Loading...
Plans (68) MEC2O17 - 00825 E25- /4 L e�#,f�0_ f� c-k 1‘I t �*c-4.�VRECEIVED7Weet_74 L;//��Gz S� OCT 2 3 2017 Pt3 CITY OF TIGARD BUILDING DIVISION SARGENTlimb S A ARCHITECTS 4 6 1 FROM ROAD PARAMUS , NJ 07652 4111 0 9 7 3 . 2 5 3 . 9 3 9 3 T E L 9 7 3 . 2 5 3 . 9 3 9 0 F A X WWW . SARGARCH . COM j j CONSULTANT I (ENGINEER): 1 • I 1 I SAD I I (N) 95 (N) Sia 1 1 m pwI 4W 6" i j DIA N. THERMOSTAT DIA.N. 1 !{ MPW ENGINEERING,LLC r------------„---,T _-_-_-_-_-_-_-- ___7--------:_7------,-_-= --------moi._-'—'-'-' '-1 -' ---'----- :-'-'-'-_ - _ i-'-'-'-' _ --1. 1 110 W.7TH STREET•SUITE 510.TULSA,OK 74119 I - 1 1 (918)582.4188.(918)582-4087 FAX A SAD I• I r RK TO 8=ROUT • I EXISTING LANDLORD OWNED I I j • (N) j • UCTURE.TYPIC•L 9 MEDIUM PRESSURE SUPPLY I� I - 205 rIA N. 1{ I li DUCTWORK. FIELD VERIFY ' _ i I (J 11 �►�� I I !I EXACT LOCATION. I :! 01-L Kt a t � I o ARCHITECTURAL SEAL: —_—_.—_-------'�..._-.r��__ I�I!1 ! � 1 1 (' -F .�y: r —_ ! —.—_—'—_—.—_ ` —_ _L-- � L ►.� —_— .rte —_—_—_—.- .I11 PROVIDE NEW 10'0 MEDIUM PRESSURE Ire = 1 = wl - _I r I r DUCTWORK FROM VAV BOX TO LANDLORD _-. __-. '.�; , . lNu Irrrrrrrrlrrlu Irrrrrl eNls MAIN SUPPLY MEDIUM PRESSURE DUCT. i I■'■ Irk\ '{_.9_4X14 ■ �0X'i0;✓ �,,*� �ip... _ •, - REFER 3/M1.2 FOR DETAIL. j '- I♦IIl•______ \\\\\\\� I �: ' !' Wil .. . -I LII�' ■ _ I I % 1 — :.- SAD "'= _ I !` i i ♦ j PROVIDE NEW SINGLE DUCT VAV UNIT WITH •'••-•• I a I ' ('I) -'-��`_ /; �O • 205 Eli ELECTRIC REHEAT COIL. INSTALL IN i • T I; i . 4W$„ O I , I ACCORDANCE WITH MANUFACTURERS j 11 '�_ . !1' i INSTALLATION GUIDE,AND AUTHORITIES I 1 /1,i] DIA. N. /SAD ii HAVING JURISDICTION. REFER TO VAV i 1 110 (N)\ > I ,► SCHEDULE FOR CONTINUATION. i 1 w ` Ij •,' - i, �� D N~. 1 CONTRACTOR'S NOTES: PROVIDE RESTROOM DOOR UNDERCUT OF �_ 1j 3/4"IF NOT CURRENTLY UNDERCUT. FIELD I SAD1 t�=����• • �� 11 , VERIFY EXACT LOCATION. I (N) 30 I II ," WRITTEN DIMENSIONS HOLD PREFERENCE 4W �' 1 a a • i• •: [ �_ O O II ♦ OVER SCALED DIMENSIONS.DO NOT SCALE I SIT JOBTHE S SITE TO VERIFY ALL EXISTINGS.THE CONTRACTORSNG MUST DIA. N. Ir l! 1 1 L r.Ia, I CONDITIONS AND DIMENSIONS BEFORE (N EF-1 I �I ; 11 i Lai SUBMITTING BIDS.REPORT ANY `� DISCREPANCIES OF ANY CONDITIONS WHICH 70 I I I �I MAY INTERFERE WITH THE PROPER I EXECUTION OF,THE CONTRACT TO THE I I1 TENANTS REPRESENTATIVE.REPORT PROVIDE NEW EXHAUST FAN AND LIGHT (N) RAG. �' I DISCREPANCIES DURING BIDDING PROCESS COMBO. CONNECT NEW 6"0 EXHAUST DUCT i 820 15 i;i AND BEFORE START OF CONSTRUCTION. TO LANDLORD EXISTING EXHAUST DUCTWORK, i II CHANGE ORDERS WILL NOT BE APPROVED I' FOR ISSUES ARISING FROM THE FIELD FIELD VERIFY EXACT LOCATION OF LANDLORD --------------------------------------------------=-----=---------------:----------•---.--------------.- 'I; CONDITIONS OR CONFLICTS BETWEEN THE OWNED SERVICES.INSTALL IN ACCORDANCE II PLANS AND THE EXISTING CONDMONS. WITH MANUFACTURERS INSTALLATION GUIDE, 11 AND AUTHORITIES HAVING JURISDICTION I REFER TO DETAIL 61M1.2,AND EXHAUST FAN I SCHEDULE FOR CONTINUATION. L DATE ISSUE 08/18117 L.L REVIEW AND PERMIT 0 9126117 U_COMNENTSANDCLARIFICATONS 1 MECHANICAL PLAN i•� I/ M1.0 SCALE: 1/4"=1'-0" NORTH MECHANICAL SCHEDULES HVAC LEGEND WORK RESPONSIBILITY , TENANTS MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL THE FOLLOWING: ' ,r, CEILING SUPPLY AIR SAD TYPE OF AIR DEVICE 1. MECHANICAL UNIT IS PROVIDED BY TENANT.CONTRACTOR SHALL INSTALL NEW VARIABLE AIR VOLUME UNIT, III N`_�lil DIFFUSER 24/24 100 AIR QUANTITY(CFM) HANGERS,PROGRAMMABLE THERMOSTAT AND ALL ITEMS REQUIRED TO PRODUCE A COMPLETE AND OPERABLE . HVAC SYSTEM. VARIABLE AIR VOLUME W/ REHEAT TERMINAL SCHEDULE 4W 12"DIA. N— NECK SIZE, ROUND OR - DIFFUSER SCHEDULE CEILING SUPPLY AIR 1 RECTANGULAR 2.DUCTWORK:THE MECHANICAL CONTRACTOR 1S TO FURNISH AND INSTALL, IN COMPLIANCE WITH THE MOST (PROVIDED BY TENANT INSTALLED BY G.C.) 111-111 DIFFUSER 12/12 DIRECTION OF AIR FLOW RECENT SMACNA STANDARDS FOR LOW AND MEDIUM PRESSURE,NEW DUCTWORK, INSULATION,FLEX DUCT, , MARK MFGR MODEL FRCS SIZE FINISH REMARKS X, INCHES,SIDE OF DUCT GRILLES,REGISTERS,DIFFUSERS,VOLUME DAMPERS, FIRE DAMPERS.NECESSARY TO RENDER THE SYSTEM CEILING RETURN AIR XN OPERATIONAL AS DESCRIBED IN THESE PLANS AND SPECIFICATIONS AND AS REQUIRED BY THE LANDLORD, - INLET SAD TITUS TMS 24"X 24" SEE NOTE 1 VW O.B.D. SHOWING MFGR, UNIT DUCT SUPPLY OUTSIDE MAX MIN. KW GRILLE 24024 LOCAL AND STATE CODES. MARK LOCATION MODEL UNIT TYPE RIS) SIZE CFM Cr.""d CFM CFM VOLTAGE HTG MCA MOCP REMARKS SAD1 TITUS TMS 12"X 12" SEE NOTE 1 W/0.8.D. SAD SUPPLY AIR DIFFUSER 4M RAG1 TITUS PAR/3 AS SHOWN SEE NOTE 1 3.ALL DUCTWORK SHALL BE HUNG AS HIGH AS POSSIBLE TO MAINTAIN ARCHITECTURAL CEILING HEIGHT RET RETURN AIR GRILLE PROJECT NAME: NOTES: El THERMOSTAT REQUIREMENTS. TR TOP REGISTER VAVR-i0 SALI s, TRANS SINGLE DUCT 2 5 t0 950 140 1400 185 20$1311 1-3KW 6.87 15 ALL 1)GC TO PAINT D IFFUSERS AND GRILLES TO MATCH CEILING FINSH.REF ARCHITECTURAL SHEET A3.0. t'� 4. FIRE DAMPERS MUST BE INSTALLED AT ALL LOCATIONS WHERE DUCTWORK PENETRATES A FIRE RATED WALL. vCEF1D FAN-LEss 2KW Z-3KW V TEMPERATURE SENSOR FD FIRE DAMPER PROVIDE ACCESS DOORS AS REQUIRED.FIRE DAMPERS TO BE OF THE TYPE APPROVED BY THE AGENCIES _ _ HAVING JURISDICTION. NOTES: IDCARBON DIOXIDE SENSOR --- SD SMOKE DAMPER Lids 1)PROVIDE IN-LINE FUSED DISCONNECT SWITCH 5.WHEN NEW DUCTWORK CONFLICTS WITH EXISTING DUCTWORK,PIPING, ETC., NEW DUCTWORK SHALL BE SET 2)PROVIDE DIRECT DIGITAL CONTROLLER AND DOC ACTUATOR -3)PROVIDE ELECTRIC HEAT COIL FSO FIRE 1 SMOKE DAMPER UP OR DOWN AS REQUIRED. LIDS GENESCO INC. 7555Vi0000NDDRIVE NEW DUCTWORK INDUWAPOLIS,w 45278 BD BACKDRAFT DAMPER 6. POWER WRING: LOCATION: THERMOSTAT SCHEDULE NEW DUCTWORKVUITH SMOKE DETECTOR LSP SUPPLY-PHOTOELECTRIC A.THE ELECTRICAL CONTRACTOR IS TO FURNISH AND INSTALL ALL EQUIPMENT AND MATERIAL REQUIRED TO ACOUSTICAL LINING PROVIDE POWER TO THE MECHANICAL EQUIPMENT FROM THE TENANT'S POWER SUPPLY. WASHINGTON SQUARE MALL THERMOSTAT BY MECHANICAL CONTRACTOR SMOKE DETECTOR 2 I RETURN-IONIZATION SPACE#A13 ETHERMOSTAT SHALL BE MANUFACTURED BY LIGHT .11NNIN4EXISTING DUCT TO REMAIN B.THE ELECTRICAL CONTRACTOR IS TO FURNISH AND INSTALL A DISCONNECT SWITCH AND STARTER ON THE 9585 SW WASHINGTON SQ. STAT,MODEL TME-AW,THERMOSTAT SHALL BE (E) EXISTING MECHANICAL EQUIPMENT. PORTLAND,566 97223 TC4JCHSCREEN PROGRAMMABLE 7-DAY TYPE.MOUNT I AT 4'A•AFF. • 4 EXISTING DUCT TO BE REMOVED (R) RELOCATE C.THE ELECTRICAL CONTRACTOR IS TO PROVIDE POWER WRING TO THE MECHANICAL EQUIPMENT. LIDS#56fi5 EXHAUST FAN SCHEDULE I ' VD VOLUME DAMPER (N) NEW 7.CONTROL WRING AND CONTROLS:THE MECHANICAL CONTRACTOR IS TO FURNISH AND INSTALL ALL - -----'R/D1 VOLUME DAMPER WI NECESSARY WRING PROJECT INFORMATION: SP WHEEL VOLTAGE - MANUFACTURER REMOTE OPERATOR � FC FLEXIBLE CONNECTION (IN CONDUIT IF REQUIRED)AND CONTROLS REQUIRED TO PROVIDE A COMPLETE AND TAG LOCATION SERVICE CFM RPM DRIVE TYPE AMPS REMARKS OPERATING SYSTEM. PROJECT NUMBER:2000-17 •W.C. DIA. PH,I Hz. MODEL NO. 60 FIELD CONNECTION DRAWN BY: BPH REVIEWED BY: MMM ® TOILET LIGHT! 70 0.3 DIRECT CEILING 2.0 120lt/6p BROAN857 1,2,s,4 8.WHERE SHOWN THE SMOKE DETECTOR IN SPACE ACTIVATES,THE LANDLORD FIRE PROTECTION AND SMOKE lu' ROOM EXHAUST MOUNTED ' CONTROL SYSTEMS SHALL SHUT DOWN THE VAV UNIT. NOTES: NOTES 9. REFER TO ARCHITECTURAL DRAWNGS FOR EXACT LOCATION OF ALL CEILING DIFFUSERS AND REGISTERS. 1)FAN SHALL BE MOUNTED IN CEIUNG WITH VIBRATION ISOLATORS. NOTES 2)FAN SHALL BE CONTROLLED BY THE TOILET ROOM LIGHT SWITCH. 3}FAN SHALL BE PROVIDED WITH LOW LEAKAGE BACHDRAFT DAMPER. 10.TENANT'S MECHANICAL CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL THE LANDLORD'S 4)REFER TO MANUFACTURERS SPECIFICATIONS SPECIFICATIONS FOR THIS INSTALLATION. TITLE: NOTES: 11.THIS CONTRACTOR IS TO HIRE LANDLORD'S SPECIFIED CONTRACTOR FOR ALL ROOF PENETRATIONS. MECHANICAL PLAN,WORK HVAC UPDATING REQUIREMENTS 12.THE MECHANICAL CONTRACTOR,AS PART OF THEIR WORK,IS TO LABEL THE TENANT NAME AND SPACE RESPONSIBILITY, AND NUMBER ON ALL MECHANICAL EQUIPMENT PER LANDLORD REQUIREMENTS. SCHEDULES 1. CONTRACTOR SHALL VISIT SITE PRIOR TO BIDDING, VERIFY EXISTING CONDITIONS AND NOTIFY 13.1F STRUCTURAL DRAWINGS FOR HVAC EQUIPMENT SUPPORTS ARE NOT ALREADY INCORPORATED INTO THIS SET OF PLANS AND SPECIFICATIONS,THE MECHANICAL CONTRACTOR,AT THEIR OWN COST AND EXPENSE,AND ARCHITECT AND ENGINEER OF ANY PROBLEMS OR CONCERNS. AS PART OF THE BID TO THE G.C.,IS TO HIRE A STRUCTURAL ENGINEER TO DESIGN THE SUPPORTS FOR THE NEW SHEET NUMBER: HVAC UNIT AND A STRUCTURAL SUBCONTRACTOR TO FURNISH AND INSTALL SUCH HANGERS 1 SUPPORTS, 2. THE FINAL TEST AND BALANCE MUST BE PERFORMED BY AN INDEPENDENT FIRM CONTRACTED BY THE BRACING, ETC.TO HANG FROM THE STRUCTURE FOR ALL NEW HVAC EQUIPMENT.G.C.TO SUBMIT AS REQUIRED GENERAL CONTRACTOR AND NOT THE MECHANICAL CONTRACTOR. THE TEST AND BALANCE FIRM ALL STRUCTURAL SHOP DRAWINGS TO THE LANDLORD'S ARCHITECT,AS REQUIRED, FOR APPROVAL, PRIOR TO SHALL HOLD A CURRENT CERTIFICATION FROM A RECOGNIZED TEST AND BALANCE ORGANIZATION. STARTING WORK THE TEST AND BALANCE OPERATION SHALL INCLUDE ALL AIR SIDE SYSTEMS REGARDLESS OF SIZE OF EQUIPMENT AND A TEST TO CONFIRM BUILDING IS NEUTRAL OR POSITIVELY PRESSURIZED. THE T&B FIRM SHALL PROVIDE A WRITTEN REPORT TO THE ARCHITECT AND THE ENGINEER UPON COMPLETION. M 1 IN 0 A