Loading...
Permit (209) CITY OF TIGARD SINGLE FAMILY INMANUFACTURED PERMIT e ' '- COMMUNITY DEVELOPMENT Permit#: SFM2018-00001 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 09/20/2018 Parcel: 2S 102AA03902 Site address: 8915 SW COMMERCIAL ST 1 Jurisdiction: Subdivision: TIGARD HIGHWAY TRACTS Lot: 27 Project: Rodriguez Project Description: Placement of a new 728 sq.ft.manufactured home. Demo credits from BUP2018-00217 applied to permit. BUILDING Floor Areas Required Setbacks Required Stories: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 5 Parking Spaces: 0 Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 6 Smoke Dwelling Units: 1 Third: 0 sf Right: 5 Detectors: Yes Total: 0 sf Value: $0.00 Rear: PLUMBING Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Catch Basins: 0 Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF RainOther Fixtures: 0 Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Drains: 0 Bckflw Prevntr: 0 MECHANICAL Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0 Heat Pump: N Hoods: 0 Other Units: 0 Furn<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0 Furn>=100K: 0 ELECTRICAL Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits 1000 sf or less: 0 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr: 0 Ea addl 500 sf: 0 20 1-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0 Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0 601-1000 amp: 0 601+amp-1000v: 0 1000+amp/volt: 0 ELECTRICAL-RESTRICTED ENERGY SF Residential Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All N Other: N Other Description: Ecompasing: BUILDING INFO Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet: NEW SFM VB R-3 0 TOTAL FEES: $338.56 REQUIRED ITEMS AND REPORTS Owner: Contractor: CASCADE MOBILE VILLA LLC BRUMBAUGH MANUFACTURED 8915 SW COMMERCIAL ST HOMES LLC TIGARD,OR 97223 PO BOX 1 BEAVERCREEK,OR 97004 PHONE: PHONE: 503-577-1884 FAX: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy i the ru or direct questions to OUNC by calling 503.232.19871/0 or 1.801.332.2344. — Issued By: �i� ..ct.. Permittee Signature: ��� /;f ' 1503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion •f the project. Approved plans are required on the job site at the time of each inspection. Manufactured Dwelling ua t� Placement Permit A licatm 14'4 4 . 1-012 01 1 ICI: l‘NI 0y1.1 City of Tigard Date/BReceived ermit No.: 13125 SW Hall Blvd.,Tigard,OR 97223 F7 1 y' Cr���i� � � fi OiT_cab t g Plan Review C Phone: 503.718.2439 Fax: 503.598.1960 Other Permit: ,� u; Date/By: Inspection Line: 503.639.4175 I ' +�;' 0 4t 1 z A I'� ) Date Ready/By: Jury: 0 See Plan Submittal TIGARD ,n Internet: www.tigard-or.gov ,,Notified/Method: Requirements 1, + `�'y sr 7 c'ti JOB SITE INFORM itIION O\1'\ER INFORMATION Site Address: p r, ( -a / Name: V r� f�O d��.J c)Park Name: Address: � � Z�� Subdivision&Lot#: � ��% ,'lstdL. 7)06, � /l' ' (. f Directions to inspection site: City: GZ 4 i I State: (., I ZIP: ,-/7 Z_.Z 3 Phone: ✓. .7..) alt 6 5�Q,,;t I Fax: Is property inside city limits? g(Yes 0 No E-mail: T I,OC kl, GOVERN11EN I :1PPR(V.1LS Zoning Sanitation Signature: Signature: Jurisdiction: Jurisdiction: Date: Date: NIANCFAC7 L RED MN l;LLING PL:10E11EN I PI:RJIIT FEES Cost(each) No.of Sum (1) Installation/re-inspection Items (a) Placement(includes placement,electrical feeder,30'of water/sewer connection). $ 275.50' I $ ,' 75'5c* (b) State surcharge at 12%(of placement fee only). $ 33.06 ( $ 3`. 4.(4.-- (b) Re-inspection(includes inspection and 12%state surcharge). $ 100.80 $ Placement permit to be obtained only by homeowner,or Oregon-licensed manufactured dwelling installer. (2) Electrical (a) Service and/or feeder(new service installation or alteration/relocation of existing service). $ See Electrical Permit Application Electrical service permit to be obtained only by homeowner performing work or signing supervisor of Oregon-licensed electrical contractor performing work. (3) Plumbing (a) New water service(for services over 30 lineal feet). $ See Plumbing Permit Application (b) New sanitation/storm sewer or rain drain(for services over 30 lineal feet). $ See Plumbing Permit Application Plumbing permit to be obtained only by homeowner performing work or Oregon-licensed plumbing contractor performing work. (4) Miscellaneous fees (a) Administrative fee(State of Oregon). $ 30.00 1 $ 7(6.�,. (b) System development fees(sewer connection,storm water,parks development&traffic impact). $ See Permit&System Development Fees SUB-TOTAL $ ; 11111, Building Permit Application Plan Submittal Requirements T I G A R D Manufactured Dwelling 1. SITE PLAN-Three (3) copies,fully dimensional and drawn to scale,labeled with: A. ❑ map&tax lot# ❑ subdivision name ❑ subdivision lot# ❑ site address ❑ zoning ❑ applicant name ❑ phone number Size requirement: 8-1/2"x 11",to a maximum 11"x 17". All details listed below shall be incorporated into the site plan: B. North arrow. C. "Drawn to scale"indicates standard architect or engineer scale. D. Footprint of structure,including accessory structures,garage,carport and decks shall reflect actual building dimensions,including retaining walls. E. Finished floor elevations,all levels. F. Garage finished floor elevation. G. Corner lot elevations. If more than 4 feet elevation differential,plan must show contour lines at 2-foot intervals. H. Location of all cuts and fills on the lot. I. Driveway corner elevations. J. Zoning setbacks (front, side and rear). K. The location of all public and private easements. L. The location,termination,and all invert elevations of all drainage piping(sanitary and storm) showing all elevations necessary to show positive gravity flow to the approved drainage device (i.e. peepholes,storm lateral, sanitary lateral). M. Residential driveways,sidewalks will be shown on site plans and will be in accordance with the City of Tigard standards. Driveway cuts shall not be permitted within 30 feet of intersecting right-of-way lines,nor within 6 feet of property lines. Weep holes/drain pipes will be installed 6 feet from adjoining property lines. Multiple driveways on individual parcels of land must have 30 feet of separation;joint-use driveways require a formal agreement. N. Show all erosion control devices proposed for site. Contact Clean Water Services (CWS) at 503-681-5113 for assistance. 0. Show location of existing facilities and new or relocated structures (utilities,well/septic systems,mailboxes, power poles,water meter,light pole,stop sign,etc.). P. Indicate property slope directions. Q. Existing and finished contours when slope in any direction exceeds 20% (additional requirements may apply- see grading policy). R. Site plan to include tree size,type and location per approved project street tree plan (if applicable),and City of Tigard Street Tree List. S. Site plan to include trees and tree protection measures as required by conditions of approval. Tree locations, driplines,and protection measures must be drawn to scale and must include the project arborist's signature of approval. 2. BUILDING PLANS-Three (3) full sets for illustrating the manufactured dwelling foundation or basement construction(no redlines or tape-ons accepted). Size requirement: up to 24"x 36"maximum, folded into eighths (9"x 12")with the plans inside. No rolled, reversed or mirrored plans will be accepted. All details listed below shall be incorporated into the building plans: A. Scale (architectural or engineering only). B. Cross sections of the manufactured dwelling foundation or basement(every set of plans shall contain a minimum of two cross sections at mid-point of each direction). C. Exterior elevation (all views shall be shown). D. Basement wall, foundation and retaining wall sections. E. Documentation by manufacturer indicating that manufactured dwelling roof can support over-framing of garage roof. F. Driveway construction. I:\Building \Pits\SFM-PermitApp.doc 10/16/2014 L 1 V-6\WP.: - ruY\i'vb i acI vett( ti 601 5 \ (c )ocL 1cpLj cuB 1)03(91,\ Nvu. 5,0\-3 (s) ) 511 - — C_.;cass . .„ Allyson Armstrong From: Gloria Pinzon-Marin Sent: Tuesday, September 18, 2018 9:28 AM To: Allyson Armstrong Subject: FW: Info needed Hi Allyson, Will this work? From: Mayra Rodriguez (MRodriguez7)<rm7758@gmail.com> Sent:Tuesday, September 18, 2018 9:26 AM To: Gloria Pinzon-Marin <gloriap@tigard-or.gov> Subject: Info needed Sent from my iPhone Begin forwarded message: From: Billy Haas <billyhaas22@gmail.com> Date: September 18, 2018 at 7:37:42 AM PDT To: rm7758Agmail.com Subject: Info The manufactured home we will install is located in the Seismic Design Category D1 of the 2010 Manufactured Dwelling Specialty Code. 1. How many feet will be between the footing and the bottom of the main house frame? 18 inches from the slab/runners to the main house frame 2. If there is a fuel gas supply line, does it meet section 3-2.5.5 (3) of the 2010 Manufactured Dwelling Installation Specialty Code? Explain how. There are no fuel gas supply lines under this home. 3. Do you meet requirement #(4) on pg 15? If no, read Earthquake Resistant Bracing on page 17. Then write down which method of bracing will be used. The home will not exceed 3 feet from the top of the footing to the bottom of the I-beam. 4. Which Method of Anchoring will be used? (from section 3-2.6 Anchoring). Oliver Technologies Cross-Drive system down perimeter of home, spacing of anchors will not to exceed 12 feet. DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may he disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 1 111111 City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT II T 1 c A uD Building Permit Review — Residential Building Permit #: 3f/% )I$"-a () , Site Address: /c c9J/ OM rr_ GI— Project Name: /rod Lot #: (New dw =subdivision name;Addition or Alteration=last name of owner) Planning Review /�� 7sal: Al0 tntci/rf� deoe//Iify site address/suite#exists and activ in permit system. 0 River Terrace Neighborhood: No ❑ Yes,See River Terrace Review Addendum Attached SityPlan Elements: Vpfxee(3)copies of site plan ]Existing structures on site e plan must be on 8-1/2"x 11"or 11 x 17"paper El Footprint of new structure(including decks)with finished al D wn to scale(standard architect or engineer scale) i.or elevations rth arrow iL Utility locations&easements (required for new and additions) address,project or subdivision name and lot number ❑Sidewalk/driveway approach hcant information(name and phone number) Location of wells/septic systems t dimensions and building setback dimensions Existing trees to be retained with drip line,and tree Square footage of buildings to be demolished protection measures .\\''K Lot area,building coverage area,percentage of coverage and ❑ greet tree size,type and location impervious area(applicable if R-7,R-12,R-25&R-40) Street names Property corner elevations(2 foot contour lines if more than >1,000 sf of impervious area created or replace ? ❑Yes 9LJNo 4 foot differential) If yes,is a storm water quality facility shown?D\(❑Yes ❑No Clean Water Services—Service Provider Lett (lot platted prior to 9/10/1995): Required: ❑ Yes,applicant was notified 0 No Received: �WII / ❑ Yes ❑ No Public Facilities Improvement(PFI) Permit: Required: ❑ Yes,applicant was notified 0 No Applied For: ❑ Yes ❑ No,stop intake /Land Use Case#: Zoning: Mu_ C% / Required Setbacks: Front Rear Side Street Side Garage Landscape Requirement: 0/0 Lot Coverage Maximum: 0( Building Height: Maximum Height Actual Height Visual Clearance Sensitive Lands: 0 Yes ❑ No Type Urban Forestry Plan Conditions "Met"prior to isssuaJW,c of building permit 1_ / [ otes: ,l`2—ev"I jee5 / < ,M_ 1 ioto4 h on . `�r�Q ,ii_c �., //,6y c2.C' 4(/ r Glr/Gf'/ ` . El ApproveEY By Planni I ____ _ ,/ Date: 9/4 8 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved 0 Not Approved Revision 3: 0 Approved ❑ Not Approved I:\BuildingWorms\BldgPermitRvw_RES_061417.docx Building Permit Submittal Original Submittal Date: 0l1/r Site Plans: # 3 Building Plans: # Building Permit#: iltsx..building permit#above. Workflow Routing: �YIj aning I Engineering en-7.-----mit Coordinator g Workflow Sign-off: L�A'S -off for Planning(include notes from planning review) Route Application Documents: L_ ngineering: (1) copy of permit application, (1) site plan, (1) building plan and oal plan review routing form. L�J'Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: 111 x 5 > ByPermit Technician: Ae' Date: Al Engineering Review Slope at building pad: 3 7o 0r Conditions"Met"prior to issuance of building permit ['Easements (encroachments)per engineering conditions of approval and plat Er Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: 0 Yes 0 No Assess Water Quantity Fee in-lieu: 0 Yes 13 No LIDA Facility on lot: 0 Yes Q No O Final Plat Recorded: O NOT Approved by Engineering: Date: Notes: IleApproved by Engineering: $,....47 Date: 9'. /7 • its. Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Permit Coordinator Review O Conditions"Met"prior to issuance of building permit O Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: VC;r-DC Fees Entered: Wash Co Trans Dev Tax: erYes 0 N/A Tigard Trans SDC: rY s 0 N/A Parks SDC: 12/-Yes 0 N/A LIDA 0 Yes 0/N/A OK to Issue Permit Approved by Permit Coordinator: Date: 1/'411. I:\Building\Forms\BldgPermitRvw_RES 010118.docx . .�