Resolution No. 18-42 CITY OF TIGARD, OREGON
TIGARD CITY COUNCIL
RESOLUTION NO. 18- Y)-
A RESOLUTION AMENDING THE MASTER FEES AND CHARGES TO ADD FEES RELATED TO
ENCROACHMENTS
WHEREAS, Ordinance 18 '19 amended Tigard Municipal Code 15.16 regarding encroachments and
adding a permit requirement for encroachments into the improved right-of-way;and
WHEREAS, the City wishes to establish fees for an encroachment permit and appeals of a denial of an
encroachment permit.
NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that:
SECTION 1: The Master Fees and Charges for the City of Tigard are amended to establish an
encroachment permit fee and appeal fee for the appeal of a denial of an encroachment permit
as shown in the attached schedule (Exhibit A).
SECTION 2: This resolution is effective immediately upon passage.
PASSED: This S 4 1-"day of Se-p,6tn-L ge-r 2018.
Mayo `-City of Tigard
ATTEST:
�aw-�X kA.5V'1L
City Recorder-City of Tigard
RESOLUTION NO. 18- :2
Page 1
Exhibit A - Encroachment Fee
Department Revenue Source Fee or Charge Effective Date
PUBLIC WORKS-DEVELOPMENT ENGINEERING
Addressing Assignment Fee $50.00 /lot or suite(up to first 20) 8/1/2017
$25.00 /lot or suite(for 21 and greater) 8/1/2017
Early Addressing Request $250.00 Prior to Plat Approval 8/1/2017
Encroachments
Encroachment Permit $100.00 11/1/2018
Encroachment Permit Appeal $250.00 11/1/2018
Erosion Control Inspection Fee
With Development
Construction Cost Estimate$0-$25,000 $80.70 7/1/2014
Construction Cost Estimate$25,001-$50,000 $107.60 7/1/2014
Construction Cost Estimate$50,001-$100,000 $161.40 7/1/2014
Construction Cost Estimate over$100,000 $161.40 plus$75 per$100,000 or fraction thereof 7/1/2014
exceeding the first$100,000
Without Development
0-0.99acres $322.80 7/1/2014
lacre of greater $322.80 plus$150 per acre or fraction thereof 7/1/2014
Reinspection Fee $96.84 per hour with a minimum of 1 hour 7/1/2014
Plan Check included in inspection fee 7/1/2014
Plan Resubmittal Review $96.84 per hour with a minimum of 1/2 hour 7/1/2014
Fee In Lieu Of Bicycle Stripuig
8-inch white stripe $2.69 /linear foot of frontage 7/1/2014
Bike lane legends $188.30 /each 7/1/2014
Directional mini-arrows $107.60 /each 7/1/2014
Mono-directional reflective markers $4.30 /each 7/1/2014
Fee In Lieu of Construction of an Onsite Stormwater Quality Facility
$1.00 /per sq.ft.of untreated impervious area 8/1/2017
Fee In Lieu Of Undergrounding
Utility Portion(one or more,accumulative):
Electrical $75.00 /lineal foot 7/1/2018
Page 1
Exhibit A - Encroachment Fee
Department Revenue Source Fee or Charge Effective Date;
Cable $15.00 /lineal foot 7/1/2018
Telecommunication $25.00 /lineal foot 7/1/2018
Trench Cost(applied only once,per lineal foot) $35.00 /lineal foot 7/1/2018
Public Facility Improvement-LIDA*Permit $300.00 /equivalent dwelling unit(EDU) 8/1/2017
for review and inspection of LIDA on single lots
*-LIDA+Low Impact Development Approaches per Clean Water Services Design and Construction Standards
Public Facility Improvement Permit 2%plan review plus 7/1/2009
5%of estimated cost of public improvement with a 7/1/2005
$300 minimum
Advanced deposit of 10%of the above or minimum of$300
Reimbursement District Application Fee $300.00 1/27/1998
Reimbursement District Fee Not to Exceed$6,000.00 unless reimbursement fee exceeds$15,000.00. 7/1/2001
Any amount over$15,000.00 shall be reimbursed by the owner;$6,000.00 limit
valid for only 3 years from Council approval of district cost.
Streetlight Energy&Maintenance Fee Based upon PGE Schedule#95 Option"A"for the first two years costs 2000
Traffic/Pedestrian Signs Cost of materials and labor 2/7/2002
Tigard Triangle Mixed Use Zone—Fees and Charges
Transportation Impact Study Actual Cost of Study by City Transportation Consultant 7/1/2018
Estimated Cost of Improvements by City Engineer(determination based on
an estimate to construct the required improvements using the average cost
Transportation Fee in Lieu of Construction of the most recent capital improvement project itemized bid prices) 7/1/2018
Engineering Pre-Screen Conference $300.00 /conference 7/1/2018
Page 2