Lateral Analysis
For
Riverside Homes — Plan 2885 Elevation A
Progress Landing Lot 8
12014 SW Redberry Court
Tigard, OR
Dec 6, 2017
PROF
4-45'
ROF4S
,�G NE. di,di0
4�, 49 8PE y
ar r
OREGON
00 • ( , q 2
Expires:�,2• .
Job No:17485
* * ' LIMITATIONS * * •
ENGINEER WAS RETAINED IN A LIMITED CAPACITY FOR THIS PROJECT.
DESIGN IS BASED UPON INFORMATION PROVIDED BY THE CLIENT, WHO IS SOLELY
RESPONSIBLE FOR ACCURACY OF SAME. NO RESPONSIBILITY AND/OR
LIABILITY IS ASSUMED BY,OR IS TO BE ASSIGNED TO THE ENGINEER
FOR ITEMS BEYOND THAT SHOWN ON THESE SHEETS.
Table of Contents
Design Criteria
Lateral Analysis L-1 — L- 15
greenmountainse.com-info@greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607
GREEN MOUNTRIN
structural engineering
STRUCTURAL DESIGN CRITERIA
Governing Code: 2012 International Residential Code (IRC)
2012 International Building Code (IBC)
Dead Load:
A. Roof 15 psf
B. Floor ...10 psf
C. Exterior walls .10 psf
D. Interior walls with gypboard each side 5 psf
Snow Load:
A. Uniformly distributed snow load ..25 psf
Floor Live Load:. 40 psf
Wind Load:based on ASCE 7-10 CH27 MWFRS Directional Procedure
A. 3 Second Gust Wind Speed V=126 mph
B. Importance Factor .. 1=1.0
C. Exposure B
D. Topographical Factor ..Kzt=1.0
E. Wind Directional Factor Kd=0.85
F. Structure classified as enclosed
Seismic Load—based on ASCE 7-10 Section 12.14
A. Mapped Spectral Acceleration for short periods.....Ss=1.0
B. Mapped Spectral Acceleration for 1 sec.period S1=0.34
C. Ductility Factor ...R=6.5
D. Seismic Design Category D
Foundation Soil Properties:
A. Undisturbed sandy silt per IBC 20012 Table 1806.2....Soil Class#5
B. Maximum vertical bearing pressure 1500 psf
Concrete:
A. 28 days design strength F'c 3000 psi
B. Reinforcing bars ASTM A615, Grade 60
II
GREEN MOUNTIAIN PROJECT: Riverside - 2885
structural engineering
DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-1
LATERAL
SEISMIC DESIGN BASED ON ASCE-7-10
1617.5 Simplified analysis procedure for seismic design of buildings
l.2-SDS
SEISMIC BASE SHEAR V:= R W (EQ.12.14-11 with F=12)
Ss mapped spectral acceleration for Ss:= 1.00
short periods(Sea 11.4.1) from USGS web site
Ss mapped spectral acceleration for S1:= 0.34
1 second period(Sec.11.4.1)
Fa Site coefficient(Table 11.41) Fa'— 1'1 Based on Soil
F„ Site coefficient(Table 11.4-2)
F�:= 1.8 Site Class D
SMS:= Fa•Ss SMs= 1.1 (Eq.11.4-1)
SMI:= F„-SI SMI= 0.61 (Eq.11.4-2)
11.4.43 Design spectrum response acceleration parameters
2
SDS:= 3•SMs Sas= 0.73 > 050g
SEISMIC
2 CATEGORY
SDI:= 3•SMI SDI= 0.41 > 0.20g D per Table 11.6-1
1.2•Sps WOOD SHEAR PANELS
V:= W
R:= 6.5 Table 9.52.2
R
1.2.0.73
V:= 6.5 •W V:= 0.135•W
12.4 Seismic Load Combinations
E:= 1.3.Y (E 9.12.4-3 with redundancy factor=13 per 12.3.42)
WSD:= 0.7•E 0.7.1.3.0.135•W 0.123•W WOOD SHEAR PANELS
II
GREEN MOUNTVIIN PROJECT: Riverside - 2885
Mlir structural engineering
DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-2
LATERAL
SIMPLIFIED WIND AND SEISMIC COMPARISON
WIND
/i. -4
11 — 7.4
ps f psf
Wind ease
Shear
Length L:= 52•ft
Height Ht:= 24•ft WIND:= L•Ht•(11•psf+ 7.4•psi)
SEISMIC WIND= 22963.2Ib
Fr Wroof
F2 — Wfioor Seismic
Wwal I
ease Shear
Aroof:= 52•ft•40•ft Aroof= 2080ft2
Afloor 43•ft•40•ft Afloor= 1720ft2
Wwalls 4•52•ft•20•ft Wwalls=4160ft2
SEISMIC:_ (Aroof•15•psf+ Afloor•151psf+ Wwalls•10•psf)•0.123 SEISMIC= 12127.8 lb
WIND GOVERNS DESIGN
II
GREEN MOUNThIN PROJECT Riverside - 2885
%IP
structural engineering DATE: 12/4/2017BY: CM
JOB NO: 17485 SHEET: L-3
LATE RAL
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE
VELOCITY PRESSURE qz:= .00256•IC,•Kzt•Kd•V2•I (Eq.6-15)
EXPOSURE B
WIND SPEED(3 second gust) Vas:= 126 mph
IMPORTANCE FACTOR I:= 1.0
TOPOGRAPHICAL FACTOR Kort:= 1.0
WIND DIRECTIONAL FACTOR Kd:= 0.85
(Table 6-4)
EXPOSURE COEFFICIENT 0'-15' KZ:= 0.57 qz:= .00256•Kz•K •Kd•V3s2•I qz= 19.69
(varies freight)
15'-20' Kz:= 0.62 qz:= .00256•Kz•Kzt•Kd•V3,2•I qz= 21.42
20'-25' Kz:= 0.66 qz:= .00256•Kz•Krt.Kd•V3s2•I qz= 22.8
26-30' K2:= 0.70 qz:= .00256•Kz•Kzt•Kd•V3s2•I qz= 24.18
II
GREEN MOUNTMIN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-4
LATERAL
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont.
WIND PRESSURE P:= q •G•CP G:= 0.85 Gust factor
CP pressure coefficient
AT WALLS For Working Stress Design Multiply WIND PRESSURE by 0.6 per IBC 1605.3.1
0'-15' WINDWARD PW:= 12.4•psf•0.85.0.8 P„,=8.43 psf
LEEWARD PL:= 12.4•psf•0.85.0.5 PL= 5.27 psf
15'-20' WINDWARD Pw:= 13.49.psf•0.85.0.8 P,,„=9.17 psf
LEEWARD PL:= 13.49•psf•0.85.0.5 PL= 5.73 psf
20' 25 WINDWARD PH,:= 14.36•psf•0.85.0.8 PW=9.76 psf
LEEWARD PL:= 14.36.psf•0.85.0.5 PL= 6.1 psf
AT ROOF
0'-15' WINDWARD Pb„,:= 12.4•psf•0.85.0.3 PW= 3.16 psf
LEEWARD PL:= 12.4•psf•0.85.0.6 PL= 6.32 psf
151-20' WINDWARD PW:= 13.49-psf•0.85.0.3 PN,= 3.44 psf
LEEWARD PL:= 13.49•psf•0.85.0.6 PL = 6.88psf
20'- ' WINDWARD P,,,:= 14.36•psf•0.85.0.3 P,w= 3.66 psf
LEEWARD PL:= 14.36.psf•0.85.0.6 PL= 7.32 psf
25'-30'
WINDWARD Pr,:= 15.23•psf•0.85.0.3 PN,= 3.88 psf
LEEWARD PL:= 15.23•psf•0.85.0.6 PL= 7.77 psf
II
GREEN MOUNThIIN
PROJECT. Riverside - 2885
tor
structural engineering
DATE: 12/4/2017 BY: CM
Joe No: 17485 SHEET: L-5
LATERAL
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont.
44 6 88 Assume
Cp-0.5 psf pg A := 35
8 f
9.17
psf11111111111111111111 6.1
psf
Mean Roof Height
18+ 22
= 20
2
Loads at Roof roof-ave
Windward 3.44.psf.5.5.ft=18.92 plf
Leeward 6.88•psf.5.5•ft= 37.84 pIf
Wall loads at upper level at main level
Windward 8.43psf•4.ft= 33.72 plf 8.43•psf.8.5.ft= 71.66 plf
Leeward 5.73•psf.4.ft= 22.92pIf 5.73.psf.8.5.ft=48.71 plf
II
Wt1417 ta4VS Roof A 044,,,9,)
6 1 r R n
+ I L-6
1
1
1
1
1 11411
IJ
1iI
1 1 11
c riiins r--- . ... ........ .J i ....44""•
PRE. UFO. TRUVES 0 24" O.C. 4n
= - ----4, 1---.,
.J_.. - __ - -•-••
_ - .-41.T.TRUSS _ _ v w
r Y!♦♦i�► '� �♦i♦ i�kio, r=��-'•11 ►-••i♦♦♦♦ii♦♦t♦♦iii••
�►•♦♦♦ ♦iii®'�♦♦'►i�1���►♦1® iii♦tw♦i♦♦i♦i♦iii
44 4,11'iic►♦♦iiiii♦��..+it►f i�l %1V-;ii ♦♦iiii
,►• ♦•♦?i••iiit•�� ►♦♦•♦♦iiii♦ �
- ♦4i►iii�►♦i♦i�►:►♦ii♦iiib • 1►♦i iii'♦iiiii♦i♦i♦t♦iI�
�►i�iiiii♦i♦iii•!.'4;t ii j.•iii•♦••••iiii•♦ii
d ♦iC►i1♦♦••1•v►• ♦I.♦♦iiiii•••
d i• i♦iiiii♦iiiiiit.„frfii♦�;►iii♦•♦•i••iii♦♦♦� s�
i��iii♦���jl��i ►♦1 •♦••i♦iii
_ n ♦ •iii♦i i''.44•1"4i1►♦•♦♦iii♦i♦♦i4#
.� 0 0i�iii•i♦i/itr'litii4 i►t•♦♦••♦•i•Oj �-
p ® *•••i♦♦•• ►♦•••Cyd' 0
i•ii•i••i��►i♦'►♦•i♦�
S► I •• i•••♦•41 •• / r ...3-- .A
.^' L-------i---Li iiiii•• i ♦�� �...
a ••••• 4, ;►.♦e L
❑ ❑ ❑ ❑ `i• 1•i41 !�' 0 0
RIDGE
i♦♦iii•4iii•♦•♦♦♦♦♦i♦•ii•i♦i♦�••♦♦i♦►••♦i♦♦♦iii♦�♦i.•iit'•♦•i►`i •i•♦••••i••i•i♦
♦♦•i
ii♦
i♦i•
•♦i♦♦
b
•i
i�
i\
♦
_
_
V
.--...113
mo='V t•'•••►i •\
.4___.
'iiiV♦ii`
/. iVi• •♦ .
_1 . • &&•. &.:♦►♦S♦♦♦•►v•a1..i.i, CO
i♦ • • • u• ♦•
Y0fii•♦•1 �•lii�'• •ii`�a ,• •i • ►♦•♦4► ••♦"�♦♦••♦♦�
iiii♦ ♦ ►• •♦ ►♦ •♦♦•♦i• ♦••
ii♦♦• • wit.+► •• • •'1'♦\♦• •♦ .,'V+?�►♦♦♦i•♦iii•••� ♦•\i/ • �.►..,,S`♦i! i * •�♦ rVie* `
iiiii-.•IM ♦ 4' it®.•i♦••••°♦ i `
♦ I ♦ i1\i♦♦4ii• i •♦ ipiti;♦♦0i•:-•-•-•••.4 ...ii\ 0 0 •
PRE UFO. i-
SES 0 24' O.C.
I
k / I I "4-7 r-----1
'Art7�i j' ❑
c.a. Immir 4. - MFG. lw : 0 24" 0.C......
W® ',CI ROOF Wp GUEST BORRMT'E Al'
JACKS 24t Q.C. 1�qlfr ® C ®.
PRE. UFO. HE t'-8" RAISED i'
O 24cCyC. MEL
II 1'-6 RAISED t
n &
ti: 51-14.0 d
u '1'eft-,
L-7
a )D1'5 1M it.
�..1 tf I I .,RMIRIMI•'
iv I
0 0
1.1
111
...... .. m 074' r
NI/
1 I
MASTER
111
BEDROOM
BEDROOM
UN 1 �...
4
I `� J jJ=
WO
�/ F
III iii
JI 11
1
5r.
° i V
"'ILAUNORY a
1 1
fy 1
it
,i
111g)I til 1 8''1
Lit--+
i
_7 P&s 4_ 2 j PdeS
�� o•!
PfeO
• LOFT
11 N
0
BEDROOM BEDROOM
THREE FOUR
L—Fi ....,...,--Laimi,
N
. c . I -1
11
1-7 2' 1'5111
��
6046 XO SLCR. 6¢040 X�0p SWR. 2030 6030 PIC.
(EGRESS) (EGRESS) 0IG.
I air4" 4104d
114 la
11
St Hi ill
Ill M
H
ill NMI a
Irl .s..
I 1
ctredb , ....._.r:-\.....:
1' ago
o
j 3�vavo — 0 h
1 71M 1
b1
0: cil IICIP 11
111 11II
�, •
I l l lei II
II
.a i ---- 1----
- wool li
C3 . , I
I� 11 n
N-3"717--HO '� i
1
1....„) �rCZ) __ __�n ,<�__ , -
II I
1±du\\I
I
a r
L
II �`
II _ X Iwo
C =d moa
woos
tv3ao woos
0NINI4 i—.....4 ,
I -
1. 1==iNaillilaBlINK
IQISvZ < ...
3 owl
9-1 o1 ,o r-
'7 wC1 idril
GREEN MOUNTMIN PROJECT Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
Joe no: 17485 SHEET: L-9
LATERAL
SHEAR WALL DESIGN
Pdl Pdl
4). Wdl I
p (� P:= wind
V:= seismic
h
R=Holdown
V Force
Based on 2012 IBC Basic Load Combinations 1605.31
0.6D+W (Equation 16-11)
0.6•D+ 0.7•E (Equation 16-12)
Overturning Moment: Mot:= P•h
L2
Resisting Moment: Mr:= 0.6- Wdi + WWali) { + 0.6 Po•L
Mot— Mr
Hoidown Force R
L
• „ GREEN MOUNTIAIN PROJECT: Riverside - 2885
low structural engineering
DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-10
LATE RAL
Left Elevation Exterior Walls
Second Level
Wind Force P:= 2260.1b P= 22601b
Length of wall L:= 5•ft+4•ft+ 19•ft L= 28ft
P
Shear v:= L v= 80.71 plf A
5
Overturning M0:= P•8•ft28 Mot= 3228.57lb•ft
Moment
(5-ft)2
Resisting Mr:= 0.6•(15•psf•2-ft+10•psf•8•ft)• 2 + 0.6.600•Ib•5•ft
Moment
Mr= 2625Ib•ft
Mot— M�
Holdown =120.71 lb
Force 5ft
Main Level
Wind Force P:= 4660.1b P=4660 lb
Length of wall L:= 14•ft+ 10•ft+ 8•ft L= 32ft
P
Shear v:= — v=145.63plf S
8
Overturning Mot:= P•9•ft•32 Mot=10485lb•ft
Moment
(8•ft)2
Resisting Mr:= 0.6.(15•psf•2•ft+ 10•psf•17•ft)• 2 + 0.6.800•Ib.8•ft
Moment
Mr= 7680lb•ft
Mot— Mr
Holdown = 350.63 lb
8•ft
Force
pg
GREEN MOUNTnIN PROJECT: Riverside - 2885
DATE: 12/4/2017 ev: CM
structural engineering .
.Joe no: 17485 SHEET: L-11
LATERAL
Front Elevation Exterior Walls
Second Level
Wind Force P:= 2373.1b P= 2373 lb
Length of wall L:= 3.5•ft+ 3•ft+ 3.3-ft+ 3.5•ft L= 13.5ft
P
Shear v:= — v=175.78plf B
3.5
Overturning Mot:= P•8•ft•— Mot= 4921.781b•ft
Moment 13.5
(3.5•ft)2
Resisting Mr:= 0.6•(15•psf•4.ft+ 10•psf•8•ft)• 2 + 0.6.600•lb•3.5•ft
Moment
Mr=1774.5lb•ft
Mot— Mr
Holdown = 899.22 lb
Force 3.5 ft MSTC48B3
Main Level
Wind Force P:= 2988•Ib P= 29881b
Length of wall L:= 2.25•ft+ 2.25•ft+1.5•ft+1.5-ft L= 7.5ft
2.25.3.5= 7.88
P
Shear Wind v:= — v= 398.4 plf D
2.25
Overturning Mot:= P•7.88•ft• 7—5 Mot= 7063.631b•ft
Moment
(2.25•ft)2
Resisting Mr:= 0.6.(15.psf•4•ft+10•psf•8•ft)• 2 + 0.6.800•Ib•2.25•ft
Moment
M
Holdown of Mr
= 2564.89l6
Mr=1292.631b•ft
Force 2.25•ft
HTTS
GREEN MOUNTS IN PROJECT: Riverside - 2885
structural engineering
DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-12
LATERAL
Right Elevation Exterior Walls
Second Level
Wind Force P:= 2260•Ib P= 2260 lb
Length of wall L:= 8•ft+ 5•ft+ 4-ft L=17ft
P
Shear v:= — v=132.94plf A
4
OverturningMot:= P•8-ft-- Mot= 4254.12lb-ft
Moment
(4.ft)2
Resisting Mr:= 0.6•(15•psf•2•ft+10•psf.8•ft) 2 + 0.6.600•lb•4•ft
Moment
Mr=1968lb•ft
Mot— M�
Holdown = 571.531b
Force Oft
Ma/n Level
Wind Force P:= 4660-lb P=46601b
Length of wall L:= 15•ft+ 8-ft+ 3•ft L= 26ft
P
Shear v:= L v= 179.23plf
8
Overturning Mot:= P•9•ft.26 Mot= 12904.621b•ft
Moment
(8•ft)2
Resisting Mr:= 0.6 (15.psf•2•ft+10.psf•17•ft) 2 + 0.6.800•Ib 8•ft
Moment
Mr= 7680lb•ft
Mot— M�
Holdown = 653.08 lb
Force 8ft
GREEN MOUNTFIIN PROJECT: Riverside — 2885
structural engineering DATE: 12/4/2017 BY: CM
Joe No: 17485 SHEET: L-13
LATE RAL
Rear Elevation Exterior Walls
Second Level
Wind Force P:= 2373.lb P= 2373 lb
Length of wall L:= 7.5•ft+ 11•ft+4.ft L= 22.5ft
P
Shear v:= L v=105.47p1f A
7.5
Overturning Mot:= P•8•ft•— Mot= 6328lb•ft
Moment 225
(7.5•ft)2
Resisting Mr:= 0.6 (15•psf•2•ft+ 10.psf•12.ft)• 2 + 0.6.600•lb•7.5-ft
Moment
Mr= 5231.25lb•ft
Mat— Mr
Holdown =146.23 lb
Force
7.5-ft
Main Level
Wind Force P:= 3813•Ib P= 3813 Ib
Length of wall L:= 6•ft+ 7•ft+ 4•ft L=17ft
P
Shear Wind v:= — v= 224.29p1f S
4
Overturning Mot:= P•9 ft 17 Mot= 8074.59lb•ft
Moment
(4,ft)2
Resisting Mr:= 0.6 (15•psf 4.ft+10•psf•8•ft)• 2 + 0.6.800•Ib•4•ft
Moment
Mot— Mr Mr= 25921b-ft
Holdown =1370.65 lb
Force 4-ft
HTT5
GREEN MOUNTAIN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-14
LATE RAL
Interior Shear Walls at back of Garage
Main Level
Wind Force P:= 4069.1b P=4069 lb
Length of wall L:= 18•ft L= 18ft
P
Shear Wind v:= - v= 226.06plf
Overturning Mot:= P•9.ft Ma= 366211b•ft
Moment
(18•ft)2
Resisting Mr:= 0.6 (10 psf•12•ft+10.psf•9•ft)• 2 + 0.6.1200•Ib•18•ft
Moment
Mat— Mr Mr= 33372Ib-ft
Holdown = 180.5 lb
Force 18ft
II
ry GREEN MOUNTIIIN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-15
LATERAL
WIND ON PORCH ROOF
126 MPH,EXP B w:= 6•ft.(4.43.psf+ 8.86•psf) w= 79.7 plf
1]
�� II
II II
I
c
� * II
v II
L■1 tl 11111111M111■
DESIGN ROOF TO CANTILEVER FROM HOUSE L:= 10-ft D:= 11.ft
w•L2
M:= 2 M= 3987Ibft
support beam on post in wall at house with
M Simpson HUCQ-SDS
C:= — T:= C C= 398.7lb
12 SDS 1/4x21/4 screws(min)x172 lbs=2064
in combined withdraw
w.L Nail top and bottom chord of first truss to wall with
v:= p v= 72.49 plf (2)16d nails at 16"o.c.(web to studs)
L r (K: \ 91Yl '2,.V [f� �. r;w GI
PLAN 2885
BeamChek v2016 licensed to:
GRAND FIREPLACE HEADER -$KSloiN AT POINT COAD Date:3/02/18
Selection 5-118x 12 GLB 24F-V4 DF/DF Lu=0.0 Ft
Conditions NDS 2015
Min Bearing Area R1=14.4 in2 R2=7.3 in2 (1.5)DL Defl= 0.02 in Recom Camber=0.03 in
fa& Beam Span 3.5 ft Reaction 1 LL 413# Reaction 2 LL 744#
Beam Wt per ft 14.94# Reaction 1 TL 9330# Reaction 2 TL 4773#
Bm Wt Included 52# Maximum V 9330#
Max Moment 9303 W Max V(Reduced) 9315#
TL Max Defl L/240 TL Actual Defl L/>1000
LL Max Defl L/360 LL Actual Defl L/>1000
Attributes Section(in') Shear(in') TL Defl(in) LL Defl
Actual 123.00 61.50 0.02 <0.01
Critical 46.52 58.22 0.18 0.12
Status OK OK OK OK
Ratio 38% 95% 11% 1%
Fb(psi) Fv(psi) E(psi x mil) Fcl(psi)
Values Reference Values 2400 240 1.8 650
Adjusted Values 2400 240 1.8 650
Adjustment Cv Volume 1.000
Cd Duration 1.00 1.00
Cr Repetitive 1.00
Ch Shear Stress N/A
Cm Wet Use 1.00 1.00 1.00 1.00
CI Stability 1.0000 Rb=0.00 Le=0.00 Ft
Loads
Point TL Distance Par Unif LL Par Unif TL Start End
B=12000 1.0 463 H=820 1.0 3.5
H
Pt loads)\ tEl
R1 =9330 R2=4773
SPAN=3.5 FT
Uniform and partial uniform loads are lbs per lineal ft.
PLAN 2885
BeamChek v2016 licensed
GRAND FIREPLACE HEADER ' Serr/ON AT Pheeftkjce' Date:3/02/18
Selection 5-1/8x 12 GLB 24F-V4 DF/DF Lu=0.0 Ft
Conditions NDS 2015
Min Bearing Area R1=0.7 int R2=0.7 int (1.5)DL Defl= <0.01 inRecom Camber=<0.01 in.
Data Beam Span 5.0 ft
Beam Wt per ft 14.94# Reaction 1 TL 487# Reaction 2 TL 487#
Bm Wt Included 75# Maximum V 487#
Max Moment 609 W Max V(Reduced) 292#
TL Max Defl L/240 TL Actual Defl L/>1000
Attributes Section(in3) Shear(in2) TL Defl(in)
Actual 123.00 61.50 0.00
Critical 3.05 1.83 0.25
Status OK OK OK
Ratio 2% 3% 1%
Fb(psi) Fv(psi) E(psi x mil) Fc..1._(psi)
Values Reference Values 2400 240 1.8 650
Adjusted Values 2400 240 1.8 650
Adjustments Cv Volume 1.000
Cd Duration 1.00 1.00
Cr Repetitive 1.00
Ch Shear Stress N/A
Cm Wet Use 1.00 1.00 1.00 1.00
CI Stability 1.0000 Rb=0.00 Le=0.00 Ft
Loads Uniform TL: 180 =A
Uniform Load A
R1 =487 R2=487
SPAN=5 FT
Uniform and partial uniform loads are lbs per lineal ft.
PLAN 2885
BeamChek v2016 licensed to:
GRAND FP CRAWLSPACE Date:3/02/18
Selection (3)2x 10 DF-L#2 Lu=0.0 Ft
Conditions NDS 2015
Min Bearing Area R1=2.2 in2 R2=2.2 in2 (1.5)DL Defl= 0.07 in
it Beam Span 11.5 ft Reaction 1 LL 1035# Reaction 2 LL 1035#
Beam Wt per ft 10.11 # Reaction 1 TL 1352# Reaction 2 TL 1352#
Bm Wt Included 116# Maximum V 1352#
Max Moment 3887'# Max V(Reduced) 1171 #
TL Max Defl L/240 TL Actual Defl L/635
LL Max Defl L 1360 LL Actual Defl L/927
Attributes Section(in') Shear(in?) TL Defl(in) LL Defl
Actual 64.17 41.63 0.22 0.15
Critical 47.11 9.76 0.58 0.38
Status OK OK OK OK
Ratio 73% 23% 38% 39%
Fb(psi) Fv(psi) E(psi x mil) Fc (psi)
Values Reference Values 900 180 1.6 625
Adjusted Values 990 180 1.6 625
Adjustments CF Size Factor 1.100
Cd Duration 1.00 1.00
Cr Repetitive 1.00
Ch Shear Stress N/A
Cm Wet Use 1.00 1.00 1.00 1.00
CI Stability 1.0000 Rb=0.00 Le=0.00 Ft
Load Uniform LL: 180 Uniform TL: 225 =A
•
Uniform Load A
•)\,
R1 =1352 R2=1352
SPAN=11.5 FT
Uniform and partial uniform loads are lbs per lineal ft.