Loading...
Permit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT ' �°„Ir ` 'S'+' Permit#: BUP2018-00249 13125 SW Hall Blvd.,Tigard OR 97223 503.718.24 9//yi/ Date Issued: 09/20/2018 TICr'ORSa g �� Parcel: 2S115AB01400 Jurisdiction: Tigard Site address: 16297 SW 113TH AVE Project: Willow Brook,Lot 19 Subdivision: Lot: 19 Project Description: Temporary Sales Office located in the garage. 11/1/2018: REPRINT permit to correct site address from 16293 to 16297. Contractor: PACIFIC LIFESTYLE HOMES Owner: MISSION HOMES NW LLC 11815 NE 99TH ST#1200 PO BOX 1689 VANCOUVER,WA 98682 LAKE OSWEGO,OR 97035 PHONE: 360-213-0813 PHONE: FAX: 360-574-6401 FEES Specifics: Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB DC Provision Review,COM TI-Ping 09/20/2018 $98.00 Occupancy Grp: B Occupancy Load: 20 Permit Fee-Additions,Alterations, 09/20/2018 $225.80 Demolition Dwelling Units: 12%State Surcharge-Building 09/20/2018 $27.10 Stories: Height: ft Plan Review 09/05/2018 $146.77 Bedrooms: Bathrooms: Plan Review-Fire Life Safety 09/20/2018 $90.32 Value: $10,000 Info Process/Archiving-Lg$2.00(over 09/20/2018 $2.00 11x17) Info Process/Archiving-Sm$0.50(up to 09/20/2018 $2.50 Floor Areas: 11 x1 7) Total Area: Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $592.49 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued B 47 y. t f,,' Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. CITY OF TIGARD BUILDING PERMIT : • COMMUNITY DEVELOPMENT Permit#: BUP2018-00249 and OR 97223 503.718.2439 13125 SW Hall Blvd.,Ti Date Issued: 09/20/2018 TrC,Alzr� 9 Parcel: 2S115AB01400 Jurisdiction: Tigard Site address: 16325 SW 113TH AVE Project: Willow Brook,Lot 19 Subdivision: Lot: 19 Project Description: Temporary Sales Office located in the garage. Contractor: PACIFIC LIFESTYLE HOMES Owner: MISSION HOMES NW LLC 11815 NE 99TH ST#1200 PO BOX 1689 VANCOUVER,WA 98682 LAKE OSWEGO, OR 97035 PHONE: 360-213-0813 PHONE: FAX: 360-574-6401 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB DC Provision Review,COM TI-Ping 09/20/2018 $98.00 Occupancy Grp: B Occupancy Load: 20 Permit Fee-Additions,Alterations, 09/20/2018 $225.80 Demolition Dwelling Units: 12%State Surcharge-Building 09/20/2018 $27.10 Stories: Height: ft Plan Review 09/05/2018 $146.77 Bedrooms: Bathrooms: Plan Review-Fire Life Safety 09/20/2018 $90.32 Value: $10,000 Info Process/Archiving-Lg$2.00(over 09/20/2018 $2.00 11x17) Info Process/Archiving-Sm$0.50(up to 09/20/2018 $2.50 Floor Areas: 11x17) Total Area: Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $592.49 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of-issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Not 'cation Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calli 503.2 2.1987 or 1.800.332.2 Issued By: //.11irittee Signature: l �'l�, ,.. 7 e Call 503.639.4175 by 7:00 a.m.for the next available inspectio4ate. 2C1 This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit ApplicationDArA ki/1l-J .ygp Commercial uolz 01 1,1( 1 USE 0\1,1 City of Tigard AUG 3 0 2018 Received Rweeete;By: 7 1/45ye 4)4471/4-- !emit Nleu,,o,,2eve—120,2 yi 0 13125 SW Hall Blvd.,Tigard,OR 97223 Pian Raytown Phone: 503-718-2439 Fax: 503-598-114 ,, r 1 i; ,.d,i, 1-1,--‘, Downy: -7' 6 -i V 11 'totaled Perak Inspection Line: 503-639-4175 (A, Y tkis t,' 3.1 kJ, nal Date Ready/fly: JUrn: fd see Page 2 for 11(3A1(I) Internet: www.tigard-or.gov Notified/Method- Supplemental information BUILDING IWVIS101 . 001. OF ‘i,,eo, 4, ,,,, :1,- 4, 4 , , , ,,,Reotnit,DIATAil.Atiii241,01040.44,00 0 New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all 0 Addition/alteration/replacement pi Merl-1k --- le (;)"f-ti CIL" equipment,materials,labor,overhead,and the profit for the gi,,,,6„ti5i4 work indicated on this application. CA79°RY'Of:C°N 0 I-and 2-family dwelling Valuation: $ gi Commercial/industrial 0 Accessory building 0 Multi-family Number of bedrooms: 0 Master builder 0 Other: Number of bathrooms: ..) JO sog avottmAilori AATo ocoloA* „.,, -, d, Total number of floors: Job site address: I(pai s...*. SLA.5 J 1.. .1.1,1/4/4V17 New dwelling area: square feet 14i) City/State/ZIP: —1--Tqco-el f Ole., Garage/carport area: square feet 1 'I Suite/bldg./apt.#: ‘i Project nairte:Vki (to- t) es7004 Covered porch area: square feet Cross street/directions to job site: Deck area: square feet CN Other structure area: square feet *Qt1RE&DAtk.",GO1411#2111Z ClECKLPT VA k Subdivision: 4 NJ t t 1 to43 by-colc_.„) Lot#: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel if: 76 i I 6-4 8 Ok40n equipment,materials,labor,overhead,and the profit for the )E$GRIRTIO14 OF VOgli ,- ,,,," ,, ,, 1: work indicated on this application. Gia-kgra,.‘„,,, Coy,.rf "IV ',Sri L04)o{-1-1cL,,. Valuation: S I 01000 Existing building area: square feet New building area: I el- square feet picoporrylowtiER TENANT AiT, ,,,,,, ,i Number of stories: ‘ ., r r, Name: .4.-4.•t.,.:t. _j-C-'.(2.4:-1_, e, le_, ..,,,,,,e, Occupancy groups: Type of construction:--p rvce. Address: 1 i (,?..$iS-- 10 -0-, City/State/ZIP:Vatj yiroltiviiv t v\M- q Ku k---2.__ Existing: Phone:(6 ) 1 .C )Q ( ,r2Fax:( ) New: PP4C***'''°•,.. ''',J,,, _,,,iir....„.: 4:c9t4TAC7 PjSO$ .,„, ', ,',,s,,,,,ru,c,,,,:u.:,,pallapn;a,rnevareviV:et:4aiewef,seeelftle:740:(aroPprrelp,fpc:sebrrsiT,:1:4;:r*,,,,, Business name: c( C(14-1'(' i i --...e ,c Le„-HDryit-€r/ ' ty.;,b Contact name: Stn Jyt,e,„,r t,....) t..4 f-1,..., l'2"-e3rb Address: ) 1,S-- )6- clorm,,s+ ..,...,,AA: 9,,, 11- ' '?' Total fees due upon application: . City/State/ZIP: va_I,c er,0,(,e_vi ko ei Vt 2m_ Amount received: Vz -77 Phone:caw 2.4 -0 g 1 z Fax::( ) ce, , , • , PHOTONV,TAtc'solin PANEL FEES* E-mail: c,„ri . UJ. I C p Uri%(aleyt„ it.' 4-9,prDgrvni w -,' ,,' ''- , IP .;,, ' Commercial and residential prescriptive installation of "-.7"-'17-.. .'7..""`''''',, ' ' '-" '''" ' '' ''''',2 roof-top mounted PhotoVoltaic Solar Panel System. Business name: (..-',-(41 ( ..f L tte s41€ , —0" -nItle) Submit two(2)sets of roof plan with connection details . and fire department access,along with the 2010 Oregon Address: Ca. - r 12 1'. I ,t44, . Solar Installation Specialty Code checklist. City/State/ZIP: Itylf.../ 61 S j 01t,e —. Permit fee(includes plan review S180.00 and administrative fees): Phone:( ) Fax:( / State surcharge(12%of permit fee): $21.60 CCB Lic.: I-1.... S-2„...0 -. Total fee due upon application: $201.60 Authorized signature: j , -1.J..e.„.6.„C„) This permit application expires If a permit is not obtained within 180 days after it has been accepted as complete. Print name: 1.,,urytyvv,y • „Doitilt Date: fy2.c.iii 8 * Fee methodology set by Tri-County Building Industry Service Board. 1:1BuildingTermits\BUPSOM_PennitApp.doc Rev.04/21/2014 440-4613T(I 1/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT RI Accessibility: Barrier Removal Improvement Plan III : II Commercial & Multi-Family - Additions or Alterations -r'GARD 13125 SW Hall Blvd..Tigard, Oregon 97223 • 503.718.2439 0 www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE(ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [11 $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: 121 $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line 12]of Valuation Computation): $ I:\Building\Perrnits\131)11._COM_PermitApp.doc Rev.12/18/2014 (A.//L t e 43 #6,---cie/ ___ Dianna Howse ! �� / �_ > From: Branden Taggart Sent: Thursday, August 23, 2018 4:52 PM To: 'permits@buildplh.com' Cc: #Building Permit Technicians Subject: Sales Office for MST2018-00171; 16325 SW 113th Ave Attachments: Branden Taggart.vcf; BU P_COM_PermitApp.pdf; ELC_PermitApp_ELR_ERE_061715.pdf Hi Summer, Regarding the model home revision that you submitted for the new deck and sales office,we will need to have the second temporary use permit for the sales office approved before we accept an electrical permit and building permit for the change to commercial use. Our planning department will likely have the temporary use permit ready by the middle of next week. At this point you can submit the building and electrical permit applications. Since we already have the plans that you submitted with the revisions and the approved site plan.you can just submit the permit applications email to TigardBuildingPermits@tigard-or. ov. I will be on vacation next week, but my co-workers will be able to create the permits and have you pay tie fees online. We will send you the link to pay the fees online at that time. I have attached the applications above for you to complete next week. If you have any questions, please send an email to our group email listed above. Thank you, Branden Taggart III4 City of Tigard ■ < ., Senior Permit Technician Community Development TICARD 13125 SW Mall Blvd Tigard,OR 97223 (503)71.8-2449 brandent@itigard-or.gov DISCLAIMER. E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 1 Branden Taggart From: Branden Taggart Sent: Thursday, August 23, 2018 4:52 PM To: 'permits@buildplh.com' Cc: #Building Permit Technicians Subject: Sales Office for MST2018-00171; 16325 SW 113th Ave Attachments: Branden Taggart.vcf; BU P_COM_PermitApp.pdf; ELC_PermitApp_ELR_ERE_061715.pdf Hi Summer, Regarding the model home revision that you submitted for the new deck and sales office,we will need to have the second temporary use permit for the sales office approved before we accept an electrical permit and building permit for the change to commercial use. Our planning department will likely have the temporary use permit ready by the middle of next week. At this point you can submit the building and electrical permit applications. Since we already have the plans that you submitted with the revisions and the approved site plan, you can just submit the permit applications via email to TigardBuildingPermits(Wtigard-or.gov. I will be on vacation next week, but my co-workers will be able to create the permits and have you pay the fees online. We will send you the link to pay the fees online at that time. I have attached the applications above for you to complete next week. If you have any questions, please send an email to our group email listed above. Thank you, Branden Taggart INw City of Tigard $:::;. Senior Permit Technician �z�r Community Development 13125 SW flail Blvd Tigard,OR 97223 {503}718-2449 brandent@tigard-or.gov 1 City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT eii lI TIGARD Building Permit Review — Commercial With Land Use Building Permit #: /.' i..4."=', 2-0/ -DO. - V9 Site Address: 1632 SLI II Avc Suite/Bldg#: Project Name: W.itk,/ e v1- 1zt,p,",--i Ca k U C (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: G arkp t C s.,rtr 4 ,h ShL c tc lirift'site address/suite#exists and active in permit system. ver Terrace Neighborhood: ❑ Yes L�'No / and Use Case#: TU'( io ib`-G'q I PlanyMatch Approved Land Use: Ii Site Plan Landscape Plan ❑ Other: / ( Urban Forestry Plan Id Elevation Plan uilding Height: Maximum Height 3 S Actual Height i"I' ( t& tO l –(J@ i 1) li/[ Y Conditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance fit; Business License: Exists: ❑ Yes ❑ No,applicant notified to obtain business license VPublic Facilities Improvement(PFI) Permit: mi No❑ Yes,applicant was notified Lid No Applied For: ❑ Yes ❑ No,stop intake Notes: Approved by Planning: .144mAit.14 ( L1 -- Date: q`s-i. Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: kj ) /ri Site Plans: # Building Plans: # _3 Building Permit#: g Enter building permit#above. Workflow Routing: - Planning i2- Engineering ErPermit Coordinator Building Workflow Sign-off: c.(a Sign-off for Planning(include notes from planning review) Route Application Documents: .'Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: m By Permit Technician: _ aA- Date: /5cP I:\Building\Forms\BldgPer iitRvw_COM_WithLandUse 060116.docx Engineering Review D"‹.-pe at building pad: 6% PFI Permit#: Pc i ;•tiaI._-001 l& 2 Conditions "Met"prior to issuance of building permit 2 Easements (encroachments)per engineering conditions of approval and plat (not typical on SDR/CUP) 0-Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes 23—No Assess Water Quantity Fee in-lieu: ❑ Yes 8' No LIDA Facility on lot: El Yes B' No ❑ NOT Approved by Engineering: Date Notes: .vi�rnv v S c'/tiJ is, ).i,.„ W%• 4 R,PIQmit el f 21 D di./ )`-€'u4 t Approved by Engineering: (Z.fi y,ttDate: q (,_,9 Revisions (after Building Submittal only) Reviewer Date Revision 1: El Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: El Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: C Fees Entered: Wash Co Trans Dev Tax: El Yes M' /A Tigard Trans SDC: C1 Yes ►"''N/A Parks SDC: ❑ Yes N/A K to Issue Permit l Approved by Permit Coordinator: Date: C11111 V-- I:\Building\Forms\B1dgPermitRvw_COM_W ithLandUse_070915.docx