Loading...
PFI2018-00163 VOIDED PF12018 00163 i V 0 City of Tigard * COMMUNITY DEVELOPMENT DEPARTMENT 2 �//rte Request for hermit Action 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503-718-2439 • w�k-NX.tigard-or.gor TO: CITY OF TIGARD Building Division 13125 SW Hall Blvd.,Tigard,OR 97223 Phone: 503-718-2439 Fax: 503-598-1960 TigardBuildingPermits@tigard-or.gov FROM: ❑ Owner ❑ Applicant ❑ Contractor KCity Staff Check(✓)one REFUND OR Name: INVOICE TO: (Business or Individual) Mailing Address: City/State/Zip: Phone No.: PLEASE TAKE ACTION FOR THE ITEMS) CHECKED (✓): CANCEL/VOID PERMIT APPLICATION. F] REFUND PERMIT FEES (attach copy of original receipt and provide explanation below) • ❑ INVOICE FOR FEES DUE (attach case fee schedule and provide explanation below). ❑ REMOVE/REPLACE CONTRACTOR ON PERMIT (do not cancel permit). Permit#: ' IS - UDUa Site Address or Parcel #: P&Ae-, Project Name: Subdivision Name: Lot#: EXPLANATION: I(1l U i rz� Signature: Date: Print Name: V Refund Policy 1. The city's Community Development Director,Building Official or City Engineer may authorize the refund of • Any fee which was erroneously paid or collected. • Not more than 80%of the application or plan review fee when an application is withdrawn or canceled before review effort has been expended. • Not more than 80%of the application or permit fee for issued permits prior to any inspection requests. 2. All refunds will be returned to the original payer in the form of a check via US postal service. 3. Please allow 3-4 weeks for processing refund requests. Route to S s Admin: Date B Route to Records: Date B Refund Processed: Date /VBy Invoice Processed: Date B Permit Canceled: Date ' ,;L//.` B Parcel Tag Added: Date B I:\Building\Forms\RegPermitAction_ 92 14.doc RECEIVED City of Tigard V 0 D JUN 2 6 2018 PUBLIC WORKS — ENGINEERING � CITY OF TIGARD PLANNING/ENGINEERING Public FacilityImprovement (PFI) Permit DESCRIPTION OF WORK(in the right-of-way) TYPE OF WORK Check one: (�} (utilities ❑Sidrualk/dtiveaav approach ❑ TYPE 1-Franchise Utilitt-\ ork pp ❑Street improve men performed by NWN, PGE Detailed description: fI 1& f_,,wj and/or utility agency. TYPE 2-Sidewalk/Driveway/Sewer Work performed for the purpose of: • Sidewalk installation or repair. Property address/location(s): J/yi3 7 OR,`j C- /71w3 • Driveway approach installation and/or repair Sanitary sewer lateral installation _ and/or main line tap Applicant: Zrfzo �,� '�ian �� ❑ TYPE 3-Full scale Development Address: _ �� �`Ox ZG�ei Work performed with Land use approval which includes an),of City/state: �S7� �. Q Zip; U the following: Phone: - 22' k Email: Y, Subdivisions or Partitions Contact name: #_ _�rA' #..- Phone:�3 - Z-�3/ Street widening • Mainline installation for Sanitary Contractor: �`,GC /��vt � sewer, Storm sewer, Tigard water CCB##; Expiration: —2-LZa.P and/or Tigard Water Service Area Address: SUBMIT COMPLETED APPLICATION TO: City/state: �' o� Zip; - City of Tigard r Phone: i'T 47,1AT31Email: Planning/Engineering - 13125 SW Hall Blvd. Contact name: ✓� —'' Phone: 503'y2 Z-9 3 'g Tigard,OR 97223 Applications for"minor work in right-of-way" Engineer: only may be emailed to: Address: "limmermit4ne d-or gov City/state: Zip: MOTO Phone: Email: t Case No.:�I _nWL0 Contact name: Application submittal fee(.007%of Engineer's Estimate) $ Estimated value of work is required(if over$5f)00): 3Sb0� Additional fees: $ - (within the public right-of-way) , Application accepted: Is work related to LAND-USE DECISION? ❑ Yes ,B No B}' Date: If so,please specify (MI.P,SDR,SUB,etc.) case #: Application reviewed: Br. Date: Is work related to a BUILDING PERMIT? ❑ Yes JO No Applicant notified: If so,please specify(BUILDING PERMIT)case#: Bv: AL.- Date: 1:1FHG1PHmitAppNot7onslyR_1pplk•10" Aev.10/16/2017 ��'rYYI Ct�' �YY1 n `r��� . i2ely DDOTCIPPYwa- ���` �C� "CityofTigard 13125SWHallBlvd. Tigard,Oregon 97223 • www.dgard-or.gov 503-718-2421 Pagelof4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: APPLICATION FEE Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITYAND SIDEWALK/ DRIVEWAY AND UTILITY PERMIT FEE CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the right of way) Engineer's estimate X 5%(less$300.00 minimum submittal fee) Sketch (including information below) Engineer's estimate X 2%Plan Review D Dimensions WATER SYSTEM FEE ❑ Street Name Part 3: All public water system improvements ❑ Site Address Engineer's estimate X 12% FULL SCALE DEVELOPMENT PFI Permit Pee Exemptions: .(Subdivisions/Partitions and Street Improvements) There will be no permit fee charged,or assurance required for the following types of work: Design Plsne • Sidewalk repair(less than 20 lineal feet) (d sets,24X36 or 22x34) • Relocate or replace mailbox ❑ Cover—Site,Vicinity,Abbreviation,Legend • Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc) • Weep hole repair ❑ Street(Plan,Profile) • Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile) • Lawn sprinkler system installation or repair ❑ Water Quality Facilities • Street tree pruning or planting 0 Grading • Planter strip landscape maintenance ❑ Landscaping/Tree Plan • Test wells ❑ Composite Utility Plan(FlectdcA Phone,Gas, Storm,Sanitary,Water,Signage,Street lights,etc) ❑ Details Note. A cash/bond assurance may be ❑ Traffic Sight Distance required per TMC 15.04.140. ❑ Signing and Striping (eusromer deposit) ❑ Street Tight Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(f applicable) ❑ Water Department Approval ❑ Engineers Construction Estimate PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard 13125 SW I fall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-71$-2421 • Page 3 of4 IA li GAS VA A / r ` � �J�/ I 71AD LT 4' SS n 707 , DIG e [u1g101 ! \ l j�Y-1 '\ cm U&M Pau EM ELLC1K 1172A on 9111111000111;rus+ / w on 001A10 rKIC roAd 111 tlf MRNM roof" / }(\ CLEANOIiT 07A im1-a-Mi Ul romiv LM OTIC cue / W.!,ul 6'SS tm rale ua EM rwr UK / 1AX 0,17"soLym / GAS LA cm c:ic s7ar.1 st>t[le uK • O:►C SMIAl1Y%VAX W / LM M HA km / 011MORDCLIO ^ CLEANOII1 DIA PINVO D 11101 SMr(b POVU50 Sim U( PRO57001 YAl�le! / T 6 EO Li A"SS ►NOQOD�'M11YAM WA ^ •q..27 31f— MFASE MA T fN�QiD S'H►IlApi 8' ' `� 4� T CLEANOUT 02A / CLEANOUT 01A j f x.50 tF �"SS / / (� Q / � i s�-►oos 4 ,O _,CLEANOUT OSA / —lJ r � / / • / / bSS a W� SON iRA4.idt m r N 1 ! 1 V[NWY WA UNELOCA TION Cc 1 ` e x-o a7c �i LV ~�Z / 0 51-0.soi CLEANOUT 06A C61- f / L \13 xl it - ��CLEANOUT OSA De;1w — —— 1"+�— —U ►• �- •sl-oe — rons�ou so, Ir a 00 'EW PACIFIC HIGHWAY;/HWY 99 r cul isrllrr r i i i►`-�"� �-. . ►. t �.1, til I I :� � i• � i. 1 1 1 1 �i