Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans
M EC2018 - 00025 I REVISIONS BY MECHANICAL CRITERIA MECHANICAL CRITERIA (CONT.) MECHANICAL SYMBOL LIST P �o co 1. BEFORE SUBMITTING A PROPOSAL,THE MECHANICAL CONTRACTOR SHALL VISIT THE 14. FABRICATE AND INSTALL GALVANIZED SHEET METAL DUCTWORK FOR VELOCITIES LESS ® SUPPLY AIR DUCT UP z N o M r- 01 SITE OF WORK AND FAMILIARIZE HIMSELF WITH ALL SITE CONDITIONS.MECHANICAL THAN 2000 FEET PER MINUTE AND STATIC PRESSURES LESS THAN 2"WATER GAUGE INit CONTRACTOR SHALL CAREFULLY EXAMINE ALL CIVIL,ARCHITECTURAL,STRUCTURAL, ACCORDANCE WITH THE LATEST EDITION OF THE"LOW VELOCITY DUCT CONSTRUCTION El SUPPLY AIR DUCT DOWN H 0 o VCO PLUMBING,MECHANICAL AND ELECTRICAL CONSTRUCTION DOCUMENTS.SUBMISSION STANDARDS"AS PUBLISHED BY THE SMACNA.PROVIDE ELBOWS,BRANCHES AND TEES g.La NOTE: EQ.ON COLUMN OR 1'-0"FROM OF A BID WILL ACKNOWLEDGE THE MECHANICAL CONTRACTOR HAS VISITED THE SITE IN SUPPLY AND RETURN DUCTS WITH TURNING VANES PER SMACNA STANDARDS. V RETURN AIR DUCT UP O ¢ '7,--i''', z r EQ. AND EXAMINED ALL CONSTRUCTION DOCUMENTS AND BID INSTRUCTIONS.THE INSULATED FLEXIBLE DUCT SHALL BE'THERMAFLEX"TYPE MK-E.DUCT SIZES SHOWN PROVIDE INTERMEDIATE BLOCKING EDGE OF WALL c, ¢ w M FOR DEVICES AS REQUIRED FOR / / MECHANICAL CONTRACTOR'S BID SHALL INCLUDE ALL MECHANICAL WORK IN THE ON THE DRAWINGS ARE SHEET METAL SIZE AND INCLUDE DUCT LINER AS SCHEDULED RETURN AIR DUCT DOWN 1:°J w F.A.VISUAL SIGNAL -0 E-' 6" 1' (,)D Z Et PLACEMENT AS DIMENSIONED / / / PROVIDED BY OTHERS. EXTERNALLY INSULATED.THE MECHANICAL CONTRACTOR SHALL PROTECT ALL DUCT M EXHAUST AIR DUCT UP U a Z C7 W SYSTEMS AND MECHANICAL EQUIPMENT OPENINGS FROM CONSTRUCTION DUST AND Z J F.A.VISUAL SIGNAL WHERE APPLICABLE 8 _At... V • i w J 2. MECHANICAL CONTRACTOR SHALL REQUEST CLARIFICATION ON ANY ITEM(S)OF THE DIRT.FOR MECHANICAL EQUIPMENT OPERATED DURING CONSTRUCTION,PROTECT ©Y EXHAUST AIR DUCT DOWN EDGE OF COLUMN OR WALL CONTRACT DOCUMENTS THAT ARE NOT UNDERSTOOD OR WHERE CONFLICTS MAY EACH RETURN AIR DUCT OPENING WITH MERV 8 FILTERS AND INSTALL MERV 8 Z ¢ O LL THERMOSTAT WALL MOUNTED TELEPHONE, EXIST.CLARIFICATIONS MUST BE PRESENTED AS A"REQUEST FOR INFORMATION"(RFI) FILTER(S)IN EQUIPMENT FILTER RACK.UPON COMPLETION OF CONSTRUCTION, �`i CHANGE IN DUCT SIZE ,` �" Z O IN WRITING PRIOR TO SUBMITTING A BID.RFI SHALL BE PRESENTED A MINIMUM OF FIVE REMOVE CONSTRUCTION FILTERS AND REPLACE EQUIPMENT FILTERS WITH NEW -fl-- w U ¢ Z ^d OR AN DEVICE 0 w O a: (7 N n U (5)WORKING DAYS BEFORE THE BID DATE.OBTAIN THE RFI FORM AT FILTERS. TURNING VANES Z ¢ i : �.6/ WWW.GANDWENGINEERING.COM/DOCUMENTS.SUBMISSION OF A BID WILL v �" Z �, 3 g;•� °� -1c2; ADDITIONAL DEVICES ACKNOWLEDGE THE MECHANICAL CONTRACTOR UNDERSTANDS THE SCOPE OF WORK, 15. ALL JOINTS AND SEAMS OF NEW DUCT AND DUCT BEING RE-USED SHALL BE CLEANED -wti- FLEXIBLE DUCT CONNECTION W M 3 V .;^ Q co co MEANS AND METHODS OF INSTALLATION,EQUIPMENT AND MATERIALS TO BE USED.RFI AND SEALED.SEAL NEW DUCTS TO THE FOLLOWING SEAL CLASSES ACCORDING TO v I U t THERMOSTAT(TYP.) THAT HAVE NOT BEEN CLARIFIED PRIOR TO BID,WILL BE PROVIDED BY THE SMACNA"HVAC DUCT CONSTRUCTION STANDARDS-METAL AND FLEXIBLE":SEAL 0--- HORIZONTAL LIFE SAFETY DAMPER Z Z t° ' MECHANICAL CONTRACTOR,AS DIRECTED BY THE ENGINEER OF RECORD,AND THE DUCTS WITH"FOSTER"32-14 SEALANT PER MANUFACTURES INSTALLATION m WHERE MULTIPLE SWITCHES OCCUR, ` > O oc'S 44,, GANG WITH SINGLE COVER PLATE I MOST STRINGENT MATERIALS,EQUIPMENT,AND SCOPE OF WORK SHALL APPLY.NO INSTRUCTIONS FOR ALL JOINTS IN LOW AND MEDIUM VELOCITY DUCT. D--- VERTICAL LIFE SAFETY DAMPER Q M V cc n r� a THEN LOCATE THE OTHER DEVICES CO LIGHT SWITCH(TYP.) ADDITIONAL COMPENSATION WILL BE MADE FOR THE FAILURE OF THE CONTRACTOR TO OUTDOOR,SUPPLY-AIR DUCTS: SEAL CLASS A. Q i _ CENTERED OFF FURTHEST LIGHT SWITCH CD n: OBTAIN CLARIFICATIONS PRIOR TO BID. OUTDOOR,EXHAUST DUCTS: SEAL CLASS C. a--- MOTORIZED AUTOMATIC DAMPER(MAD) 4-, V a D OUTDOOR,RETURN-AIR DUCTS: SEAL CLASS C. U �%�% SWITCH OR DIMMER ° DUPLEX RECEPTACLE, 3. THE MECHANICAL CONTRACTOR'S BID SHALL BE BASED ON THE SCHEDULED UNCONDITIONED SPACE,SUPPLY-AIR DUCTS IN PRESSURE CLASS 2-INCH W.G.AND L_- MANUAL DAMPER MECHANICAL ABBREVIATIONS J v COMMUNICATION OUTLET,ETC. �� 5 x a 0 Zo co EQUIPMENT,MATERIALS,AND MANUFACTURERS WHICH FORM THE"BASIS OF DESIGN". LOWER:SEAL CLASS B. - DOOR OR SIDE LITE FRAME v iD �$ �` (TYP.) ALL OTHER EQUIPMENT,MATERIALS,AND MANUFACTURERS,ARE CONSIDERED UNCONDITIONED SPACE,EXHAUST DUCTS: SEAL CLASS C. QF CARBON DIOXIDE DETECTOR AFF ABOVE FINISHED FLOOR ^ U 0 a �. 2 "' SUBSTITUTIONS.CONTRACTOR PROPOSED SUBSTITUTIONS MUST BE SUBMITTED TO UNCONDITIONED SPACE,RETURN-AIR DUCTS: SEAL CLASS B. CO 2 AHJ AUTHORITY HAVING JURISDICTION 1= Q v THE ENGINEER OF RECORD FOR REVIEW AND WITH A COMPLETED SUBSTITUTION CONDITIONED SPACE,SUPPLY-AIR DUCTS IN PRESSURE CLASS 2-INCH W.G.AND Oco CARBON MONOXIDE DETECTOR AHU AIR HANDLING UNIT ?- `� •'p t9 REQUEST FORM.OBTAIN THIS FORM AT WWW.GANDWENGINEERING.COM/DOCUMENTS. LOWER:SEAL CLASS C. A.I.P. ABANDON IN PLACE "_ ;-- APPROVALS OF SUBSTITUTIONS ARE CONTINGENT UPON ENGINEER'S REVIEW.THE CONDITIONED SPACE,EXHAUST DUCTS: SEAL CLASS B. QM MANOMETER AL ALUMINUM 7. • • MECHANICAL CONTRACTOR SHALL MAKE NO PRIOR ASSUMPTIONS ON SUBSTITUTIONS CONDITIONED SPACE,RETURN-AIR DUCTS:SEAL CLASS C. ALT ALTERNATE NOT APPROVED BY THE ENGINEER.IF THE ENGINEER APPROVES A SUBSTITUTION S PRESSURE SWITCH AP ACCESS PANEL ' 0 C ENTE N E DEVICE LOCATION DIAGRAM REQUEST,THE MECHANICAL CONTRACTOR WILL BE HELD RESPONSIBLE FOR 16. TEST AND ADJUST ALL AIR HANDLING EQUIPMENT,TERMINALS,AND AIR DEVICES TO AS AIR SEPARATOR d : ',1 M-100 NO SCALE ENGINEERING REVISIONS,PHYSICAL SIZE,CAPACITIES,COORDINATION, PROVIDE THE REQUIRED AIR VOLUME AGAINST THE AVAILABLE SYSTEM STATIC Q--- RETURN AIR SMOKE DETECTOR ATC AUTOMATIC TEMPERATURE CONTROL VALVE SUPPLEMENTAL DRAWINGS AND INFORMING OTHER TRADE CONTRACTORS RELATED PRESSURE. TEST AND SET ALL DAMPERS,SUPPLY,RETURN,OUTDOOR AIR AND ATR ALL THREAD ROD TO THE INSTALLATION,AS TO ANY SPECIFIED ITEM CHANGES.THE MECHANICAL EXHAUST DEVICES TO THE CFM SHOWN ON THE DRAWINGS.PROVIDE ALL REQUIRED OO REF REFRIGERANT(Rxxx)DETECTOR ATU AIR TERMINAL UNIT JAN 9 2018 CONTRACTOR SHALL BEAR AS PART OF HIS CONTRACT,ANY ADDITIONAL COSTS SHEAVE AND BELT MODIFICATIONS REQUIRED TO OBTAIN CFM QUANTITIES SHOWN ON AV MANUAL AIR VENT SPECIFICATION FOR LOCATION OF DEVICES INCURRED IN HIS WORK OR BY THE OTHER CONTRACTORS AS A RESULT OF INSTALLATION FOR OTHER THAN"BASIS OF DESIGN"MATERIALS AND EQUIPMENT. THE DRAWINGS. TESTING AND BALANCING SHALL BE IN ACCORDANCE WITH PROCEDURES OUTLINED IN TESTING AND BALANCING MANUAL AS PUBLISHED BY REFRIGERANT LEAK HORN-STROBE BB DI BDD BASEBOARD HEATER BACK DRAFT DAMPER CITY OF TIGARD ltd A. WHEN MOUNTING MULTIPLE DEVICES FROM DIFFERENT TRADES IN THE SAME LOCATION(SUCH AS LIGHTING SMACNA.PROVIDE A TEST AND BALANCE REPORT PERFORMED AND PREPARED BY AN 0 THERMOSTAT BES BANKING EQUIPMENT SUPPLIER V UILDRNG IRRO SWITCHES,THERMOSTATS,ETC.),THEIR ARRANGEMENT SHALL BE IN ACCORDANCE WITH THE FOLLOWING: 4. MECHANICAL CONTRACTOR SHALL PERFORM WORK IN A SAFE MANNER.COMPLY WITH INDEPENDENT TESTING AND BALANCING CONTRACTOR CERTIFIED AABC OR NEBB. BFF BELOW FINISHED FLOOR �F 11 APPLICABLE OSHA SAFETY GUIDELINES DURING THE COURSE OF COMPLETING THE PROVIDE AN ELECTRONIC COPY OF THE TESTING AND BLANACING REPORT,INCLUDING I> PIPE/DUCT IN ATTIC BMS BUILDING MANAGEMENT SYSTEM 1. LOCATE DEVICES AS SHOWN ON THE ARCHITECTURAL PLANS,ELEVATIONS OR SECTIONS. WORK DESCRIBED ON THESE CONSTRUCTION DOCUMENTS. A MARKED UP PLAN,FOR REVIEW BY THE ENGINEER.TESTING AND BALANCING REPORT BOD BOTTOM OF DUCT 2. WHEN SHOWN ON MECHANICAL OR ELECTRICAL DRAWINGS,BUT NOT ON ARCHITECTURAL DRAWINGS,DEVICES SHALL BE COMPLETED AND PROVIDED TO THE ENGINEER PRIOR TO TENANT MOVE IN. P PIPE/DUCT BELOW FLOOR OR GRADE BOE BOTTOM OF EQUIPMENT SHALL BE UNIFORMLY AND SYMMETRICALLY MOUNTED. VERTICALLY ALIGN DEVICES MOUNTED AT HEIGHTS 5. SHOP DRAWINGS SHALL BE SUBMITTED ELECTRONICALLY AS PDF FILES. SHOP BOP BOTTOM OF PIPE INDICATED,UNLESS SEPARATED HORIZONTALLY BY A MINIMUM OF 24". DRAWINGS SHALL INCLUDE TRANSMITTAL PAGE(S)INDICATING THE NAME OF THE 17. MECHANICAL CONTRACTOR SHALL PROVIDE TEMPERATURE CONTROL WIRING THIS D PIPE/DUCT ABOVE CEILING BS BRANCH SELECTOR-DAIKIN 3. DEVICES INSTALLED IN MASONRY OR SURFACES TO RECEIVE WOOD PANELS,WALL COVERING OR SIMILAR PROJECT,AND THE NAME,ADDRESS,AND PHONE NUMBER OF THE GENERAL AND WORK,NO EXCEPTIONS OR EXCLUSIONS. ALL SYSTEMS SHALL BE COMPLETECH CHILLER 0 ® MATERIALS SHALL BE INSPECTED BY THE ARCHITECT AT TIME OF ROUGH-IN. MECHANICAL CONTRACTORS. GENERAL CONTRACTOR AND MECHANICAL INCLUDING,BUT NOT LIMITED TO;EXPERTISE,DESIGN,EQUIPMENT,CABINETS,BOXES, EXPOSED DUCT,W/MILL PHOSPHATIZED FINISH CLG CEILING ® 0 4. IF THE CONTRACTOR HAS ANY DOUBTS REGARDING THE LOCATION OF DEVICES,HE SHOULD CONSULT WITH CONTRACTOR SHALL REVIEW SHOP DRAWING SUBMITTALS FOR COMPLIANCE, RELAYS,SWITCHES,CONTACTORS,TRANSFORMERS,CURRENT TRANSFORMERS, CO CARBON MONOXIDE 1111111 C:t Q ® THE PROJECT ARCHITECT/ENGINEER PRIOR TO ROUGHING-IN. CONTENT AND COMPLETENESS AND PROVIDE A STAMP WITH THE DATE OF REVIEW AND WATER METERS AND ELECTRICAL ACCESSORIES. THE EXPANSION OF THE EXISTING PIPE/DUCT ON ROOF CO2 CARBON DIOXIDE 5. CONTRACTOR SHALL CONFIRM THE FINAL LOCATION OF MONITORS WITH THE TENANT PRIOR TO ROUGH-IN. SIGNATURE OF THE REVIEWER. TRANSMITTAL PAGE SHALL HAVE INDEX WITH BAS INTO THIS TENANT FINISH SHALL INCLUDE ALL REQUIRED COMPONENTS TO CR CONDENSER WATER RETURN Z hi 0 AN SIGNALS SHALL BE A MINIMUM OF 36"HORIZONTALLY FROM ANY MONITOR. SPECIFICATION SECTION AND DESCRIPTION OF SUBMITTED ITEMS. NO EXCEPTIONS MONITOR AND CONTROL THE NEW HVAC EQUIPMENT AND METER WATER AND I.T. G NEW CONNECTION TO EXISTING(VERIFY SIZE CRAC COMPUTER ROOM AIR CONDITIONER AND LOCATION IN FIELD PRIOR TO BID) JJJ WILL BE TAKEN.SHOP DRAWINGS NOT SUBMITTED IN THIS FORMAT WILL BE REJECTED ELECTRICAL USE AS REQUIRED BY PROPERTY MANAGER. WIRING EXPOSED IN RETURN CRCU COMPUTER ROOM CONDENSING UNIT W C W B. DEVIATIONS FROM THE ABOVE PRINCIPLES WITHOUT PRIOR APPROVAL BY THE ARCHITECT/ENGINEER SHALL BE AND WILL NOT CAUSE REASON FOR PROJECT DELAYS.EQUIPMENT SHALL NOT BE AIR PLENUM SHALL BE PLENUM RATED CABLE.PROVIDE SHOP DRAWINGS FOR REVIEW GN NEW BRANCH DUCT TAP&CONNECTION CS CONDENSER WATER SUPPLY IILJ Q CORRECTED BY THE INSTALLING CONTRACTOR.ANY COST,INCLUDING CUTTING&PATCHING,ENTAILED IN THE REMOVAL, ORDERED UNTIL ENGINEER OF RECORD HAS PROCESSED APPLICABLE SHOP AND PROCESSING.THE SHOP DRAWINGS SHALL CONTAIN A CONTROL SEQUENCE TO EXISTING CSST CORRUGATED STAINLESS STEEL TUBING RELOCATION,AND REINSTALLATION OF ANY DEVICES SHALL BE THE RESPONSIBILITY OF THAT CONTRACTOR. DRAWINGS.A MINIMUM OF SEVEN WORKING DAYS WILL BE ALLOWED FOR SUBMITTAL STATEMENT AND WIRING DIAGRAM WITH ALL PARTS INDICATED OR A BILL OF MATERIAL. # DUCT INSULATION(SEE SCHEDULE) CT COOLING TOWERZ 1 PROCESSING BY THE ENGINEER.SUBMITTALS SHALL INCLUDE BUT NOT BE LIMITED TO: ALL CONTROLS SHALL BE SUPPLIED IN ACCORDANCE WITH THE BUILDING STANDARDS. © CU CONDENSING UNIT J COMPUTER ROOM AC EQUIPMENT AND ACCESSORIES,ALL NEW SCHEDULED ALL NEW EQUIPMENT AND PROGRAMMING SHALL COMPLY WITH BUILDING STANDARD Q ®ie. PLAN NOTE SYMBOL CUH CABINET UNIT HEATER EQUIPMENT AND ACCESSORIES,REGISTERS AND DIFFUSERS,AND TEST AND BALANCE MONITOR AND CONTROL POINTS. ALL COSTS ASSOCIATED WITH HARDWARE, DDC DIRECT DIGITAL CONTROL 0 REPORT. SOFTWARE AND TIME TO FULLY INTEGRATE THIS NEW EQUIPMENT INTO THE BUILDING Q REVISION SYMBOL DIFF DIFFUSER '� C.) STANDARD BAS SHALL BE INCLUDED IN THIS BID. DISC DISCONNECT 6. SUBMIT AND PAY FOR ALL REQUIRED WORK PERMITS.PROVIDE ALL REQUIRED x x EQUIPMENT CALLOUT(SEE SCHEDULE) DLSS DUCTLESS SPLIT SYSTEM INSPECTIONS AND RE-INSPECTIONS.PROVIDE A SIGNED CERTIFICATE OF INSPECTION 18. THE LANDLORDS CONSTRUCTION CRITERIA,LEASE AGREEMENT,AND CONSTRUCTION DN DOWN AT THE PROJECT COMPLETION. STANDARDS ARE HERE-IN MADE PART OF THIS CONTRACT.ALL REQUIREMENTS IN THE "" GRILLE/DIFFUSER CALLOUT(SEE SCHEDULE) DPS DIFFERENTIAL PRESSURE SWITCH LANDLORDS CONSTRUCTION CRITERIA,LEASE AGREEMENT,AND CONSTRUCTION a (E) EXISTING 7. ALL EQUIPMENT AND MATERIALS SHALL BE SPECIFICALLY PROVIDED PER WRITTEN STANDARDS REFERRED TO AS TENANT WORK IS DEFINED AS DIVISION 15 MECHANICAL Q LIFE SAFETY DAMPER CALLOUT(SEE SCHEDULE) EA EXHAUST AIR INSTALLATION INSTRUCTIONS AS PUBLISHED BY THE MANUFACTURER OF THE WORK AND IS TO BE PROVIDED BY THE CONTRACTOR.IT IS THE RESPONSIBILITY OF EBB ELECTRIC BASE BOARD EQUIPMENT OR MATERIAL PROVIDER.MEANS AND METHODS OF INSTALLATION ARE TO THE MECHANICAL CONTRACTOR TO OBTAIN COPIES OF THESE DOCUMENTS AND EXISTING DUCT TO REMAIN EC ELECTRICAL WORK CONTRACTOR BE PROVIDED BY THE MECHANICAL CONTRACTOR.MECHANICAL CONTRACTOR SHALL COMPLETELY FAMILIARIZE HIMSELF WITH THESE DOCUMENTS PRIOR TO BIDDING THIS EF EXHAUST FAN RECTANGULAR DUCT HANGER SCHEDULEUNDERSTAND THE PRODUCT,MEANS AND METHODS OF INSTALLATION.THE PROJECT.SUBMISSION OF A BID ACKNOWLEDGES THE MECHANICAL CONTRACTOR HAS - - - - EXISTING TO BE DEMOLISHED EG EXHAUST GRILLE BAR JOIST OR MECHANICAL CONTRACTOR SHALL OBTAIN THE INSTALLATION INSTRUCTIONS AND COMPLIED WITH THIS REQUIREMENT OF THE CONTRACT. EMS ENERGY MANAGEMENT SYSTEM PAIR SPACING: 10 FT. 8 FT. 5 FT. 4 FT. OTHER MECHANICAL PIPING EQPT EQUIPMENT REQUIREMENTS PRIOR TO BID.ALL RFI AND CLARIFICATIONS OF SCOPE DURING STRUCTURAL ER EXHAUST REGISTER DUCT PERIMETER, CONSTRUCTION WHERE THE CONTRACTOR HAS NOT PREVIOUSLY OBTAINED THIS 19. THE MECHANICAL CONTRACTOR SHALL DISCONNECT AND REMOVE ALL INDICATED MAXIMUM HALF WIRE/ WIRE/ WIRE/ WIRE/ COMPONENT ERV ENERGY RECOVERY VENTILATOR STRAP STRAP STRAP STRAP INFORMATION FOR BIDDING PURPOSES WILL NOT BE CAUSE FOR ADDITIONAL COSTS EXISTING MECHANICAL EQUIPMENT OCCURRING IN DEMOLISHED WALLS,FLOORS, A COMPRESSED AIR LINE ROD ROD ROD ROD OR CONSTRUCTION DELAY. ATTICS AND CEILING AREAS.REFER TO THE ARCHITECTURAL DRAWINGS FOR THE ET EXPANSION TANK IN.x GA IN.x GA IN.x GA IN.x GA jilo GENERAL SCOPE OF DEMOLITION. DISCONNECT AND REMOVE MECHANICAL -CD- CONDENSATE DRAIN EUH ELECTRIC UNIT HEATER P/2=30" 10 GA 10 GA 12 GA 12 GA8. THE MECHANICAL SCOPE OF WORK SHALL BE PROVIDED TO COMPLY WITH THE 2014 EQUIPMENT,DUCTS,AIR DEVICES,AND PIPING OCCURRING IN THESE AREAS. ---CD--- CONDENSATE DRAIN BELOW FLOOR OR GRADE EWC ELECTRIC WATER COOLER 1x22 1 x 22 1 x 22 1 x 22 EWH ELECTRIC WATER HEATER (.135") (.135") (.106") (.106") OREGON MECHANICAL SPECIALTY CODE,LOCAL ORDINANCES,STATE LAW,AND MECHANICAL COMPONENTS INCLUDING MOTORS,TEMPERATURE CONTROL DEVICES, ---CR--- CONDENSER WATER RETURN P!z=72• 1 x is 3I8^ 1 x 20 114^ 1 x zz 1/4^ 1x22 1/4• FEDERAL LAW.REFER TO THE ARCHITECTURAL CODE BLOCK OR THE MUNICIPALITY GRILLES,DIFFUSERS,AIR TERMINALS,HANGERS,MOUNTING HARDWARE,ETC.,MUST BE SHEETEET METEXH EXHAUST A -CS- CONDENSER WATER SUPPLY FA FIRE ALARM P/2=96" 1 x 16 3/8" 1 x 18 3/8" 1 x 20 3/8" 1 x 22 1/4" WEBSITE FOR THE APPLICABLE CODES AND ADOPTED ORDINANCES PRIOR TO BID. REMOVED FROM THE PREMISES,TO BE LEGALLY DISPOSED OF BY THE MECHANICAL FAAP FIRE ALARM ANNUNCIATOR PANEL If M P/2=120" 1.5 x 16 112" 1 x 16 3/8" 1 x 18 3/8" 1 x 20 1/4" STRAP Ho SUBMISSION OF A BID ACKNOWLEDGES THE MECHANICAL CONTRACTOR HAS CONTRACTOR.ALL LOOSE ENDS OF SYSTEMS WHERE SUCH ABANDONMENT HAS --CHR-- CHILLED&HOT WATER RETURN P/2=168" 1.5 x 16 1/2" 1.5 x 16 1/2" 1 x 16 3/8" 1 x 18 3/8^ FACP FIRE ALARM CONTROL PANEL PERFORMED THIS REQUIREMENT AND THE BID INCLUDES LABOR AND MATERIAL TO TERMINATED SHALL BE TRIMMED CLEAR AND APPROPRIATELY CAPPED OR SEALED INA -CHS- CHILLED&HOT WATER SUPPLY FC FLEX CONNECTION PROVIDE CODE COMPLIANCE.SEISMIC RESTRAINTS AND ANCHORAGE SHALL BE SAFE AND SECURE MANNER BEHIND NEW FINISHES.MAINTAIN SYSTEM CONTINUITY TO P/2=192" NONE 1/2" 1.5 x 16 1/2" 1 x 16 3!8" 1 x 16 3/8" \ 9. MECHANICAL CONTRACTOR SHALL PROVIDE FIELD COORDINATION WITH OTHER EXISTING WORKING CONDITION OF ALL MECHANICAL EQUIPMENT AND TO RETURN FCU FAN COIL UNIT w PROVIDED TO COMPLY WITH THE 2014 OREGON BUILDING SPECIALTY CODE. ADJOINING AREAS AS NEEDED,THIS INCLUDES BUT IS NOT LIMITED TO REMOVAL, --CWR-- CHILLED WATER RETURN FD FIRE DAMPER P/2=193"+ SPECIAL ANALYSIS REQUIRED MODIFICATION AND REINSTALLATION OF EQUIPMENT AS NEEDED TO SUSTAIN THE SINGLE HANGER MAXIMUM ALLOWABLE LAP JOINED STRAPS,MINIMUMLim LOAD RATED -CWS- CHILLED WATER SUPPLY FPC FIRE PROTECTION CONTRACTOR }7 LOAD FASTENERS(PLACE FASTENERS IN �I, SHEET METAL FRT FIRE-RETARDANT-TREATED Q 0 SERIES,NOT SIDE BY SIDE): II TRADES;SYSTEMS AS SHOWN ARE DIAGRAMMATIC AND GIVE THE GENERAL THESE AREAS TO FULL WORKING ORDER AT PROJECT COMPLETION. D DRAIN LINE SCREW ARRANGEMENT AND LOCATIONS ONLY.MECHANICAL CONTRACTOR SHALLFSC FOOD SERVICE CONSULTANT 0 C W/VVASHER G GAS LINE FSD FIRE/SMOKE DAMPERi 6 STRAP WEIGHT WIRE/ WEIGHT STRAP FASTENERS COMPLETELY REVIEW ARCHITECTURAL DRAWINGS,STRUCTURAL DRAWINGS,CEILING 20. THE MECHANICAL CONTRACTOR SHALL CONFINE HIS ACTIVITIES TO THE AREA SET FSEC FOOD SERVICE EQPT.CONTRACTOR -' ROD IN.x GA (QTY)-SIZE ELEVATIONS,AND SYSTEM DRAWINGS OF OTHER TRADES FOR DETAILS OF ASIDE FOR HIM TO DO HIS WORK AND SHALL NOT INTERFERE WITH ANY OF THE OWNER -HG- HOT GAS LINE IN.x GA LBS. 0(IN.) LBS. (2)-#10 SMS or CONSTRUCTION.ROUGH-IN OF MECHANICAL DEVICES,AIR TERMINALS,EQUIPMENT, OR TENANT ACTIVITIES. THE MECHANICAL CONTRACTOR WILL NOT BE PERMITTED TO FTU FAN TERMINAL UNIT Z, I- 1 x 18,20,22 --HPWR-- HEAT PUMP WATER RETURN FV FIELD VERIFY 1 x 22 260 0.106 80 (1)-1/4"0 BOLT PIPING,ATTACHMENTS,AND HANGERS SHALL BE BASED ON THIS REVIEW.EXACT STORE MATERIAL EXCEPT WITHIN THE AREAS AS DIRECTED BY THE G.C. SHOULD ANY --HPWS- HEAT PUMP WATER SUPPLY GC GENERAL WORK CONTRACTOR 1 x 20 320 0.135 120 1 x 16 2 -1/4"0 BOLT LOCATIONS AND FINAL LAYOUT SHALL BE DETERMINED IN THE FIELD,PROVIDE ALL DISTURBANCE OF EXISTING INSTALLATION BE NECESSARY,THE CONTRACTOR SHALL O GF GAS FURNACE NECESSARY EQUIPMENT,DUCT TRANSITIONS,FITTINGS,HANGERS,SUPPORTS,AND SO INFORM THE OWNER OR TENANT WELL IN ADVANCE OF THE TIME CONTEMPLATED --HPC-- HIGH PRESSURE CONDENSATE 1 x 18 420 0.162 160 1.5 x 16 (2)-3/8.0 GWH GAS WATER HEATER 1 x 16 700 1/4 270 OFFSETS REQUIRED FOR A COMPLETE INSTALLATION IN ALL RESPECTS.THE FOR THE DISTURBANCE.AFTER A PLAN ACCEPTABLE TO THE OWNER OR TENANT HAS --HWR-- HOT WATER RETURN HP HEAT PUMP STRUCTURE MECHANICAL CONTRACTOR MEANS AND METHODS OF INSTALLATION SHALL PROVIDE BEEN FORMULATED,THE G.C.SHALL KEEP IN CLOSE PERSONAL CONTACT WITH THE 1.5 x 16 1100 3/8 680HP HORSEPOWER NOT REQUIRED FOR FOR OPERATING EFFICIENCY,NEATNESS OF APPEARANCE,AND EASE OF WORK TO SEE THAT IT IS EXECUTED IN ACCORDANCE WITH THE AGREED PROCEDURE. -HPS- HIGH PRESSURE STEAM 1/2 1250 IDUCTWORK WITH MAINTENANCE. THE MECHANICAL CONTRACTOR WILL PREPARE DIMENSIONED FIELD HRCU HEAT RECOVERY CONDENSING UNIT LESS THAN 6 SQ.FT. -HWS- HOT WATER SUPPLY HWCP HOT WATER CIRC.PUMP 5/8 2000ERECTION DRAWINGS WHERE REQUIRED FOR USE BY THE INSTALLERS,TO INSURE 21. CONTINUITY OF ALL BUILDING SERVICES AND UTILITIES SERVING FACILITIES IN THE HX HEAT EXCHANGER HANGER STRAPS= CROSS-SECTIONAL --LPC-- LOW PRESSURE CONDENSATE 12" PROPER INSTALLATION AND COORDINATION.THE MECHANICAL CONTRACTOR SHALL BUILDING SHALL BE MAINTAINED WITHOUT INTERRUPTION,EXCEPT FOR SUCH A PERIOD 3/4 3000 MAX (SEE CHART) AREA IAH INTAKE AIR HOOD NOTE:TABLE ALLOWS FOR DUCT WEIGHT,1 LB./SQ.FT.INSULATION WEIGHT,AND NORMAL TAKE THEIR OWN MEASUREMENTS AT THE BUILDING,AND BE RESPONSIBLE FOR THE OF TIME DESIGNATED BY THE G.C.THE MECHANICAL CONTRACTOR SHALL SO -LPG- LIQUIFIED PETROLEUM GAS(PROPANE) IOM INSTALLATION&OPERATION MANUAL0 60 in.MAX. UNLESS FOOT OF CORRECT LAYOUT,INTERPRETATION,AND USE OF ALL SIZES AND DIMENSIONS.THE ARRANGE AND EXECUTE HIS WORK THAT ANY CONNECTIONS,EITHER TEMPORARY OR -LPS- LOW PRESSURE STEAM REINFORCEMENT AND TRAPEZE WEIGHT. ID INSIDE DIAMETER STRAP IS PLACED CONTRACTOR SHALL KEEP"AS-BUILT"INFORMATION DURING CONSTRUCTION AND PERMANENT,OR REARRANGEMENT OF PRESENT EQUIPMENT,DUCTWORK AND PIPING IR INFRA-RED TUBE HEATER(GAS) UNDER A BOTTOM FURNISH TO THE OWNER OR TENANT A RECORD SET OF LEGIBLE BLACK LINE PRINTS SHALL BE IN SUCH A MANNER AS TO ASSURE FULL RESUMPTION OF SERVICE AT THE --MPC-- MEDIUM PRESSURE CONDENSATE IV INTAKE VENTILATOR REINFORCEMENT AND AN ELECTRONIC COPY OF THESE DOCUMENTS AT THE PROJECT COMPLETION. TIME DESIGNATED BY THE G.C.PROVIDE TEMPORARY CROSS CONNECTIONS,DUCTS, PIPING,HANGERS AND VALVES NECESSARY TO ASSURE THIS CONTINUITY OF THE -MPS- MEDIUM PRESSURE STEAM KEF KITCHEN EXHAUST FAN LLSV LIQUID LINE SOLENOID VALVE L" ""1 10. REVIEW ARCHITECTURAL DRAWINGS AND EXISTING SITE CONDITIONS FOR ALL FIRE RATINGS AND FIRE RATED ASSEMBLIES PRIOR TO BIDDING THE PROJECT.PROVIDE FIRE BUILDING MECHANICAL SYSTEM AT NO ADDITIONAL COST TO THE OWNER OR TENANT. MAINTAIN IS DEFINED TO INCLUDE,BUT IS NOT LIMITED TO,REMOVAL,MODIFICATION -MUW- MAKE-UP WATER LV LOUVER < ,f� 'a. -RL- REFRIGERANT LIQUID LINE LPG LIQUIFIED PETROLEUM GAS(PROPANE) STOP AT EACH RATED WALL,FLOOR,CEILING-ROOF ASSEMBLY PENETRATION. FIRE AND REINSTALLATION OF EQUIPMENT AND PIPING AS NEEDED TO SUSTAIN THE MAX MAXIMUM 4. °e_ c SCREWS STOP SYSTEMS SHALL BE MANUFACTURED BY"3M".PROVIDE IN STRICT COMPLIANCE EXISTING WORKING CONDITION OF THE MECHANICAL SYSTEM.THE MECHANICAL -RS- REFRIGERANT SUCTION LINE MC MECHANICAL WORK CONTRACTOR < °a •d< ° MIN. WITH THE MANUFACTURER'S APPLICATION DETAILS AND INSTRUCTIONS.PROVIDE CONTRACTOR SHALL RETURN THESE SYSTEMS OR AREAS TO FULL WORKING ORDER -e-TYPE- EXISTING PIPE TO BE REMOVED MCA MINIMUM CIRCUIT AMPERES TAGGED CERTIFICATIONS AT EACH PENETRATION.PROVIDE SHOP DRAWINGS FOR AT PROJECT COMPLETION. EXISTING PIPE TO BE REMOVED MDC MOTOOR CONTROL DAMPER CENTER d ° HANGER REVIEW WITH THE U.L.LISTING AND TEST CRITERIA.PROVIDE FIRE STOPPING WHEREI /�1- - '%. "LI \ REQUIRED BY THE AUTHORITY HAVING JURISDICTION.EQUAL SYSTEMS AS -TYPE(E)- EXISTING PIPING MIN MINIMUM STRAP LOAD RATED IMANUFACTURED BY"SPEC SEAL"OR"HILTI"WILL BE ACCEPTABLE. MH MOUNTING HEIGHT WASHER WASHER FASTENERS , BAND OF SAME SIZE 11. PROVIDE DUCT,PIPING,AND HANGER PENETRATIONS OF NON-RATED ASSEMBLIES MECHANICAL PIPING SYMBOLS MTD P M OVER CURRENT PROTECTION NUT _; ; MOUNTED 1' AS HANGER STRAP A WITH DRAFT STOPPING,OR SMOKE BARRIER SEALANT SYSTEMS.THROUGH 0 AUTOMATIC AIR VENT(AAV) MUA MAKE-UP AIR PENETRATION SEALANT SYSTEMS SHALL BE MANUFACTURED BY"3M".APPLY IN STRICT MUW MAKE UP WATER T A�T COMPLIANCE WITH THE MANUFACTURER'S APPLICATION DETAILS AND INSTRUCTIONS. AUTOMATIC FLOW CONTROL VALVE NC NORMALLY CLOSED CITY 1 i��OF TIGARD WASHERS MAY BE OMITTED ) 36"0 MAX- AUTHORITY HAVING JURISDICTION. QUA PROVIDE DRAFT STOPPING OR SMOKE BARRIER MS AS MANUFACTURED BOY"SPEC AL OF THE GENERAL NOTES: MECHANICAL VALVE (3-WAY)AUTOMATIC TEMPERATURE CONTROL NO NORMALLYNIC NOT IN OOPENT WITH 100 LB MAX LOAD ON REVIEWED FOR CO COMPLIANCE 22 GA STRAP WHEN FOLDED 24"0 MAX. SEAL"OR"HILTI"WILL BE ACCEPTABLE. ❑❑ AUTOMATIC TEMPERATURE CONTROL OA OUTDOOR AIR I- A. CONTRACTOR SHALL CAREFULLY COORDINATE ANY FLOOR PENETRATIONS WITH Dkl VALVE (2-WAY) OD OUTSIDE DIAMETER W Approved; [ 12. THE MECHANICAL CONTRACTOR SHALL GUARANTEE ALL LABOR,EQUIPMENT AND GENERAL CONTRACTOR,TENANTS CONSTRUCTION COORDINATOR,BUILDING OWNERS BALL VALVE(BV) OX OXYGEN W OTCs r i -u I i p MATERIAL INSTALLED UNDER THIS CONTRACT TO BE FREE FROM DEFECTS FORA REPRESENTATIVE AND TENANT BELOW. POST TENSIONED FLOOR SLAB CONSTRUCTION PC PLUMBING WORK CONTRACTOR T R PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE AND SHALL REPAIR OR SHALL BE X-RAYED AND ALL STRUCTURAL SYSTEMS PERMANENTLY MARKED ON THE I�I CHECK VALVE(CV) PCF POUNDS/CUBIC FOOT .♦i^. REPLACE WITHOUT COST TO THE OWNER ANY EQUIPMENT WHICH IS DEFECTIVE OR FLOOR STRUCTURE AND IDENTIFIED PRIOR TO ANY PENETRATION BEING PERFORMED. PSG PUMP SUCTION GUIDE CO Permlt#: ��� 7 i - Z © DUCT HANGER DETAILS 0 CIRCUIT SETTER(CS) s, IMPROPERLY INSTALLED. IN ADDITION,THIS CONTRACTOR SHALL ASSUME FULL PT PRESSURE TREATED Address: M-100 NO SCALE RESPONSIBILITY FOR ANY DAMAGE TO THE BUILDING AND ITS CONTENTS OR OTHER B. LONG LEAD TIME ITEMS THAT MAY IMPACT THE PROJECT SCHEDULE MUST BE PVC POLYVINYL CHLORIDE W EQUIPMENT CAUSED BY DEFECTS OR IMPROPER INSTALLATION OF EQUIPMENT OR IDENTIFIED ALONG WITH THE SCHEDULE IMPACT AT TIME OF BID. FAILURE TO COMPRESSED AIR QUICK-CONNECT RA RETURN AIR J Suite ��t��� MATERIALS INSTALLED UNDER THIS SECTION OF THE WORK. COMMUNICATE LEAD TIME ISSUES WILL RESULT IN THE CONTRACTOR,AT HIS EXPENSE, 0 CONCENTRIC PIPE REDUCER RAH RELIEF AIR HOOD Date: inikPROVIDING TEMPORARY FIXTURES OR EQUIPMENT TO ALLOW FOR SCHEDULED TENANT RF RETURN FAN . B .�� :�r�� l 13. MECHANICAL CONTRACTOR SHALL CUT AND PATCH(OR PATCH AFTER DEMOLITION) OCCUPANCY. THE TENANT/DESIGN TEAM WILL CONSIDER ALTERNATE PRODUCT b ECCENTRIC PIPE REDUCER RG RETURN GRILLE a) ROOF,FLOORS,WALLS,AND CEILINGS WHERE REQUIRED TO INSTALL NEW SUGGESTIONS BY THE CONTRACTOR(IF SUBMITTED PRIOR TO BID)TO MAINTAIN THEM RL EXISTING DEVICE RELOCATED g MECHANICAL EQUIPMENT,DUCT,AND/OR PIPING SYSTEMS AND/OR DEMOLITION OF SCHEDULE. EMERGENCY GAS SHUT-OFF VALVE RR RETURN REGISTER J SUCH.SURFACES�+ REFRIGERANT PIPING ROOFING REPAIRS SHALL EALL BE PATCHED AND LEFT PE FORMED BY A QUALIFY FOR FINAL SCHEDULED IED IED ROOFING CONTRACTOR ISH. C. CONTRACTOR SHALL PROVIDE TEMPORARY/PORTABLE EQUIPMENT FOR COOLING I✓'1 FLEXIBLE PIPE CONNECTION RTD RESISTANCE TEMPERATURE DETECTOR Q VALIDITY OF PERMIT RTU ROOF TOP UNIT R THAT MAINTAINS THE ROOF WARRANTY AT THE MECHANICAL CONTRACTOR'S EXPENSE. AND/OR HUMIDITY CONTROL IF REQUIRED FOR CONSTRUCTION AND APPLICATION OF 0 GAS SHUT-OFF VALVE(SOV) RV RELIEF VENTILATOR THE ISSUANCE OF A PERMIT SHALL NOT BE INSTALLED IN Z LL ALL ROOFING WORK SHALL BE INCLUDED IN THE MECHANICAL CONTRACTOR'S BID. FINISHES. SA SUPPLY AIR e. BASED ON CONSTRUCTION MEANS OF EGRESS,AND SHALLSD SPLITTER DAMPER g DOCUMENTS AND OTHER ( GATEVALVE(GT.V. SF SUPPLY FAN DATA SHALL NOT PREVENT COMPLY WITH OMSC 1107.2.2 SG SUPPLY GRILLE I THE CODE OFFICIAL FROM FOR PENETRATIONS -I GEAR OPERATED BUTTERFLY VALVE Dia GLOBE VALVE(GL.V.) SMS SHEET METAL SCREW [ , SS STAINLESS STEEL v ® HOSE END VALVE SSF SIDE STREAM FILTER W REQUIRING THE CORRECTION TA TRANSFER AIR `5 OF ERRORS.OSSC 105.4 LP MANUAL AIR VENT(MAV) TEMP TEMPORARY a OFFICE COPY 4 PETE'S PLUG TOD TOP OF DUCT (TEMPERATURE&PRESSURE PORT) TXV AUCT THERMAL EXPANSION VALVE OP TOP OF PIPE THE ACTIVATION OF DA PLUG VALVE ' DATE a SMOKE DETECTOR SHALL TYP TYPICAL 09/27/2017 ACTIVATE A VISIBLE AND Q PRESSURE GAUGE UH UNIT UON UNLESS TOTHERWISE NOTED SCALE AUDIBLE SUPERVISORY a PRESSURE REDUCING VALVE(PRV) UNV UNIVERSAL AS NOTED 0' THROUGHUTR UP SIGNAL AT A CONSTANTLY STRAINER(STR) MGR VAV VARIABLE AIR VOLUME JRA ATTENDED LOCATION STRAINER WITH BLOWDOWN GMSC 606.4.1JOB CEN004 N Iii VRV VARIABLE REFRIGERANTVFD VARIABLE FREQUENCY T VOLUME VRF VARIABLE REFRIGERANT FLOW gTHERMOMETER ' VSD VARIABLE SPEED DRIVE SHEET W/ WITH 0 RI TRIPLE DUTY VALVE(TDV) WP WEATHERPROOF [S$/l-100 VALVE IN RISER WSHP WATER SOURCE HEAT PUMP e XFMR TRANSFORMER C 3 WATER METER a OF SHEETS tE HDL DESIGN HERE BI EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS AND DRAWINGS ARE T TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER WITHOUT OBTAINING THE EXPRESSED WRITTEN PERMISSION OF HDL DESIGN NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAINING WRITTEN PERMISSION AND CONSENT. REVISIONS BY COMPUTER ROOM DUCT-FREE SPLIT SYSTEM Z 0o co *MITSUBISHI N o M N INDOOR SECTION-FAN COIL OUTDOOR SECTION-CONDENSING UNIT O r 0 o U M COOLING HEATING ELECTRICAL DATA REFRIG. LINE NOTES =N 0 n PLAN MODEL NO.* CFM TOTAL SEER WEIGHT PLAN MODEL NO.* COOLING CAPACITY ELECTRICAL DATA SIZES(O.D.) WEIGHT O Q z MARK KW VOLTS/PH MCA MOCP (LBS) MARK (LBS) c_, z O3- cL .- (MBH) (EER) MBH AMBIENT(°F) VOLTS/PH. MCA M.O.C.P. SUCTION'LIQUID w CRAC-1 PKA-A18HA7 425 18.0 18.5(9.9) N/A - 1.0 15 29 CRCU-1 PUY-A18NKA7 18.0 95 208/1 11 20 1/2 1/4 99 1,2,3,4 U = v Lti (D • W w 04 w 'aLL NOTES: 1. PROVIDE OUTDOOR UNIT WITH EQUIPMENT CURB, CYCLE PROTECTOR,0°LOW AMBIENT OPERATION,AND REFRIGERANT LINE SET. PROVIDE INDOOR UNIT WITH WIRED CONTROLLER AND WALL r' v ¢ z c ■ MOUNTED CONDENSATE PUMP BECKETT#CB201 UL WITH SAFETY SWITCH AND POWER CORD(INTERLOCK FANCOIL WITH CONDENSATE PUMP TO SHUT DOWN FANCOIL ON PUMP FAILURE). INDOOR UNIT `-' 0 c C7 cn v FROM OUTDOOR UNIT. Z ' z M 'i O ,,,,,,,r4- POWERED o Z v 0 � 0 •- oig 2c0 v 2. SYSTEM IS CAPABLE OF 165'LINE LENGTH AND 100'LIFT WITH A MAXIMUM OF 15 BENDS. COORDINATE PIPING ROUTE WITH PROPERTY MANGER TO KEEP WITHIN LIMITATIONS PRIOR TO BID. Z ¢ 8, H V) C a V o I I Q, 3. REFRIGERANT LINE SIZES LISTED ARE UNIT CONNECTION SIZES. REFER TO THE MANUFACTURER FOR PIPE SIZES BASED ON EQUIVALENT LINE LENGTH. PROVIDE OIL TRAPS WHERE RECOMMENDED BY >-. M V °� o THE MANUFACTURER. Qu �... m ' t 4. CONTRACTOR SHALL DISABLE ALL NIGHT AND WEEKEND TEMPERATURE SET-BACKS. U -'-' oo Jp,) j 6x a. o SEQUENCE OF OPERATION: Q oo FAN-ON, COOLING SETPOINT-68° F. -- ■ v MECHANICAL PIPE & PIPE INSULATION G(c5 VENTILATION AIR SCHEDULE SPECIFICATION SCHEDULEQP 2014 OREGON MECHANICAL SPECAILTY CODE f 5 ROOM NAME ROOM NUMBER (2014 OMSC)MINIMUM VENTILATION RATES (NOT ALL SYSTEMS MAY BE REQUIRED ON THIS PROJECT) G QZONE FLOOR ZONE TABLE 403.3 MINIMUM TABLE 403.3 MINIMUM TABLE 403.3.1.2 OUTSIDE AIR AREA SQ. FT. POPULATION VENTILATION RATE VENTILATION RATE ZONE AIR DISTRIBUTION BASED ON SUPPLY RETURN e ��'�� (Az) (Pz) (CFM/PERSON) (CFM/SQ. FT.) EFFECTIVENESS (Ez) 2014 OMSC AIR AIR Q� O� ��00 OPEN OFFICE 500,508,519,528 7905 40 5 0.06 0.8 840 8825 ,�l PRIVATE OFFICES REFER TO PLAN 1725 13 5 0.06 0.8 211 3250 \4.k �Q4 CONFERENCE ROOMS REFER TO PLAN 1980 50 5 0.06 0.8 461 3250 .0/ BREAK ROOM 522,525 580 12 5 0.06 0.8 119 1550 ® C eGO COPY 511 170 1 5 0.06 0.8 18 225 LIC, Q PIPE MATERIAL ski 'i'-C) STORAGE 506 130 0 - 0.12 0.8 20 50 §:O SEAMLESS DRAWN COPPER TYPE"L-ACR"ASTM B280,WROUGHT COPPER m .... FITTINGS ASME B16.22,ASME B16.50, BRAZE PER AWS A5.8/A5.8M;ASTM B32 • TOTAL FIFTH FLOOR 1668 17150 15482 p SOLDER 95-5 OR ALLOY HB. Emil) do g. PROPERTY MANAGER TO ADJUST OUTDOOR AIR SYSTEM TO COMPLY WITH OUTDOOR AIR REQUIREMENTS. SEAMLESS ANNEALED COPPER TYPE"L-ACR"ASTM B280,WROUGHT COPPER ZJ FITTINGS ASME B16.22,ASME B16.50, BRAZE PER AWS A5.8/A5.8M;ASTM B32 • W SOLDER 95-5 OR ALLOY HB. V DRAWN COPPER DWV TUBE,ASTM B306,CAST COPPER FITTINGS ASME TERMINAL UNIT SCHEDULE _ 0* E B16.18, OR WROUGHT COPPER ASME B16.22,SOLDER:ASTM B 32 LEAD • TRANE FREE WITH ASTM B 813 WATER-FLUSHBLE FLUX. *MODEL SIZE CFM STATIC PRESSURE NC LEVELS FAN ELECTRIC HEAT COIL NOTES PLAN MARK PIPE INSULATION UNIT OUTLET MAX MIN. INLET DOWN MIN. RAD. DISCH. CFM ESP HP CFM KW V/PH. STEPS E.A.T. L.A.T. FP 5-4 EXISTING 80 - 600 150 - - - - - - - - - 5.0 - - - 90 1 PIPE DIAMETER:ALL • FP 5-5 EXISTING 80 - 900 150 - - - - - - - - - 3.0 - - - 90 1 1/2"THICK, NOTE 1 (WITH VAPOR BARRIER)OR NOTE 2(NO VAPOR BARRIER) FP 5-6 EXISTING 80 - 550 150 - - - - - - - - - 3.0 - - - 90 1 PIPE DIAMETER<1.5" • FP 5-7 EXISTING 100 - 825 230 - - - - - - - - - 5.5 - - - 90 1 1-1/2"THICK, NOTE 2. 3 FP 5-11 EXISTING 80 - 650 150 - - - - - - - - - 4.0 - - - 90 1 PIPE DIAMETER> 1.5" FP 5-12 EXISTING 80 - 750 150 - - - - - - - - - 4.0 - - - 90 1 1-1/2"THICK, NOTE 2. •3 FP 5-13 EXISTING 80 - 900 150 - - - - - - - - - 4.0 - - - 90 1 NOTES: 1. INORGANIC GLASS FIBER WITH ASJ 2. CLOSED CELL ELASTOMERIC 3. INSULATE REFRIGERANT PIPE PER FP 5-14 EXISTING 80 - 1000 150 - - - - - - - - - 3.5 - - - 90 1 §. K=0.27(BTU-IN/H-SQFT-°F)AT 75°F, 1.5 PCF K=0.25(BTU-IN/H-SQ.FT-°F)AT 75°F, 0.05 EQUIPMENT MANUFACTURER'S FP 5-15 EXISTING 80 - 500 150 - - - - - - - - - 3.5 - - - 90 1 ASTM C 547;TYPE I,TYPE IV PERM-IN I.O.M. COAT INSULATION ON FP 5-16 EXISTING 100 - 1050 230 - - - - - - - - - 6.0 - - - 90 1 it ASTM:C 585, C 795 ASTM C 534,TYPE I-TUBULAR GRADE BUILDING EXTERIOR WITH 2 FP 5-17 EXISTING 80 - 875 150 - - - - - - - - - 3.5 - - - 90 1 ASTM C 1136(JACKETS);TYPE I, II, III, IV,VIII ASTM E 84 COATS OF ARMAFLEX TYPE WB FP 5-18 EXISTING 80 - 550 150 - - - - - - - - - 4.5 - - - 90 1 ASTM:C 665, C 1617, C 1338 ASTM G-21/C 1338 FINISH, UV, OZONE,&MOISTURE FP 5-19 EXISTING 80 - 550 150 - - - - - - - - - 3.0 - - - 90 1 ASTM: C 1104, C 356 ASTM G-22 RESISTANT COMPOUND. GREENGUARD CERTIFICATION ASTM D 1056,2B1 FP 5-20 EXISTING 80 - 500 150 - - - - - - - - - 3.0 - - - 90 1 Q 0) GREENGUARD CHILDREN&SCHOOLS NFPA 255 FP 5-21 VPEF 02-08 19x14 600 150 0.75 0.25 0.17 32 22 250 0.25 0.17 400 3.0 277/1 2 64.4 88.1 3,5 ® o i CERTIFICATION NFPA 90A&90B FP 5-22 VPEF 02-08 19x14 500 150 0.75 0.25 0.12 30 20 200 0.25 0.17 350 3.0 277/1 2 63.6 90.7 3,5 Q_ NFPA 90A&90B UL 723 11111 FP 5-23 VPEF 02-08 19x14 500 150 0.75 0.25 0.12 30 20 200 0.25 0.17 350 3.0 277/1 2 63.6 90.7 3,5 UL CLASSIFIED UL 181Zc3 °..x 1 GREENGUARD CERTIFICATION GREENGUARD CHILDREN&SCHOOLS W 5-4 EXISTING 100 - 650 230 - - - - - - - - - 2.5 - - - - 1 W 59-0 - CERTIFICATION W 5-5 EXISTING 80 - 875 150 - - - - - - - - - 2.5 - - - - 1 W 5-6 EXISTING 80 - 800 150 - - - - - - - - - 2.0 - - - - 1 1.111) g PIPE INSTALLATION: W 5-7 EXISTING 80 - 800 150 - - - - - - - - - 2.0 - - - - 1 W 5-8 EXISTING 80 - - - - - - - - - - - - 2.0 - - - - 4fi W fi CONDENSATE PIPE: W 5-10 EXISTING 80 - 900 150 - - - - - - - - - 2.0 - - - - 1 1. PROVIDE MINIMUM 1 %SLOPE IN DIRECTION OF FLOW. 0 W 5-11 EXISTING 60 - - - - - - - - - - - - 1.0 - - - - 6 REFRIGERANT PIPE: W 5-12 EXISTING 60 - 250 0 - - - - - - - - - 1.0 - - - - 1 1. PROVIDE LIQUID LINE SIGHT GLASS AND DRYER-STRAINER AS MANUFACTURED BY SPORLAN OR EQUAL. W 5-13 EXISTING 60 - - - - - - - - - - - - - - - - - 3 2. INSTALL REFRIGERANT PIPING IN COMPLIANCE WITH ASHRAE 15,"SAFETY CODE FOR REFRIGERATION SYSTEMS." W 5-14 EXISTING 80 - 600 150 - - - - - - - - - - - - - - 2 3. COMPLY WITH ASME B31.5, "REFRIGERATION PIPING AND HEAT TRANSFER COMPONENTS." W 5-15 EXISTING 60 - 475 80 - - - - - - - - - - - - - - 2 4. CONSTRUCT SOLDERED JOINTS ACCORDING TO ASTM B 828 OR COPPER DEVELOPMENT ASSOCIATION'S"COPPER TUBE HANDBOOK." - 5. CONSTRUCT BRAZED JOINTS ACCORDING TO AMERICAN WELDING SOCIETY'S"BRAZING HANDBOOK,"CHAPTER"PIPE AND TUBE." 6. USE TYPE BCuP, COPPER-PHOSPHORUS ALLOY FOR JOINING COPPER SOCKET FITTINGS WITH COPPER PIPE. NOTES: 1. EXISTING UNIT, BALANCE AS SHOWN. UNIT HAS ELECTRIC HEAT, SET HEATING PRIMARY CFM TO PROVIDE 90 DEGREE DISCHARGE TEMPERATURE. 7. USE TYPE BAg, CADMIUM-FREE SILVER ALLOY FOR JOINING COPPER WITH BRONZE OR STEEL. 8. TESTS AND INSPECTIONS IN COMPLIANCE WITH ASME B31.5, CHAPTER VI. 2. EXISTING UNIT, BALANCE AS SHOWN. 3. PROVIDE WITH ELECTRIC HEATING COIL, FIBRE FREE LINER, INDUCED AIR FILTER, DISCONNECT SWITCH (DOOR INTERLOCK TYPE), FUSE BLOCK, PRESSURE INDEPENDENT BUILDING STANDARD DIGITAL(DDC)CONTROLS,AND BUILDING STANDARD THERMOSTAT. DUCT INSULATION SCHEDULE 4. EXISTING UNIT NOT IN SCOPE OF WORK. SHOWN FOR REFERENCE ONLY. NO CHANGE. MATERIAL FIELD VAPOR ID TAG BTU.IN B FORM R-VALUE NO. OF APPLIED RETARDER 5. DDC HARDWARE, INSTALLATION AND PROGRAMMING SHALL BE IN ACCORDANCE WITH PROPERTY MANAGEMENT REQUIREMENTS. KHSQ.FT.F AT75F. /D-' 3 NESS LAYERS JACKET REQUIRED CO • 6. RELOCATE UNIT AS SHOWN AND BALANCE TO ORIGINAL AIRFLOW. W MINERAL-FIBER BLANKET �'1 (0.26/0.75) N/A 1" 3.8 ONE FOIL&PAPER YES 0 LINERGRILLE, REGISTER, AND DIFFUSER SCHEDULE *TITUS 0 .24/1.5) N/A 1" 4.2 ONE NONE YES W PLAN MARK MODEL NO.* NECK SIZE FACE SIZE MAXFP.D. BORDER PATTERN FINISH NOTES 0 GENERAL NOTE: DUCT SIZES INDICATED ON DRAWINGS ARE SHEET METAL SIZE AND INCLUDE LINER SPECIFIED. EX-S EXISTING SUPPLY DIFFUSER; BALANCE TO INDICATED CFM 1,3 CO SA PAS 60 24"x24" 110 0.1 TYPE 3 4-WAY #26 1,2,3 J CO SB PAS 80 24"x24" 235 0.1 TYPE 3 4-WAY #26 1,2,3 < J 72. SC TBDI-80 100 48"x(2) 1"SLOTS 300 0.1 TYPE 3 2-WAY #26 2,4 U Q a EX-R EXISTING RETURN GRILLE 1,3 Q Q o RA PAR 22"x 22" 24"x24" 1700 0.08 TYPE 3 - #26 1,2,3 = Q f Wc Z NOTES: 1. SECURE GRILLE/DIFFUSER TO CEILING GRID WITH A MINIMUM OF(4)#10 TECH SCREWS. G Q 2. MECHANICAL CONTRACTOR TO VERIFY CEILING CONSTRUCTION WITH ARCHITECT AND EXISTING CONDITIONS AND ENSURE THAT .64 66 IT IS COMPATIBLE WITH GRILLE, REGISTER,AND DIFFUSER FRAMING, INCLUDING BORDER TYPES,T-BARS,AND CROSS NOTCHES. A 3rs, . FRAME TO FIT LAY-IN CEILING NO SCREW HOLES. 4. PROVIDE WITH MISC. CEILING GRID TEES. DATE 09/27/2017 a SCALE o AS NOTED MGR JRA q r, o JOB CEN004 s o SHEET N m F. li M-101 a OF SHEETS 5 Li: I HDL DESIGN HEREBY!EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS AND DRAWINGS ARE tin TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER WITHOUT OBTAINING THE EXPRESSED WRITTEN PER1.4110N OF HDL DESIGN NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAINING WRITTEN PERMISSION AND CONSENT. I I REVISIONS BY SILCONE CAULK BEFORE ROOFING P q=o 03 IS APPLIED. ALL AROUND PIPE(S) oo N R, c: 20 GUAGE SHEET METAL CAP GASKET 1"3 PCF DENSITY LINER H� p4 (:),`, Oo n , ATTACHED WITH SHEET METAL SPIN IN WITH DAMPER w C7 �_SCREWS NAILER BY CURB MANUFACTURER Q ¢ :5; Z INSULATED FLEXIBLE DUCT(8'MAX. LENGTH) G Z - m da r ' SECURE CAP TO CURB0 IY U �: z 90 ADJUSTABLE ELBOW PULL FLEX \ - --- . ® H w Ili j , 8"OVERHANG INSULATION OVER ELBOW TO GRILLE CONNECTION,SEAL WITH TIE WRAP. C7 ---I '' F2� CONNECT WITH SHEET METAL SCREWS 4 MAIN DUCT00 w 3 0 Q OVERLAP ROOFING UP& INTO BOX v ¢ Z 0 11 III LOCATIONS AT COLLAR. �, STANDARD CEILING Z �, 3 To O ao .o PIPE OR CONDUIT GRID SUPPORT PATTERN C7 U Z � 00 00 PREFABRICATED ROOF CURB LZ 0 N g n .3 -° SEAL SEAMS WITH EXPANDING FOAM 14" FLASHING SECURE DIFFUSER TO CEILING Z ' Z (9 c)4$ � M M GRID WITH A MINIMUM OF(4) n o >- M o45 ROOFING AND RIGID INSULATION 10'MIN ROOFING MATERIAL #10 TEK SCREWS. I T 7/ / 1 \\\�\ 1 � 0 0 li v o s i (BY CONTRACTOR) MAIN DUCT WITH 1"3 PCF DENSITY LINER U °%°% o --_---------_--- LAY-IN DIFFUSER / Jp� > .. 9 _' _ PER SCHEDULE SPIN IN WITH MANUAL VOLUME DAMPER mom 1:2 a >4 7, inIF CONCRETE DECK OMIT STEEL,SET Z 4(.. o cl / \ CURB ON DECK WITH FIRE TREATED a LAY-IN CEILING DIFFUSER AND BRANCH DUCT INSULATED FLEXIBLE DUCT(8' MAX. LENGTH) L WOOD BLOCKING TO LEVEL CURB,AND M-102 NO SCALE ATTACH CURB TO DECK WITH (6)3/8" .... \ \3-1/2"X3-1/2"X5/16"ANGLE WELDED TO .A DIA. EXPANSION BOLT WITH WASHERS. PULL FLEX INSULATION OVER /i STRUCTURAL STEEL WITH FIRE TREATED (MIN.4 CORNERS OF CURB) COLLARS SEAL WITH TIE WRAP. WOOD BLOCKING AS REQUIRED TON ATTACH CURB TO STEEL WITH LEVEL CURB. SEE ARCHITECTURAL AND CONNECT WITH SHEET METAL STRUCTURAL PLANS FOR ANY DEVIATION (6)3/8"DIA.THRU BOLTS WITH SCREWS 4 LOCATIONS AT WASHERS MIN.4 CORNERS OF \ FROM ANGLE SIZES. NOTE: ( COLLAR. ALL ROOF WORK SHALL COMPLY WITH BUILDING STANDARDS CURB AND CENTER OF LONG .......................................................................................... AND BE INCLUDED IN MECHANICAL CONTRACTOR'S BID. THIS SIDE DIFFUSER PLENUM FULL SIZE CONTRACTOR SHALL USE PROPERTY MANAGER APPROVED OF DIFFUSER NECK, INSULATE ROOFING CONTRACTOR AND MAINTAIN ROOF WARRANTIES. - WITH 1/2"-2#DENSITY LINER SPIN IN COLLAR 0 PIPING THRU ROOF DETAILz 0 2 0 a M-102 NO SCALE CimilliTE O LAY-IN SLOT DIFFUSER PER SCHEDULE C. 0 Mr W U.L.SYSTEM WL5028 111111-: Q F RATING=1-HR.AND 2-HR. L RATING AT AMBIENT=4 CFM/SQ.FT. a LAY-IN CEILING DIFFUSER AND BRANCH DUCT T RATING=1/2-HR. L RATING AT 400°F=LESS THAN 1 CFM/SQ.FT. M-102 NO SCALE J "THY-CURB"(4)SEISMIC CONDENSING UNIT FRONT VIEW SECTION A-A lalU HOLD-DOWN STRAPS - �— --.-- ATTACHED WITH(10)#10 TEK ' = A i0 r NOTE: SCREWS (5)EACH SIDE, ® 1"NEOPRENE ISOLATION PADS ALL ROOF WORK SHALL COMPLY WITH PROVIDE SHOP DRAWING r_ (1)EACH CORNER 0 LOW PRESSURE RIGID ROUND DUCT PER BUILDING STANDARDS AND BE INCLUDED IN SUBMISSION. , : 0 IMAX MUM 8'-0"ELONG) ``"Iffr b L ��DRAWINGS MECHANIC2CTOR L CONTRACTOR'S BID. THIS PROVIDE SLACK AS _I / 7RECOMENDBYRESTRAINT A..,.,\WOOD NAILER MANUFACTURER �• ' AND MAINTAIN ROOF WARRANTIES. ,� ,�j� o b L / ° �3 firm, I SPIN-IN WITH LOCKING CONDENSING UNIT %,„----/ DIFFUSER 1”NEOPRENE/CORK ISOLATION PAD © © (SEE GRILLE, REGISTER& © QUADRANT DAMPER(TYP.) DIFFUSER SCHEDULE) _ BY M.C. (4) REQUIRED .: GALV. SHEETMETAL CAP OVER A �( ^A INSULATED SHEETMETAL DISCHARGE / VARIABLE VOLUME BOX ROOFING TACKED TO WOOD "MICRO METL"TYPE MM475 EQUIPMENT , „ (SEE SCHEDULE) §. SUPPORT FURNISHED AND INSTALLED BY 1.GYPSUM WALL ASSEMBLY(1-HR.OR 2-HR.FIRE-RATING)(2-HR.SHOWN). PLENUM (MINIMUM 5'-0" LONG) NAILER 2.PENETRATING ITEM TO BE ONE OF THE FOLLOWINGEC HVAC CONTRACTOR. (TYP OF 2)OR RUBBER VIBRATION ISOLATORS& "PATE"EQUAL 3.MAXIMUM 3/4"THICK(AB/PVC)FLEXIBLE FOAM TYPE PIPE INSULATION. 'F a--• ALL THREAD ROD(TYP. OF 4) ROOFING TO BE LAPPED UP 4.HILTI FS-ONE HIGH PERFORMANCE INTUMESCENT FIRESTOP SEALANT: VAV AIR INLET t q SUPPORT UNDER CAP ;/j ,_� A.MINIMUM 5/8"DEPTH OF SEALANT FORA 1-HR.FIRE-RATING. ROOF INSULATION B.MINIMUM 1-1/4"DEPTH OF SEALANT FOR A 2-HR.FIRE-RATING. STRAIGHT RIGID ROUND > 2'-0" 5.MINIMUM 1/2"CROWN HILTI FS-ONE HIGH PERFORMANCE INTUMESCENT FIRESTOP DUCT MIN. 3 DIAMETERS ROOFING SEALANT AT PIPE INSULATION/WALL INTERFACE. g 11 11 II III II/ � III � III II� �� II II � _ II ® O III / I I 1 III I I I I I I I I I III NOTES:1.MAXIMUM DIAMETER OF OPENING=7-1/2". TRANSITION TO VAV _ 2.ANNULAR SPACE=MINIMUM 0",MAXIMUM 1-1/2". 1111-; - IF CONCRETE DECK OMIT STEEL 7 i INLET SIZE Z O 0- SET CURB(S)ON DECK WITH a —t J r' SEE HILTI FIRESTOP INSTALLATION MANUAL FOR ADDITIONAL INSTRUCTIONS STAINLESS STEEL BANDING-, FIRE TREATED WOOD BLOCKING ROOF DECK HILTI,INC. TULSA,OK 1-800-879-8000 U STRAP(TYPICAL) TO LEVEL CURB,AND ATTACH U.L.SYSTEM NO.WL5028 �� CURB(S)TO DECK WITH(6)3/8" - - 3-1/2"X3-1/2"X5/16"ANGLE WELDED TO MEDIUM PRESSURE __________._-----CONICAL FITTING �' DIA. EXPANSION BOLT WITH STRUCTURAL STEEL. ATTACH CURB(S) INSULATED METAL PIPE THROUGH INSULATED FLEXZ WASHERS. (MIN.4 CORNERS OF TO STEEL WITH(6)3/8"DIA. BOLT WITH (MAXIMUM 6-0" LONG) fi CURB) WASHERS. (MIN.4 CORNERS OF CURB) © 1 -HR. OR 2-HR. GYPSUM WALL ASSEMBLY U v ROOF STRUCTURE M-102 NO SCALE 0 Li MAIN SPIRAL SUPPLY DUCT (MEDIUM PRESSURE) © CONDENSING UNIT SUPPORT DETAIL 8 VAV BOX INSTALLATION DETAIL M-102 NO SCALE M-102 NO SCALE MOM LOW PRESSURE „ Mr b I I CONDENSATE DRAIN INSULATED FLEX ` l RIGID ROUND DUCT PER (MAXIMUM 8-0 LONG) POWER DRAWINGS STRUCTURE REFRIGERANT PIPING I II II Q MAINTAIN MINIMUM 12"CLEARANCE IN FRONT OF J 11 DUCT OPENING AND 8"CLEARANCE ABOVE. I SPIN-IN WITH LOCKING 0 0 o0 FLOOR/ROOF CONSTRUCTION COORDINATE WITH ALL OTHER TRADES TO ENSURE DIFFUSER QUADRANT DAMPER(TYP.) LAY-IN CEILING ABOVE THIS CLEARANCE IS MAINTAINED. SEE GRILLE, REGISTER& Allek DIFFUSER SCHEDULE) VOI r ` ELECTRIC HEATER SECTION CO -- PIPING RACKED ON WALL(TYP) -- a - . . —� i-� a s • a ° a a .d a a. INSULATED SHEETMETAL L L—_J I a ® FAN TERMINAL UNIT ¶ Q MOUNTING BRACKET PROVIDED ^ PLENUM (MINIMUM 5'-0" �� w (SEE SCHEDULE) �""' WITH UNIT. FASTEN TO STUDS I PER MANUFACTURER'S INSTRUCTIONS I s8" LONG) -- ,- .07,1 W I ;. RUBBER VIBRATION ISOLATORS& CI COMPUTER ROOM AIR-CONDITIONING _12"- D '� __Jr_- a �- 3/8"ALL THREAD ROD(TYP. OF 4) UNIT(CRAG-1) 8"MIN (D+2") J,-1 D PRIMARY AIR INLET INDUCED AIR WITH J �- ( 1)1 - /-'-'' OUTSIDE DIMENSIONFILTER& FRAME Q I 1"ACOUSTICAL / SIZE AS SHOWN STRAIGHT RIGID ROUND ' ( , 2 LINING �. DUCT MIN. 3 DIAMETERS M = o DISCONNECT BY E.C. ON PLANS 1111-----------"-----_ Z POWER ENTRY THROUGH %/_>< ___ USE 12X8 IF TRANSITION TO FTU INLET Z is' I BOTTOM OF UNIT. OMIT TURNING VANE NO SIZE SHOWN �� SIZE o f 6"MIN. STAINLESS STEEL BANDING 0 f l � STRAP(TYPICAL) W N I LL: WALL STUDS-SEE LJ: CEILING DUPLEX RECEPTACLE BY E.C. / -."----------.------ ----------CEILING MEDIUM PRESSURE `/ CONICAL FITTING Q ARCHITECTURAL PLANS INSULATED FLEX g u. 9 WALL (MAXIMUM 3'-0"LONG) , AIR , FLOW DATE Cr,66 Li: S - 09/27/2017 EXTERNAL CONDENSATE PUMP SCALE AS NOTED o, MAIN SPIRAL SUPPLY DUCT MGR RETURN AIR BOOT - PLENUM TO PLENUM (MEDIUM PRESSURE) JRA 6 FINISHED FLOOR M-102 NO SCALE JOB CEN004 © CRAC UNIT MOUNTING DETAIL 9 FAN TERMINAL UNIT INSTALLATION DETAIL SHEET 1. M-102 NO SCALE 11-1O2 M-102 NOT TO SCALE I e OF SHEETS 0 LL HDL DESIGN HER : EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS AND DRAWINGS ARE DT TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER WITHOUT OBTAINING THE EXPRESSED WRITTEN PERMIIISMI OF HDL DESIGN NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAINING WRITTEN PERMISSION AND CONSENT. I I I . REVISIONS BY , Fes- �o co - z oN N , o w 2o I ¢ a �o U co OQ -03 Z 4. , N 'iZ ce U U W Z J U 0 w u, Z rn . O 3 LU ¢ itU - ZZw C I v E LLOC73(14) ¢ �, - U z �M H Z a to n O`. vsC 15 C d co 0 Z Z W r%� r7 QM U Q • o ^^ 0 L' V (1) (4) L -' ,----o1 cn E 0 Jo) 5 ri L 6 Q o U 0a. 8 Q -7 0 Z ■ - -o -c ✓ 15.Ventilation.Ventilation,either natural or mechanical,is provided in accordance with Chapter 4 of the International Mechanical Code. Plans reference page/section: P-101 Where mechanical ventilation is provided,the system has the capability to reduce the outdoor air supply to the minimum required by Plans reference page/section:N/A Chapter 4 of the International Mechanical Code. j 31.All service water heating requirements are listed in requirements section specific to the system. COMcheck Software Version 4.0.7.0 Generic Requirements:Must be met by all systems to which the requirement is applicable: Plans reference page/section: M-rot ✓ 1. Calculation of heating and cooling loads.Design loads are determined in accordance with the procedures described in the Section 5: Compliance Statement Mechanical Co m p I i a n ce Certificate ASHRAE/ACCA Standard 183.Alternatively,design loads have been determined by an approved equivalent computation procedure. 16.Demand controlled ventilation(DCV).DCV is required for spaces larger than 500112 for simple systems and spaces larger than 150 ft2 p rritt for multiple zone systems. Compliance Statement:The proposed mechanical alteration project represented✓ 2. Cooling equipment economizers:The total capacity of all cooling equipment without economizers must be less than 240 kBtu/h.This P P P p oleo ep esTh ed in this document is consistent with the building plans, Plans reference page/section:M-100 and other calculations submitted with this permitI project lists 18 kBtu/h capacity without economizers.That portion of the equipment serving dwelling units and guest rooms is not specifications application.The proposed mechanical alteration project has been economizE. C included in determining the total capacity of units without economizers. ✓ 17.Kitchen hoods.Kitchen makeup is provided as required by the Oregon Mechanical Specialty Code. to meet the 2014 Oregon Energy Efficiency Specialty Code,Chapter 8,requirements in COMcheck Version 4.0.7.0 and to comply with the -: mandatory requirements in the Requirements Checklist. Q Section 1: Project Information Plans reference page/section:N/A N • Plans reference page/section:M-100 Z�'✓ 18.Enclosed parking garage ventilation controls.In Group S-2,enclosed parking garages used for storing or handling automobiles employs Kevin S. Griesemer-Principal 44444.4„,.. 9/27/2017 - Energy Code:2014 Oregon Energy Efficiency Specialty Code 3. Equipment and s stem sizing.Heatingand coolingequipment and s stems capacity do not exceed the loads calculated in accordance automatic carbon monoxide sensingdevices. Name-Title SiDate C; (V �/ Y 9Y P Y g Project Title:Centene Corporation with Section 503.2.1. Project Type:Alteration Plans reference page/section:N/A Plans reference page/section:M_100 Section 6: Post Construction Compliance Statement Construction Site: Owner/Agent: Designer/Contractor: ✓ 19.Duct and plenum insulation and sealing.All supply and return air ducts and plenums are insulated with the specified insulation.Whenz ✓ J 4. HVAC Equipment Performance Requirements.Reported efficiencies have been tested and rated in accordance with the applicable test located within a building envelope assembly,the duct or plenum is separated from the building exterior or unconditioned or exempt 13221 SW 68th Parkway G&W Engineering Corp. u HVAC record drawings of the actual installation,system capacities,calibration information,and performance data for each equipment procedure.The efficiency has been verified through certification under an approved certification program or,if no certification program spaces by a minimum of R-8 insulation.All ducts,air handlers and filter boxes are sealed.Joints and seams comply with Section 603.9 W 5th Floor 138 Weldon Parkway provided to the owner. exists,the equipment efficiency ratings are supported by data furnished by the manufacturer. of the International Mechanical Code. V Tigard,OR 97223 Maryland Heights,MO 63043 (] HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor. 1 5. Thermostatic Controls.The supply of heating and cooling energy to each zone is controlled by individual thermostatic controls that j 20.Low-pressure duct systems.All longitudinal and transverse joints,seams and connections of low-pressure supply and return ducts are respond to temperature within the zone. securely fastened and sealed with welds,gaskets,mastics(adhesives),mastic-plus-embedded-fabric systems or tapes installed in u Written HVAC balancing and operations report provided to the owner. IMI 0 Section 2: General Information accordance with the manufacturer's installation instructions. The above post construction requirements have been completed. Plans reference page/section:M-301 Building Location(for weather data): Tigard,Oregon Plans reference page/section:M-100 go Climate Zone: 4c i6. Heat pump supplementary heat.Heat pumps having supplementary electric resistance heat have controls that,except during defrost, prevent supplementary heat operation when the heat pump can meet the heating load. ✓ 21.Medium-pressure duct systems.All ducts and plenums designed to operate medium-pressure are insulated and sealed in accordance Principal Mechanical Designer-Name Signature Date with Section 503.2.7.Pressure classifications specific to the duct system are clearly indicated on the construction documents. Section 3: Mechanical Systems List Plans reference page/section:N/A Y Plans reference page/section:M-100 ✓ 7. Set point overlap restriction.Where used to control both heating and cooling,zone thermostatic controls provide a temperature range ' ' Quantity System Type&Description or deadband of at least 5°F(2.8°C)within which the supply of heating and cooling energy to the zone is capable of being shut off or ✓ 22.High-pressure duct systems.Ducts designed to operate at high-pressure are insulated and sealed in accordance with Section 503.2.7. reduced to a minimum. 1 CRAG-1 (Single Zone): In addition,ducts and plenums are leak-tested in accordance with the SMACNA HVAC Air Duct Leakage Test Manual. Cooling:1 each-Split System,Capacity=18 kBtu/h,Air-Cooled Condenser,No Economizer,Economizer Plans reference page/section:M-100 Plans reference page/section: N/A exception:Computer Room Applications Proposed Efficiency=18.50 SEER,Required Efficiency: 13.00 SEER ✓ 8. Optimum Start Controls.Each HVAC system has controls that vary the start-up time of the system to just meet the temperature set ✓ 23.Manuals.The construction documents require that an operating and maintenance manual be provided to the building owner by the Fan System: FAN SYSTEM 1 I Network Room--Compliance(Motor nameplate HP method):Passes point at time of occupancy. mechanical contractor.See long description for specifications. Fans: Plans reference page/section:M-100 Plans reference page/section:M-100 FAN 1 Supply,Constant Volume,425 CFM,0.1 motor nameplate hp ✓ 24Air System Design and Control.Each HVAC system having a total fan system motor nameplate hp exceeding 5 hp meets the provisions 1 9. Off-hour controls.Each zone is provided with thermostatic setback controls that are controlled by either an automatic time clock or of Sections 503.2.10.1 through 503.2.10.2. 1 S-1: programmable control system. Electric Instantaneous Water Heater,Capacity:0 gallons ✓ Exception applies:Zones that will be operated continuously. Plans reference page/section: N/A No minimum efficiency requirement applies Ee 25Allowable fan floor horsepower.Each HVAC system at fan system design conditions does not exceed the allowable fan system motor Plans reference page/section:M-101 nameplate hp(Option 1)or fan system bhp(Option 2)as shown and calulated in requirement details. Section 4: Requirements Checklist X 10.Shutoff damper controls.Both outdoor air supply and exhaust are equipped with not less than Class I motorized dampers. Plans reference page/section:N/A In the following requirements,blank checkboxes identity requirements that the applicant has not acknowledged as being met.Checkmarks Plans reference page/section:N/A ✓ 26.Motor nameplate horsepower.For each fan,the selected fan motor is no larger than the first available motor size greater than the brake identify requirements that the applicant acknowledges are met or excepted from compliance.'Plans reference page/section'identifies where in horsepower(bhp). ' la the plans/specs the requirement can be verified as being satisfied. ✓ 11.Freeze Protection and Snow melt system controls.Freeze protection systems,such as heat tracing of outdoor piping and heat Cl exchangers,including self-regulating heat tracing,include automatic controls capable of shutting off the systems when outdoor air Plans reference page/section:M-100 ill C Requirements Specific To:CRAC-1 : temperatures meet code criteria. j 27.Large Volume Fan Systems.Fan systems over 8,000(7 m3/s)cfm without direct expansion cooling coils that serve single zones reduce ✓ ✓ 1. Equipment meets minimum efficiency: Split System: 13.00 SEER Plans reference page/section:N/A airflow based on space thermostat heating and cooling demand.A two-speed motor or variable frequency drive reduces airflow to a ✓ 2. Energy recovery ventilation systems.Individual fan systems that have both a design supply air capacity of 5,000 cfrn or greater and a maximum 60 percent of peak airflow or minimum ventilation air requirement as required by Chapter 4 of the International Mechanical z minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system. 12.Separate air distribution systems.Zones with special process temperature requirements and/or humidity requirements are served by PP Y P 9 9 PP Y q Y 9Y rY Y ✓ Code,whichever is greater. �? separate air distribution systems from those serving zones requiring only comfort conditions;or shall include supplementary control �_ Plans reference page/section:N/A provisions so that the primary systems may be specifically controlled for comfort purposes only. Plans reference page/section:N/A t_; Plans reference page/section:M-100 �/ 28All air-conditioning equipment and air-handling units with direct expansion cooling and a cooling capacity at ARI conditions greater than I. Requirements Specific To:S-1 : or equal to 110,000 Btu/h that serve single zones have their supply fan operation controlled according to code specific requirements. ✓ 1. Newly purchased equipment meets the efficiency requirements. No efficiency requirements for electric instantaneous water heater. 1 13.Humidity control.Where a humidity control device exists it is set to prevent the use of fossil fuel or electricity to produce relative Z ✓ 2. Service water-heating equipment performance efficiency.Water heating equipment efficiency has been verified through data furnished humidity in excess of 30 percent.Where a humidity control device is used for dehumidification,it is set to prevent the use of fossil fuel Plans reference page/section: M-100 bythe manufacturer or through certification under anapproved certification program. or electricity to reduce relative humidity below 60 percent. WN 9 P 9 ✓ 29.Series fan-powered terminal unit fan motors.Fan motors for series fan-powered terminal units are electronically-commutated motors C' 1 3. Temperature controls.Service water-healing equipment have controls to allow a setpoint of 110°F for equipment serving dwelling units Plans reference page/section: N/A and have a minimum motor efficiency of 70 percent when rated in accordance with NEMA Standard MG 1-2006 at full load rating 0 and 90°F for equipment serving other occupancies.The outlet temperature of lavatories in public facility rest rooms is limited to 110°F. conditions. 14.Humidity control.Where a humidity control device exists it is set to maintain a deadband of at least 10%relative humidity where no Plans reference page/section:P-100 Plumbing Criteria active humidification or dehumidification takes place. Plans reference page/section: N/A 4. Heat traps.Water-heating equipment not supplied with integral heat traps and serving noncirculating systems have heat traps on the Plans reference page/section:N/A / 30.Hot Gas Bypass Limitation.For cooling systems<=240 kBtu/h,maximum hot gas bypass capacity is no more than 50%total cooling supply and discharge piping associated with the equipment. capacity. t Project Title:Centene Corporation Report date:09/25/17 Project Title:Centene Corporation Report date:09/25/17 Project Title:Centene Corporation Report date:09/25/17 Project Title:Centene Corporation Report date:09/25/17 - Data filename:F:\2017 Projects\2017-0321.00\Electrical\Comcheck\2017-0321.00_Centene Tigard Comcheck.cck Page 1 of 4 Data filename:F:\2017 Projects\2017-0321.00\ElectricahComcheck\2017-0321.00_Centene Tigard Comcheck.cck Page 2 of 4 Data filename:FA2017 Projects\2017-0321.001Electrical\Comcheck\2017-0321.00_Centene Tigard Comcheck.cck Page 3 of 4 Data filename:F:12017 Projects12017-0321.00\Electrical\Comcheck\2017-0321.00_Centene Tigard Comcheck.cck Page 4 of 4 • W U Z Q J 0.. M O 0 J Q ro U n LL z ). Q 0 Oor •,... AI 2a m EA cG n 0 N N DATE 09/27/2017 a SCALE AS NOTED 0, MGR JRA 0 N , m JOB A CEN004 s Q. N m 0 -, M-103 0 3N I .. d OF SHEETS N LL: I HDL DESIGN HERE BI�EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS AND DRAWINGS ARE T TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER WITHOUT OBTAINING THE EXPRESSED WRITTEN PERMI ION OF HDL DESIGN NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAINING WRITTEN PERMISSION AND CONSENT. I I I REVISIONS BY H v o co O oM N N co O ¢ z a , 0 z '9 oc w C7 ♦ w W . , wcn C� U � r�Q�r,� Z �-' ■ t c) LZ-1 ¢ Q i n U C, m O a _ Z or 3 f-: •— � 6 59, °2 v M z GENERAL NOTES - MECHANICAL DEMOLITION PLAN NOTES - MECHANICAL DEMOLITION Q M 8 03 D V co r A. UNLESS OTHERWISE NOTED, EXISTING DUCT, SUPPLY DIFFUSERS, RETURN AIR GRILLES, 1. IDENTIFY ANY PIPING WITHIN THE AREA OF THE PROPOSED NETWORK ROOM AND NOTIFY THE i t '1°: o TRANSFER AIR GRILLES,TERMINAL UNITS AND HVAC CONTROLS SHALL REMAIN AND BE ARCHITECT AND ENGINEER DURING THE BID PERIOD FOR DIRECTION ON HOW TO RELOCATE _J 0) > c? REUSED. PROTECT FROM DUST AND DAMAGE. THEM. ll'il^ i a B. TURN OVER TO PROPERTY MANAGER/OWNER OR PROPERLY DISPOSE OF ANY REMAINING 2. CAREFULLY REMOVE AND RELOCATE EXISTING THERMOSTAT. EXTEND CONTROL WIRING TO �L Q o REMOVED AIR DEVICES AFTER RELOCATED DEVICES ARE ACCOUNTED FOR. NEW LOCATION. ■ r 3. CAREFULLY REMOVE AND RELOCATE EXISTING SUPPLY AIR DIFFUSER. REMOVE FLEX DUCT. CAP AND SEAL MAIN DUCT IF BRANCH DUCT IS NOT REUSED. 4. CAREFULLY REMOVE AND RELOCATE EXISTING RETURN AIR GRILLE. 5. CAREFULLY REMOVE AND RELOCATE EXISTING VAV BOX ABOVE CEILING. REMOVE PORTION OF DUCT AS REQUIRED. 6. REMOVE EXISTING RETURN AIR TRANSFER. 7. CAREFULLY REMOVE ALL EXISTING DUCTWORK DOWNSTREAM OF EXISTING VAV BOX. PREPARE TO ATTACH NEW DUCT. 8. CAREFULLY REMOVE PORTION OF EXISTING DUCT INDICATED. CAP OPEN END OF DUCT. 9. NO HVAC WORK IN THIS AREA. id a Z� No We �° o O O •__ O 1,11 110 � O' LII 1 \ 100(E) L1 - - I I -` 0 r 100(E) 7seis 1 _ / —� 100(E) 10077 d d d d 8 b 4 d 1 O T / / ( - 2 100(E 100(E) 100(E) 100(E) 100(E 100(E) FP ❑ l Li / . 00 ir& Mr ir,Ell V ____i..... / 0 1- FP20 1 100(E) , ETA1 \ I 5-19 " 'za � IMINII=MI AIM 10 I=01 I=40 4IM 4 / / 9 9 5-6 irk 4. ' ❑ _ (E) (E) m ❑ 100(E il 100 E 80 / / //) 100(E)/ 1771 1 - �/ /0 /./ 1 Er 4- Tar /� ----- '1 100(E) 100 E I ❑ j I '�� (ri� 8 4 /A 0 1i�/i /�/ // /r�// /rfif/fi%//rf5/.555' i �- 01111 =1 Cr.II MI: 1111=11601= J1 I I1n80 ❑ ��� �[rC' CO 1 ®I . 4 0 1 80(E) \0 - iL1 ,:IN ...,,- , 1 10E1 \ 1,___, - El 7 0 11111 CZ1 5. 6 u 4 - r ' �—,. 40,/ 1 I i ap I Li I I� // (E) A 1 L--IN 100(E) ® O 97. ❑ © 60(E) 80(E) / � / 1 -V n 111 I ---1--t80(E) 1 1 I 1 ® a :6 I / _ A ��� „/,/ . I I\ %///I Irk) g i..*.1,_ - / 100(E) , / I/ 4111r 9 /) u II i80(E) �/ 1 ---- " • 1_I_ IF i V / �' g g /tel O \ fi /DN / // V❑ ❑ a :.. II El t■� A71I g g/ , / / I r_ iiiMili'/ 80(E) (L1 I 11 / / /II 1 I ❑ ❑ ji 0 I 100(0) n / / I L _ I ___7______ill 111 1 Y.. _ i B. E © I D / C /�\ I.Pr 7 r ) • (E) 11 , = 1....e ,e,./ �/0 An® 0 1 1 �� Ell /0 1 ` /'� _® / —�E /jf 5-10 1 .‘1,, 90(E) //‘‘/ - -- ---- - �// �'!//'T� '•///".( I T / 100(E) 5 /� ' B0(E) � �i//7 i 1 , 01 1:11 El �, / /100:7)/7 / /A ❑ 0 ir 2 2 i 1101 // A �� ........_._____40.0......„.„.IP i ��/ I 5-16 100(E), _ a 1E1 I e 1 ��y -, 4p 1 a ♦ 1 . , ILS 1 -ISI ,: ❑ / C 80 E �- - - - i 7 / . El j 8 f..3 . i 1 -� I -=.. ,100(.›........- 3 1 0 1 i J ,_i 80(E) 1 9 I f - I © 9 FPS ' ✓ I 1 FP ,/� I 1 2 Ilii m m n 1 1 / Q 5-20t Eigef❑ 100(E) 1 3 1317 Z An ti El Oil .1 a: ip. o :ILL LIM MIIIIIIMINM AN.01 GNI MMIIIIP al MR Ea / 1 E i.i. r- --'_'-[W fili I „ I.! , ..Lw IA W 1 7-7—•1 _.1.1 iEr.1— 100(E) 100(E) 100(E) / Ar ' / IAE _,�9-i�i 100E 100(E) 100(E) 100(E) 1 - -<pJ 100(E) 100(E) ❑ 100(E) ® U 0 O "- 100(E) 100(E) 100(E) u:m—mR-1p--o 2 - _/-.= _ � _ - r - � - _ _ - - O LE i._...__+__.44,15fF 8 1 100(E) 1 N. 100( ) 11 DATE 09/27/2017 v (E)_ 100(E) 100(E) SCALE ' - 100(E) ,00 AS NOTED ' '14 / o0,./ `'\ MGR JRA clN cl JOB O O O \i�i �� CEN0040 I�L�IsI�� O O O O SHEET N N PARTIAL FIFTH FLOOR CEILING PLAN - MECHANICAL DEMOLITIONFtA —N201 SCALE: 1/8"= 1'-0" . n OF SHEETS 0 i I HDL DESIGN HEREBII EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS AND DRAWINGS ARE tliT TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER WITHOUT OBTAINING THE EXPRESSED WRITTEN PERMI ION OF HDL DESIGN NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAINING WRITTEN PERMISSION AND CONSENT. I I I I . REVISIONS BY , GENERAL NOTES - MECHANICAL n PLAN NOTES - MECHANICAL Mo � Z -1 MN , A. EXISTING DUCT SIZES, DUCT LOCATIONS, EQUIPMENT SIZES, EQUIPMENT LOCATIONS,AND J. OFFSETS AND TRANSITIONS ARE TO BE PROVIDED FOR COORDINATION WITH OTHER 1. NEW LOCATION FOR EXISTING THERMOSTAT. EXTEND CONTROL WIRING TO NEW LOCATION. - o4 0 r•..,- ' AIR DEVICE SIZES WERE OBTAINED FROM EXISTING PLANS OR LIMITED SITE SYSTEMS AND THE BUILDING STRUCTURE. CUT AND PATCH AS REQUIRED. _ O n ' Q w -4o U CD OBSERVATIONS AND SHALL BE CONSIDERED APPROXIMATE. SITE VERIFY EXISTING c4 ; tA`V 0 t; DIMENSIONS AND LOCATIONS DURING BIDDING PROCESS AND IDENTIFY ANY K. PROVIDE ACCESS PANEL WHERE REQUIRED FOR HVAC DAMPERS AND COMPONENT 2. NEW LOCATION FOR EXISTING SUPPLY DIFFUSER. CONNECT TO EXISTING BRANCH DUCT O ¢ p W Z 1. ' DISCREPANCIES PREVENTING THE NEW SCOPE OF WORK AS SHOWN. ACCESS WHEN INSTALLED ABOVE NON-ACCESSIBLE CEILINGS. WITH NEW FLEX DUCT, RIGID ROUND METAL DUCT OR PROVIDE NEW TAP TO EXISTING MAIN Q W ro DUCT. I- ' B. WHERE WALLS ARE EXTENDED UP TO DECK REPLACE FLEX DUCTS WITH SHEETMETAL L. COORDINATE ACTUAL ROUTE OF SUPPLY, RETURN, EXHAUST DUCT,AND MECHANICAL U _n Z 3 w DUCT THROUGH WALL. PIPING ROUTES IN THE FIELD. COORDINATE WITH ARCHITECTURAL, ELECTRICAL, 3. NEW LOCATION FOR EXISTING RETURN AIR GRILLE. U • w w ' PLUMBING, FIRE PROTECTION,AND STRUCTURAL CONDITIONS. z w >.. 5' D C. WIPE CLEAN FACE OF EXISTING SUPPLY DIFFUSERS AND RETURN GRILLES. 4. PROVIDE WALL MOUNTED COMPUTER ROOM AIR CONDITIONING UNIT AS SCHEDULED AND ckl - tg 3 c- Z 0 ' IL M. COORDINATE DUCTWORK DROPS WITH STRUCTURAL COMPONENTS. SPECIFIED. WALL MOUNT UNIT AT 6'-0"A.F.F.TO BOTTOM. PROVIDE CONDENSATE PUMP, 4 a U x ¢ 2 r" ■ .^� 5 D. PROVIDE INSULATED BASE FOR THERMOSTATS OR SENSORS LOCATED ON EXTERIOR MOUNT PUMP BENEATH UNIT AT 5'-0"A.F.F.AND EXTEND CONDENSATE PIPING ABOVE Z ' a C7 3 `i N WALL OR COLUMN FURRING THAT IS INTEGRAL WITH EXTERIOR WALL. N. EQUIVALENT AREA DUCTS AND MODIFICATIONS TO LAYOUT ARE ACCEPTABLE BASED ON CEILINGS TO EXISTING SERVICE SINK IN JANITORS CLOSET. EXTEND REFRIGERANT PIPING t z M 3 O °' c U Z FIELD CONDITIONS AND COORDINATION. ABOVE CEILINGS THEN UP THROUGH ROOF TO CONDENSING UNIT ON ROOF. PROVIDE PIPE A M V `N 0 °r° v , s- E. WHERE DUCTS PENETRATE THE ASSEMBLY, FIRE STOP CAULK SHALL BE APPLIED IN PENETRATION BOX ON ROOF AS DETAILED. FLASH AND SEAL WATER TIGHT. COIL W Q w S H cn C . o @ ACCORDANCE WITH MANUFACTURES INSTALLATION GUIDELINES AND U.L. LISTED TESTING O. PRIOR TO THE START OF CONSTRUCTION,THE MECHANICAL CONTRACTOR SHALL CONDENSATE PUMP CORD AND SECURE NEATLY TO WALL. Z -' Z W I r:) M a> � APPROVALS. COMPLETELY REVIEW AND CONFIRM THE INTENDED RETURN AIR PATH TO MECHANICAL I--.I F.5 U Des ce n r, c EQUIPMENT IS OPEN AND WILL BE FUNCTIONAL. CONFIRM AGAIN, PRIOR TO THE AIR 5. PROVIDE COMPUTER ROOM CONDENSING UNIT ON ROOF AS SCHEDULED AND SPECIFIED. RURS 3/4" CD d • c o r F. THE MECHANICAL CONTRACTOR SHALL PROTECT ALL OPEN DUCT, PIPING,AND BALANCE OF THE MECHANICAL SYSTEM. UNIT SHALL SET DEAD LEVEL ON EQUIPMENT RAILS. EXTEND RAILS A MINIMUM OF 6"BEYONDlir . v a, a, 1= MECHANICAL EQUIPMENT, NEW AND EXISTING FROM CONSTRUCTION DUST AND DIRT. EQUIPMENT ON BOTH SIDES. EXTEND REFRIGERANT PIPING AS SCHEDULED TO _ J pUj j v , c9 MECHANICAL SYSTEMS SHALL NOT BE OPERATED DURING CONSTRUCTION EXCEPT P. COORDINATE LOCATION AND SUPPORTS OF MECHANICAL UNITS WITH OTHER TRADES. CORRESPONDING EVAPORATOR COIL. COORDINATE LOCATION OF UNITS WITH LANDLORDS I L 5 = a o WHERE WRITTEN APPROVAL IS OBTAINED FROM THE ENGINEER AND OWNER.WHEN CONSTRUCTION REPRESENTATIVE PRIOR TO SETTING EQUIPMENT CURBS. ANCHOR TO — Q I i� V a APPROVAL IS ISSUED, PROTECT EACH RETURN AIR DUCT OPENING WITH MERV 8 FILTERS Q. REFRIGERANT AND CONDENSATE PIPING SHALL BE ROUTED AT THE BOTTOM OF STRUCTURE AND FLASH INTO ROOF PER ROOFING COMPANIES WARRANTY REQUIREMENTS. CRAG 1 i� Q o 0 AND INSTALL MERV 8 FILTER(S) IN EQUIPMENT FILTER RACK. PRIOR TO TESTING AND STRUCTURE WHERE POSSIBLE. -v BALANCING, REMOVE FILTERS AND INSTALL NEW MERV 8 FILTERS.AT COMPLETION OF 6. REFRIGERANT LINES UP TO ROOF. COORDINATE PIPING ROUTE TO ROOF WITH PROPERTY 0 I - CONSTRUCTION, REMOVE CONSTRUCTION FILTERS AND REPLACE EQUIPMENT FILTERS MANAGER. CONSULT EQUIPMENT MANUFACTURER FOR REFRIGERANT LINE SIZING. 4 , WITH NEW FILTERS. 7. NO PIPING SHALL BE INSTALLED ABOVE NETWORK ROOM. G. ELBOWS IN MECHANICAL SYSTEMS DUCTS SHALL BE HELD TO A MINIMUM. COORDINATE LOCATION OF DUCTS WITH OTHER TRADE CONTRACTORS PRIOR TO STARTING WORK. 8. SPILL CONDENSATE DRAIN INTO EXISTING SERVICE SINK. PROVIDE CODE REQUIRED AIR GAP. NETWORK 9 H. ADEQUATE SPACE SHALL BE PROVIDED FOR THE FIRE SUPPRESSION SPRINKLER PIPING. 9. NETWORK ROOM WALL SHALL BE FRAMED AROUND EXISTING ROOF DRAIN PIPING SO THAT 5044 - -1 1-___-1 COORDINATE DUCT ELEVATIONS WITH FIRE SPRINKLER CONTRACTOR PRIOR TO START OF PIPING DOES NOT RUN ABOVE ROOM. CONSTRUCTION. El 1-___-1 1-_---1 10. NEW LOCATION FOR EXISTING VARIABLE AIR VOLUME BOX TO AVOID NEW WALL TO DECK. I. COORDINATE DUCT OPENINGS IN THE WALL FRAMING WITH THE FRAMING CONTRACTOR CONNECT TO EXISTING DUCTWORK FULL SIZE OF EXISTING. INSULATE TO MATCH EXISTING. PRIOR TO START OF CONSTRUCTION. 11. PROVIDE FAN TERMINAL UNIT(FTU)WITH ELECTRIC REHEAT AS SCHEDULED AND SPECIFIED. UNIT SHALL HANG FROM THREADED RODS SECURED TO STRUCTURE WITH VIBRATION L--_J L-- ISOLATORS. EXTEND INSULATED SUPPLY AIR DUCT FULL SIZE FROM UNIT CONNECTIONS AND C TRANSITION TO DUCTS SIZED AS SHOWN. INTERLOCK WITH WALL MOUNTED THERMOSTAT. hi W12. PROVIDE TRANSFER AIR SLEEVE HIGH ABOVE CEILING SIZED AS SHOWN. REFER TO DETAIL AlkENLARGED NETWORK ROOM < 6/M-102. Z O Q _ ❑ M-301 SCALE: 1/4"= 1'-0" Lusy N 'I 13. NO HVAC WORK IN THIS AREA. imioLJJ ® 300 300 3® m CD O O a 0 3°0 ,,, �--Iign— ,°° O O O O 1 o z ® ® 108 ® W / j• U6 300 300 NNIII 100 250 i ' :ii! ii..uI • ' ' I .uI300 ,.iI . Tawmawmor - ' 200 1WPM 00(E) LEI � 1j 1 - I� II _ i -- � �� Eli 00 �lw��■■�■ , ❑ �`E) '�I(E) ■■ �1� ■■ FP 54 �` O 11 ■1 - - [off LM � iimailin � V i � 100 � 100'(E) - ,� �100(E) 100 � � � 1041 i] ® 'p m I ' l ulin" _ D M■ ■ oj\io.,E) , 2E , HOTEL r/I// ® ® i� L�/IVTI l � F. 2 ®� �.� �■ • ��■ ■�. 512 , 11111. :� ® 5D2 , ® � ,ora - 2®�11�� � ► . � ,ii � � � -I �P , •� : , _ FP:.• ..+� _ :=CSC=C. �dii:1=111:32a:FP:73747114 . .;. � _ m8 �,9 i � ® -_: ,� I� 2 ,.:® 00 ® 0�t© ®0o(E)l'.ill_ ® ��■ 80 \ �. ... _ 1�1 ® ■ , )oril. ® �,-�., �����C� �■ � � ®�� ,� ) � �:12r, ■I• � •�� I �®I �� � ��� � I ► �.I � :,, , L.�6 ♦ 0 `�(E) � � §. It -- ® ►T OR •.�� >ox1 "II1■ ■�` o �IL � �■ �c o 0_■ � m >- A t g 5D� -■ AP, ilmimmili®im -- it �J� 1 =■ilim UDDLE 2 ■ ; �■ �� �:• vir 3_ ,_ ..0 �,L� �� .:( 0, �"�I _ _� 1■ . 1■ ®��ZI■O—X111._ El_! Ilkillimommmesid0Illearn 514Pr i Pr �I0 iii 2 )‘__ 5 � VA I1ll7.411111111.111._ D-I '- �J�, ---_'1 s% ■� �. 1I1PRI T -- ® 13 I iii..n...-m----...w, INI11.1 �� ® '1pp � :>•� \ 511 ` �, Z _ III lir I mil ir 11 II 5° I 60 I I 80 !I..: ...........All ...,.. El haN Mk IL.k 8° ' LIIN.P liall \ oft limit-) g , _ rimr-i50*-AilliiiiiF ® 7 ❑ 0CONF. 3 )ab, —� sTIt:' I� ® � ELEV�,TORS ETWORK I/, iiiErail rtc- piiiiim. ommion © �® ■ iii 1 mum13 ,I — = 504III STA 2 AmT1 El HEMEN L_____Al , 11 D 11111101111 Ner Ankilli 80 11111111111, link WOMENs MENS II= I II 1 506 47 . 13 13 , —3/4" �a �011111.11.---1111.1Ns:km 0_010 eireommmummm TRA lir i NEW ❑ �,a CD M-301 I'� ®; MIMI /All / i / - I - ■■■El7sa■ iil�1 1111111.111111111111111.11111111 Oil ii7��==■■■■1 11/PAlLawiall11602°°©i► NCIIIIIIIIIII �_ _llikii�'Ili' CD , • mwrolordiammiik I goI■�I . �►w�■I■ ■ . ►� ►•.,�■■.■�� IIIlitillirm ■■rte bo Iwo. wail_ _ S: ' Pew ,. --L �■ .111111111"LIF �_ Iii—����—� / I �4 11111‘1011111 :,RAI a ►i 80 ►a a �� �� %■� ���--���� �7�:1■■ ■I■■■■� 80E� ■■■!■ ■l �.o! MI I ©i►LIJ I o , li ® ■■■■■■1■U ■ ■■■■■N■■■■■1 ■ l�=11111■L fv. ® � ■�®■ ,3 _ m, 516 a i iis aft At,a C3,:"E dr. I, E 3 \ afietk eack MINI . ■_ 110IIIIIIII.III.H.....11.1 ■ , 516 I PI 42Di 10x12 1E1 $�1111111 , 1.7111-0-eig-i-, .mmii, ..•. iii I. ME I atki 1 ■ :i-'— a :nu_ 14............ 8f7! cc -11 '1 III® toa E) par �,1/ � (T`� ) II ; 150 Elm • • ' � �— n® ®II M, �!1u e, �� • (TYP.ofs) _ ® -. ® 88 w1111111 200 i___ IIMAA —_, . _..ccp—p _ p® 2°° . (TyP,.OF4) • 1 ® 1111 ® 1111 yr' I ■ i/ ' '.. ,® �I E ► �Ir I __,,.2 ■ ® I INN - 1 5-,$ { • (Tl P.OF 4) • I FP 720 iii IIco■■ 7■■ IAra I , p _ILHIEwrO � ® 10 , , 7.. ........■� ■ 519 , 5FP-0 ®> Z � I ❑ ■r ® ® oF�ICE • �� IOWAN! ©�oIE �� ® — J o - _ R 11M1111% — ® ® .lig111— "�__ IMIIIMMIII I I J , 518 / � - 250a w�T 111 150 -�-*- - - - - I♦ ® Jg ..� s..l_CA- • 11 -C.- • ..t>_�` ©i,_ ���' © _ 8.,= ® � 52D _ _ 0 III IV' I� ® Qv,o�ICE I� o>=BICE 9 . 0 � ac FrA 4 � m AI I _ _ ■� 0lid _�. �i. L.... �� Z, 00(E) 527 52! igi 100(E) 100 1001E) 1111111 Walt• 250 MI 1 ® EMI 11111111111 3 O • '■ I '100(E) immiu 1�®� ■ , IMP= t�®�■■ V'���Y 100 ,00(E) = �- mss- _�-� -----�-• ■�-., - -_--- �.��- --- - -- _ _ - - --- Oarli _ . E ► �! .III■ a -- w vN I . alk AM U ® ® 250 250 ® 250 I a P lc r MIMI ) �� I ® 250 250 250 250 250 250 250 N ® �� �.., I 52� I - 300 25o I CO1 EE inri �"' B1�E,�1K ,aa'(�) DATE09/27/2017 00 E) �g '• 100.(E) ® 100(E) ! SCALE —_ / AS NOTED ® ® 1%/- •%.....,.._ ��\ ® ® '"� JRA li a 250 250 f,° 300 300 �i A 'OB CEN004 N CD O O O �■�.i � .l O O O O 1 SHEET N N \ PARTIAL FIFTH FLOOR CEILING PLAN - MECHANICAL M-301 Q SCALE: 1/8 = V-0" o OF SHEETS " I HDL DESIGN HERM]EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS AND DRAWINGS ARE1)T TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER WITHOUT OBTAINING THE EXPRESSED WRITTEN PERMI ION OF HDL DESIGN NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PART! WITHOUT FIRST OBTAINING WRITTEN PERMISSION AND CONSENT.