Of I AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER PGE'S PERMIT. TION CB4TI81 ADA/M61RA710N Q(303-252-1987) J.R.U-T—h WO G.. THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 46 HOURS (^�c:,w DESIGN 6T PepNf(5031 DRAWER er BEFORE WORK IS TO BEGIN A COPY OF THE PERMIT MUST BE ON SITE. TO REWEST UTILITY LOCATES CALL THE OREGON RRlee wWs bell Ir TOD SHATTUCK 672-5466 PENKA TANTILOVA UTILITY NOTIFICATION CENTER,811 AT LEAST CGII 6eleTe rnerroH.w rvoa 2 BUSINESS DAYS PRIOR TO EXCAVATION. Yw a6. 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED Page 84 2011 Edition Stationary Lane Closure with Flagging Diagram 320 Diagram 320 covers total closure of one lane of a two-lane, two-way roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads(less than 400 ADT)with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater, when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4)should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the"Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 September 2016 —————————— —— -—————————— CI) N o N Single Flagger Operation ,� i ' � o °� � � o � g � o � o � � � rn N a a n for Lop VO�)mes „ m� I (Optional) _' a o S 8 0 8BE n v FLAGUM I PREPARED ONE LANE a H s H c H AD TO STOP M r 8 8 8 I " �— ..— — — ROAD 8 8 v r, I WORK o S K o K e K e K A I»-I AHEAD 0 '^ • R�vrrd. O W W N N N N N N N V V1 d A \ \ BE H/•���I to In Vt 0 0 0 0 U1 aNpMr _ M siov FIW I (D f---- ` --------------------i ' A B I 1 mile _I � 'T1 f` max. U �G Buffer Protection Vehicle ROAD w/TMA(both Optional) WORK See Chapter 4 AHEAD BE � ONE LANE ° TO s oP Two Flagger Operation NADm co �, (Optional) p �,