Loading...
Plans (123) M EC2018 - 00308 nn GENERAL NOTES _ _ry _ r• GENERAL DOOR AND HARDWARE 44. COORDINATE ELECTRICAL REQUIREMENTS FOR MECHANICAL SYSTEM. TO INDICATE THE DIRECTION OF EGRESS WHEN THE EXIT SERVES AN OCCUPANT LOAD OF ^ 45. DESIGN-BUILD CONTRACTOR SHALL PREPARE A WRITTEN SCOPE OF HVAC WORK WITH BID. FIFTY OR MORE. .. 1. THE GENERAL NOTES ARE INTENDED TO CONVEY DESIGN INTENT NOT OTHERWISE STATED IN 22. DOORS SHALL OPEN FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL THIS IS TO INCLUDE NEW EQUIPMENT, NUMBER OF ZONES, DESCRIPTION AND QUANTITY OF 68. PROVIDE ILLUMINATION AT EXITS WITH LIGHT HAVING THE INTENSITY OF NOT LESS THAN 1 - = //�" ©© �, ' THE DRAWINGS AND SPECIFICATIONS. THE PROJECT INTENT IS TO PROVIDE A COMPLETE KNOWLEDGE OR EFFORT. CONTROLS AND THERMOSTATS, ETC. OWNER WILL REVIEW SCOPE OF WORK PROPOSED FOOT-CANDLE AT THE FLOOR LEVEL PROVIDE EMERGENCY SYSTEM LIGHTING WHERE THE A -rte ^C, -H-'I T E C T S WORKING TENANT OR BUILDING IMPROVEMENT. 23. NEW DOOR HARDWARE SHALL MATCH EXISTING BUILDING STANDARD LEVER HANDLE WITH PRIOR TO ACCEPTANCE OF BID. EXISTING SYSTEM SERVES AN OCCUPANT LOAD OF A 100 OR MORE AS REQUIRED BY CODE. 2. ALL WORK SHALL CONFORM TO THE 2012 INTERNATIONAL BUILDING CODE(IBC), 2014 FINISH TO MATCH BUILDING STANDARD. FINISH OF HINGES AND CLOSERS TO MATCH. ALL 46. DESIGN-BUILD CONTRACTOR TO PROVIDE CERTIFICATION THAT OUTDOOR AIR MATCH EXISTING BUILDING STANDARD WHERE POSSIBLE FOR REQUIRED EMERGENCY 720 NW Davis 503.221.1121 OREGON STRUCTURAL SPECIALTY CODE(OSSC), 2014 OREGON MECHANICAL SPECIALTY HARDWARE SHALL BE ADA ACCESSIBLE. REQUIREMENTS OF CURRENT CODES WILL BE MET FOR EACH OCCUPANCY USE WITHIN THE SYSTEMS AND INSTALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CURRENT Suite 300 503 221.2077 D CODE(GMSC), 2014 OREGON FIRE CODE, 2014 OREGON ENERGY EFFICIENCY SPECIALTY 24. CONTRACTOR SHALL VERIFY COMPATIBILITY OF HARDWARE SPECIFIED WITH BUILDING TENANT IMPROVEMENT AREA. NATIONAL ELECTRICAL CODE. CODE(OEESC), 2014 OREGON PLUMBING SPECIALTY CODE(OPSC), 2014 OREGON ELECTRICAL KEYING SYSTEM. 47. INTERIOR AND PERIMETER OFFICES SHALL NEVER BE ON THE SAME ZONE. CONFERENCE 69. PROVIDE VISUAL AND AUDIBLE ALARM SIGNAL APPLIANCES INTEGRATED INTO THE BUILDING Portland OR 97209 www.Irsarchitects.com SPECIALTY CODE(OESC)AND TO CONDITIONS AND SPECIFICATIONS OF ALL GOVERNING 25. PROVIDE NEW DOORS MATCHING EXISTING DOORS'VENEER SLICING PATTERN AND GRAIN ROOMS AND LUNCHROOMS CAPABLE OF SEATING(6) OR MORE SHALL ALWAYS BE ON THEIR ALARM SYSTEM AS REQUIRED BY ADA AND CURRENT OSSSC STANDARDS, PROVIDE RECEIVED AUTHORITIES. DENSITY, AND FINISH. OWN ZONE. ADDITIONAL ELECTRICAL SERVICE AS REQUIRED. COORDINATE REQUIREMENTS WITH 3. CAREFULLY EXAMINE THE PROJECT SITE AND CONSTRUCTION DOCUMENTS. VERIFY ALL 26. PROVIDE CLOSERS ON ALL TENANT ENTRY OR EXIT DOORS TO MATCH EXISTING BUILDING 48. DESIGN-BUILD CONTRACTOR SHALL VERIFY THE SUITABILITY AND CONDITION OF SCHEDULED BUILDING OWNER. ALARM LOCATIONS INDICATED ON PLANS ARE ONLY FOR REFERENCE. DIMENSIONS AND CONDITIONS PRIOR TO START OF WORK AND REPORT ANY DISCREPANCIES STANDARD FINISH AND TYPE. EQUIPMENT TO BE RE-USED OR RELOCATED. DETERMINE ITEMS THAT NEED TO BE 70. PROVIDE SHOP DRAWINGS FOR ALARM SYSTEM LAYOUT AS REQUIRED BY CODE. APR 3 a 2018 TO THE ARCHITECT. 27. PROVIDE DOOR OPENINGS IN RATED WALLS COMPLYING WITH REQUIRED SMOKE CONTROL REPAIRED OR REPLACED. PRICE THESE ITEMS SEPARATELY AND AS EXCEPTIONS/ 71. VERIFY SERVICEABILITY AND REUSABILITY OF EXISTING ELECTRICAL EQUIPMENT,AND CITY OF TIGARO 4. OBTAIN AND PAY FOR ALL PERMITS AND FEES TO COMPLETE THE WORK. OBTAIN AND PAY ASSEMBLY AND INDICATED FIRE PROTECTION RATING OF NO LESS THAN 20 MINUTES. CLARIFICATIONS IN BID. REPAIR OR REPLACE AS NECESSARY. 8 N agi1i • FOR ADDITIONAL DRA WINGS AND SPECIFICATIONS REQUIRED FOR PERMITS. WHERE EXISTING DOOR OPENINGS DO NOT COMPLY WITH PRESENT BUILDING CODE 49. AUTOMATIC SPRINKLER SYSTEM SUPERVISION: ALL VALVES, INCLUDING THOSE IN PITS, 72. VERIFY THE CAPACITY AND REUSABILITY OF EXISTING ELECTRICAL PANELS TO MEET BUILDING l'.! DIVISION I {U °! 5. THE CONTRACTOR SHALL PROVIDE AND PAY FOR DUMPSTER AND TELEPHONE. REQUIREMENTS, PROVIDE NEW DOORS, FRAMES AND HARDWARE THAT COMPLY. SHALL BE MONITORED BY UL LISTED FIRE MARSHAL-APPROVED CENTRAL STATION. WATER PROJECT REQUIREMENTS. 6. COORDINATE ARCHITECTURAL WORK WITH MECHANICAL AND ELECTRICAL DESIGN BUILD 28. ADJUST THE RESISTIVE FORCE OF ALL NEW AND EXISTING INTERIOR DOOR CLOSERS IN THE FLOW AND HIGH/LOW PRESSURE FOR DRY PIPE SYSTEMS IF USED) SHALL BE SUPERVISED, 73. TERMINATE ALL CONDUITS IN STANDARD DUPLEX BOXES, UNLESS OTHERWISE INDICATED. 276 -t WORK AND SUBMIT ALL DESIGN BUILD PLANS TO ARCHITECT FOR REVIEW PRIOR TO PROJECT AREA TO A MAXIMUM PRESSURE OF 5 LBS. TO COMPLY WITH ADA REQUIREMENTS. AS WELL AS OTHER FEATURES DEEMED NECESSARY BY CURRENT NATIONAL FIRE 74. KNOWN EXISTING (E) ELECTRICAL AND PHONE/DATA OUTLETS HAVE BEEN INDICATED ON THE { • CONSTRUCTION. PROTECTION ASSOCIATION STANDARDS. DRAWING. ADDITIONAL EXISTING OUTLETS MAY EXIST AND SHOULD BE VERIFIED BY • i 7* 7. DIMENSIONS TAKE PRECEDENCE OVER SCALE. DIMENSIONS ARE TYPICALLY TO FACE OF FINISHES 50. PREPARE SPRINKLER SYSTEM SHOP DRAWINGS FOR COORDINATION WITH ARCHITECTS CONTRACTOR. II ckPORILVID, 4„ FINISH UNLESS OTHERWISE NOTED. DRAWINGS BY ARCHITECT. 75. VERIFY WITH TENANT OR OWNER LOCATIONS OF ELECTRICAL AND VOICE/DATA OUTLETS FOR :SF 8. KEEP PROJECT AREA OF WORK FREE OF GARBAGE AND DEBRIS ON A DAILY BASIS. 29. REPAIR/REFINISH ANY DAMAGE TO EXISTING FINISH SURFACES IN IMPROVEMENT AREA 51. PAY ALL FEES AND OBTAIN ALL PERMITS AND APPROVALS FROM GOVERNING AGENCIES SYSTEMS FURNITURE PRIOR TO INSTALLATION. 409. DO NOT DISTURB ADJACENT TENANTS BY NOISY CONSTRUCTION(i.e., JACK HAMMERING OR CAUSED BY CONSTRUCTION OPERATIONS. NECESSARY TO COMPLETE THE WORK. 76. SMOKE DETECTION DEVICES INDICATED ON THE DRAWINGS ARE FOR REFERENCE ONLY. CORE DRILLING), OR ODORS(i.e., PAINTING OR ADHESIVE FROM FLOOR OR WALL 30. PAINT EXISTING WALLS WITH 2 COATS OF EGGSHELL FINISH PAINT UNLESS OTHERWISE 52. PROVIDE FIRE DAMPERS AS REQUIRED BY CURRENT OSSSC STANDARDS FOR NEW CONFIRM SPACING OF DETECTORS WITH DEVICE LISTING. COVERINGS), SCHEDULE SUCH ACTIVITIES FOR AFTER NORMAL BUSINESS HOURS. NOTED. SUBMIT COLOR DRAW-DOWNS TO ARCHITECT AND OWNER FOR APPROVAL PRIOR TO CONFIGURATION OF FIRE-RATED PARTITIONS. 77, CLEAN AND REPAIR EXISTING SMOKE DETECTORS TO BE REUSED TO GOOD WORKING COORDINATE SUCH ACTIVITIES WITH BUILDING OWNER. APPLICATION. 53. BALANCE DESIGN-BUILD HVAC SYSTEM TO TENANT AND BUILDING OWNERS SATISFACTION. CONDITION. 10. STORAGE OUTSIDE OF BUILDING IS NOT ALLOWED WITHOUT AUTHORIZATION BY BUILDING 31. WHERE ALL NEW PARTITIONS ABUT, JOIN OR CONNECT TO EXISTING SURFACES, WALLS, OR TOUR EXISTING CONDITIONS AND CONTACT OWNER FOR QUESTIONS PRIOR TO BID. 78. CLEAN NEW, EXISTING, AND RELOCA TED LIGHT FIXTURES IN PROJECT AREA, OR IN AREAS OWNER. NEW CONSTRUCTION, THE FINISHED SURFACE SHALL BE ALIGNED FLUSH. 54. INSTALL TEMPORARY FILTERS ON HVAC VAV BOXES AFFECTED BY WORK OF PROJECT PRIOR AFFECTED BY WORK OF THIS PROJECT, AT COMPLETION OF JOB. RELAMP AND REPLACE 11, OWNER SHALL NOT BE RESPONSIBLE FOR TOOLS OR MATERIAL GOODS STOLEN OR 32. ALL NEW WALLS AND PARTITIONS SHALL HAVE TAPED JOINTS(3) COATS SANDED AND PRIMED TO CONSTRUCTION. REMOVE FILTERS AT COMPLETION OF THE PROJECT. BALLAST IN LIGHT FIXTURES AS REQUIRED TO RESTORE TO WORKING ORDER. CONSULTANT: DAMAGED ON SITE. TO MEET PAINT READY REQUIREMENTS. 55. COORDINATE ZONE CONTROL OF EXISTING HVAC SYSTEM AT IMPROVEMENT AREA. 79, CLEAN AND REPAIR EXISTING EXIT SIGNS TO BE REUSED. REPLACE BATTERY AND/OR 12. CONTACT OWNER'S REPRESENTATIVE TO COORDINATE SCHEDULED ITEMS TO BE SALVAGED 33. EXISTING WALLS AND SURFACES SHALL BE STRIPPED, RESURFACED, AND PATCHED AS SEPARATE AND REROUTE EXISTING DUCTWORK AND CONTROLS REQUIRED TO PROVIDE BALLAST IF NOT IN GOOD WORKING CONDITION. FOR RETURN. REQUIRED. INDEPENDENT OPERATION BY TENANTS ON EACH SIDE OF A DEMISING WALL. 80. COORDINATE TELECOMMUNICATIONS AND MODIFICATION TO BUILDING ALARM SYSTEM 13. UPON COMPLETION OF WORK, BE RESPONSIBLE FOR RETURN TO OWNER OF ALL MASTER 34. DISPOSE OF ALL PAINT MATERIALS OFF SITE. DO NOT POUR DOWN DRAINS, CATCH BASINS, 56. CLEAN ALL NEW AND EXISTING HVAC GRILLS AND DIFFUSERS SCHEDULED TO REMAIN. ALL PROVIDED BY TENANT. VERIFY WITH TENANT LOCATION OF NEW OUTLETS PRIOR TO KEY ORIGINALS OR CARD ACCESS DEVICES. OR IN LANDSCAPING. DUCTWORK BEHIND GRILLS SHALL BE A UNIFORM DARK COLOR. INSTALLATION. 14. WARRANTY ALL PARTS, LABOR, EQUIPMENT, AND MATERIAL PROVIDED UNDER THIS 35. PROVIDE A FULL GALLON OF EACH WALL COLOR WITH LABELS IN TENANT CLOSET OR UNDER 57. DESIGN-BUILD CONTRACTOR AT COMPLETION SHALL PREPARE AND SUBMIT AN AIR 81. REMOVE ALL UNUSED OR ABANDONED ELECTRICAL WIRING, EQUIPMENT AND PHONE AND CONTRACT OF A PERIOD OF ONE YEAR, UPON FINAL COMPLETION OF CONTRACT. SINK, LABEL ALL LEFT OVER PAINT,AND DELIVER TO OWNER WHERE DIRECTED. BALANCING REPORT TO THE OWNER. DATA CABLING. CONFIRM WITH OWNER PRIOR TO REMOVAL.ALL WIRING AND CABLING TO 15. SUBMIT SUBSTITUTION REQUESTS ON CSI FORM TO ARCHITECT FOR APPROVAL. 36. TAPE AND SAND EXPOSED GYPSUM BOARD FOR A FLAT, SMOOTH SURFACE FINISH TO MATCH 58. HVAC CONTRACTOR TO PROVIDE 100%FRESH AIR SUPPLIED TO ENTIRE TENANT SPACE REMAIN SHALL BE SUSPENDED FROM STRUCTURE AS REQUIRED BY CURRENT CODE. ARCHITECT'S DECISION IS FINAL WHETHER A PROPOSED PRODUCT IS ACCEPTABLE FOR EXISTING ADJACENT SURFACES IN BUILDING, UNLESS OTHERWISE INDICATED. THREE CALENDAR DAYS PRIOR TO THE FIRST DAY AFTER SUBSTANTIAL COMPLETION. SUBSTITUTION. 37. PROVIDE FINISH MATERIALS MATCHING ESTABLISHED BUILDING STANDARD QUALITY, UNLESS PROVIDE 100%FRESH AIR WITHOUT MAKING OTHER TENANTS UNCOMFORTABLE SCHEDULING OF FIRE SPRINKLER AND ALARM SYSTEMS 16. APPLICATION OF MATERIALS TO SURFACES EXISTING OR PROVIDED UNDER THIS CONTRACT OTHERWISE INDICATED. PROWDE COLORS APPROVED BY OWNER AND ARCHITECT. IMPLIES ACCEPTANCE AND SUITABILITY OF EXISTING CONDITIONS. 38. CONTRACTOR TO FILL AND PATCH EXISTING CONCRETE SLABS AND SHALL PROVIDE SMOOTH ELECTRICAL-DESIGN BUILD 82. CONTACT OWNER'S REPRESENTATIVE FOR INSTRUCTIONS WHEN SCHEDULING WORK ON 17. ALL WORK INDICATED ON DRAWINGS SHOULD BE CONSIDERED NEW UNLESS IDENTIFIED AS UNIFORM SURFACE PRIOR TO NEW FLOOR COVERINGS TO BE INSTALLED. FIRE SPRINKLER&ALARM SYSTEMS. EXISTING TO REMAIN OR TO BE REUSED. 59. ELECTRICAL SYSTEM AND REQUIREMENTS ARE DESIGN-BUILD. SUBMIT ELECTRICAL DESIGN 18. ALL MATERIALS AND PRODUCTS USED ON THE JOB SITE SHALL BE"ENVIRONMENTALLY SAFE', FURNISHINGS TO ARCHITECT FOR COORDINATION WITH ARCHITECT'S DRAWINGS PRIOR TO ACCESSIBLE FIXTURE MOUNTING REQUIREMENTS LOW ODOR, AND NONFLAMMABLE. USE OF ANY PRODUCT NOT COMPLYING WITH THIS CONSTRUCTION. CRITERIA MUST BE APPROVED BY THE BUILDING OWNER. 39, INSTALL BUILDING STANDARD WINDOWCOVERINGS AT ALL PERIMETER WINDOWS IN 60. IF AN OVERRIDE SYSTEM EXISTS, PROVIDE EACH TENANT SPACE WITH AN OVERRIDE SWITCH 83. ALL DIMENSIONS INDICATED ON THIS SHEET ARE CLEAR MINIMUM TO FACE OF FINISH. 19. CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY DAMAGE OR CLEANING THROUGHOUT IMPROVEMENT AREA UNLESS OTHERWISE NOTED. DO NOT PROVIDE NEW IF ALREADY FOR FULL-SERVICE BUILDINGS. DIMENSIONS TO TOILET ROOM ACCESSORIES ARE TO THE CENTER LINE AS NOTED OR TO THE STRUCTURE DEEMED TO BE A RESULT OF HIS/HER WORK. THOROUGHLY CLEAN PREMISES EXISTING. REPAIR AND/OR REPLACE ANY DAMAGED WINDOWCOVERINGS TO MATCH 61. PAY ALL FEES AND OBTAIN ALL PERMITS AND APPROVALS FROM GOVERNING AGENCIES HIGHEST PORTION OF THE OPENING OR OPERATING DEVICE. UPON COMPLETION OF WORK, INCLUDING WASHING OF WINDOWS, SO THAT BUILDING IS EXISTING. NECESSARY TO COMPLETE WORK. READY FOR OCCUPANCY BY TENANT. INCLUDE CLEANING OF ADJACENT AREAS WITHIN AND 40. FURNITURE INDICATED ON PLANS IS FOR REFERENCE ONLY AND SHALL BE CONSIDERED NOT 62. COORDINATE ITEMS REQUIRED FOR DEMOLITION NOT INDICATED ON DRAWINGS. 84. ALL ITEMS INDICATED BELOW MAY NOT OCCUR ON THIS PROJECT. SEE PROJECT PLANS AND AROUND THE BUILDING THAT ARE NOT PART OF TENANT IMPROVEMENTS, BUT WERE IN CONTRACT. 63. COORDINATE ELECTRICAL REQUIREMENTS FOR MECHANICAL SYSTEMS. ELEVATIONS FOR ITEMS THAT OCCUR. SEE ARCHITECTURAL PLANS FOR ACCESSIBILITY AFFECTED BY TENANT IMPROVEMENT CONSTRUCTION OPERATIONS. 64. DESIGN-BUILD CONTRACTOR SHALL PREPARE A WRITTEN SCOPE OF ELECTRICAL WORK TO AND/OR ADAPTABILITY CONFORMANCE IN THE HORIZONTAL PLAN LAYOUT. 20. CONTRACTOR TO PROVIDE MECHANICAL AND ELECTRICAL AS-BUILT DRAWINGS, ALL BE PERFORMED TO THE OWNER WITH BID. WARRANTIES AND OPERATING MANUALS TO BUILDING OWNER WI THIN TWO WEEKS OF MECHANICAL-DESIGN BUILD 65. ELECTRICAL LIGHTING ON DRAWINGS IS PROVIDED FOR REFERENCE ONLY AND IS INTENDED 85. CONFORMANCE TO FIXTURE MOUNTING HEIGHT REQUIREMENTS ARE APPLICABLE IN ANY COMPLETION OF WORK. CONTRACTOR ALSO IS TO PROVIDE FINAL CERTIFICATE OF TO SHOW FIXTURE TYPES AND LOCATIONS. ELECTRICAL DESIGN IS BY DESIGN-BUILD PUBLIC AREA OR EMPLOYEE AREA MORE THAN 1000 SF,AS THEY OCCUR PER PROJECT OCCUPANCY. NO RETAINAGE SHALL BE RELEASED UNTIL OWNER HAS RECEIVED THESE -•41. MECHANICAL SYSTEM AND REQUIREMENTS ARE DESIGN-BUILD. SUBMIT PLANS AND CONTRACTOR IN ACCORDANCE WITH EXISTING BUILDING STANDARDS. COMPLY WITH ITEMS. SPECIFICATIONS TO ARCHITECT FOR COORDINATION WITH ARCHITECTS DRAWINGS, IN ENERGY CODE REQUIREMENTS AS REQUIRED BY CURRENT ENERGY CODES AND PROVIDE 86. VERIFY ACCESSORY SIZE WITH MANUFACTURER TO ENSURE CONFORMANCE WITH REQUIRED 21. ALL DEMOLITION WORK TO CONFORM TO CURRENT OSHA STANDARDS. PROVIDE ADEQUATE ADDITION, CONTRACTOR SHALL PROVIDE WITH SUBMITTAL(2) COPIES OF A COLORED FLOOR ENERGY CALCULATIONS REQUIRED FOR WORK OF THIS PROJECT. MOUNTING HEIGHTS. BRACING ON EXISTING CEILING FRAMING SYSTEM PRIOR TO DEMOLITION. PLAN DESIGNATING WHICH AREAS ARE CONTROLLED BY EACH THERMOSTAT MECHANICAL 66. SWITCHING FOR LIGHTING IS INDICATED IN THE DRAWING FOR REFERENCE ONLY AND IS DESIGN MUST BE APPROVED BY OWNER AND MECHANICAL ENGINEER IF EMPLOYED BY INTENDED TO ONLY SHOW SWITCH LOCATIONS. REQUIREMENTS FOR DUAL SWITCHING, 87. PROVIDE CODE-COMPLIANT BLOCKING WITHIN WALLS AS REQUIRED FOR PROPOSED AND ARCHITECT PRIOR TO CONSTRUCTION. AUTOMATIC AREA SHUT OFF CONTROLS AND ALL OTHER CODE REQUIREMENTS SHALL BE THE FUTURE ACCESSORIES AND GRAB BAR MOUNTING FIXTURES. BLOCKING IS REQUIRED FROM 42. PAY ALL FEES AND OBTAIN ALL PERMITS AND APPROVALS FROM GOVERNING AGENCIES RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR. PROVIDE A MINIMUM OF ONE SWITCH STUD SPACE TO BACK OF SURFACE OF ALL FIXTURES INCLUDING BUT NOT LIMITED TO NECESSARY TO COMPLETE WORK. PER ROOM, UNLESS OTHERWISE INDICATED. TUB/SHOWER ENCLOSURES. 43. COORDINATE ITEMS REQUIRED FOR DEMOLITION NOT INDICATED ON DRAWINGS. 67. PROVIDE ILLUMINATED EXIT SIGNS AT REQUIRED EXIT DOORWAYS AND WHERE NECESSARY 88. FLOOR DRAINS: ACCESSIBLE FIXTL RES REQUIRE A CLEAR FLOOR SPACE CONTIGUOUS OR OVERLAPPING THE ACCESSIBLE ROUTE. FLOOR DRAINS SHOULD NOT BE PLACED IN THIS CLEAR;FLOOR SPACE. EXCEPTION. DRAINS MAY RESIDE IN CLEAR FLOOR SPACE PROVIDED PROJECT NUMBER: 218007 DRAIN HOLES DO NOT EXCEED 1/2"DIA. MAX.;FLOOR SLOPE DOES NOT EXCEED 2% IN ANY DIRECTION;AND THE ELEVATION CHANGE AT THE DRAIN LIP DOES NOT EXCEED 1/8". END OF GENERAL NOTES Total Quality Logistics T.I. Triangle Pointe 13333 SW 68th Parkway Suite 220 Tigard, Oregon 97223 4'-0" OFFICE COPY P.All - _ ♦ D • *O - , REViECITY OCA:::: ISOIANCEii`[ - ¢ z h 2 z /41Ik WIMP 2 ,,,IIIPti. to I Approved. j 5� IJL Aster ♦ X X 10 MAX ! Permit#: r.3�-r -, n l 2 - O C7 3 0 �' 2'-6, Fig.308.2.1 Fig. 308.3.1 3 � Address: ���,, 4 �.� 6 Ss' p K�`l Suite#: 7,ZO'� CLEAR FLOOR SPACE CLEAR FLOOR SPACE UNOBSTRUCTED UNOBSTRUCTEDDatc: � PARALLEL APPROACH FORWARD APPROACH FORWARD REACH SIDE REACH By: )¶ `cam I 5/ iit * 4"MAX -a�+.�".�` :- '�01_ ! FIRE ALARM SIGNALISTROBE ANNUNCIATOR PANEL �� - p-�° OPERABLE THERMOSTAT filWALL MOUNTED FIRE i�r�art�•� r�'��rl� '; MOUNTED PHONE FIRE EXTINGUISHER SIGN EXTINGUISHER EMERGENCY POWER t'al'-,•'�: '� ly EXIT SIGN `r (V,Witi t v maMir i MANUAL PULL RECESSED FIRE OFF PUSH BUTTON SHEET TITLE: 20' MAX z EXTINGUISHER CABINET >20"-25" " ELECTRICAL OUTLET STATION TACTILE a 1 TYPICAL DOOR !O' INTERCOM _ General Notes & Fig. 308.2.2 '� 9" SIGNAGE SHELF AND OPENING / TO RAISED ELECTRICAL OUTLET TELEPHONE STATION !O` ,� a OBSTRUCTED HIGH FORWARD REACH - CHARACTERS AT CASEWORK OUTLET AND �'` ♦ BASE_OF POLE N • SWITCHES CHARACTER Standard Mounting a 10"MAX 10'-24A O r ♦ - - c�♦ 7 ¢ --- • ♦ _ • co L W Q = o _ LU a m To 2 z z X Heights °IP LIMITS OF PROTRUDING OBJECTS '� 1 ¢ w © cc 0 o o o 4 x `° cq c� 7n � 111-111 ,� z 1Uj .- w - �a ;nom int � oEXCEPTIONS: CARD k, o °L° i, O it z ¢ z M z o p v o v o m a Q v `r `°READER ® O n UJ a a O_ H1411 !. HANDRAILS MAY PROTRUDE 41/2 MAX, �- v O U Q O o I- ♦M! - 1 M ; 2. DOOR CLOSERS AND DOOR STOPS 0 E♦ ♦ ♦ ♦ ♦ ♦ ♦ N ♦ ♦ ♦ SHALL BE PERMITTED TO BE 78"MIN Fig, 308.3.2 ABOVE FLOOR SIDE APPROACH DRAWN BY: DRM TYPICAL AT DOOR MISCELLANEOUS WALL MOUNTINGS DATE ISSUED: OBSTRUCTED HIGH SIDE REACH ICC/ANSI A117.1-2009 SECTION 308 REACH SHELVES(SECTION 603.4) RANGES(ALL DIMENSIONS ARE NOT TO SCALE) REVIEW SET 02.15.18 1-- 6- 6- PERMIT SET 02.19.18 5 I a 1. ACCESSIBLE FIXTURE MOUNTING REQUIREMENTS (PER ICC/ANSI A117.1-2009) Wv SCALE: NOT TO SCALEA100 i SHEET: n LRS Architects,Inc.0 2018 W m m c - - - - 1!, : :,' 11.-11r: „-, S ii IIIIIIIIIIIIIIIIIII .. IIIIIIIIIArilNNE .. ^ .. .... ^.. Imo mills Il ... MEMI ^R-C-^ 1TECTS i , V r 720 NW Davis 503.221.1121 ft FS iiS1 , Suite 300 503 221.2077 D • Portland OR 97209 www.lrsarchitects.com vi o II :p /1_TiP, ro. PP. / itt I IL XIAi liall• FA Ilia mo FS FS in Se 44411° t -r plIgrAlle 1151 ri PP 1 aillEill a vowo PP l a IIIIIII rirT w C.SPATT .... .. • • . • � ■ �M .1444,4 iiiii • • F IMIZIS_ .„,,,, ,,,....., , ,,.. . as — L ,1 ri imrimmm,, pal ifli I / op lippliii • _ coi, gii rills Nimmint . i , :, . Er �� CONSULTANT: O X ' X TYPi Fl • • • • • a . , i ----7• ii, 0�limi. ; mil PP ®° PP1 ,., I fe't X iii.'I V 1 FA spy IFS 1111 FS PP011 –1 EMI I @ @ @ FSPlIii Pt% IIIE 0 i 1 i r 1 Inille 111 • periv. r 'a IFS 11111111111111, 1_ ar, ► _ .1111111111_ ► �I •• AI I - . • i t I 7rf ., ,_____ rn -1 IIII ---rn ' ial, II, --'"- • 1. REFLECTED CEILING PLAN SCALE: 1/8"= 11-0" - T..., . PROJEC o NUMBER: 218007 GENERAL NOTES KEYNOTES LEGEND Total Quality A. REFER TO SHEET A100 FOR A COMPLETE LIST OF GENERAL NOTES. PROVIDE JUNCTION BOX IN CEILING FOR TENANT-PROVIDED POWER POLES Logistics CS EL1 (2-4 CIRCUITS PER POLE DEPENDING ON LENGTH OF CUBICLE PACK). EXISTING 2X4 ACOUSTICAL SUSPENDED CEILING B. ALL ELECTRICAL WORK IS DESIGN BUILD-EXISTING&NEW LIGHT FIXTURES LOCATIONS TO BE VERIFIED ONSITE WITH TENANT AND FURNITURE Triangle Pointe SHOWN FOR REFERENCE ONLY. VERIFY EXISTING CONDITIONS AND REPORT VENDOR PRIOR TO CONSTRUCTION. X EXISTING HVAC SUPPLY 13333 SW 68th Parkway ANY DISCREPANCIES TO ARCHITECT. SUBMIT ELECTRICAL PLANS TO ARCHITECT FOR REVIEW PRIOR TO CONSTRUCTION. CLEAN&RESTORE ALLPROVIDE POWER AND BACKING IN CEILING FOR TENANT-PROVIDED / Suite 220 LIGHTS TO WORKING ORDER PRIOR TO JOB COMPLETION. O2 PROJECTOR. / EXISTING HVAC RETURN Tigard, Oregon 97223 C. ALL MECHANICAL WORK IS DESIGN BUILD-EXISTING DIFFUSERS SHOWN FOR 0 PROVIDE NEW OR RELOCATED BUILDING STANDARD LED EXIT SIGN. \ REFERENCE ONLY. VERIFY EXISTING CONDITIONS AND REPORT ANY EXISTING BUILDING STANDARD LIGHT FIXTURE . DISCREPANCIES TO ARCHITECT. SUBMIT MECHANICAL PLANS TO ARCHITECT 0 PROJECTION SCREEN INSTALLED BY TENANT. PATH OF EGRESS SHOWN FOR REFERENCE ONLY FOR REVIEW PRIOR TO CONSTRUCTION. CLEAN ALL DIFFUSERS PRIOR TO JOB COMPLETION. (DEFERRED SUBMITTAL) D. SUBMIT PROPOSED LOCATIONS FOR EMERGENCY LIGHTING,STROBES,SMOKE PROVIDE NEW OR RELOCATED BUILDING DETECTION&SPRINKLERS TO ARCHITECT FOR REVIEW AND COORDINATION STANDARD 2x4 LIGHT FIXTURE PRIOR TO CONSTRUCTION. x EXISTING LIGHT FIXTURE TO BE REMOVED OR RELOCATED E. CEILING CONFIGURATION TO REMAIN UNLESS OTHERWISE NOTED. 0 EXISTING RECESSED LIGHT FIXTURE F. REPLACE ALL DAMAGED CEILING TILES&GRID TO MATCH EXISTING BUILDING STANDARD. ,1 ft �� ® ®4 EXIT SIGNS(W/INTEGRAL ARROW WHERE OCCURS) G. WHERE NEW LIGHTS ARE ADDED-MATCH EXISTING BUILDING STANDARD TYPE 4e_G Q c•�tc c,,: tJ �' AND FINISH. ����J Mocaq "Fo I • EXISTING SPRINKLER 5:1 H. PROVIDE(1)CONSISTENT CEILING PANEL(STYLE&COLOR)THROUGHOUT (our �D( .. —__ "�- � �_ +8'10" CEILING HEIGHT AFF ENTIRE AREA OF WORK IF NOT ALREADY EXISTING. �`"� �� -�at/, Y..4- o--,_ jdU ate_ ®S SPEAKER 6, 7�.�. ') Of EXISTING SMOKE DETECTOR SHEET TITLE: s ra: 1734--A-11( tH 2- I o k goof• IAA*u1/4,4 46 Si 01-e---)14 i • o-t S GU /-4., . c4_,• k A t( au.vd-.r FS EXISTING FIRE STROBE Reflected PP, TENANT-PROVIDED POWER POLE Ceiling Plan 0 . 7,2e—bectecittc_. At r 4-41-2-4"-e—o1-7-47:,------_,r tc.s.,— an DRAWN BY: DRM O m DATE ISSUED: ei 0 -r. REVIEW SET 02.15.18 n. PERMIT SET 02.19.18 m a m .a2 A203 m 0 SHEET: N o LRS Architects,Inc.0 2018 m N C Qc x