Loading...
Resolution No. 18-42 CITY OF TIGARD, OREGON TIGARD CITY COUNCIL RESOLUTION NO. 18- Y)- A RESOLUTION AMENDING THE MASTER FEES AND CHARGES TO ADD FEES RELATED TO ENCROACHMENTS WHEREAS, Ordinance 18 '19 amended Tigard Municipal Code 15.16 regarding encroachments and adding a permit requirement for encroachments into the improved right-of-way;and WHEREAS, the City wishes to establish fees for an encroachment permit and appeals of a denial of an encroachment permit. NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that: SECTION 1: The Master Fees and Charges for the City of Tigard are amended to establish an encroachment permit fee and appeal fee for the appeal of a denial of an encroachment permit as shown in the attached schedule (Exhibit A). SECTION 2: This resolution is effective immediately upon passage. PASSED: This S 4 1-"day of Se-p,6tn-L ge-r 2018. Mayo `-City of Tigard ATTEST: �aw-�X kA.5V'1L City Recorder-City of Tigard RESOLUTION NO. 18- :2 Page 1 Exhibit A - Encroachment Fee Department Revenue Source Fee or Charge Effective Date PUBLIC WORKS-DEVELOPMENT ENGINEERING Addressing Assignment Fee $50.00 /lot or suite(up to first 20) 8/1/2017 $25.00 /lot or suite(for 21 and greater) 8/1/2017 Early Addressing Request $250.00 Prior to Plat Approval 8/1/2017 Encroachments Encroachment Permit $100.00 11/1/2018 Encroachment Permit Appeal $250.00 11/1/2018 Erosion Control Inspection Fee With Development Construction Cost Estimate$0-$25,000 $80.70 7/1/2014 Construction Cost Estimate$25,001-$50,000 $107.60 7/1/2014 Construction Cost Estimate$50,001-$100,000 $161.40 7/1/2014 Construction Cost Estimate over$100,000 $161.40 plus$75 per$100,000 or fraction thereof 7/1/2014 exceeding the first$100,000 Without Development 0-0.99acres $322.80 7/1/2014 lacre of greater $322.80 plus$150 per acre or fraction thereof 7/1/2014 Reinspection Fee $96.84 per hour with a minimum of 1 hour 7/1/2014 Plan Check included in inspection fee 7/1/2014 Plan Resubmittal Review $96.84 per hour with a minimum of 1/2 hour 7/1/2014 Fee In Lieu Of Bicycle Stripuig 8-inch white stripe $2.69 /linear foot of frontage 7/1/2014 Bike lane legends $188.30 /each 7/1/2014 Directional mini-arrows $107.60 /each 7/1/2014 Mono-directional reflective markers $4.30 /each 7/1/2014 Fee In Lieu of Construction of an Onsite Stormwater Quality Facility $1.00 /per sq.ft.of untreated impervious area 8/1/2017 Fee In Lieu Of Undergrounding Utility Portion(one or more,accumulative): Electrical $75.00 /lineal foot 7/1/2018 Page 1 Exhibit A - Encroachment Fee Department Revenue Source Fee or Charge Effective Date; Cable $15.00 /lineal foot 7/1/2018 Telecommunication $25.00 /lineal foot 7/1/2018 Trench Cost(applied only once,per lineal foot) $35.00 /lineal foot 7/1/2018 Public Facility Improvement-LIDA*Permit $300.00 /equivalent dwelling unit(EDU) 8/1/2017 for review and inspection of LIDA on single lots *-LIDA+Low Impact Development Approaches per Clean Water Services Design and Construction Standards Public Facility Improvement Permit 2%plan review plus 7/1/2009 5%of estimated cost of public improvement with a 7/1/2005 $300 minimum Advanced deposit of 10%of the above or minimum of$300 Reimbursement District Application Fee $300.00 1/27/1998 Reimbursement District Fee Not to Exceed$6,000.00 unless reimbursement fee exceeds$15,000.00. 7/1/2001 Any amount over$15,000.00 shall be reimbursed by the owner;$6,000.00 limit valid for only 3 years from Council approval of district cost. Streetlight Energy&Maintenance Fee Based upon PGE Schedule#95 Option"A"for the first two years costs 2000 Traffic/Pedestrian Signs Cost of materials and labor 2/7/2002 Tigard Triangle Mixed Use Zone—Fees and Charges Transportation Impact Study Actual Cost of Study by City Transportation Consultant 7/1/2018 Estimated Cost of Improvements by City Engineer(determination based on an estimate to construct the required improvements using the average cost Transportation Fee in Lieu of Construction of the most recent capital improvement project itemized bid prices) 7/1/2018 Engineering Pre-Screen Conference $300.00 /conference 7/1/2018 Page 2