Loading...
PFI2018-00251 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12018-00251 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 09/19/2018 Parcel: SEG775 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Job M2420237 Project Description: SEG775, associated with 11720 SW 72nd Ave. Relocate facilities for street widening. Owner: FEES Description Date Amount PHONE: Contractor: PHONE: FAX: Applicant: JAMES CHRISMAN 10800 SW AVERY ST TUALATIN, OR 97062 PHONE: 503-464-7777 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Issued By: --�— ovv Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12018-00251 Type: Condition Name: Status: Severity: PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI—Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI—Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI—Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI—Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI—Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI—Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. RECE"WED City of Tigard SEP 19 2018 PUBLIC WORKS — ENGINEERING CITY -7_. .....: `Ar-,D tYImprovementRmLA!� NE` +'�GEN'N RING Public Facili PFI Perit TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) Sd TYPE 1—Franchise Utility Work Check one: iZ Utilities ❑ Sidewalk/driveway approach ❑ Street improvements performed by NWN, PGE Detailed description: Relocate facilites for street widening and/or utility agency. ❑ TYPE 2—Sidewalk/Driveway/Sewer PGE Job M2420237 Work performed for the purpose of • Sidewalk installation or repair. Property address/location(s): 11720 SW 72nd Ave Tigard, OR 97223 ' Driveway approach installation J � and/or repair • Sanitary sewer lateral installation and/or main line tap Applicant: Portland General Electric TYPE 3—Full scale Development PP El Work performed with Land use Address: 10800 SW Avery St approval which includes any of City/state: Tualatin, OR Zip: 97062 the following: Phone: 503-464-7777 Email: preregcoord@pgn.com • Subdivisions or Partitions Contact name: James Chrisman Phone: 503-736-5749 • Street widening • Mainline installation for Sanitary Contractor: Don Burke Excavation Inc. (DBA- DBEC) sewer, Storm sewer, Tigard water and/or Tigard Water Service area CCB#: 150901 Expiration: Address: 15604 SE Ruby Dr SUBMIT COMPLETED APPLICATION TO: City/state: Milwaukie, OR Zip: 97267 City of Tigard 503-652-0175 Accountin di DBEC.com Planning/Engineering Phone: Email: 9@ 9 13125 SW Hall Blvd. Contact name: Doug Weeks Phone: 503-519-7768 Tigard,OR 97223 Applications for"minor work in right-of-way" Ke Wa Corpnly may be emailed to: Engineer: KeyWay P row,permitsnae.tigard-or.gov Address: 7275 SW Hermoso Way City/state: Tigard, OR zip: 97223 Phone: 503-684-5100 Email: Case No.: Z �-OOL� Contact name: Geff Halle 503-560-2553 Application submittal fee(.007%of Engineers Estimate) $ Estimated value of work is required(if over$5,000):$213,443.74 additional fees: $ (within the public right-of-way) Application accepted: By: Y_ Date: f l`l y Is work related to a LAND-USE DECISION? ❑ Yes Ij No If so, please specify (MLP,SDR,SUB, etc.) case #: Application reviewed: By: 131S Date: ' Is work related to a BUILDING PERMIT? ❑ Yes No applicant notified: If so,please specify(BUILDING PERMIT)case#: By: �� Date: —I'b 7 I:\ENG\PennitApplications\pTi—application Rev.10/16/2017 City ofTigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page I of4 APPLICANTS NOTE: Person specified as "Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. * With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s) must sign this application in the space provided or submit a written authorization with this application. Franchised Utilities are not required to obtain the owner's signature on the application BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject ro e • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. STEVE HURSH 9/19/2018 Applicant/Authorized Agent's signature Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT CityofTigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 Page 2 of4 DEVELOPMENT ENGINEERING FEES FOR STAFF t'SE' ONLY Public Facility Improvement(PFI)Permit: 11 DETAILED SUBMITTAL APPLICATION FEE REQUIREMENTS Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/ DRIVEWAY AND UTILITY PERMIT FEE CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the right of way) Engineer's estimate X 5% (less$300.00 minimum submittal fee) Sketch Engineer's estimate X 2%Plan Review (including information below) ❑ Dimensions WATER SYSTEM FEE ❑ Street Name Part 3: All public water system improvements ❑ Site address Engineer's estimate X 12% FULL SCALE DEVELOPMENT PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements) There will be no permit fee charged,or assurance required for the following types of work: Design Plans • Sidewalk repair(less than 20 lineal feet) (6 sets,24x36 or 2204) • Relocate or replace mailbox ❑ Cover—Site,Vicinity,abbreviation,Legend • Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.) • Weep hole repair ❑ Street(Plan,Profile) • Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile) • Lawn sprinkler system installation or repair ❑ Water Quality Facilities • Street tree pruning or planting ❑ Grading • Planter strip landscape maintenance ❑ Landscaping/Tree Plan • Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,Sanitary,Water,Signage,Street Lights,etc) ❑ Details Note: A cash/bond assurance maybe ❑ Traffic Sight Distance required per TMC 15.04.140. ❑ Signing and Striping (customer deposit) ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department approval ❑ Engineers Construction Estimate PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 Page 3 of SAMPLE SKETCH: Edge of Pavement I '— Ditch Streetlight I ■!■!■i■!•!■!■!■!�!■! Rain zTain I I ' Tlr—ro os' cf'Sgwlerr"rnr"' I I Ne I Existing House Existing >1 Driveway cr� C 1 ■'t I , I •ti a � I I o� a 0I 1 Existing Shop Powerpole . : ■ 95' 1 I " Property Le" Fire Hydrant(FH) I I I I Scale: 'I"=30' � � I I I I ' I I � I ' I I I MINIMUM SKETCH REQUIREMENTS (Put"N/A"if Not Applicable): North arrow Property lines & dimension Slope of property Street &street name(s) Existing building, structures Utility&street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water, storm) PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard - 13125 SW Hall Blvd. - Tigard,Oregon 97223 - www.tigard-or.gov - 503-718-2421 - Page 4 of4 PL-108 p1-108 R]S f195 COMMERCIAL LEGEND INSTALL 50-Z D728erC�ONDUIT mS NEW PGE FACILITIES TO BE INSTALLED UNLESS OTHERWISE SPECIFIEDLi 2-6"POLE ro ( ) 30 LEAD UNITS -T IZ"BRACKET '� PR118,939, -.0 •' ' 660-PGF SWITCH VAULT,WITH 64-357P-PGE TOP I Mw PROVIDED&INSTALLED BY CUSTOMER A5 23'LEAD 1 ]U L 5106-PGE SWITCH VAULT,WITH 5106-T-3-332P-PGE TOP 1 'i0 L PROVIDED 6 INSTALLED BY CUSTOMER GI NEU 5,7574 I 612-PGE VAULT,WITH 612-T-2436P-6065-PGE TOP WA SW BAYLOR ST PROV DED 8 INSTALLED BY CUSTOMER INSTALL SWITCH VERTICAL 1i' DISCONNECT WARMS PCE 70 INSTALL (MU0503) \ I a--.... INSTALL 3-20 AL-XLP XT PRIMARY IN 4-PVC CONDUIT PROVIDED&INSTALLED BY CUSTOMER VT-84 • 1 _ _--IIS_ IN5TAL1 1--750 AL EPR AT PRIMARY IN 2 OF 2-6 PVC O' CONDUITS.PROVIDED&INSTALLED BY CUSTOMER 2-6"PVC CONDUIT SPD-104 041 PROVIDED d INSTALLED BY CUSTOMER 1 1 'N" INSTALL 2-6"POLE INSTALL 1200AMP PAD MOUNTED SWITCH DUIT UNITS Io F 12"BRACKET Q FAULT INDICATOR u VT-96 R� LSIZE FU amour SIZE FUSING IS NOTED O "O-PGE SWITCH VAULT I POLES ____- 6X MOTS L 1 ----__ -_ 1.vers TO.E T�.yu 6041LE CLASS p,2,3,I,Hl,H2,5) APr O LDurDw I 1 + H7 ct LE HEIGHT(FEET) AMIIOYED ATGt 1 Ips of Ln To I 1 INSTALL 50.2 D 128 RE SIT AT FIAT 1 1 GRADF, 1 1 APIROYFD RT TGE 11 3 lb HOT LD1D$$ 1 30'LEAD FRAMING TRANSMISSION d DISTRIBUTION(SEE CODES BELOW) PVC knWITH t 1 A3 VAULTS 1 1 PR118,939F EX15. • • L 1 Ga PR 939. C)12 1—DIST-1.1--C1.1,14041,10120 1 RISIMi Soo u 1 T ((MMY1IV1��r,ST - 13PH 10FT SGl DE F6ERG .POLY 31WU N FKTI TS'C t� VT--98 e EU 5,D c V1-33 1 J 1 j W N5.757a ExrsING 1- 1 eFs INSTALL SWITCH VERTICAL TO na867 W 1 1 DISCONNECT 10'ARMS ANCHORS 4' A'TO Q 1 (MU0503) E t VT 81 IS ,ItAD t II A 672 VAULT WIS66 1.0.TO/ Z ;1 !.6_ EDIT FO AWT SWITCllES y.1 C4 _,1 j ANCHOR COOS Al A3 A5 A7 AB PD-104 ]Tlr a, T I AT 11 a.d•TO H GUYING ��•�� �TgN�R� I I d � n S F] � S Ta'ro �] T�enG9 aur rYc I 1 n oe 1 I GUY 01 W G7 2p 22 1 2 GEM G2 GS GB GIl1 23 I 3 GUYS G3 Gd G9 GI 2 71 IL '10 1 VTN �1 1 lV ALNIR 11 AN LelF 9nq Y To e� 1 5106-PGE VAULT 51064aa32P-PU VT-84 ELOTE 1 i YMRT A■ �1 ®NnER D \.jamAr LOU I L Q 4L'w ilppLoED EEA r �u rxy I 1 •q 1 rt 6 0o FEDI 13Rxi I1Mi1R� ;, 11DR no, e areuuMeu 1 ANY DEVIATION FROM THIS DESIGN MUST • mr rtA1- I r ` �• i• 6 N Mo^` ` BE APPROVED BY PGE PROJECT MANAGER •• AG rD 1 Vf 96 1 i1r A/R. 1"TO VT 33 11 CONSTRUCTION NOTES: CMDEV U, - 1 F 1,ROAD R D RrsPaFrslltr FOR ALL rREMCH,CONDUIT,VAxiT.PADS AW F, 5106-PGE VAULT ;F SW CLINTON ST ALL C CROSSINGS. TO SW 1 3 332P PGE 1/ J.ALL CONDUIT 10 A NSTAUEa WITH 30 EVCUES(FON)COVER AT TOP Of COEDUII A.TO 1r 1 FROM FINAL GRADE. Vr 64 / VT-96 Q= i 1 3 ALL PCE COMIXI TORS TO BE INSTALLED N GRAY,SCHEDULE ID,ELECTRICAL ORAOF. �f F,plei T y 1 1 INC CONDUIT WITH NYLON�AND MIAMI!Of PIAL S1Y�KwOSIRW�RO.W LAS.TEST).PGE TO DETFAM" rNAr1OUT1a e 7 H L MS AND ]/EHOMLOMIt INCHES CLEARANCE RFIN'EEN CAT AND OTHER UTRITIES�ELBOWS PD 104 MNiR TwLtO Y,cr 1 I ITIOr E SMALLER TO N M NCH WRIT.ALL IDS MUST N FACTORY MADE F iliOrTr u Irwi,Lro j 1 APPROVID.PIWIGLASSrHAN 1EMDS�RFp11RW FOR Itt"F 151 HET70 AIR 60 W.M RADIUSAPGlDSOOR LCNOR UR ONDL 1 CA FOR ANY IHNGTII RLN WITH"ORF iHIW AD DEGAM N BIERS PVC SCHEDULE 1�� R AlMoRM M HOE 1, W BEERS ARE ACCEPTABLE FOR RUNS OF ISO FFET OR LEST.THE AWWALOW TOTAL II LW NMOSIIT ;1 WNDS N ANY CONDUIT RUH a 270 OfcE s. DIP IT—BORING 11U AErAFITS 9LACI.HUFF THIGH D-11TI P011FIH11fNF,DUR `- e r CM SCHEDUU M PVC WITH A MECHANICAL CONNECT ((CEll—.OR DIG MfC—IC1 ♦�MTgE1Dr 11RL_ VT-92 7N0 CONNECTON PIT DUCT)AS AN ALTERNATIVE 70 MOPE DUL7.HDPE SMALL MEET THE To :• R�N MW 1K 1 REOIIIREMFNTS OF PGE SPECIFICATION LC20515(AVAILABLE ON WOUEST EROM PGE IROFE( •I • MANAGER)FOR SAFETY REASONS THE DUCI SMALL BE&ACR WITH THREE EQU/ I SPACE I• 1"TO EDS OPIPE ED SE REOUIIRfD AfIERIPES HIS A IN$1AWTIONUWITH PGETION MISM'M PRANDREESENT TEST OF Vf 9B H S ALL FOE TRANSFOIMM TO N NSTAIED B FEIr fAero FROM ANY COMBUSTIBLE .MAB BUILDING.WNL 01 OVIVIN" AND/PAE 4WM FROM ANY iMf""ANT. 4ID RDOL 1-d'TO VS-T P01 TRANSFORMERS MUST!WTMLN IS PRET OF A ORNFNLE AREA Y0�EW N 92 ALWAYS MAINTAIN D FEET CLEARANCE N FRONT OF ALL T4VISFCNMERS. 660-PGE SWITCH VAULT a.TRANSFORMER PADS ARE TO RE SET SO TAT THE T P IS a 00CM0 AEOVE FINAL DRAM COFDUT IS TO OF INSTALLED N PAD AS INDICATED N OFTAR r EV' 1'IaTa_ AND TO 101ND INCHAMC"ABOFEE PAD. --__-_ _',\� 1 AL3 TO RE 1.STEN BVRRER POSIT ARE REOLFIRED AROUND ILRIJSFORAIHS nur ARE fXM5f0 SETTATT LOCATI TO VIIRCLEs. _ D ry MIE 1.ALL SWITCH VAULTS TO RE SET AT FM4L GRAD6 NATE CH ORAVEL RAND 4� ''I�T'- / ]TOP OF IID TO CONOUTS ALIGNED TO ENTER THE VAE W"),MT END LOWER RNOCILOVIT(TFAM-DUCTS) '/ 12TH 1=-I /S FE SA AT PIAL (SR DETApS ON SMC-) LGRADE. AMoDVFD N TGE. 9 PGE TO BE MOTNW AND 0 PECT ALL CONDLO,VAULT AND PAD e4STA141IOW e 4 tDHOTOROSS BEFORE W�LC ALL J w REQ.. T D LOCATIONS TO BE FIELD VERIFIED VT%41 TO I VAITS 10"PER TO P'GE 81.10110M SERVICE"QtME.r 5 BOOR POR PIAIIR3 aIARS 4..WNWAA 300 u A Sffc1Mc REOURI6MFM3.L"TO Yi'I- SICH:Lf EALTI FC D.DESIGN 3 EASED ON STANDARD WDERGRgNO EGIIMFM.000"41A DARD M� iNE CUSTOMER. MAY N AN OPTION AT AM AWROW COR TO VT 8 IT 1.1 ,:I DELIVERY AND DIVISIOM OF OWNERSHIP BETWEEN IME CUSTOMER.1n TO ' 8 PGL WILT SBF AT THE UNE SIDE OF THE NEW CUSICM/ER PROVIDED SWITCH GEAR R, VT 97 r THIN[ AS-BUILT VERIFICATION & NESC VIOLATIONS CORRECTED """MOLT 5106-PGE VAULT IN,documentoccurorely mpresenn FIELD ConstnEaTwH 3706-T�3-33yJ'f.E SAFETY Foreman: DDM: V1 TO T Po 1 x VT-92 F1RSe11 General Foreman: Dote: MrHa T ro (Signature on required far field construction changes.) VMAne SDPM£NG REVIEW: ASBUILT BY DESIGNER: ].T.-AT—awro (_ONTACT SERVICE COORDINATOR LATe.IW7 scut NTS AccoLrNr'1070001 ASVD_1000004599 NO M2420237 1— LMALIL "rRENUI AND coNoun Nsnc,O MOR TO R; AMNWO n eh ID B,CFr111 FGe wII01 INSIAII w�R1 TITLE s LSo HOT morn,rTE.:,H n.c.nllEo --: 72ND AVENUE PROPERTY UC RMrILEE 1' SERVICE COORDINATOR CIRCTMT yg E na' 503 323700 ON 800.512-8818(SALEM) WEST PORTLAND-72ND 17.22 •I f i�;H 6rM R •ImNTION CALL 811 BEFORE YOU DIG PGE ` LocAmN •I • `/ 11720 SW 72ND AVE,TIGNID,OR 97223 I• F>aSTR+G UW REQUIRES YOU T IC FOLLOW RULES.ROILED ' A' TELE OREGON UTILITY NOTF1CA710N CENTER. DESCRIPTHON THOSE RULES ARE SET FORTH W OAR 952401-W , TDSWD- DDR �T�, THROUGH 952-001-OM.YOU MAY OBTAIN COMES OF 1/f Rl/lE5 8Y CALLING THE OREGON UTILITY [OLINTY Cf/DN(S) WOR[23 SHEFi N-UNP aAw ZJ' WASHINGTON Cll-36D MT37T397 I pF I NOTIFICATION CENTER ADAVNLTTRATON®(503-232-1987) LINE C1LEW OlMER DESIGN R n10HE(503) OMWN RY T REQUEST UTILITY LOCATES CALL THE OREGON {ROW d1sY1 m Lw CHRIS 1EWETT 677-5481 CESAR DEL ROSARIO UTILITY NOTIFICATION CENTER BIT AT LEAST a WWII d MAWEroH,w rine 2 BUSINESS DAYS PRION TO EXCAVATION. T+\'14 6 PORTLAND GENERAL ELECTRIC CO. ALL RIGMS RESERVED ————————— ——— ———— N o I 1 o Cn CD Cn 0� I Sin�1.er Fla erO eration3 as I gg PLow Volumes ro (Optional) � Q (ADT<400) �" o 0 o cn o D 0 i I BE 0 0 0 7 �. I a*ooEn I PREPARED ONE LANE W a I Tt s u s c r I TO STOP S p r— AHEAD UD nrx ? I — •T• I • ROAD • ®••.• CD ' ♦ I WORK —4\ o cwn o C7 I K°K°K°K A I AHEAD n O O O N J 0 Harm W� I O CA _ an Cl g 4 Cnca M I ro I 'D r- I CD 0 07 UD N O(T O d d 0000cno M � A B � I • i--- --- ------------I r �+ � 1 mile _I -n fmax. Ca B A Buffer Protection Vehicle ETA ROAD w/TMA(both Optionao WORK See Chapter 4 AHEAD BE (Q ONE LANE ROAD PREPARED Two Flagger Operation AHEAD TO STOP CDN �, (Optional) 0 °cn°