Plans (68) MEC2O17 - 00825
E25-
/4 L e�#,f�0_ f� c-k 1‘I t �*c-4.�VRECEIVED7Weet_74 L;//��Gz S�
OCT 2 3 2017
Pt3 CITY OF TIGARD
BUILDING DIVISION
SARGENTlimb
S A
ARCHITECTS
4 6 1 FROM ROAD
PARAMUS , NJ 07652
4111 0 9 7 3 . 2 5 3 . 9 3 9 3 T E L
9 7 3 . 2 5 3 . 9 3 9 0 F A X
WWW . SARGARCH . COM
j j CONSULTANT
I (ENGINEER):
1
•
I
1
I
SAD I I
(N) 95 (N) Sia 1 1
m pwI
4W 6" i j
DIA N. THERMOSTAT DIA.N. 1 !{ MPW ENGINEERING,LLC
r------------„---,T _-_-_-_-_-_-_-- ___7--------:_7------,-_-= --------moi._-'—'-'-' '-1 -' ---'----- :-'-'-'-_ - _
i-'-'-'-' _ --1. 1 110 W.7TH STREET•SUITE 510.TULSA,OK 74119
I
- 1 1 (918)582.4188.(918)582-4087 FAX
A SAD I• I
r RK TO 8=ROUT • I
EXISTING LANDLORD OWNED I I j • (N) j • UCTURE.TYPIC•L 9
MEDIUM PRESSURE SUPPLY I� I - 205 rIA N. 1{ I li
DUCTWORK. FIELD VERIFY ' _
i I (J 11 �►�� I I !I
EXACT LOCATION. I :! 01-L Kt a t � I
o ARCHITECTURAL SEAL:
—_—_.—_-------'�..._-.r��__ I�I!1 !
� 1 1 (' -F .�y: r —_ ! —.—_—'—_—.—_ ` —_ _L--
� L ►.� —_— .rte —_—_—_—.- .I11
PROVIDE NEW 10'0 MEDIUM PRESSURE Ire = 1 = wl - _I r I r
DUCTWORK FROM VAV BOX TO LANDLORD _-. __-. '.�; , . lNu Irrrrrrrrlrrlu Irrrrrl eNls
MAIN SUPPLY MEDIUM PRESSURE DUCT. i I■'■ Irk\ '{_.9_4X14 ■ �0X'i0;✓ �,,*� �ip... _
•, -
REFER 3/M1.2 FOR DETAIL. j '- I♦IIl•______ \\\\\\\� I �: ' !' Wil .. .
-I
LII�' ■ _ I I %
1 — :.- SAD "'= _ I !` i i ♦ j
PROVIDE NEW SINGLE DUCT VAV UNIT WITH •'••-•• I a I ' ('I) -'-��`_ /;
�O • 205 Eli
ELECTRIC REHEAT COIL. INSTALL IN i • T I; i . 4W$„ O I , I
ACCORDANCE WITH MANUFACTURERS j 11 '�_ . !1'
i
INSTALLATION GUIDE,AND AUTHORITIES I 1 /1,i]
DIA. N.
/SAD ii
HAVING JURISDICTION. REFER TO VAV i 1 110
(N)\ > I ,►
SCHEDULE FOR CONTINUATION. i 1 w ` Ij •,'
- i, �� D N~. 1 CONTRACTOR'S NOTES:
PROVIDE RESTROOM DOOR UNDERCUT OF �_ 1j
3/4"IF NOT CURRENTLY UNDERCUT. FIELD I SAD1 t�=����• • �� 11 ,
VERIFY EXACT LOCATION. I (N) 30 I II
," WRITTEN DIMENSIONS HOLD PREFERENCE
4W �' 1 a a • i• •: [ �_ O O II ♦ OVER SCALED DIMENSIONS.DO NOT SCALE
I SIT JOBTHE S SITE TO VERIFY ALL EXISTINGS.THE CONTRACTORSNG MUST
DIA. N. Ir l! 1 1 L r.Ia, I CONDITIONS AND DIMENSIONS BEFORE
(N EF-1 I �I ; 11 i Lai
SUBMITTING BIDS.REPORT ANY
`� DISCREPANCIES OF ANY CONDITIONS WHICH
70
I I I �I MAY INTERFERE WITH THE PROPER
I EXECUTION OF,THE CONTRACT TO THE
I I1 TENANTS REPRESENTATIVE.REPORT
PROVIDE NEW EXHAUST FAN AND LIGHT (N) RAG. �' I DISCREPANCIES DURING BIDDING PROCESS
COMBO. CONNECT NEW 6"0 EXHAUST DUCT i 820 15 i;i AND BEFORE START OF CONSTRUCTION.
TO LANDLORD EXISTING EXHAUST DUCTWORK, i II
CHANGE ORDERS WILL NOT BE APPROVED
I'
FOR ISSUES ARISING FROM THE FIELD
FIELD VERIFY EXACT LOCATION OF LANDLORD --------------------------------------------------=-----=---------------:----------•---.--------------.- 'I; CONDITIONS OR CONFLICTS BETWEEN THE
OWNED SERVICES.INSTALL IN ACCORDANCE II PLANS AND THE EXISTING CONDMONS.
WITH MANUFACTURERS INSTALLATION GUIDE, 11
AND AUTHORITIES HAVING JURISDICTION I
REFER TO DETAIL 61M1.2,AND EXHAUST FAN I
SCHEDULE FOR CONTINUATION.
L DATE ISSUE
08/18117 L.L REVIEW AND PERMIT
0 9126117 U_COMNENTSANDCLARIFICATONS
1 MECHANICAL PLAN i•�
I/
M1.0 SCALE: 1/4"=1'-0" NORTH
MECHANICAL SCHEDULES HVAC LEGEND WORK RESPONSIBILITY ,
TENANTS MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL THE FOLLOWING:
' ,r, CEILING SUPPLY AIR SAD TYPE OF AIR DEVICE 1. MECHANICAL UNIT IS PROVIDED BY TENANT.CONTRACTOR SHALL INSTALL NEW VARIABLE AIR VOLUME UNIT,
III N`_�lil DIFFUSER 24/24 100 AIR QUANTITY(CFM) HANGERS,PROGRAMMABLE THERMOSTAT AND ALL ITEMS REQUIRED TO PRODUCE A COMPLETE AND OPERABLE .
HVAC SYSTEM.
VARIABLE AIR VOLUME W/ REHEAT TERMINAL SCHEDULE 4W 12"DIA. N— NECK SIZE, ROUND OR -
DIFFUSER SCHEDULE CEILING SUPPLY AIR 1 RECTANGULAR 2.DUCTWORK:THE MECHANICAL CONTRACTOR 1S TO FURNISH AND INSTALL, IN COMPLIANCE WITH THE MOST
(PROVIDED BY TENANT INSTALLED BY G.C.) 111-111 DIFFUSER 12/12 DIRECTION OF AIR FLOW RECENT SMACNA STANDARDS FOR LOW AND MEDIUM PRESSURE,NEW DUCTWORK, INSULATION,FLEX DUCT, ,
MARK MFGR MODEL FRCS SIZE FINISH REMARKS X, INCHES,SIDE OF DUCT GRILLES,REGISTERS,DIFFUSERS,VOLUME DAMPERS, FIRE DAMPERS.NECESSARY TO RENDER THE SYSTEM
CEILING RETURN AIR XN OPERATIONAL AS DESCRIBED IN THESE PLANS AND SPECIFICATIONS AND AS REQUIRED BY THE LANDLORD, -
INLET SAD TITUS TMS 24"X 24" SEE NOTE 1 VW O.B.D. SHOWING
MFGR, UNIT DUCT SUPPLY OUTSIDE MAX MIN. KW GRILLE 24024 LOCAL AND STATE CODES.
MARK LOCATION MODEL UNIT TYPE RIS) SIZE CFM Cr.""d CFM CFM VOLTAGE HTG MCA MOCP REMARKS SAD1 TITUS TMS 12"X 12" SEE NOTE 1 W/0.8.D. SAD SUPPLY AIR DIFFUSER
4M RAG1 TITUS PAR/3 AS SHOWN SEE NOTE 1 3.ALL DUCTWORK SHALL BE HUNG AS HIGH AS POSSIBLE TO MAINTAIN ARCHITECTURAL CEILING HEIGHT
RET RETURN AIR GRILLE PROJECT NAME:
NOTES: El THERMOSTAT REQUIREMENTS.
TR TOP REGISTER
VAVR-i0 SALI s, TRANS SINGLE DUCT 2 5 t0 950 140 1400 185 20$1311 1-3KW 6.87 15 ALL 1)GC TO PAINT D IFFUSERS AND GRILLES TO MATCH CEILING FINSH.REF ARCHITECTURAL SHEET A3.0. t'� 4. FIRE DAMPERS MUST BE INSTALLED AT ALL LOCATIONS WHERE DUCTWORK PENETRATES A FIRE RATED WALL.
vCEF1D FAN-LEss 2KW Z-3KW V TEMPERATURE SENSOR FD FIRE DAMPER PROVIDE ACCESS DOORS AS REQUIRED.FIRE DAMPERS TO BE OF THE TYPE APPROVED BY THE AGENCIES
_ _ HAVING JURISDICTION.
NOTES: IDCARBON DIOXIDE SENSOR --- SD SMOKE DAMPER Lids
1)PROVIDE IN-LINE FUSED DISCONNECT SWITCH 5.WHEN NEW DUCTWORK CONFLICTS WITH EXISTING DUCTWORK,PIPING, ETC., NEW DUCTWORK SHALL BE SET
2)PROVIDE DIRECT DIGITAL CONTROLLER AND DOC ACTUATOR
-3)PROVIDE ELECTRIC HEAT COIL
FSO FIRE 1 SMOKE DAMPER UP OR DOWN AS REQUIRED. LIDS GENESCO INC.
7555Vi0000NDDRIVE
NEW DUCTWORK
INDUWAPOLIS,w 45278
BD BACKDRAFT DAMPER 6. POWER WRING: LOCATION:
THERMOSTAT SCHEDULE NEW DUCTWORKVUITH SMOKE DETECTOR
LSP SUPPLY-PHOTOELECTRIC A.THE ELECTRICAL CONTRACTOR IS TO FURNISH AND INSTALL ALL EQUIPMENT AND MATERIAL REQUIRED TO
ACOUSTICAL LINING PROVIDE POWER TO THE MECHANICAL EQUIPMENT FROM THE TENANT'S POWER SUPPLY. WASHINGTON SQUARE MALL
THERMOSTAT BY MECHANICAL CONTRACTOR SMOKE DETECTOR
2 I RETURN-IONIZATION SPACE#A13
ETHERMOSTAT SHALL BE MANUFACTURED BY LIGHT .11NNIN4EXISTING DUCT TO REMAIN B.THE ELECTRICAL CONTRACTOR IS TO FURNISH AND INSTALL A DISCONNECT SWITCH AND STARTER ON THE 9585 SW WASHINGTON SQ.
STAT,MODEL TME-AW,THERMOSTAT SHALL BE (E) EXISTING
MECHANICAL EQUIPMENT. PORTLAND,566 97223
TC4JCHSCREEN PROGRAMMABLE 7-DAY TYPE.MOUNT I
AT 4'A•AFF. • 4 EXISTING DUCT TO BE REMOVED (R) RELOCATE C.THE ELECTRICAL CONTRACTOR IS TO PROVIDE POWER WRING TO THE MECHANICAL EQUIPMENT. LIDS#56fi5
EXHAUST FAN SCHEDULE I ' VD VOLUME DAMPER (N) NEW
7.CONTROL WRING AND CONTROLS:THE MECHANICAL CONTRACTOR IS TO FURNISH AND INSTALL ALL
- -----'R/D1 VOLUME DAMPER WI NECESSARY WRING PROJECT INFORMATION:
SP WHEEL VOLTAGE - MANUFACTURER REMOTE OPERATOR � FC FLEXIBLE CONNECTION (IN CONDUIT IF REQUIRED)AND CONTROLS REQUIRED TO PROVIDE A COMPLETE AND
TAG LOCATION SERVICE CFM RPM DRIVE TYPE AMPS REMARKS OPERATING SYSTEM. PROJECT NUMBER:2000-17
•W.C. DIA. PH,I Hz. MODEL NO. 60 FIELD CONNECTION
DRAWN BY: BPH REVIEWED BY: MMM
® TOILET LIGHT! 70 0.3 DIRECT CEILING 2.0 120lt/6p BROAN857 1,2,s,4 8.WHERE SHOWN THE SMOKE DETECTOR IN SPACE ACTIVATES,THE LANDLORD FIRE PROTECTION AND SMOKE
lu' ROOM EXHAUST MOUNTED '
CONTROL SYSTEMS SHALL SHUT DOWN THE VAV UNIT.
NOTES: NOTES 9. REFER TO ARCHITECTURAL DRAWNGS FOR EXACT LOCATION OF ALL CEILING DIFFUSERS AND REGISTERS.
1)FAN SHALL BE MOUNTED IN CEIUNG WITH VIBRATION ISOLATORS. NOTES
2)FAN SHALL BE CONTROLLED BY THE TOILET ROOM LIGHT SWITCH.
3}FAN SHALL BE PROVIDED WITH LOW LEAKAGE BACHDRAFT DAMPER. 10.TENANT'S MECHANICAL CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL THE LANDLORD'S
4)REFER TO MANUFACTURERS SPECIFICATIONS
SPECIFICATIONS FOR THIS INSTALLATION.
TITLE:
NOTES: 11.THIS CONTRACTOR IS TO HIRE LANDLORD'S SPECIFIED CONTRACTOR FOR ALL ROOF PENETRATIONS.
MECHANICAL PLAN,WORK
HVAC UPDATING REQUIREMENTS 12.THE MECHANICAL CONTRACTOR,AS PART OF THEIR WORK,IS TO LABEL THE TENANT NAME AND SPACE RESPONSIBILITY, AND
NUMBER ON ALL MECHANICAL EQUIPMENT PER LANDLORD REQUIREMENTS. SCHEDULES
1. CONTRACTOR SHALL VISIT SITE PRIOR TO BIDDING, VERIFY EXISTING CONDITIONS AND NOTIFY 13.1F STRUCTURAL DRAWINGS FOR HVAC EQUIPMENT SUPPORTS ARE NOT ALREADY INCORPORATED INTO THIS
SET OF PLANS AND SPECIFICATIONS,THE MECHANICAL CONTRACTOR,AT THEIR OWN COST AND EXPENSE,AND
ARCHITECT AND ENGINEER OF ANY PROBLEMS OR CONCERNS. AS PART OF THE BID TO THE G.C.,IS TO HIRE A STRUCTURAL ENGINEER TO DESIGN THE SUPPORTS FOR THE NEW SHEET NUMBER:
HVAC UNIT AND A STRUCTURAL SUBCONTRACTOR TO FURNISH AND INSTALL SUCH HANGERS 1 SUPPORTS,
2. THE FINAL TEST AND BALANCE MUST BE PERFORMED BY AN INDEPENDENT FIRM CONTRACTED BY THE BRACING, ETC.TO HANG FROM THE STRUCTURE FOR ALL NEW HVAC EQUIPMENT.G.C.TO SUBMIT AS REQUIRED
GENERAL CONTRACTOR AND NOT THE MECHANICAL CONTRACTOR. THE TEST AND BALANCE FIRM ALL STRUCTURAL SHOP DRAWINGS TO THE LANDLORD'S ARCHITECT,AS REQUIRED, FOR APPROVAL, PRIOR TO
SHALL HOLD A CURRENT CERTIFICATION FROM A RECOGNIZED TEST AND BALANCE ORGANIZATION. STARTING WORK
THE TEST AND BALANCE OPERATION SHALL INCLUDE ALL AIR SIDE SYSTEMS REGARDLESS OF SIZE OF
EQUIPMENT AND A TEST TO CONFIRM BUILDING IS NEUTRAL OR POSITIVELY PRESSURIZED. THE T&B
FIRM SHALL PROVIDE A WRITTEN REPORT TO THE ARCHITECT AND THE ENGINEER UPON COMPLETION. M 1 IN 0
A