Loading...
Plans (62) M EC2017 - 00626 1 i ' CI'S He alth , ......_ SPECIAL_INSPECTION REQUIRED State of Oregon Structural Specialty Code 41*CVS Concr to and Reinforcing Steel Bolts Installed in Concrete ❑ Special Moment-Resisting Concrete Frame Health 7358 SW DURHA \A . 0AD ❑ : : ' ° ° ' , El SCOPE OF WORK El High-Strenght Bolting 0CV S C 0 R Structural Masonry THIS PROJECT INCLUDES THE RENOVATION OF AN EXISTING CLEAN ROOM SUITE STORE NUMBER: 48140 A �f LAN ❑ Reinforced Gypsum Concrete (COMPOUNDING, PREP ROOM AND COMPOUNDING ANTE), THE INSTALLATION OF A NEGATIVE CORAM, INC. �� ��1d Insulating Concrete Fill PRESSURE SUITE (NEGATIVE PRESSURE ROOM AND ANTE) AND THE ADDITION OF 2 7358 S w DURHAM RD. ROOFTOOP UNITS. THE TENANT SPACE IS APPROXIMATELY 9,678 SF AND THE AREA OF EJ Spray Applied Fire-Resistive Materials ALTERATION IS APPROXIMATELY 1,669 SF. THE PROJECT DOES NOT INCREASE THE SQUARE PORTLAND, OR 97224 AuG 16 2017 FOOTAGE OF THE TENANT SPACE. THERE WILL BE A TEMPORARY CLEAN ROOM ERECTED PROJECT TYPE: PHARMACY Cl Pilings,Drilled Piers and Caissons FOR USE DURING THE CONSTRUCTION OF THIS PROJECT, WHICH HAS BEEN PERMITTED CITY ��TI�A� co ,n � r.r, c„ ,- SEPARATELY (BUP2o17-00067). THIS SITE DOES NOT INCLUDE A RETAIL PHARMACY. DEAL TYPE: NPR v� - � ��,S�C� zzzzzzw ❑ Shotcrete p ►� CS PROJECT NUMBER 0106369 w w w w w w ❑ Special Grading, and Filling J J J J J J J J J J J .J C CD Ct] CO CC] CCICC1 m Smoke-Control Systems 0 HHH DRAWINGINDEX TEAV IVEVBERS etherInspeotivns- ca ca cz, CI C3 Ci C) ..7".41.1.1,7*----- ' - ' PROJECT INFORVATION ARCHffECTOFRECORD i1 ■ CS COVER SHEET MECHANICAL/ STANTEC The building shall be in compliance with the: Ahe- TENANT CVS/HEALTH, INC. ARCHITECT: GPD ENGINEERING AND ARCHITECTURE PLUMBING 2014 Oregon Structural Specialty Code (OSSC) PROJECT PROFESSIONAL CORPORATION ARCHITECTURAL MANAGER: PRO E MAIN STREET MARK SALOPEK ENGINEER: 111 GRANT AVE. MIKE CUSHMAN 2014 Oregon Plumbing Specialty Code (OPEC) 1 CVS DRIVE PAULA DESMARAIS �� ■ ■ A-0.1 SPECIFICATIONS SUITE 2531 TEL: (330) 572-2112 SUITE 201 TEL. (607) 321-6125 2014 Oregon Mechanical Specialty Cade (GMSC) ■ ■ A-0.2 SPECIFICATIONS SUITE 300 TEL: (401) 770-5398 ENDICOTT, NY 13760 2014 Oregon Electrical Specialty Code (OESC) GPD� d�du� ■ ■ A-0.3 SPECIFICATIONS WOONSOCKET, RI 02895 AKRON, OH 44311 MSALOPEK@GPDGROUP.COM 2014 Oregon Energy Efficiency Specialty Code (OEESC) Profe�onal Corporation ■ ■ A-0.4 ACCESSIBLE CODE COMPLIANCE INFORMATION 520 South Main Street,Suite 2531 STRUCTURAL STANTEC ELECTRICAL STANTEC Akron,OH 44311 _ .-� ■ ■ A-1.0 OVERALL/EXITING PLAN ENGINEER: ENGINEER: - 330.572.2100 Fax: 330.572.2102 ■ ■ A-1.1 DEMOLITION FLOOR PLAN CONSTRUCTION CVS/HEALTH, INC. ■ ■ A-1.2 DEMOLITION REFLECTED CEILING PLAN PROJECT 111 GRANT AVE. SCOTT TUBBS 111 GRANT AVE. VINCE FERRACCIOLI RESPONSIBILITY SCHEDULE ■ U . A-1.3 DEMOLITION ROOF PLAN MANAGER: 4785 GRANITE DRIVE ERIK BRACONE SUITE 201 TEL: (585) 413-5365 SUITE 201 TEL: (607) 321-6140 ■ ■ A-1.4 FLOOR PLAN ROCKLIN, CA 95677 TEL: (916) 532-1744 ENDICOTT, NY 13760 ENDICOTT, NY 13760 GC CVS ■ ■ A-1.5 REFLECTED CEILING PLAN ERIK.BRACONE@CVSHEALTH.COM DIV DESCRIPTION Cil J REMARKS CONSULTANT: ■ ■ A-1.5a SEISMIC CEILING DETAILS ■ ■ A-1.6 ROOF PLAN TELECOMM & WB ENGINEERING T ? z Z � Z - ■ ■ A-6.1 INTERIOR ELEVATIONS & DETAILS PERSONAL 1 GENERAL REQUIRE�nEN s ■ ■ A-7.1 DETAILS SECURITY: 155 SEAPORT BLVD. CHUCK CORRADI 1. Permits and Fees X Includes building permit & tap fees and winter conditions if applicable and approved by CVS Project SEAPORT W, FLOOR 2 TEL: (617) 443-4950 Manager and Director of ABBRPvil A TION S (ABBREVIATIONS SHOWN ARE NOT BOSTON, MA 02210 TEL: (617) 443-4959 Construction as an ailowonce. STRUCTURALNECESSARILY USED ON THE DRAWINGS} 8 OPENINGS �,-.�,.....,.-w,-.,-- ,0,. <-, ,S,TRIJC F TALLA PP TJ .-Ji ve,L-AN ,. v rr 1. Doors (Compound. Suite) x X X NAI: OH PACE ■ S-1.1 CLEANROOM SEISMIC BRACING PLAN AND DETAILS '�r A C (CONTINUED) F J N (CONTINUED) R T (CONTINUED) 2. Doors (NPR) X X X BY HODESS I .,-.A._. ., ....r._1._......,_. ......,t,..=...._....,,..,,_"_. -.,, ... ......,._ r....,._ ._.�..._,_ -f j'Z\ AB ANCHOR BOLT CJ CONTROL JOINT FA FIRE ALARM J-BOX JUNCTION BOX • NEPA NATIONAL FIRE PROTECTION RA RETURN AIR THRU THROUGH 9 FINISHES MECHANICAL P LU Vi B I N G A/C AIR CONDITIONING CTR CENTER FRCP FIRE ALARM CONTROL PANEL JT JOINT ASSOCIATION RAD RADIUS T THERMOSTAT 1. Resilient Flooring X X X NAI: ARMSTRONG / AC ALTERNATING CURRENT CV CHECK VALVE FCO FLOOR CLEANOUT JST JOIST NIC NOT IN CONTRACT RCP REFLECTED CEILING PLAN, TIP TYPICAL ACC ACCESSIBLE CW COLD WATER FD FIRE DAMPER, FLOOR DRAIN NL NIGHT LIGHT RD ROOF DRAIN T THICKNESS STRUCK ACI AMERICAN CONCRETE INSTITUTE FIN FINISH (ED) r\ NO NUMBER RE: REFERENCE, REFER TS TUBULARS EL (STRUCT) 2. Flooring Sealant X X ■'■ M-0.1 MECHANICAL LEAD SHEET ADA AMERICANS WITH DISABILITIES ACT D FIXT FIXTURE NOM NOMINAL REINF REINFORCING TRS TRUSS (STRUCT) ADJ ADJUSTABLE FDN FOUNDATION k KIPS (1000 LBS) NTS NOT TO SCALE READ REQUIRED I I 3. Paint X X X NAI: BENJAMIN MOORE • ■ M-0.2 MECHANICAL GENERAL NOTES AFF ABOVE FINISHED FLOOR DBL DOUBLE FLG FLANGE kV KILOVOLT RO ROUGH OPENING U _ RISC AMERICAN INSTITUTE OF STEEL CONS. DC DIRECT CURRENT FTG FOOTING kVA KILOVOLT-AMPS RPM REVOLUIIDNS PER MINUTE DEVELOPER• ■ ■ M-1.0 MECHANICAL SPECIFICATIONS DEG DEGREES FF FINISHED FLOOR kW KILOWATT UL UNDERWRITERS 11 EQUIPMENT ALUM ALUMINUM REFS DIRECT-APPLIED EXTERIOR FLR FLOOR kWH KILOWATT-HOUR RTU ROOFTOP UNIT • ■ ■ M-1.1 MECHANICAL DEMO/INSTALL PARTIAL FLOOR PLANS AMP AMPERE, AMPS - OA OUTSIDE AIR LABORATORIES, INC. I. Compounding Pass-through X X X NAI: TERRA UNIVERSAL ARCH ARCHITECT, ARCHITECTURAL FINISH SYSTEM FR FIRE-RETARDANT- TREATED IRE RETARDANT I OC ON CENTER UON UNLESS OTHERWISE NOTED ■ ■ M-1.2 MECHANICAL DEMO/INSTALL PARTIAL ROOF PLANS ASHRAE AMERICAN SOCIETY OF HEATING, DIA DIAMETER TREATED MATERIALS L DCC OCCUPANTS UPS UNINTERRUPI1BLE 2. NPR Carts, tables X X X NAI: EAGLE ■ ■ M-2.0 MECH. AIR FLOW DIAGRAM U. PRESSURIZATION PLAN REFRIGERATION AND AIR DIM DIMENSION FRP FIBERGLASS REINFORCED LB POUNDS OF OUTSIDE FACE SCHED SCHEDULED POWER SUPPLY CONDITIONING ENGINEERS DL DEADLOAD PANEL LF LINEAR FEET OD OUTSIDE DIAMETER SD SMOKE DAMPER, / ■ ■ M-2.1 MECHANICAL DETAILS & SCHEDULES ASTM AMERICAN SOCIETY OF TESTING AND DN DOWN FT FOOT, FEET LL LIVE LOAD, LANDLORD OH OPPOSITE HAND STORM DRAIN V 3. Negative Pressure Room X x X BY HODESS MATERIALS DS DOWNSPOUT G LLH LONG LEG HORIZONTAL OPNG OPENING SECT SECTION V VOLT ■ ■ FP-1.D FIRE PROTECTION DEMO/INSTALL PARTIAL FLOOR PLANS OIL DETAIL LLV LONG LEG VERTICAL OSB ORIENTED STRAND BOARD 5 SENSOR VA VOLT-AMPERE 4. Hazardous Drug Refrigerator X X X NAI: Hellmer Horizon H-Unit ■ ■ P-O.1 PLUMBING LEAD SHEET B DINGS DRAWINGS OSHA OCCUPATIONAL SAFETY AND SF SQUARE FEET , ,.. - GA GAUGE LONG LONGITUDINAL HEALTH ADMINI5TRATiON SHT SHEET VERT VERIFYINFIELD Fes- 5. Narcotics Safee ^K X� X X NAI: Fire King (Corporate Safe} • • P-1.0 PLUMBING INSTALLATION PARTIAL FLOOR PLANS BLDG BEUTALhDING E GALV GALVANIZED LP LOW POINT SIM SIMILAR GC GENERAL CONTRACTOR LTG LIGHTING P VRC VERTICAL RECIPROCATING GB GRADE BEAM SHT MIL SHEET METAL CONVEYOR Signage X X X BY HODESS BUTT BOTTOM EA EACH LWC LIGHT WEIGHT CONCRETE SPEC SPECIFICATION At b. NPR Plenum Si nae �' ELECTRICAL EF EXHAUST FAN GWB GYPSUM WALL BOARD PAR PARALLEL VTR VENT THROUGH ROOF BTU BRITISH THERMAL UNIT L LENGTH SQ SQUARE � ` BOF BOTTOM OF FOOTING EXPANSION JOINT GAB GRADED AGGREGATE BASE PC PIECE L..• 22 PLUMBING ELEV ELEVATION GYP GYPSUM WALL BOARD M PDU POWER DISTRIBUTION UNIT SS STAINLESS STEEL, `�r BRG BEARING EIFS EXTERIOR INSULATION AND PH PHASE SANITARY SEWER i i 1. Sink X X X NAI: EAGLE • ■ E-0.1 ELECTRICAL LEAD SHEET H STD STANDARD W WIDTH _ CI r p I�AI FINISH SYSTEM MAX MAXIMUM PL PLATE ■ ■ E-1.O ELECTRICAL S� wl�JS.'ra.la- x�l -, ELEC ELECTRICAL MDP MAIN DISTRIBUTION PANEL PLBG PLUMBING STL STEEL w/ WITH 2. Eyewash fixture X X X NAI. EAGLE `"^r`r ~"� ,n CF CUBIC FEET EMBED EMBEDMENT HOT HEIGHT MECH MECHANICAL PNL PANEL STIFF STIFFENER W/O WITHOUT Q ■ ■ E-1.1 ELECTRICAL DEMO PARTIAL FLOOR PLAN {'.t2 CD CONDENSATE ;,.Z EMPLOYEE HORIZ HORIZONTAL MEZZ MEZZANINE PIV POST INDICATOR VALVE STIR STIRRUPS WCO WALL CLEANOUT 23 MECHANICAL VEAL'• Q� j� -1 CLT CAI �� A rV - ISL NS CATES CFMCERCUBIC PER MINUTE -MIS ENERGY MANAGEMENT SYSTEM HP HORSEPOWER OR HIGH POINT MFR MANUFACTURER PSF POUNDS PER SQUARE FOOT SUSPCT SUSPENDED L WG WATER CLOSET 1. Hoods X X X NAI: BAKER �'l `(� ..�, --.,4„ � J..,,�� �, ,�. ENCL ENCLOSURE HTR HEATER MIN MINIMUM PVC POLYVINYL CHLORIDE WD WOOD �, •rl, • E-1.3 ELECTRICAL INSTALLATION PARTIAL FLOOR PLANS CKT CIRCUIT EOD EDGE OF DECK HVAC HEATING, VENTILATING AND MLO MAIN LUGS ONLY PWD PLYWOOD 5J SAW JOINT WL WIND LOAD `� CENTERLINEWP WEATHERPROOF 2. FFU's (Compound. Suite) X X NAI: ENVIRCO. 'ti •en i h h. .. . �..r,.,/.....,_. ,.....^..• _h._...-^.�•.�.•._.•-..-/j• EO EQUAL AIR CONDITIONING MO MASONRY OPENING 11r1 I�S. 5:1I()I'F1l �` i ' L tj Po. LG CEILING EQUIP EQUIPMENT MSB MAIN SWITCHBOARD Q WO WALL OPENING Cn CLR CLEAR OR CLEARANCE EXGR EXTERIOR GRADE I MTD MOUNTED WWF WELDED WIRE FABRIC 3. FFU's (NPR) X X X NAI: BY HODESS "� ■ ■ E-2.1 ELECTRICAL ONE-LINE DIAGRAM CMU CONCRETE MASONRY UNIT EXH EXHAUST T&B TOP AND BOTTOM WF WIDE FLANGE (STRUCT) AKRON, OH CO CLEANOUT EXP EXPANSION ID INSIDE DIAMETER QTY QUANTITY T FTG TOP OF FOOTING 4. RTU (Compound. Suite) X X X NAI: ENGINEERED AIR O COL COLUMN EXIST EXISTING IE INVERT ELEVATION TEMP TEMPERATURE NU. G03F, PHYSICAL SECURITY 8c TELECOM CONC CONCRETE, CONCENTRIC EXT EXTERNAL, EXTERIOR INT INTERIOR N/A NOT APPLICABLE THICK THICKNESS tP CONT CONTINUOUS, CONTINUATION EW EACH WAY IN INCH, INCHES NEC NATIONAL ELECTRICAL CODE THRESH THRESHOLD XFMR TRANSFORMER 5. RTU (NPR) X X X NAI: ENGINEERED AlR 41Volr. v COORD COORDINATE EWC ELECTRIC WATER COOLER INSUL INSULATION NEMA NATIONAL ELECTRICAL ■ ■ PS-0.1 PHYSICAL SECURITY LEGEND MANUFACTURER'S ASSOC. TO TOP OF I� �� I, t; NE NEAR FACE 70J TOP OF JOIST - - Y 26 ELECTRICAL III II PS-2.1 PHYSICAL SECURITY SPECIFICATIONST05 TDP of STEEL l 1. Interior Lighting X X X Or relocated. NAI; NESCO Vir 661isila7 o E■ ■ PS-2.2 PHYSICAL SECURITY SPECIFICATIONS � '1G� • �I ■ ■ PS---2.3 PHYSICAL SECURITY SPECIFICATIONS ...REVIEWED EORCO $ A 'UNC NPR Lighting X X X 8Y HODESS ■ ■ PS-3.1 PHYSICAL SECURITY CONSTRUCTION PLAN 3. Intercom X X REFER TO LOW VOLTAGE DWGS a5 ppm :GENERAL PROJECT NOTES . a0 ■ ■ PS-4.1 PHYSICAL SECURITY DETAILS reproved plans crlose_4 .I 1;+ 1 4S t , / 4. LOW S/Oltpge �( ,l( x NAI: 1NN04 GC TO CARRY INN04 co ■ ■ T-O.1 TELECOMMUNICATIONS LEGEND Shall be on job site. y GC to coordinate with REVISIONS: ■ ■ T-2.1 TELECOMMUNICATIONS SPECIFICATIONS f 5. Security X X X NAI: Stanley TO bids. - - Stanley BID. GC to coordinate �'`,.., % ,- ■ ■ T-2.2 TELECOMMUNICATIONS SPECIFICATIONS Address: „ : <►.1 4' s.`.4 wIth CPI an bids. , BULLETIN 8 /2J17 ■ •■ T-2.3 TELECOMMUNICATIONS SPECIFICATIONS Suite Mt • �-- ' 1. CONTRACTORS SHALL NOT SCALE THESE DRAWINGS FOR CONSTRUCTION PURPOSES. IN THE REFER TO NON-RETAIL SUPPLIER TAKE-OFF LIST FOR NAI CONTACT Q •■ ■ T-3.1 TELECOMMUNICATIONS CONSTRUCTION PLAN EVENT OF OMISSION OF NECESSARY DIMENSIONS OR INFORMATION, CONTRACTOR SHALL NOTIFY 17. PAINT ALL WALL SURFACES, DOOR FRAMES, BULKHEADS AND CEILINGS IN ROOMS WHERE i2a2 a • �,.,,,� ,., _� NOTE: u, ■ •■ T-4.1 TELECOMMUNICATIONS DETAILS ARCHITECT, FIGURED AND CALCULATED DIMENSION TAKES PRECEDENCE OVER SCALED INDICATED ON ROOM FINISH SCHEDULE. PAINT BEHIND ALL MOVEABLE ITEMS ADJACENT TO WALLS '. , . •MOFA r : INFORMATION. NON-RETAIL SUPPLIER TAKE-OFF LIST TO BE SUPPLIED BY CVS ■ ■ T-4.2 TELECOMMUNICATIONS DETAILS MEASUREMENTS. DETAILED DRAWINGS AND LARGER SCALE DRAWINGS TAKE PRECEDENCE OVER RECEIVING PAINT AND RELOCATE ITEMS. OKE DETECTOR SHALL CONSTRUCTION PROJECT MANAGER. j SMALLER SCALE DRAWINGS. ALL PLAN DETAILS AND WALL SECTIONS ARE ASSUMED TO BE . ■ ■ T-4.3 TELECOMMUNICATIONS DETAILS TYPICAL CONDITIONS UNLESS DETAILED OR NOTED OTHERWISE. 18. ALL WEATHER - EXPOSED SURFACES SHALL HAVE A WEATHER RESISTIVE BARRIER TO ACTIVATE A VISIBLE AND o PROTECT THE INTERIOR WALL COVERING. EXTERIOR OPENINGS SHALL BE FLASHED IN SUCH A AUDIBLE SUPERVISORY ® 2. ALL FINISHED FLOOR ELEVATIONS RE: TO ARCHITECTURAL DRAWINGS ONLY. RE: CIVIL MANNER AS TO MAKE THEM WATERPROOF, :.� DRAWINGS FOR RELATIONSHIP TO PROJECT BENCHMARK(S). SIGNALATA CONSTANTLY LOCATION VAP L 19. ALL WOOD BLOCKING TO BE TREATED. ATTENDED LOCATION n 3, VERIFY ALL DIMENSIONS, CONDITIONS, AND GRADES AT JOB SITE, ALL CONTRACTORS SHALL o COORDINATE THEIR WORK WITH OTHER TRADES AND REPORT DISCREPANCIES, PRIOR TO THEIR 20. DEMOLITION & CONSTRUCTION MUST BE SEQUENCED & COORDINATED TO INSURE THAT THE OMSC+ 606.'4.1 o CONSTRUCTION, TO THE ARCHITECT FOR REVIEW AND CLARIFICATION OR ACTION_ BUILDING BUSINESS OPERATIONS ARE MAINTAINED. COORDINATE ALL WORK WITH BUILDING _ a MANAGEMENT PRIOR TO PROCEEDING. z4. VERIFY SIZE, LOCATIONS AND CHARACTERISTICS OF ALL EQUIPMENT TO BE FURNISHED WITH • MANUFACTURERS CR SUPPLIERS BEFORE BEGINNING CONSTRUCTION. 21. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED 5 POUNDS FOR EXTERIOR AND oINTERIOR DOORS. KEY PLAN „, e, 5. VERIFY SIZE AND LOCATION OF ALL OPENINGS FOR MECHANICAL AND ELECTRICAL EQUIPMENT 1- AND RELATED WORK WITH CONTRACTORS INVOLVED AND EQUIPMENT TO BE FURNISHED. FOR 22. PROVIDE SEMI-RECESSED FIRE EXTINGUISHERS. LOCATIONS AND CLASSIFICATIONS OF EXTINGUISHERS a CONSTRUCTION DETAILS NOT SHOWN, USE THE MANUFACTURER'S STANDARD DETAILS OR SHALL BE IN ACCORDANCE WITH CFC 906 AND CALIFORNIA CODE OF REGULATIONS (CCR), TITLE 19. DRAWING BY: -oAPPROVED SHOP DRAWINGS / DATA SHEETS IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, 0 23. ALL RECEPTACLE DEVICES AND FACE PLATES TO MATCH EXISTING. RE: MEP. OFFICE COPY „.-,., DATE: June 6, 2017 L 6, CEILING HEIGHTS SCHEDULED ON THE ROOM FINISH SCHEDULE OR REFLECTED CEILING PLAN ARE TAKEN FROM THE FINISHED FLOOR ELEVATION(. 24. ASCERTAIN THE EXTEND OF WORK NECESSARY TO NOT ONLY ACHIEVE THE AESTHETIC INTENT, BUT ALSO SYVBOLSLn 7. ALL PLAN DIMENSIONS ARE TO FINISHED FACE OF FINISHED WALLS, FACE OF MASONRY, AND TO COMPLY WITH GOVERNING CODES & REGULATIONS, WHICH MAY REQUIRE ADDITIONAL WORK AND OR ,,.,,u. JOB NUMBER: 2016285.50 a CENTERLINE OF COLUMNS, UNLESS NOTED OTHERWISE. EQUIPMENT. TITLE: Ti;00 8. VERIFY ALL ELEVATIONS AND DIMENSIONS OF STRUCTURAL ELEMENTS WITH ARCHITECTURAL 25. ORDER ALL PARTS NECESSARY FOR INSTALLATION OF FIXTURES SPECIFIED, U.O.N. `.1111111110 V) DRAWINGS. IN CASE OF CONFLICT, NOTIFY ARCHITECT, THE CONTRACTORS SHALL VERIFY ALL �� COVER SHEET �' CENTERLINE ENLARGED PLAN DIMENSIONS AND BE RESPONSIBLE FOR THEM. ALL DIMENSIONAL DISCREPANCIES ARE TO BE 26. PROVIDE COORDINATING MECHANICAL, ELECTRICAL, AND PLUMBING WORK REQUIRED FOR PROPER FUNCTION :.:, ... o OF COLUMN un �'- �- A-7. DETAIL MARK BROUGHT TO THE ATTENTION OF THE ARCHITECT. OF ALL FIXTURES AND EQUIPMENT. RE: MEP. %- • - °�° I I 13. COORDINATE WITH MECHANICAL CONTRACTOR FOR LOCATIONS OF ALL FLOOR DRAINS. 27. CLEAN AND PREPARE SLAB TO ACCEPT FINISHES. C.C. TO CONFIRM AND REPORT MOISTURE CONTENT TO SHEET NUMBER: co - - - ` J ARCHITECT PRIOR TO FINISH WORK. 14. ALL PLUMBING WET WALLS (EXCLUDING CHASES) SHALL BE FRAMED WITH 6" METAL STUDS. Sr(0 SECTION MARK PROJECT AREA 111,��� (---Nk So 15. ALL PRODUCTS UTILIZED IN THIS CONSTRUCTION SHALL BE ASBESTOS FREE. 28. PROVIDE DETECTION SYSTEM, EMERGENCY LIGHTING AND EXIT SIGNS AS REQUIRED BY GOVERNING CODES,�id ELEVATfON 3 SIM - SIMILAR RULES, AND REGULATIONS. RE: MEP. �/oA-5 1 MARK I A-5• 'OH' - OPPOSITE 16. TRANSITION OF DIFFERENT FLOORING MATERIALS AT DOORWAYS SHALL OCCUR AT CENTERLINE , It HAND OF DOORS TYPICALLY. 29. GC TO COMPLY WITH CONSTRUCTION SITE MAINTENANCE GUIDELINES OF LOCAL JURISDICTION. NORTH `� \ NORTH Lt M �, 0 COMMENTS: -, II II E v N G co 0 y (i1 O D CI i.� - - 3-C FACTORY Ii.INSULATION 9 _ I ANCHORS TO BE 3/8" DIA. LAG S-1.0GENERAL NOTES BOLTS 3" MIN. PENETRATION BASE CHANNEL R TIP CVS 1. REINFORCING TO BE ADDED AT JOISTS THAT SUPPORT AHU. i , , , , f 1" NEOPRENE GASKET FIELD # - .441 NEM I I w MOUNTED (SEE NOTE 1) 2. CONTRACTOR IS RESPONSIBLE FOR VISITING THE PROJECT SITE TO VERIFY EXISTING I 12" 4 * /r FFAC Oram. ORQR LTEWELDED CONDITIONS PRIOR TO SUBMITTING THE BID. 3. MANUFACTURED LUMBER TO BE 2.0 MICROLAM LVL. _ I E , . 2 xI I _J I , 1 st 4* I DUCT RAIL 4. DIMENSIONAL LUMBER TO BE #2 SPF KILN DRIED Fb=875 PSI MIN, Fv=135 PSI MIN. Health FACTORY MOUNTED f 5. ANCHOR CURB TO ROOF DECK USING " DIAMETER LAG BOLTS, tri / 3" MIN. PENETRATION INTO 2x6. SHING / "E" / MEMBRANE I * 3"x2"x3/16" ANGLE PRE-DRILL STORE NUMBEB CURB DIMENSIONS INSIDE TO INSIDE CURB WALLS • 1 1/2"FLRIGID INSULATION FOR 1/2" BOLT " RTU-1 RTU-2 " " 12" ** 1 1/2 x1 1/2"x1/8" ANGLE PRE-DRILL CORAM, INC. "A" 121 1/2" 141 1/2" . (37)\ ELEVATION 1/2 HOLES AT 24 C-C STRIP AEIFOR 1/2" BOLT INSTALLATION KEYED NOTES 7358 S D DURHAM RD. IN CENTER OF BOTTOM MEMBRANE PORTLAND, OR 97224 "B" 50 3/4" 6O 3/4" S-1.0 SCALE: NTS FLANGE ROOF .� `� ANCHORS TO BE 3/8"- ��� Q GLUE AND NAIL NEW MEMBERS TO EXISTING W/ 16D NAILS CD 8" O.C., STAGGERED. "C" 48 1/4" 40 i j4" - - - - DEAL WS NPR DIA. LAG BOLTS 3" MIN. SEE DETAIL 2. D28 1/4 20 1/4" -4�` PENETRATION `////////?k ////)////////1/// //////////////N 0 PROVIDE SIMPSON LUS26, LUS26-2, 28 OR 210 JOIST HANGERS TO EXISTING FRAMING. CSPROJECT 0106369 "E" 117 1/2" 137 1/2 2" 7 1/8" --/ �,P ,` 3" MIN. INSTALL AFTER GLUED MEMBERS ARE INSTALLED. • EXISTING PLYWOOD \ WOOD 2x / "A" / / , 3" 1.5"\ DIMENSION ROOF DECK 0 CUT & ATTACH EXISTING PURLINS TO NEW MEMBERS. PROVIDE JOIST HANGERS. �- 10" / (3) HOLDING ANGLES AT "B" CENTERS 10" �� LUMBER 3_c SECTION SHORE EXIST. FRAMING SIMPSON LUS24 AS REQUIRED. ARCHITECT OF RECORD / 1.5"�� , -' , S-1.0 SCALE: NTS Q SEE DETAIL 3/5-101 FOR CURB ANCHORAGE. �� n n -- 1 �, ' ° RTU 10w F o 7 o F — ° NATES: w w w w S SSSS Sahli} / 1. 3/8 X 3/4 NEOPRENE GASKET FOR 2 TO 4 At2.; \ / o�_ / CHANNELS, OR 3/8" X 1-1/2" NEOPRENE GASKET 4 WELD BRACKET TO ROOF \ / / FOR CHANNELS 6" AND OVER. I" " 11,-^: CURB AT INSTALLATION \ / / ism \ / / 2. CURB MAY BE BROKEN DOWN FOR SHIPPING. IN L //j/ REINFORCEMENT BRACKET \/ / THESE CASES, FIELD ASSEMBLY WILL BE REQUIRED (2) HOLDING ANGLES ° /\ / BY INSTALLING CONTRACTOR. "C" / \ / o j 1 1/2" x 1 1/2" x 1/8" AT "D" CENTERS / \ / 3. CONTINUOUS BASE SUPPORT TO CURB PANELS, / \ / INCLUDING THE CENTER SUPPORT PANEL, IS Ell \ CONSULTANT: / \ / REQUIRED. / \ ("3-7)') -1.0 / ANCHORS TO BE 3/8" DIA. L �i k_ _ - - - _J 4. DIMENSIONS GIVEN IN INCHES ONLY. �� \ LAG BOLTS 3" MIN. N Q� PENETRATION _ s�t�,�� 110 Sta ntec 0 EXISTING PLYWOOD f .. o o I o ] ROOF DECK o . • 10" �� '/ // / • ///// /4// / / / / // / /// < \ Stantec y LJ ° L0 ° U 16,'\\ k k [3" MIN. [ 4" 4" NI 111 GRANT AVENUE SUITE 201 ENDICOTT, NY 13760 __ Tel. (607OTT, 137 00 3—B PLAN VIEW � www.stantec.com PROJECT#191001405 S-1,0 SCALE: NTS (--3.- 1 RTU CURB ANCHORAGE ELEVATION & SECTION WOOD 2x �"- SECTION DETAIL �� O S-1 0 SCALE: NTS DIMENSION . ��, LUMBER �� SCALE: NTS S-1.0 SCALE: N.T.S. ' DEVELOPER Ci) el 0 4 ,, 1,,,L ________ i\- __ _ _ 1 ------ --- -- f k- - --- ---- ( 1 I 'f' e i I 11, e / �, 2x8 0 I 1 l . T // e TYP. _ - I EXIST. x4 JOISTS AML• I e \ 1ri— I - 1:1 ."01 O - - E i 1 _w14, 858 PE w w ' " I li I 03/ TnY ,X — I i — e 1% x14 e / LVL x 24'-6" I I ( N 1 I(2) 2)(6_ 110 — ` - ' 414 W �- z avow o \ II 0/7//7 FS O8 ft „Is: / i 1I 0 0 RREs1 e 7_ 7 � 1 j1�a"x11Y4" LVL x 24' 6" 112 2X6 1I �X- . I,'�ff,��\ ! ) RTU-2I ; I i I REVISIONS: \ I 320006/06/2017 \\ O I # I Q I ISSUE FOR BID/PERMIT I I ti vv0 1 i 7( 12x �E-� 0 I i ` \\ TYP. I i L_ _I I I 11 '4"x11)4" LVL x 24'-6" I \ \ ' \\\ j I I I RTU-1 \ i EXIST. 31'4"x15" i ; 1 I 3600# —__- \ WOOD BEAM ( I I I I — \\ ; E \\\ I en 1 ( 1 1 I I DRAWING BY: <(<" — i \ 1 I DATE: AUGUST 2, 2017 - L _ _ - -- \ % - _ i — — JOB NUMBER: 2016285.50 I I I TITLE: PORTLAND "RENOVATIONS" g \,,- I e m : EXIST. B"x264" I I STRUCTURAL INSTALLATION r N GLUCAN BEAM PARTIAL ROOF PLAN D - _ \ - ee _.._ __ .._ - - - - - - _- SHEET NUMBER: 64 e I \ e I I g 1 ar' 1 A i te - ----N ‘-------- - --- - ------- - '- - --------- n „ (Th STRUCTURAL INSTALLATION PARTIAL ROOF PLAN .0 a� . 1-§ 8 0 SCALE: 1/4"=1'-0" N om 0 1 TABLE 1705.3 `'N IPCVS 12'-4 '�" REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION 12'-4%" EXISTING 2x4 0 2'-0" O.C. TYPE CONTINUOUS PERIODIC REFERENCED STANDARD IBC REFERENCE Health or 1. INSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS. a. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR X ACI 318: 17.$.2.4 +' UPWARDLY INCLINED ORIENTATIONS TO RESIST ..4314' / SUSTAINED TENSION LOADS. i� d / � `O a. MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT X ACI 318: 17.$.2 ST \ �, — _ �,b DEFINED IN 1.a. • NW lllIlI4l CORAM, INC. N\ // 7358 S W DURHAM RD. / ,_le , DESIGN CRITERIA 1 PORTLAND, OR 97224 PROJECT -TYPE PHAI�I ACY LOCATION: PORTLAND, OREGON tea.T B PM lip \ \ / BUILDING CODE: INTERNATIONAL BUILDING CODE 2012 0106369 ---- ' 0 CS PROJECT NUMBER ■ �, 111 ' A. DEAD LOADS CLEAN ROOM - 10 PSF �p/•►� I 41111 EXISTING WALL / — ARCHITECT RECORD I� II ' L7O4G69:uCTu:: -- 4 Ilk ♦` DESIGN BASE SHEAR(S) - 1.92 KIPS t ® \\AV SEISMIC RESPONSE COEFFICIENT(S), Cs - N/A lhk ''• _ >>• RESPONSE MODIFICATION COEFFICIENT(S), R. — 2.5 \4� `�7/ ANALYSIS PROCEDURE USED — EQUIVALENT LATERAL FORCE e 4 ` ! �� EXISTING 31'4x15 0 7'-6" O.C. EXISTING 6,x263 GLULAM 6 \/\\\ 24'-6" O.C. MIP • CONSULTANT: 1ROOF LEVEL PLAN GROUND LEVEL PLAN (1) 4x6 W/ SIMPSON LU54 S-1 .1 SCALE: NONE FACE MOUNT HANGAR TO 31'4x15 • S-1 .1 SCALE: NONE EXISTING 31''4x15 EXISTING PLYWOOD ROOF1N Stantec T-6" O.C. 111 GRANT AVENUE SUITE 201 -'1►- f r j ENDCCOTT, NY 1.3760 1 Tel. (607)-321-6100 www.stantec.com PROJECT#191001405 i ti 20 DEVELOPER N' 'N 1565 0 lilir Jam., 'AIVie THREADED ROD AND CONNECTIONI maim � , LOCK NUT AND WASHER FOR )i"0 TO BE COMPLETED BY OTHERS. WHERE Jr 4"� WIRE �,� (1) HILTI HIT-HY 200 ADHESIVE 5"x2"4/4" ASTM A36 BENT PLATE �_ THREADED ROD THREADED ROD CONNECTS TO A 2x4 O. d` ANCHORING SYSTEM W/")6"0 W/ HOLE FOR Y"0 WIRE AND HOLE 1ii , ABOVE, REINFORCE WITH AN ADDITIONAL I 2x4 (NO. 1 OR BETTER) WITH 10d 1 I THREADED ROD W/ EMB. FOR Y"0 THREADED ROD NAILS 12" O.C. inu 1 2" PANEL WALL PROVIDE INSTALLATION PER TAPPED FOR-"0 THREADED ROD SYSTEM BY OTHERS II ICC-ES III ESR-3187TURNBUCKLE ASSEMBLYBY OTHERS � NOTES: BY OTHERS CONNECTION FORCES CLRFD)� '—ALS � � VERTICAL FORCE _ .040K ,�A� 2/ : 4::;..: _ :a...,.!-.%..:.71..7.4 SHEAR FORCE ,679K SEAL: •l' J * 2" PANEL WALL I111111 imim FORCE IN ROPE - 1.017K :#'+:'``.•:.� +::` s•• --' ;.��: -' �e_sto RQppS �� �g �G1NE % 44 tv ;.."•�` .p` .;�•+: .; << 2" CEILING PANEL 85835PE �' Ark 3 ROOF CONNECTION ELEVATION S-1 .i SCALE: NONE I. y .•`OREGON. moo'. EXISTING 5' SLAB 5 TURNBUCKLE CONNECTION .. FSS �F a% S-1 .1 SCALE: NONE is` REVISIONS: (--- ANCHOR DETAIL A BULLETIN 1 08/11/2017 S-1 ,1/ SCALE: NONE 8. EXISTING 2x4 ROOF PURUN '•-�/ EXISTING PLYWOOD ROOFlN 0 2'-0" O.C. (1) 4x4 BLOCK L(X_ • EXISTING 2x4 - - - X ', '�� r N (1) 0 A307 THROUGH BOLT M 9(e110 HOLE W/ (1) )1'00 A307 THROUGH BOLT � CTION Ji, o11111M10%glit et- O THREADED ROD ANDA TO BE COMPLETED BY OTHERS.EWHEREc3�. 4"0 WIREDRAWING BY: '1 Z/1110ALUr ,-# THREADED ROD CONNECTS TO A 2x4 /SIMPSON LUS44 FACE :(kv �jr, ABOVE, REINFORCE WITH AN ADDITIONAL KN 1 icp MOUNT HANGER \o l'; 2x4 (NO, 1 OR BETTER} WITH 10d Eta' a ari_ '' � ' 1 �' DATE: AUGUST 3, 2017 NAILS 0 12■ O.C.4��11111 (1) 4x4 W/ LUS44 FACE MOUNTJOB NUMBER: 2016285.50 ���' Ill+ NOTES! A r r 4°',�� (1) 4x6 6"x2"x3/8" ASTM A36 PLATE HANGER TO 31'4x15 CONNECTION FORCES CLRFD)� TITLE: PORTLAND "RENOVATIONS" toll 10 x2 x ASTM A36 PLATE WITH 1g111� WITH HOLE FOR Y"0 WIRE VERTICAL FORCE = .040K gh, HOLE FOR Y"0 WIRE SHEAR FORCE = .679KL r CLEAN ROOM SEISMIC BRACING .1- -2 FORCE IN ROPE = 1.017K NI PLAN AND DETAILS of SHEET NUMBER: . a BLOCK CONNECTION 4 ROOF CONNECTION ELEVATION Y ,.i 7 CD SCALE: NONE - 1 I . JOIST CONNECTION S-1 .1 SCALE: NONE a g S-1 .1 SCALE: NONE COMMENTS: ill 2 4'r MECHANICAL LEGEND AND ABBREVIATIONS PROJECT GENERAL NOTES APICVS (ALL ITEMS DO NOT NECESSARILY APPLY) 1. THE INTENT OF THE DRAWINGS IS TO PROVIDE A COMPLETE HEATING, VENTILATION, AND AIR NECK SIZE A/C AIR CONDITIONING FCU FAN COIL UNIT PD PRESSURE DROP CONDITIONING SYSTEM FOR THE PROPOSED PROJECT. THE SYSTEM PROVIDED SHALL CONFORM TO THE NEC TYPE RETURN AIR GRILLE/REGISTER e POINT OF CONNECTION PLANS, DIAGRAM, AND SCHEDULE SHOWN ON THE DRAWINGS. ITEMS OR WORK NOT SHOWN OR ACH AIR CHANGES PER HOUR QTY QUANTITY SPECIFIED, BUT REQUIRED FOR A COMPLETE HEATING, VENTILATION AND AIR CONDITIONING SYSTEM Health FH FUME HOOD SHALL BE PROVIDED AND SHALL CONFORM WITH ACCEPTED TRADE PRACTICES, LOCAL CODES, AND NECK TYPE SIZE SUPPLY AIR DIFFUSER POINT OF DISCONNECTION AD ACCESS DOOR RA RETURN AIR GOVERNING AUTHORITIES. AFF ABOVE FINISH FLOOR FLEX FLEXIBLE CONNECTION RAC ROOFTOP AIR CONDITIONING 2. THE DRAWINGS AND SPECIFICATIONS ARE PRESENTED TO DEFINE SPECIFIC SYSTEM REQUIREMENTS AND ROUND TO RECTANGULAR /\/\ OPPOSED BLADE DAMPER FSD FIRE SMOKE DAMPER W/ AUTO RESET SERVE TO EXPAND ON THE PRIMARY CONTRACT REQUIREMENTS OF PROVIDING A COMPLETE SYSTEM. DUCT TRANSITION AHU AIR HANDLING UNIT FIRE/SMOKE REHEAT THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE ONLY THE GENERAL ARRANGEMENT OF THE ITEMS EXHAUST FAN VD F- VOLUME DAMPER ALT ALTERNATE FD FIRE DAMPER COMPRISING THE SEVERAL SYSTEMS IN THE HEATING, VENTILATION AND AIR CONDITIONING WORK. 4 RHC REHEAT COIL STORE MASER FD/FSD D FIRE DAMPER / FIRE SMOKE DAMPER AP ACCESS PANEL FL FLOOR RM ROOM 3. ONOT SCALE DRAWINGS. FIELD VERIFY EXISTING CONDITIONS. INVESTIGATE INVESTIGATE CONDITIONS DEANDNSTALLOK INSUCH A MANNERTHAT INTERFERENCES BETWEEN PIPES, CORAM, INC. o FAN BD BALANCE DAMPER FPM FEET PER MINUTE RPM REVOLUTIONS PER MINUTE CONDUIT, DUCTS, EQUIPMENT, ARCHITECTURAL AND STRUCTURAL FEATURES SHALL BE AVOIDED. 7358 S W DURHAM RD, DUCT SMOKE DETECTOR PROVIDE ITEMS THAT MAY BE REQUIRED TO MEET THE CONDITIONS AT THE BUILDING. BHP BRAKE HORSEPOWER FPS FEET PER SECONDPORTLAND, OR 97224 - FFU 2'x4' (FAN FILTER UNIT SA SUPPLY AIR 4. PROTECT FLOORING FROM DAMAGE DURING CONSTRUCTION PERIOD. PROVIDE APPROPRIATE PROTECTIVE PROJECT TWE PHARMACY W/LIGHT) '--' --* DIFFUSER AIR FLOW BOT BOTTOM FVC FUME HOOD VOLUME CONTROLLER SAT SUPPLY AIR TEMPERATURE BARRIER UNDER EQUIPMENT OR MATERIALS STORED ON FLOORS, AND IN AREAS WHERE CONSTRUCTION BTU BRITISH THERMAL UNIT MAY DAMAGE THE FLOOR SURFACES. FLOOR SURFACES INCLUDING SEALERS DAMAGED DURING THE DEAL TME APR ' FFU 2'x4' (FAN FILTER UNIT) GAL GALLON CONSTRUCTION SHALL BE REPLACED AT THE COST OF THE CONTRACTOR. DUCT ELEVATION BRITISH THERMAL SCAV SUPPLY CAV BOX FFU 2'x2' (FAN FILTER UNIT) BTUH UNITS PER HOUR GALV GALVANIZED SD SUPPLY AIR DIFFUSER 5. COORDINATE ALL WORK WITH WORK SHOWN ON THE DRAWINGS FOR OTHER TRADES. COORDINATE THE 0106369CS PROJECT NUIVEIEFO -- DIRECTION OF AIR FLOW GPH GALLON PER HOUR EXACT LOCATION OF THE ROOF TOP UNIT WITH EXISTING CONDITIONS. DUCT UP THRU ROOF CAV CONSTANT AIR VOLUME SFN SUPPLY AIR FAN GPM GALLON PER MINUTE ARCHTECT OFD -- FLEX CONN. >< SUPPLY AIR DUCT UP 's CD CONTROL DAMPER SCH SCHEDULE X SUPPLY AIR DUCT DOWN --o PIPE TURNED UP CFM CUBIC FEET PER MINUTE HP HORSEPOWER SHP SASH HOOD POSITION -/ RETURN AIR DUCT UP - PIPE TURNED DOWN CONN CONNECTION HR HOUR SPEC SPECIFICATION , � ' RETURN AIR DUCT DOWN O KEY NOTE CONST CONSTRUCTION HVAC �ARNCQNDTIONINGG, SS STAINLESS STEEL �� BALANCING PROCEDURE - CLEAN ROOM SUITE �` CU COPPER HUM HUMIDIFIER TA TRANSFER AIR --Ti PRESSURE DIFFERENTIAL 90' ELBOW WITH TURNING VANES "a SENSOR DAT DISCHARGE AIR TEMPERATURE INSUL INSULATION T.C. TEMPERATURE CONTROL 1. THE INTENT OF THIS SYSTEM IS TO PROVIDE VENTILATION TO THE CLEAN SPACES PER THE FOLLOWING THERMOSTAT KWH KILOWATT HOUR TOS TOP OF STEEL RATES; PREPARATION ROOM AT MORE THAN 20 AIR CHANGES PER HOUR, THE ANTE ROOM AT MORE DDC DIRECT DIGITAL CONTROL THAN 50 AIR CHANGES PER HOUR, AND THE COMPOUNDING ROOM AT MORE THAN 30 AIR CHANGES AxB RECTANGULAR DUCT SIZE LAT LEAVING AIR TEMPERATURE TSP TOTAL STATIC PRESSURE PER HOUR. NPR ANTE ROOM 40 ACH, AND NEG. PRESSURE ROOM 70 ACH. AIR CHANGE RATE MAY BE (INCHES) 0 HUMIDISTAT DEMO DEMOLISH, DEMOLITION HIGHER DUE TO COOLING LOAD. LF LINEAR FEET TSTAT THERMOSTAT KO ROUND DUCT DIA DIAMETER 2. PRESSURIZATION SHALL CASCADE FROM THE COMPOUNDING (CLEAN) ROOM TO THE ANTE AND FROM DUCT WORK SQUARE TO ROUND DN DOWN MAX MAXIMUM V VOLT THE ANTE ROOM TO THE PREPARATION ROOM AND FROM THE PREPARATION ROOM TO THE ROUND TO RECTANGULAR MBH THOUSAND BTU/HR VAV VARIABLE AIR VOLUME NON-CLASSIFIED SPACE. PRESSURIZATION FOR NPR SUITE SHALL CASCADE FROM NPR ANTE ROOM TO CONSULTANT: K DUCT TRANSITION /�\ BUILDING SECTION DP DIFFERENTIAL PRESSURE ( P) D MCC MOTOR CONTROL CENTER VD VOLUME DAMPER NEC. PRESSURE ROOM, PREP ROOM AND SHALL BE GREATER THAN 0.03 1N. W.C. FOR EACH ROOM. � DSD DUCT SMOKE DETECTOR 3. PROVIDE FINAL AIR FLOW READINGS AND CERTIFICATION REPORT FOR THE FOLLOWING; MIN MINIMUM VEL VELOCITY • SUPPLY AIR FROM RTU-1 & RTU-2. � DWG DRAWINGStantec(.111$ CONTROL DAMPER Q MOTORIZED DAMPER MA MAKE UP AIR W WATT EG EXHAUST/RETURN AIR GRILLE N NORTH • RETURN AIR TO RTU-1. WB WET BULB EAT ENTERING AIR TEMPERATURE NC NORMALLY CLOSED • OUTSIDE AIR TO RTU-1 & RTU-2. Stantec WC WATER COLUMN • RELIEF AIR FROM RTU-1 & RTU-2 111 GRANT AVENUE SUITE 201 DIFFUSER/GRILLE TAG CAV NIC NOT IN CONTRACT DUCT WORK BRANCH TAP E-EXHAUST7SCAV EXHAUST BOX VSD VARIABLE FREQUENCY DRIVE • SUPPLY AIR FROM FAN POWERED HEPAs IN EACH ROOM. ENDICOTT, NY 13760 DIFFUSER # NG NATURAL GAS R=RETURN \ EF EXHAUST FAN VP VELOCITY PRESSURE • DIFFERENTIAL PRESSURE ACROSS ALL DOORS FROM ROOM TO ROOM. Tel. (607)-321-6100 S= XX-XX SUPPLY GNO NORMALLY OPEN =GRILLEEL ELEVATION • CLEAN PRESSURE DROP ACROSS EACH NEPA. www.stantec.com PROJECT#199001405 D=DIFFUSER CFM ELEC ELECTRIC (AL) NPR NEGATIVE PRESSURE ROOM • DISCHARGE STATIC PRESSURE FROM RTUs. ESP EXTERNAL STATIC PRESSURE NTS NOT TO SCALE • RTU STATIC PRESSURE PROFILES. I DEVELOPER: EXIST EXISTING OA OUTSIDE AIR • RETURN STATIC PRESSURE NEAR RTU-1. 1 • ROOM VOLUMES AND AIR CHANGE RATES. 4. PROVIDE TEST PLUGS TO CAP ALL DUCT PENETRATIONS WHEN THE TAB WORK IS COMPLETE. 5. AIR CHANGE RATES MAY BE GREATER THAN MINIMUMS DUE TO SPACE COOLING LOADS. 6. BALANCE TO VALUES SHOWN ON THE AIR FLOW DIAGRAM ON DRAWING M-2.0 RTU SCHEDULE IS PROVIDED FOR UNIT SIZING PURPOSES. L 1 SEAL: �_to PR Op ro 1\` / 's:2 ::Ni - CLEAN ROOM SUITE ADA REQUIREMENT GENERAL DEMOLITION NOTES ' UPON COMPLETION, REVIEW AND APPROVAL OF THE FINAL TESTING AND BALANCING OF THE HVAC SYSTEM, ti1 . --- 'f?Nf$ ' 1I711>teir: THE CONTRACTOR SHALL COMMISSION THE CLEAN ROOM SYSTEM, INCLUDING BUT NOT LIMITED TO: 1. SCHEDULE DEMOLITION WORK WITH THE OWNER. OWNER'S PLANT MAINTENANCE STAFF SHALL BE RESPONSIBLE FOR SYSTEM SHUTDOWNS. r,I,G¢ 1. COMPLETE CLEANING AND DISINFECTION OF ALL HVAC ELEMENTS IN CONTACT WITH AIR DELIVERED TO / TOP THE CLEAN ROOM SUITE. OF 24" MAX. fi 2. WHERE DRAWINGS INDICATE DEMOLITION OF EXISTING PIPING, DUCTWORK, AND OTHER MECHANICAL RAT)OHDIATE - �;cv THERMOSTAT, EQUIPMENT, SUCH SERVICES SHALL BE PROPERLY TERMINATED IN AN APPROVED MANNER TO ALLOW 2. REVIEW AND RECORD THE PRESSURE DROP ON ALL FILTER ELEMENTS. SWITCH, +�-- TOP AFFECTED SYSTEMS TQ REMAIN IN OPERATION. J" 3. OPERATIONAL CONFIRMATION OF THE HVAC SYSTEM, INCLUDING, OUTLET, ¢ OF CONTROL w THERMOSTAT, a. HEATING. x d SWITCH, 3. IN SOME CASES, EXISTING CONDITIONS ARE SHOWN ON DEMOLITION DRAWINGS IN AREAS REQUIRING REVISIONS: b, COOLING. OUTLET, NO DEMOLITION. IN SUCH CASES, INFORMATION IS PROVIDED FOR REFERENCE ONLY. r :0.,c) ,_ CONTROL1�IISSUE EOR BID/PERMIT 06/06/2017 c. DEHUMIDIFICATION. 4. EQUIPMENT INDICATED FOR REMOVAL SHALL BE REVIEWED BY THE OWNER. REMOVE EQUIPMENT THE d. MAINTENANCE OF REQUIRED AIR CHANGE. tilli OWNER WISHES TO RETAIN AND DELIVER TO LOCATION DESIGNATED BY OWNER. REMOVE PROMPTLY FROM SITE MATERIALS AND EQUIPMENT INDICATED FOR REMOVAL WHICH ARE NOT SPECIFIED FOR e. MAINTENANCE OF REQUIRED PRESSURE DIFFERENTIAL. FINISHED allalk �, FINISHED REUSE, STORAGE, OR RETAINAGE BY OWNER. FLOORF.A4 -r -- FLOOR - - - 5. STORE OFF-SITE EXISTING EQUIPMENT TO BE REUSED PRIOR TO INSTALLATION. ALL NEW DEVICES, OUTLETS, SWITCHES, CONTROLS, ETC. SHALL BE INSTALLED WITH CONCERN FOR ALIGNMENT WITH WORK OF OTHER TRADES. PROVIDE VERTICAL AND HORIZONTAL ALIGNMENT WITH 6. CONTRACTOR SHALL VERIFY THAT ANY SERVICE OR SYSTEM TO BE REMOVED IS NOT REQUIRED EQUAL SPACING BETWEEN CENTER LINES. IF DOCUMENTS DO NOT INDICATE ALIGNMENT AND/OR WITHIN OR OUTSIDE OF THE AREA PRESENTLY UNDER CONSTRUCTION. i SPACING CONSULT WITH ARCHITECT PRIOR TO ROUGH IN. 7. THE CONTRACTOR SHALL TAKE CARE TO DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED AND NOT TO DISTURB ANY WORK WHICH IS TO REMAIN. IF, IN THE COURSE OF r - DEMOLITION, THE CONTRACTOR DESTROYS ANY WORK WHICH IS TO REMAIN, THE CONTRACTOR SHALL CLEAN ROOM CLASSIFICATIONS REPAIR OR REPLACE, AS NECESSARY, SUCH WORK AT THE CONTRACTOR'S EXPENSE.at - - -- 7 CONTRACTOR SHALL INSTALL ALL COMPONENTS AND SYSTEMS TO MEET THE LATEST USP 797 STANDARDS 8. IN THE EVENT THAT DEMOLITION WORK EFFECTS THE STRUCTURAL SUPPORT OF EXISTING MECHANICAL DRAWING BY: o AND APPLICABLE CODES. CLEAN ROOM SUITE TO BE CERTIFIED AS FOLLOWS: SYSTEMS THAT ARE TO REMAIN AND ARE NOT PART OF THE DEMOLITION WORK, THE CONTRACTOR mSHALL PROVIDE SUPPORTS FOR EXISTING MECHANICAL SYSTEMS TO REMAIN IN MANNER APPROVED DATE: AUGUST 2, 2017 0, 1. COMPOUNDING (CLEAN) ROOM: SO 7 BY THE OWNER AND IN ACCORDANCE WITH APPLICABLE CODES. 3 2. COMPOUNDING ANTE ROOM: SO 8 2 3. PREP ROOM: SO 8 JOB NUMBER: 2016285.50 i 4. EDGEGARD HOODS: SO 5 9. PROVIDE SUPPORT AS REQUIRED FOR ANY EXISTING DUCTWORK, PIPING AND MECHANICAL EQUIPMENT €„ WHOSE EXISTING SUPPORT IS AFFECTED BY GENERAL DEMOLITION. "RENOVATIONS" e; 5. NPR ANTE ROOM:6. SO 8 TITLE: PORTLAND O 7 N o 7. BIO-SAFETY TIVE RCABINETS:ESSURE OOM: ( 50 5) NSF CLASS II, TYPE A2. 10. DEMOLITION OF EXISTING PIPING SHALL INCLUDE CAPPING OF PIPING BELOW FLOORS OR IN WALLS MECHANICAL AS APPLICABLE WHERE EQUIPMENT IS BEING REMOVED. ANY PIPING NO LONGER REQUIRED SHALL BE REMOVED AND CAPPED BACK AT THE LAST POINT OF CONTINUING SERVICE TO MINIMIZE ABANDONED LEAD SHEET h C PIPING. I SHEET NUMBER: Eog M-O . 1 STa SZ"g' a"8 ° C�M Iu�EI TS`�"`.�..�.....� `•A ii II o a 5 GENERAL REQUIREMENTS (APPLICABLE TO ALL TRADES) ( GENERAL NOTES MECHANICAL GENERAL NOTES IOCVS FAN FILTER UNIT(FFU) SPEED CONTROLS WORK COVERED BY CONTRACT DOCUMENTS REQUESTS FOR INFORMATION (RFI'S) 1. CONTRACTOR IS RESPONSIBLE FOR VISITING THE PROJECT SITE TO VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING THE BID. PROVIDE ENVIRCO MULTI CHANNEL SPEED CONTROLLER: THE CONTRACTOR SHALL FURNISH ALL MATERIAL, LABOR, EQUIPMENT,TOOLS, SUPERVISION, ETC. GENERAL: IMMEDIATELY ON DISCOVERY OF THE NEED FOR ADDITIONAL INFORMATION OR • COORDINATE WITH THE MANUFACTURER, INSTALLATION INSTRUCTIONS AND ENVIRCO- DWG TITLE : TO COMPLETE THE WORK AS SHOWN AND IMPLIED BY THE CONTRACT DOCUMENTS FOR TESTED, INTERPRETATION OF THE CONTRACT DOCUMENTS, CONTRACTOR SHALL PREPARE AND SUBMIT AN 2. VERIFY EXISTING CEILING SYSTEM WHERE BEING PARTIALLY MAINTAINED. LIGHTS AND FAN CVS CONTROL SCHEMATIC 001 I DWG#-CVS-001 (LMG) Health APPROVED AND OPERATIONAL FACILITIES/IMPROVEMENTS. RFI IN THE FORM SPECIFIED. FILTER UNITS (FFU'S)ARE BEING REPLACED. GRID LAYOUT MODULE AND GRID TYPE AND • PROVIDE LOCKABLE TRANSPARENT WALL MOUNT ENCLOSURE. - - ENGINEER WILL RETURN RFI'S SUBMITTED TO ENGINEER BY OTHER ENTITIES CONTROLLED PROFILE MUST BE IDENTIFIED AND COORDINATED WITH THE CVS STANDARD FFU, ENVIRCO PROVIDE RECORD DOCUMENTATION FOR ALL FFUS: WORK UNDER SEPARATE CONTRACTS _ BE Y COACONTRACTOND SUBMIT RFI'S R WTH NO PO ASPROMPT MANNER SO AS TO AVOID DELAYS IN MAGIC 2x4 3"x 47.63"X 16.43"H.DC ADJUST GRID RSRE RLA OUT AS REQUIRED TO ACCOMMODATE ELECTRICAL OOM SIDE REPLACEABLE FILTER AND MOTOR), SIZE AND • RETAIN THE"CERTIFICATE OF CONFORMANCE" ON DELIVERY AND PROVIDE TO CVS REGIONAL FACILITY MANAGER AS SUBMITTAL. COOPERATE FULLY WITH SEPARATE CONTRACTORS SO WORK ON THOSE CONTRACTS MAY BE CONTRACTOR'S WORK OR WORK OF SUBCONTRACTORS MECHANICAL INSTALLATION. PROVIDE NEW GRID AND TILE AS REQUIRED. • RECORD BOTH THE FFU SERIAL NUMBER, HEPA FILTER SERIAL NUMBER AND CONTROLLER STORE NUMBER CARRIED OUT SMOOTHLY,WITHOUT INTERFERING WITH OR DELAYING WORK UNDER THIS OF RFI: INCLUDE A DETAILED, LEGIBLE DESCRIPTION OF ITEM NEEDING INFORMATION OR ADDRESS. CORAM, INC. • CONTRACT OR OTHER CONTRACTS, COORDINATE THE WORK OF THIS CONTRACT WITH WORK 3. VERIFY EXISTING CLEANROOM PARTITION SYSTEM FOR DOOR AND WINDOW REPLACEMENTS. PERFORMED UNDER SEPARATE CONTRACTS. INTERPRETATION AND THE FOLLOWING: THE INTENT IS FOR THE FINAL INSTALLATION OF DOORS, FRAMES, WINDOW FRAMES, AND 7358 S W DURHAM RD. PROJECT NAME. GLASS TO BE FLUSH WITH THE CLEANROOM WALL FINISH. FRAMES TO BE SEAMLESS,WITH A SEISMIC BRACING PROJECT NUMBER. FLUSH AND SMOOTH TRANSITION TO THE ADJACENT WALL FINISH. REPLACEMENT OF DOORS (FOR ALBUQUERQUE, GOLETA, HAYWARD, HENDERSON, LOS ANGELES, MURRAY, NASHVILLE, PORTLAND, OR 97224 OWNER-FURNISHED PRODUCTS DATE. WITH THE TWO-PIECE CLAMSHELL FRAME WILL REQUIRE ADVANCE OPENING MEASUREMENTS PORTLAND, SAN ANTONIO, SAN DIEGO &ST. LOUIS) PHARMACY - NAME OF CONTRACTOR. AND PRE-ORDER.APPROXIMATELY 9 WEEKS LEAD TIME ON THE ASI 220. WINDOW SECURELY FASTEN ALL PIPING AND DUCTWORK WITHIN STRUCTURES TO THE BUILDING CONSTRUCTION OWNER WILL FURNISH PRODUCTS INDICATED. THE WORK INCLUDES RECEIVING, UNLOADING, NAME OF OWNER. REPLACEMENTS SHOULD BE COORDINATED SIMILARLY. DE Y WI RFI NUMBER, NUMBERED SEQUENTIALLY. BY MEANS OF HANGERS, SUPPORTS, GUIDES, ANCHORS AND SWAY BRACES TO MAINTAIN PIPE AND INTEGHANDRATING G INTO THE PROTECTING, AN MAKED INSTALLING OWNER FUNCTIONINGFY PRODUCTS AND DUCTWORK ALIGNMENT, TO PREVENT SAGGING AND TO PREVENT NOISE AND EXCESSIVE STRAIN ON 0106369 INTEGRATING INTO PROJECT TO IT A FULLY SYSTEM, - RFI SUBJECT. - SPECIFICATION TITLE AND RELATED PARAGRAPHS,AS APPROPRIATE. 4. THE INTENT IS TO CLEAN AND SEAL ALL VOIDS IN THE CEILING PLENUM WALLS AND ROOF TO PIPING AND DUCTWORK DUE TO MOVEMENT UNDER OPERATING CONDITIONS. ■ TYPICALLY OWNER-FURNISHED PRODUCTS (VERIFY WITH DRAWING SET): - DRAWING NUMBER AND DETAIL REFERENCES,AS APPROPRIATE. PRODUCE AN AIRTIGHT SPACE. ALL UNPAINTED/UNCOATED MATERIAL SHALL BE PREPARED SUPPORTS FOR ALL PIPING AND DUCTWORK SHALL BE IN ACCORDANCE WITH THE LATEST SMACNA - ROOFTOP AIR HANDLING UNITS. - FIELD DIMENSIONS AND CONDITIONS,AS APPROPRIATE. AND PAINTED TO ENSURE NO SHEDDABLE MATERIAL COULD BECOME AIRBORNE. CONDITIONS GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS (OSHPD EDITION IN CALIFORNIA) OR - HEPA FAN FILTER UNITS. CONTRACTOR'S SUGGESTED RESOLUTION. SUCH AS EXPOSED RUST, CHIPPED PAINT, OXIDIZED METAL SHOULD BE INSPECTED AND OTHER CONTRACTORS SIGNATURE. TREATED APPROPRIATELY WHILE THE CEILING BELOW IS"OPEN".THE FINAL INSTALLATION OTHER SUCH GUIDANCE AS DIRECTED BY THE AUTHORITY HAVING JURISDICTION. OF - PASS-THROUGHS. - ATTACHMENTS: INCLUDE SKETCHES, DESCRIPTIONS, MEASUREMENTS, PHOTOS, PRODUCT WILL INCLUDE HOLD DOWN CLIPS AND COMPLETELY SEALING EVERY CEILING TILE TO THE GRID DATA, SHOP DRAWINGS, COORDINATION DRAWINGS,AND OTHER INFORMATION NECESSARY TO MAKE THE PLENUM SPACE INACCESSIBLE. ELECTRIC DUCT REHEAT COILS TO FULLY DESCRIBE ITEMS NEEDING INTERPRETATION. GENERAL: -- INCLUDE DIMENSIONS,THICKNESSES, STRUCTURAL GRID REFERENCES,AND DETAILS OF 5. THE SPACE INSIDE THE PLENUM NEEDS TO BE INSPECTED FOR PAINTING REQUIREMENTS.ANY 1. DUCT HEATERS SHALL BE INDEECO AFFECTED MATERIALS,ASSEMBLIES, AND ATTACHMENTS ON ATTACHED SKETCHES. UNFINISHED MATERIALS NEED TO BE CLEANED, PREPARED AND PAINTED. IF RUST, OXIDATION a, TYPE QUZ STANDARD FLANGED HEATERS (WHITE RUST), CHIPPED FINISHES ARE DISCOVERED, THEN THOSE MATERIALS ARE TO BE WORK RESTRICTIONS RFI FORMS: SOFTWARE-GENERATED FORM WITH SUBSTANTIALLY THE SAME CONTENT AS CLEANED, PREPARED AND PAINTED. 2. APPROVALS: HEATERS AND PANELBOARDS SHALL MEET THE REQUIREMENTS OF THE NATIONAL INDICATED ABOVE,ACCEPTABLE TO THE ENGINEER. ELECTRICAL CODE AND SHALL BE LISTED BY UNDERWRITERS LABORATORIES FOR ZERO WORK RESTRICTIONS, GENERAL: COMPLY WITH RESTRICTIONS ON CONSTRUCTION OPERATIONS. - ATTACHMENTS SHALL BE ELECTRONIC FILES IN ADOBE ACROBAT PDF FORMAT. 6. IF RUST OR CHIPPED PAINT IS DISCOVERED ON A STEEL BEAM OR PIPE, THEN THE ENTIRE CLEARANCE TO COMBUSTIBLE SURFACES AND FOR USE WITH HEAT PUMPS AND AIR - BUILDING AND CLEANROOM OPERATIONS AND WITH OTHER REQUIREMENTS OF LANDLORD BEAM OR PIPE SYSTEM EXPOSED IN THE PLENUM SHOULD BE PAINTED. IF OXIDATION OR CONDITIONING EQUIPMENT. AND CVS. INSTALLATION UNFINISHED GALVANIZED METAL DECK IS DISCOVERED, THEN THE ENTIRE UNDERSIDE OF THE 3. HEATING ELEMENTS SHALL BE OPEN COIL, 80% NICKEL, 20% CHROMIUM, GRADE A RESISTANCE USE OF SITE: LIMIT USE OF PROJECT SITE TO WORK IN AREAS WITHIN THE CONTRACT LIMITS METAL DECK NEEDS TO BE PAINTED, NO SPOT OR TOUCH UP PAINTING WOULD BE WIRE. TYPE C ALLOYS CONTAINING IRON OR OTHER ALLOYS ARE NOT ACCEPTABLE. COILS INDICATED. GENERAL: LOCATE THE WORK AND COMPONENTS OF THE WORK ACCURATELY, IN CORRECT ACCEPTABLE. THE ENTIRE SURFACE OF THE MATERIAL OR SYSTEM EXPOSED IN THE PLENUM SHALL BE MACHINE CRIMPED INTO STAINLESS STEEL TERMINALS EXTENDING AT LEAST 1-INCH - DRIVEWAYS, WALKWAYS AND ENTRANCES: KEEP DRIVEWAYS AVAILABLE TO OWNER, ALIGNMENT AND ELEVATION,AS INDICATED. SHOULD BE PAINTED. ITEMS NOT TO BE PAINTED INCLUDE LIGHTS, HEPA FAN FILTER UNITS, INTO THE AIRSTREAM AND ALL TERMINAL HARDWARE SHALL BE STAINLESS STEEL. COILS OWNER'S EMPLOYEES, AND EMERGENCY VEHICLES AT ALL TIMES. DO NOT USE THESE AREAS - MAKE VERTICAL WORK PLUMB AND MAKE HORIZONTAL WORK LEVEL. LABELS, FRP FINISHES OR TRIM, PLASTIC OR MYLAR FACINGS OR FINISHES. SHALL BE SUPPORTED BY CERAMIC BUSHINGS STAKED INTO SUPPORTING BRACKETS. FOR PARKING OR STORAGE OF MATERIALS. - WHERE SPACE IS LIMITED, INSTALL COMPONENTS TO MAXIMIZE SPACE AVAILABLE FOR 4. HEATER FRAMES AND TERMINAL BOXES SHALL BE CORROSION RESISTANT STEEL. UNLESS -- SCHEDULE DELIVERIES TO MINIMIZE USE OF DRIVEWAYS AND ENTRANCES BY MAINTENANCE AND EASE OF REMOVAL FOR REPLACEMENT. 7. ALL CLEANING, PREPARATION AND PAINTING IS TO BE DONE PER THE PAINT MANUFACTURER'S OTHERWISE INDICATED,THE TERMINAL BOX SHALL BE NEMA 1 CONSTRUCTION AND SHALL BE CONSTRUCTION OPERATIONS. CONCEAL PIPES, DUCTS, AND WIRING IN FINISHED AREAS UNLESS OTHERWISE INDICATED. SPECIFICATIONS AND RECOMMENDATIONS. THE PRODUCTS SPECIFIED ON THE DRAWINGS ARE PROVIDED WITH A HINGED, LATCHING COVER AND MULTIPLE CONCENTRIC KNOCKOUTS FOR CONSULTANT: -- SCHEDULE DELIVERIES TO MINIMIZE SPACE AND TIME REQUIREMENTS FOR STORAGE OF TO BE USED. FIELD WIRING. MATERIALS AND EQUIPMENT ON-SITE. COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND RECOMMENDATIONS FOR \... 5. ALL HEATERS SHALL BE FURNISHED WITH A DISC TYPE,AUTOMATIC RESET THERMAL CUTOUT NOISE, VIBRATION AND ODORS: COORDINATE OPERATIONS THAT MAY RESULT IN HIGH LEVELS OF INSTALLING PRODUCTS IN APPLICATIONS INDICATED. ` - NOISE AND VIBRATION, ODORS, OR OTHER DISRUPTION TO BUILDING OCCUPANTS WITH OWNER. FOR PRIMARY OVER-TEMPERATURE PROTECTION.ALL HEATERS SHALL ALSO BE FURNISHED INSTALL PRODUCTS AT THE TIME AND UNDER CONDITIONS THAT WILL ENSURE THE BEST POSSIBLE WITH DISC TYPE, LOAD CARRYING MANUAL RESET THERMAL CUTOUTS, FACTORY WIRED IN (3Stantec WORKING HOURS: WORKING HOURS ARE MONDAY THROUGH FRIDAY AS DEFINED BY THE LOCAL RESULTS. MAINTAIN CONDITIONS REQUIRED FOR PRODUCT PERFORMANCE UNTIL SUBSTANTIAL SERIES WITH HEATER STAGES FOR SECONDARY PROTECTION. HEAT LIMITERS OR OTHER CVS CORAM BRANCH HOURS. COMPLETION. FUSIBLE OVER-TEMPERATURE DEVICES ARE NOT ACCEPTABLE. 6. HEATERS SHALL BE RATED FOR THE VOLTAGE, PHASE,AND NUMBER OF HEATING STAGES CONTRACTOR MAY REQUEST TO WORK EXTENDED HOURS OR ON WEEKENDS WITH PRIOR CONDUCT CONSTRUCTION OPERATIONS SO NO PART OF THE WORK IS SUBJECTED TO DAMAGING INDICATED IN THE SCHEDULE.ALL THREE-PHASE HEATERS SHALL HAVE EQUAL, BALANCED, Stantec APPROVAL FROM CVS TO MAINTAIN SCHEDULE. OPERATIONS OR LOADING IN EXCESS OF THAT EXPECTED DURING NORMAL CONDITIONS OF THREE-PHASE STAGES.ALL INTERNAL WIRING SHALL BE STRANDED COPPER WITH 105°C 111 GRANT AVENUE SUITE 201 OCCUPANCY. INSULATION AND SHALL BE TERMINATED IN CRIMPED CONNECTORS OR BOX LUGS. SUBSTITUTION PROCEDURES 7. TERMINAL BLOCKS SHALL BE PROVIDED FOR ALL FIELD WIRING AND SHALL BE SIZED FOR ENDICOTT, NY 13760 SUBSTITUTIONS FOR CAUSE: CHANGES PROPOSED BY CONTRACTOR THAT ARE REQUIRED DUE TO SEQUENCE THE WORK AND ALLOW ADEQUATE CLEARANCES TO ACCOMMODATE MOVEMENT OF INSTALLATION OF 75°C COPPER WIRE RATED IN ACCORDANCE WITH NEC REQUIREMENTS. Tel. (607)-321-6100 CONSTRUCTION ITEMS ON SITE AND PLACEMENT IN PERMANENT LOCATIONS. CHANGED PROJECT CONDITIONS, SUCH AS UNAVAILABILITY OF PRODUCT, REGULATORY CHANGES, 8. HEATERS SHALL BE FURNISHED, EITHER WITH THE CONTROL OPTION SPECIFIED IN THE WWw,stantec.cor PROJECT#191001405 OR UNAVAILABILITY OF REQUIRED WARRANTY TERMS. ATTACHMENT: PROVIDE BLOCKING AND ATTACHMENT PLATES AND ANCHORS AND FASTENERS OF SCHEDULE AND DESCRIBED BELOW, OR WITH THE SPECIFIC COMPONENTS LISTED IN THE ADEQUATE SIZE AND NUMBER TO SECURELY ANCHOR EACH COMPONENT IN PLACE,ACCURATELY SCHEDULE. SUBSTITUTIONS FOR CONVENIENCE: CHANGES PROPOSED BY CONTRACTOR OR OWNER THAT ARE LOCATED AND ALIGNED WITH OTHER PORTIONS OF THE WORK. WHERE SIZE AND TYPE OF a. OPTION K-THERMAL CUTOUTS, AIRFLOW SWITCH, CONTACTORS (WHERE REQUIRED), SCR NOT REQUIRED IN ORDER TO MEET OTHER PROJECT REQUIREMENTS BUT MAY OFFER ADVANTAGE ATTACHMENTS ARE NOT INDICATED, VERIFY SIZE AND TYPE REQUIRED FOR LOAD CONDITIONS. (WITH STEP CONTROLLER IF HEATER DRAWS OVER 96 AMPS THREE-PHASE OR 192 AMPS DEVELOPER' TO CONTRACTOR OR OWNER. - MOUNTING HEIGHTS: WHERE MOUNTING HEIGHTS ARE NOT INDICATED , MOUNT SINGLE-PHASE), FUSES (IF OVER 48 AMPS), CONTROL CIRCUIT TRANSFORMER,AND i�. 1 i SUBSTITUTION REQUESTS: SUBMIT THREE COPIES OF EACH REQUEST FOR CONSIDERATION. COMPONENTS AT HEIGHTS DIRECTED BY ENGINEER. BUILT-IN SNAP-ACTING DOOR INTERLOCKED DISCONNECT SWITCH. IDENTIFY PRODUCT OR FABRICATION OR INSTALLATION METHOD TO BE REPLACED. INCLUDE 9. WHEN SPECIFIED IN THE SCHEDULE, OR BELOW, HEATERS WILL BE SUPPLIED WITH THE SPECIFICATION TITLE AND DRAWING NUMBERS AND TITLES. JOINTS: MAKE JOINTS UNIFORM WIDTH. WHERE JOINT LOCATIONS IN EXPOSED WORK ARE NOT FOLLOWING SPECIAL FEATURES: - DOCUMENTATION: SHOW COMPLIANCE WITH REQUIREMENTS FOR SUBSTITUTIONS AND THE INDICATED, ARRANGE JOINTS FOR BEST VISUAL EFFECT. FIT EXPOSED CONNECTIONS TOGETHER a. INSULATED TERMINAL BOX TO FORM HAIRLINE JOINTS. FOLLOWING,AS APPLICABLE. b. TRANSFORMER SECONDARY FUSING (CLASS II) STATEMENT INDICATION WHY SPECIFIED PRODUCT OR FABRICATION OR INSTALLATION HAZARDOUS MATERIALS: USE PRODUCTS, CLEANERS,AND INSTALLATION MATERIALS THAT ARE c. STEP CONTROLLER CANNOT BE PROVIDED, IF APPLICABLE. NOT CONSIDERED HAZARDOUS. -- COORDINATION INFORMATION, INCLUDING A LIST OF CHANGES OR REVISIONS NEEDED '10, WHEN SPECIFIED IN THE SCHEDULE, OR BELOW, HEATERS SHALL BE SUPPLIED WITH THE TO OTHER PARTS OF THE WORK AND TO CONSTRUCTION PERFORMED BY SEPARATE PROGRESS CLEANING FOLLOWING THERMOSTATS: CONTRACTORS THAT WILL BE NECESSARY TO ACCOMMODATE PROPOSED a. PROPORTIONAL ELECTRONIC ROOM THERMOSTAT SUBSTITUTION. GENERAL: CLEAN PROJECT SITE AND WORK AREAS DAILY, INCLUDING COMMON AREAS. ENFORCE -- DETAILED COMPARISON OF SIGNIFICANT QUALITIES OF PROPOSED SUBSTITUTION WITH REQUIREMENTS STRICTLY. DISPOSE OF MATERIALS LAWFULLY. - THOSE OF THE WORK SPECIFIED. SIGNIFICANT QUALITIES MAY INCLUDE ATTRIBUTES SEAL SUCH AS PERFORMANCE, WEIGHT, SIZE, DURABILITY,VISUAL EFFECT, SUSTAINABLE SITE: MAINTAIN PROJECT SITE FREE OF WASTE MATERIALS AND DEBRIS, • DESIGN CHARACTERISTICS, WARRANTIES,AND SPECIFIC FEATURES AND REQUIREMENTS ,cy PROF INDICATED. INDICATE DEVIATIONS , IF ANY, FROM THE WORK SPECIFIED. WORK AREAS: CLEAN AREAS WHERE WORK IS IN PROGRESS TO THE LEVEL OF CLEANLINESS �'e �ti''G N FF. -- PRODUCT DATA, INCLUDING DRAWINGS AND DESCRIPTIONS OR PRODUCTS AND NECESSARY FOR PROPER EXECUTION OF THE WORK. 65 r' FABRICATION AND INSTALLATION PROCEDURES. REMOVE LIQUID SPILLS PROMPTLY. -- SAMPLES,WHERE APPLICABLE OR REQUESTED. - WHERE DUST WOULD IMPAIR PROPER EXECUTION OF THE WORK,VACUUM THE ENTIRE r ' EGON -- CERTIFICATES AND QUALIFICATION DATA,WHERE APPLICABLE OR REQUESTED. WORK AREA,AS APPROPRIATE. -- MATERIAL TEST REPORTS FROM A QUALIFIED TESTING AGENCY INDICATING AND 'Q tit I 1 INTERPRETING TEST RESULTS FOR COMPLIANCE WITH REQUIREMENTS INDICATED. INSTALLED WORK: KEEP INSTALLED WORK CLEAN. CLEAN INSTALLED SURFACES ACCORDING TO BERT.!-G� -- DETAILED COMPARISON OF CONTRACTOR'S CONSTRUCTION SCHEDULE USING WRITTEN INSTRUCTIONS OF MANUFACTURER OR FABRICATOR OF PRODUCT INSTALLED, USING j PROPOSED SUBSTITUTION WITH PRODUCTS SPECIFIED FOR THE WORK, INCLUDING ONLY CLEANING MATERIALS SPECIFICALLY RECOMMENDED. IF SPECIFIC CLEANING MATERIALS ARE EFFECT ON THE OVERALL CONTRACT TIME. IF SPECIFIED PRODUCT OR METHOD OF NOT RECOMMENDED, USE CLEANING MATERIALS THAT ARE NOT HAZARDOUS TO HEALTH OR EXPIRATION DATE l '-3©-z°'1 CONSTRUCTION CANNOT BE PROVIDED WITHIN THE CONTRACT TIME, INCLUDING LETTER PROPERTY AND THAT WILL NOT DAMAGE EXPOSED SURFACES, FROM MANUFACTURER, ON MANUFACTURER'S LETTERHEAD, STATING DATE OF RECEIPT OF PURCHASE ORDER, LACK OF AVAILABILITY, OR DELAYS IN DELIVERY. CONCEALED SPACES: REMOVE DEBRIS FROM CONCEALED SPACES BEFORE ENCLOSING THE -- COST INFORMATION. SPACE. -- CONTRACTOR'S CERTIFICATION THAT PROPOSED SUBSTITUTION COMPLIES WITH REVISIONS: REQUIREMENTS IN THE CONTRACT DOCUMENTS EXCEPT AS INDICATED IN SUBSTITUTION EXPOSED SURFACES IN FINISHED AREAS: CLEAN EXPOSED SURFACES AND PROTECT AS REQUEST, IS COMPATIBLE WITH RELATED MATERIALS,AND IS APPROPRIATE FOR NECESSARY TO ENSURE FREEDOM FROM DAMAGE AND DETERIORATION AT TIME OF SUBSTANTIAL 0 ISSUE FOR BID/PERMIT 06/06/2017 APPLICATIONS AS INDICATED. COMPLETION. PROJECT SCHEDULE PROJECT SCHEDULE: WITHIN 48 HOURS OF PROJECT AWARD, CONTRACTOR SHALL SUBMIT A CONSTRUCTION PROJECT SCHEDULE, IN A GENERALLY ACCEPTED FORMAT SUCH AS GANTT CHART, TO PROVIDE SPECIFICS ON WORK ACTIVITIES AND PHASING TO ALLOW FOR MONITORING OF PROGRESS. a+ ie ASEQUENCE OF OPERATION "RTU-1 " - CLEAN ROOM SUITE UNIT SEQUENCE OF OPERATION "RTU-2"- NEG. PRESSURE RM UNIT DRAWING BY: 1 RTU-1 SHALL OPERATE AS FOLLOWS: RTU-2 SHALL OPERATE AS FOLLOWS: DATE: AUGUST 2, 2017 0 1. UNIT SHALL BE RUN CONTINUOUSLY. THE DISCHARGE TEMPERATURE FROM THE AIR HANDLER SHALL BE MAINTAINED AT A SETPOINT OF 55'F (ADJUSTABLE). 1. UNIT SHALL BE RUN CONTINUOUSLY. THE DISCHARGE TEMPERATURE FROM THE AIR HANDLER SHALL BE JOB NUMBER: 2016285.50 5, MODULATED AS NEEDED TO MAINTAIN AT A SETPOINT OF 65°F (ADJUSTABLE) AS SENSED BY THE ROOM TITLE: PORTLAND "RENOVATIONS" fri b 2. UPON A CALL FOR DEHUMIDIFICATION, AS SENSED BY THE ROOM HUMIDITY SENSOR LOCATED IN THE TEMPERATURE SENSOR LOCATED IN THE COMPOUNDING (CLEAN) ROOM. 15 COMPOUNDING (CLEAN) ROOM, THE DX SYSTEM SHALL BE ENERGIZED AND STAGED ON TO MAINTAIN 2. UPON A CALL FOR DEHUMIDIFICATION, AS SENSED BY THE ROOM HUMIDITY SENSOR LOCATED IN THE MECHANICAL E,- = THE ROOM RELATIVE HUMIDITY AT 50% (ADJ.). THE SUPPLY AIR SHALL BE SUB-COOLED BELOW 55 N 'F AND THEN REHEATED BY THE ELECTRIC REHEAT COIL AS REQUIRED. NEGATIVE PRESSURE ROOM, THE DX SYSTEM SHALL BE ENERGIZED AND STAGED ON TO MAINTAIN THE GENERAL NOTES ROOM RELATIVE HUMIDITY AT 50% (ADJ.). THE SUPPLY AIR SHALL BE SUB-COOLED BELOW 55 T AND ii 3. UPON A CALL FOR HEATING FROM ANY OF THE SPACE SENSORS, THE ELECTRIC REHEAT COIL FOR THEN REHEATED BY THE ELECTRIC REHEAT COIL AS REQUIRED. 01 a g THAT SPACE SHALL MODULATE WITH SCR CONTROL TO MAINTAIN THE ROOM TEMPERATURE AT 65'F SHEET NUMBER: Io- la (ADJUSTABLE). 3. HOOD EXHAUST FANS SHALL RUN CONTINUOUSLY. REMOTELY ACTUATED BUBBLE TIGHT DAMPERS SHALL EBE PROVIDED FOR EMERGENCY USE. THEY SHALL BE ELECTRICALLY ACTUATED TO OPEN, SPRING TO FAIL t4-O . 2iCLOSED AND OPERATED FROM ILLUMINATED WALL SWITCHES WITHIN THE COMPOUNDING (CLEAN) ROOM. c`.0..mMErs; II It E 2 PACKAGED ROOF TOP UNIT GENERAL MECHANICAL SPECIFICATIONS ,CVS OWNER WILL PRE-PURCHASE ROOF TOP UNIT AND CURB. THIS CONTRACT SHALL RECEIVE, STORE, AND INSTALL UNIT. 1. METAL DUCTS A. SINGLE-WALL RECTANGULAR DUCTS AND FITTINGS Health PART 1 - GENERAL a. SHEET METAL: EXCEPT AS OTHERWISE INDICATED, FABRICATE DUCTWORK FROM GALVANIZED SHEET STEEL COMPLYING WITH ANSI/ASTM A 527, LOCKFORMING QUALITY, WITH 1.1 RELATED DOCUMENTS ANSI/ASTM A 525, G90 ZINC COATING, MILL PHOSPHATIZED FOR EXPOSED LOCATIONS. A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT. INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS APPLY TO THIS SECTION. b. APPLICABLE LEAKAGE CLASSES: DUCTWORK SHALL BE RATED FOR SEAL CLASS "A". ALL JOINTS, SEAMS AND CEILING / WALL PENETRATIONS ARE TO BE SEALED. 1.2 SUMMARY c. GENERAL FABRICATION REQUIREMENTS: COMPLY WITH SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE" BASED ON LOW A. THIS SECTION INCLUDES CUSTOM PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS (ROOFTOP UNITS) WITH THE FOLLOWING COMPONENTS AND STATIC-PRESSURE OF +/- 2" WC. STORE ACCESSORIES: d. TRANSVERSE JOINTS: SELECT JOINT TYPES AND FABRICATE ACCORDING TO SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE," FIGURE CORAM, INC. 1. DIRECT-EXPANSION COOLING WITH DEHUMIDIFICATION CAPABILITY 1-4, "TRANSVERSE (GIRTH) JOINTS," FOR STATIC-PRESSURE CLASS, APPLICABLE SEALING REQUIREMENTS, MATERIALS INVOLVED, DUCT-SUPPORT INTERVALS, AND 7358 S W DURHAM RD. 2. HOT-GAS BYPASS OTHER PROVISIONS IN SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE." PORTLAND, OR 97224 3. ELECTRIC REHEAT e. LONGITUDINAL SEAMS: SELECT SEAM TYPES AND FABRICATE ACCORDING TO SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE," FIGURE 4. GAS HEAT 1-5, "LONGITUDINAL SEAMS - RECTANGULAR DUCTS," FOR STATIC-PRESSURE CLASS, APPLICABLE SEALING REQUIREMENTS, MATERIALS INVOLVED, DUCT-SUPPORT 5. INTEGRAL, DISCHARGE AIR TEMPERATURE AND HUMIDITY CONTROLS. INTERVALS, AND OTHER PROVISIONS IN SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE." DEAL ME NF'R 6. ROOF CURBS. f. ELBOWS, TRANSITIONS, OFFSETS, BRANCH CONNECTIONS, AND OTHER DUCT CONSTRUCTION: SELECT TYPES AND FABRICATE ACCORDING TO SMACNA'S "HVAC DUCT 7. RELIEF FANS CONSTRUCTION STANDARDS - METAL AND FLEXIBLE," CHAPTER 2, "FITTINGS AND OTHER CONSTRUCTION," FOR STATIC-PRESSURE CLASS, APPLICABLE SEALING CS PROJECT KUMBEFO 0106369 1.3 DELIVERY, STORAGE, AND HANDLING REQUIREMENTS, MATERIALS INVOLVED, DUCT-SUPPORT INTERVALS, AND OTHER PROVISIONS IN SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND A. UNIT SHALL BE SHIPPED WITH DOORS SCREWED SHUT AND OUTSIDE AIR HOOD CLOSED TO PREVENT DAMAGE DURING TRANSPORT AND THEREAFTER WHILE FLEXIBLE." IN STORAGE AWAITING INSTALLATION. B. SEALANT AND GASKETS ARCHITECT B. FOLLOW INSTALLATION, OPERATION, AND MAINTENANCE MANUAL INSTRUCTIONS FOR RIGGING, MOVING, AND UNLOADING THE UNIT AT ITS FINAL LOCATION. a. GENERAL SEALANT AND GASKET REQUIREMENTS: SURFACE-BURNING CHARACTERISTICS FOR SEALANTS AND GASKETS SHALL BE A MAXIMUM FLAME-SPREAD INDEX OF RECORD C. UNIT SHALL BE STORED IN A CLEAN, DRY PLACE PROTECTED FROM CONSTRUCTION TRAFFIC IN ACCORDANCE WITH THE INSTALLATION, OPERATION, AND OF 25 AND A MAXIMUM SMOKE-DEVELOPED INDEX OF 50 WHEN TESTED ACCORDING TO UL 723; CERTIFIED BY AN NRTL. MAINTENANCE MANUAL. 1) TWO-PART TAPE SEALING SYSTEM 2) TAPE: WOVEN COTTON FIBER IMPREGNATED WITH MINERAL GYPSUM AND MODIFIED ACRYLIC/SILICONE ACTIVATOR TO REACT EXOTHERMICALLY WITH TAPE TO PART 2 - NOT APPLICABLE FORM HARD, DURABLE, AIRTIGHT SEAL. 3) TAPE WIDTH: 3 INCHES. 4) SEALANT: MODIFIED STYRENE ACRYLIC. PART 3 - EXECUTION 3.1 FIELD QUALITY CONTROL 5) WATER RESISTANT. A. MANUFACTURER'S FIELD SERVICE: A FACTORY-AUTHORIZED SERVICE REPRESENTATIVE SHALL INSPECT, TEST, AND ADJUST COMPONENTS, ASSEMBLIES, AND 6) MOLD AND MILDEW RESISTANT. EQUIPMENT INSTALLATIONS, INCLUDING CONNECTIONS. REPORT RESULTS IN WRITING FOR ENGINEER TO REVIEW. 7) MAXIMUM STATIC-PRESSURE CLASS: 2-INCH WG, POSITIVE AND NEGATIVE. B. TESTS AND INSPECTIONS (PRE-STARTUP): 8) SERVICE: INDOOR AND OUTDOOR. 9) SERVICE TEMPERATURE: MINUS 40 TO PLUS 200 DEG F. 1. AFTER INSTALLING RTUs AND AFTER ELECTRICAL CIRCUITRY HAS BEEN ENERGIZED, TEST UNITS FOR COMPLIANCE. 10) SUBSTRATE: COMPATIBLE WITH GALVANIZED SHEET STEEL (BOTH PVC COATED AND BARE), STAINLESS STEEL, OR ALUMINUM. FOR INDOOR APPLICATIONS, USE 2. INSPECT FOR AND REMOVE SHIPPING BOLTS, BLOCKS, AND TIE-DOWN STRAPS. SEALANT THAT HAS A VOC CONTENT OF 250 G/L OR LESS WHEN CALCULATED ACCORDING TO 40 CFR 59, SUBPART D (EPA METHOD 24). 3. OPERATIONAL TEST: AFTER ELECTRICAL CIRCUITRY HAS BEEN ENERGIZED, START UNITS TO CONFIRM PROPER MOTOR ROTATION AND UNIT OPERATION. 4. TEST AND ADJUST CONTROLS AND SAFETIES. REPLACE DAMAGED AND MALFUNCTIONING CONTROLS AND EQUIPMENT. 2. DUCT ACCESSORIES D. REMOVE AND REPLACE MALFUNCTIONING UNITS AND RETEST AS SPECIFIED ABOVE. CONSULTANT. 3.2 STARTUP SERVICE A. VOLUME DAMPERS A. FACTORY-AUTHORIZED SERVICE REPRESENTATIVE TO PERFORM STARTUP SERVICE; FURNISHED BY OWNER. a. LOW-LEAKAGE RATING AND BEARING AMCA'S CERTIFIED RATINGS SEAL FOR BOTH AIR PERFORMANCE AND AIR LEAKAGE. B. UNIT MANUFACTURER TO COMPLETE INSTALLATION AND STARTUP CHECKS WITH ASSISTANCE AND COOPERATION OF THE INSTALLING CONTRACTOR. CHECKLIST F -IARN r.it, TO INCLUDE BUT NOT LIMITED TO THE FOLLOWING: b. FRAMES: I +� , - HAT SHAPED 1. INSPECT FOR VISIBLE DAMAGE TO UNIT CASING. -- GALVANIZED-STEEL CHANNELS, 0.064 INCH THICK. 2. INSPECT FOR VISIBLE DAMAGE TO COMPRESSOR, COILS, AND FANS. - MITERED AND WELDED CORNERS. 3. VERIFY THAT LABELS ARE CLEARLY VISIBLE. StanteC C. BLADES: 4. VERIFY THAT CLEARANCES HAVE BEEN PROVIDED FOR SERVICING. - MULTIPLE BLADE WITH MAXIMUM BLADE WIDTH OF 8 INCHES. 111 GRANT AVENUE SUITE 201 5. REMOVE ALL SHIPPING WOOD FROM THE BLOWER SECTION(S). - OPPOSED-BLADE DESIGN FOR RECTANGULAR DUCT, SINGLE BLADE FOR ROUND DUCT. ENDICOTT, NY 13760 6. ON DOWN DISCHARGE HEATING UNITS, MAKE SURE ALL SHIPPING WOOD SUPPORTS ARE REMOVED FROM HEAT EXCHANGE (SIDEWALL ACCESS). - GALVANIZED STEEL. 0.064 INCH THICK. Tel. (607)-321-6100 7. REMOVE ALL OTHER SHIPPING WOOD, SHIPPING BOLTS AND BLOCKS FROM ISOLATED BLOWER ASSEMBLIES, HEAT WHEEL, HEAT PIPES, AND CONDENSER -- BLADE EDGING: CLOSED-CELL NEOPRENE EDGING. SECTIONS. REMOVE ALL SHIPPED LOOSE ITEMS AND SPARE FILTERS FROM UNIT SECTIONS. www.stantec.com PROJECT#191001405 8. REMOVE SHIPPING CLIPS/MATERIAL FROM COMPRESSOR ASSEMBLIES. 3. DUCT INSULATION SHALL BE KNAUF DUCT WRAP ON ALL DUCTWORK WITH VAPOR BARRIER, MIN. R-6 - 9. CONFIRM FOR ALL UNITS SHIPPED SPLIT THAT THE SECTIONS ARE JOINED, THE WIRING IS COMPLETED AND AIR FILTERS ARE INSTALLED. 4. CONDENSATE DRAIN PIPING SHALL BE TYPE "M" HARD DRAWN COPPER TUBING WITH WROUGHT COPPER FITTINGS AND LONG RADIUS ELBOWS. SIZES SHALL BE 3/4" UNLESS 10. CONFIRM REFRIGERATION LINES ARE CONNECTED AND SYSTEM IS CHARGED. INDICATED OTHERWISE ON THE DRAWINGS; RUN TO ROOF OR DRAINS AS NOTED. DEVELOPER: 11. CONFIRM GAS CONNECTIONS ARE COMPLETED; LINES PURGED AND PROPER INLET GAS PRESSURE IS AVAILABLE IF APPLICABLE. 5. EQUIPMENT FLEX CONNECTION SHALL BE DURO DYNE EXCELON OR APPROVED EQUAL. 12. CONFIRM VENT LINES ARE CONNECTED AND INSTALLED PER ENGINEERED AIR'S INSTALLATION AND MAINTENANCE MANUAL. 6. ELECTRIC DUCT HEATERS (REHEAT COILS) GENERAL: 13. CONFIRM ALL REMOTE WIRING IS COMPLETED TO UNIT INCLUDING REMOTE STATUS PANELS IF PROVIDED AND CONTROLS (BY OTHERS). A. DUCT HEATERS SHALL BE INDEECO, TYPE QUZ STANDARD FLANGED HEATERS 14. CONFIRM MAIN POWER IS TURNED ON TO THE UNIT DISCONNECT SWITCH. LEAVE DISCONNECT "ON" FOR COMPRESSOR CRANKCASE HEATERS B. APPROVALS: HEATERS AND PANELBOARDS SHALL MEET THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE AND SHALL BE LISTED BY UNDERWRITERS 15. CONFIRM CORRECT VOLTAGE, FUSE SIZE, BREAKER SIZE AND WIRE SIZE HAVE BEEN CONNECTED. LABORATORIES FOR ZERO CLEARANCE TO COMBUSTIBLE SURFACES AND FOR USE WITH HEAT PUMPS AND AIR CONDITIONING EQUIPMENT. 16. CONFIRM DUCTWORK IS COMPLETED TO UNIT. C. HEATING ELEMENTS SHALL BE OPEN COIL, 80% NICKEL, 20% CHROMIUM, GRADE A RESISTANCE WIRE. TYPE C ALLOYS CONTAINING IRON OR OTHER ALLOYS ARE NOT 17. CONFIRM ALL CONSTRUCTION WORK IN UNIT OPERATING AREA IS COMPLETED. ACCEPTABLE. COILS SHALL BE MACHINE CRIMPED INTO STAINLESS STEEL TERMINALS EXTENDING AT LEAST 1-INCH INTO THE AIRSTREAM AND ALL TERMINAL HARDWARE 18. INSPECT FAN-WHEEL ROTATION FOR MOVEMENT IN CORRECT DIRECTION WITHOUT VIBRATION AND BINDING. SHALL BE STAINLESS STEEL. COILS SHALL BE SUPPORTED BY CERAMIC BUSHINGS STAKED INTO SUPPORTING BRACKETS. 19. REVIEW INSTALLATION, OPERATION AND MAINTENANCE MANUALS FOR ANY OTHER ITEMS THAT REQUIRE ATTENTION. D. HEATER FRAMES AND TERMINAL BOXES SHALL BE CORROSION RESISTANT STEEL. UNLESS OTHERWISE INDICATED, THE TERMINAL BOX SHALL BE NEMA 1 CONSTRUCTION 20. COORDINATE AVAILABILITY OF RELATED TRADES FOR SCHEDULED START UP DATE (GAS FITTER, REFRIGERATION MECHANIC AND ELECTRICIAN). AND SHALL BE PROVIDED WITH A HINGED, LATCHING COVER AND MULTIPLE CONCENTRIC KNOCKOUTS FOR FIELD WIRING. 21. CONFIRM THERE ARE NO AIR FLOW RESTRICTIONS. ENGINEERED AIR IS NOT RESPONSIBLE FOR DAMAGES TO EXTERNAL DUCT WORK DIFFUSERS OR E. ALL HEATERS SHALL BE FURNISHED WITH A DISC TYPE, AUTOMATIC RESET THERMAL CUTOUT FOR PRIMARY OVER-TEMPERATURE PROTECTION. ALL HEATERS SHALL ALSO MIXING BOXES. BE FURNISHED WITH DISC TYPE, LOAD CARRYING MANUAL RESET THERMAL CUTOUTS, FACTORY WIRED IN SERIES WITH HEATER STAGES FOR SECONDARY PROTECTION. 22. SITE IS SAFE TO WORK ON AND MEETS MINIMUM REQUIREMENTS FOR GOVERNING SAFETY CODE AND APPLICABLE LAWS. HEAT LIMITERS OR OTHER FUSIBLE OVER-TEMPERATURE DEVICES ARE NOT ACCEPTABLE. SEAL: 00QRpr£ 23. CONFIRM THAT THE DRAIN CONNECTIONS FROM THE UNITS ARE ALL COMPLETED (SEE OPERATIONS AND MAINTENANCE MANUALS FOR INSTRUCTIONS) F. HEATERS SHALL BE RATED FOR THE VOLTAGE, PHASE, AND NUMBER OF HEATING STAGES INDICATED IN THE SCHEDULE. ALL THREE-PHASE HEATERS SHALL HAVE �G�1L ��,�- fi S oEQUAL, BALANCED, THREE-PHASE STAGES. ALL INTERNAL WIRING SHALL BE STRANDED COPPER WITH 105'C INSULATION AND SHALL BE TERMINATED IN CRIMPED 4,, + 24. ENSURE THAT ALL HEAT EXCHANGER CONDENSATE LINES FOR THE HIGH EFFICIENT INDIRECT F1RED (INDOOR AND OUTDOOR UNITS) ARE ALL CONNECTORS OR BOX LUGS. � �'iGD �PE�COMPLETOD. 25. CLEAN CONDENSER COIL AND INSPECT FOR CONSTRUCTION DEBRIS. G. TERMINAL BLOCKS SHALL BE PROVIDED FOR ALL FIELD WIRING AND SHALL BE SIZED FOR INSTALLATION OF 75'C COPPER WIRE RATED IN ACCORDANCE WITH NEC 26. INSPECT AND RECORD PERFORMANCE OF INTERLOCKS AND PROTECTIVE DEVICES; VERIFY SEQUENCES. REQUIREMENTS. / REGON27. INSPECT CONTROLS FOR CORRECT SEQUENCING OF HEATING, MIXING DAMPERS, REFRIGERATION, AND NORMAL AND EMERGENCY SHUTDOWN. H. HEATERS SHALL BE FURNISHED, EITHER WITH THE CONTROL OPTION SPECIFIED IN THE SCHEDULE AND DESCRIBED BELOW, OR WITH THE SPECIFIC COMPONENTS LISTEDti� L28. MEASURE AND RECORD THE FOLLOWING MINIMUM AND MAXIMUM AIRFLOWS. PLOT FAN VOLUMES ON FAN CURVE. IN THE SCHEDULE. " RT,1• Q`�- :-: a. SUPPLY-AIR VOLUME. 1) OPTION K - THERMAL CUTOUTS, AIRFLOW SWITCH, CONTACTORS (WHERE REQUIRED), SCR (WITH STEP CONTROLLER IF HEATER DRAWS OVER 96 AMPS b. RETURN-AIR VOLUME. THREE-PHASED OR 192 AMPS CT SWITCH.NGLE--PHASE), FUSES (IF OVER 48 AMPS), CONTROL CIRCUIT TRANSFORMER, AND BUILT-IN SNAP-ACTING DOOR i EXPIRATION 2a, I c. RELIEF-AIR VOLUME. I. WHEN SPECIFIED IN THE SCHEDULE, OR BELOW, HEATERS WILL BE SUPPLIED WITH THE FOLLOWING SPECIAL FEATURES: d. OUTDOOR-AIR INTAKE VOLUME. 1) INSULATED TERMINAL BOX 29. SIMULATE MAXIMUM COOLING DEMAND AND INSPECT THE FOLLOWING: 2) TRANSFORMER SECONDARY FUSING (CLASS II) - a. COMPRESSOR REFRIGERANT SUCTION AND HOT-GAS PRESSURES. 3) STEP CONTROLLER REVISIONS: b. SHORT CIRCUITING OF AIR THROUGH CONDENSER COIL OR FROM CONDENSER FANS TO OUTDOOR-AIR INTAKE. J. WHEN SPECIFIED IN THE SCHEDULE, OR BELOW, HEATERS SHALL BE SUPPLIED WITH THE FOLLOWING THERMOSTATS: QISSUE FOR BID/PERMIT 06/06/2017 1) PROPORTIONAL ELECTRONIC ROOM THERMOSTAT 30. VERIFY OPERATION OF REMOTE PANEL INCLUDING PILOT-LIGHT OPERATION AND FAILURE MODES. INSPECT THE FOLLOWING: a. LOW-TEMPERATURE SAFETY OPERATION. 7. HUMIDITY SENSOR b. FILTER HIGH-PRESSURE DIFFERENTIAL ALARM. A. VAISALA HMW93D WALL-MOUNTED HUMIDITY SENSOR c. RELIEF-AIR FAN OPERATION. B. POWER PROVIDED FROM ENGINEERED AIR UNIT POWER SUPPLY; COORDINATE WITH UNIT MANUFACTURER. d. SMOKE AND FIRESTAT ALARMS. C. ACCURACY: +/- 1.7% RH AT 50' TO 1O4'F FROM 0 TO 90% RH D. SIGNAL OUTPUT: 0 TO 10 VDC 3.3 CLEANING AND ADJUSTING E. SUPPLY VOLTAGE: 18 TO 35 VDC; 24 VAC A. OCCUPANCY ADJUSTMENTS: WHEN REQUESTED WITHIN 12 MONTHS OF DATE OF SUBSTANTIAL COMPLETION, PROVIDE ON-SITE ASSISTANCE IN ADJUSTING F. NIST CALIBRATION CERTIFICATE SYSTEM TO SUIT ACTUAL OCCUPIED CONDITIONS. PROVIDE UP TO TWO VISITS TO SITE DURING OTHER-THAN-NORMAL OCCUPANCY HOURS FOR THIS PURPOSE. 8. SUBMITTALS: PROVIDE SUBMITTALS FOR REVIEW AND APPROVAL FOR ALL CRITICAL MATERIAL AND EQUIPMENT, TO INCLUDE BUT NOT BE LIMITED TO; B. AFTER COMPLETING SYSTEM INSTALLATION AND TESTING, ADJUSTING, AND BALANCING RTU AND AIR-DISTRIBUTION SYSTEMS, CLEAN FILTER HOUSINGS AND a. REHEAT COILS INSTALL NEW FILTERS. 3.4 DEMONSTRATION b. VOLUME DAMPERS, GRILLES. c. ELECTRICAL EQUIPMENT. 0 A. ENGAGE A FACTORY-AUTHORIZED SERVICE REPRESENTATIVE TO TRAIN OWNER'S MAINTENANCE PERSONNEL TO ADJUST, OPERATE, AND MAINTAIN RTUs. d. HUMIDISTAT. vi o1 e. DUCT FABRICATION/INSTALLATION DRAWINGS DRAWING BY: 3. 9. PROVIDE RECORD DOCUMENTATION OF FINAL TESTING, BALANCE, AND COMMISSIONING TO OWNER AND ENGINEER. DATE: AUGUST 2, 2017 JOB NUMBER: 2016285.50 t TITLE: PORTLAND "RENOVATIONS" i -5 MECHANICAL 5 c SPECIFICATIONS a E 07 SHEET NUMBER: En E a$ M- 1 .O 0 Y ti 7 m C M ErS: A ii II E mg li 0 o • 4 r DEMOLITION KEYED NOTES 1 IF _.—.4*_____ . t. 1 IPCVS 01 NOT USED 1 10 i ,--- 0 REMOVE ALL DUCTWORK AS INDICATED. Health �� Q REMOVE EXISTING TRANSFER GRILLE. PREP z....17 60 I 0 REMOVE ALL EXISTING FFUs. fra-- ...10 ROOM 44411411161\ls • ( ) COQ POUND I i �1 REMOVE EXISTING RETURN GRILLE. STORE ., 1(72 r...... ,.. ... _4 ANTE ROC M AIIIIIMik , , .e 0L { 101 CORAM, INC, 1 _-_, —� 7358 S W DURHAM RD. r i PORTLAND, 120 ' 0 OR 97224 Ad al - `, ! 1 _ IIIIs _k i - - _ ; BSC 0 }p c 1 PROJECT WE PHA C1� — 7:10 ' � �` F .'� INSTALLATION KEYED NOTES IYPB PPR 2 2 I1 _, _ - llIllIlIl x I -1' _ 0 22"x14" SA DOWN FROM RTU-1. W PROJECT 0106369 L _ , „:„71- rri 7 -/- - 44. ....... RECORD ♦ Et 1 1r�� �,. � Q 22"x12" RA UP TO RTU-1. 1 ARCHITECT OF 00 111111L - © 12"x6" RA UP FROM LOW WALL RETURN GRILLE. 0 011 +� L14/ I N ��1 r teir - 0 4 � i ��:! I��A > O 24"x8" TRANSITIONED TO 12"x8" RECIRCULATION AIR UP FROM LOW WALL RETURN I aDMPO NDING GRILLE. 0 1 i . : � ROM \ I 1 \ III ;: I I I IIS , no I � ea ( - ! 014"x12" RA UP FROM 24"x8" LOW WALL RETURN DUCT. #‘11* �/,� I01-11 `' ir, �o SECURE 4._ CIRC. � l I 7y ';� 1r,_ ��� !► " 0 18"x8" RA UP FROM 24"x8" LOW WALL RETURN DUCT. STDRAEE T27� I COOLER I +/ I •ffi (T2 I C 104 `- 7 , _i ' .-_... O 32"x8" RECIRCULATION AIR UP FROM 63"x8" LOW WALL RETURN DUCT. a g r� — 0 ' 10 I lo... !` I 0 NEW 2'X4' FFU. REFER TO SPECIFICATION AND SCHEDULE. BALANCE TO CFM SHOWN. gii:.• , __ VP CONSULTANT - ~ 1124--::› .e` ..1�:.. 0 PROVIDE a-10 VDC NIST TRACEABLE HUMIDiSTAT. WIRE TO RTU HUMIDITY INPUT. ` in., II� 'IIIII � REFER TO M-1.0 FOR HUMIDISTAT SPECIFICATIONS. ... _ ( Sitanitec \ lir, , ' 1 3 11 ' 1rids __. , 0 24"x15" SA DOWN FROM RTU-2. 1,-- - - -/1 \ II I '`� NO °` 1171 PROVIDE AND MOUNT BUBBLE TIGHT DAMPER IN EXHAUST DUCTWORK AS SHOWN. REFER 1 N II I TO M-2.1 FOR SCHEDULE. $tC1nfEC i �'' � � ' 1 111 GRANT AVENUE SUITE 201 \\,/ IN f ENDICOTT, NY 13760 I • — Tel. (607)-321-6100 (Ji?, f — - 1— ./ 1 € www.stantec.com PROJECT#191001405 I \ , ----- 1/ - (#74 1 MECHANICAL DEMOLITION PARTIAL FIRST FLOOR PLANf7 II DEVELOPER. M-1.1 SCALE:1/4"=1°-0" • N k n !\---,-/ 1 iT n .. .16,2_.‘„,„ 1 280 CFM /� 1 RHC 0 RG-1 0 RG-2 0 Y -106 RG-1 (2X)FFU-1 29fl CFM P" TE• �W$rr PP IT�l IIIXI _�M. i/D- FFU--1� RHC--106 I --- - - - — PDa �,� _..� e �� -__—�.- ®:��: D � � f� � 250 'CFM � 0 4,417A6:0... �1 �; , . — `.„ , , PROF 3X) ,. Ii,lIfPiLiA s',� E 16x8 �8 ` O, jsFFU-1�- -- 20X12 FF -1 � � 14x8 '�'� _ ""� ., 1 392 CFM i 39� CFM ■II�`I 1111 7 �G l�F 710 CFM V *OAL OM 0-® POS ' Iliii%, ARG-3 . ,, 1° /" 300 CFM 1 oft 3X FFU-1 �, ` ®� Oa ( } I 12x6 Vi:149,A 405 CFM _ -- 74410& u- ► 1 I 1 22x 1 • INRG-1 ' 2 1'IlFA 1 RHC - IR ; I 118"x 4" ( " 1101I 41 22x1 BAKEEDG GA Fr Fl lama otiDA'E: - -zo/9 I ID 11\sse ellirir, 24 , MIX D--AIR. PL-EN M Milt �- s. a��. ___ lip--1—r .,4x , mw ilir4/: ME 1D . Emir .Is 16x10 0 ' 'w11 jJo Ogi 1 II0 L 'u 1r= RHC1 Oa -, or ,,, 20"x6 ,�1 '� 111 1$ �_�� 1� }� 38fl CFM 38fl CFM �� REVISIONS. tii . 1 � ��� +'� �`� // D - un _ ___-*A',,,!, ►moi __ 1�ISSUE FOR BID/PERMIT 06/06/2017 �� FFU-1* 0 „/'-'-'\, ,r,,A 46, IN 14x8 392 CF ‘11211111 Ir 61 161 '� 4it , , .., , , riz 0 rM 0 .1_ ta, 1\370A ` `t��' .- 'X 'V�.NP A I 1 ,,,,, RHC.4-,' __... '` 1 i A E 2Ox 1 , VI';'" ,- 111111 FI 2 , 92 CF ® i j•f-� 20 S MPD ND►NC o __ ____-___ MN 1 �■ t CI 1_1J I UP ITHRU FF ,� 0 I wI ROgF TO SECU 3`2 &' M �� ': /� �� ¢ - - - vi 1N::!!!!-- � �TORA+. Ij m NgA0 , II 7 F-1 _ . ( 104 11.1111111111,M;ML14141111F �� � I ll RIM '•T[I3ULE''i< `FFU 1 FFU-1 j DRAWING BY: e#41 :4111111100111100) 1 C3 / _ -380 — -380 FM II IAKER1EDGEGARD HF BAKER EDGEGARD HF + =Ill' DATE: AUGUST 2, 2017 ! 1 I RG-1 i r I E JOB NUMBER: 2016285.50 ` IIIIIII NM E TITLE: PORTLAND "RENOVATIONS" Fel T? r� gg FFU SPEED 13 I MECHANICAL DEMO/INSTALL N c CONTROLLER I ' I PARTIAL FIRST FLOOR PLANS gyr SHEET NUMBER: B.E 151 \\ , 1 M- 1 • 1 \Sliglv ________I ill a 2 MECHANICAL INSTALLATION PARTIAL FIRST FLOOR PLAN ry: _.....1 C M E a KA-1.1 SCALE:1/4"=1°-0" N 1 I / JI I. 0 11110 C-3) At 4 ..___,, e ----..\\ I DEMOLITION KEYED NOTES 411PCVS < i I Q REMOVE , U, IATED CONTROLS.EXISTING MAINTAINROOF ELECTRICAL CURBRTFEED FORDUCT RISERS CONNECTIONAND TOASSOCNEW. r— Q J EI EAST I 7 Health LI Iry STORE I Ki I CORAM, INC. �°.�\-ci LLN D 1 L _ _ — — — — 7358 S W DURHAM RD. —� P 7 7 i I PORTLAND, OR 97224 z_z�.J , - _.. PROJECT TYPE PHis AiCY C - — _ _ _ .._.... — — — — — I DEAL TYPE NM IC8 PROJECT MAGER 0106369 I \ 1 I I ARCHITECT OF RECORD I \ r / / /1 _ _ _ _ 1 i 1 f� I r. .. I I 1 I1 II1 I I I I l ii CONSULTANT: EXIST - - - - - '- _ _ _ tang RTU 1 OUTLINE OF CLEAN ROOM SPACES j BELOW FOR REFERENCE I Stantec tr 111 GRANT AVENUE SUITE 201 ENDICOTT, NY 13760 __ __ - - - - - - Tel. (607)-321-6100 / I I www.stanteC.COm PROJECT#191001405 te- 1 1 MECHANICAL DEMOLITION PARTIAL ROOF PLAN1113 M-1.2 SCALE:1/4"=1'-0" N �� I P I }� DEVELOPER: V `i 4. GO '�;� f� 1 I � i C INSTALLATION KEYED NOTES ( 11, INSTASTRULL URNEW OWNERDRAWINS SULDRI TT CEFEO HET I STRUCTURAL GFORPPADDITIONALIEdTsANINFORMATIONROOFURBS.REGARDINGRR TINSTALLATION.ARCITCURAL AND 0 PROVIDE INSTALLATION OF EXHAUST FAN EF-1 AND ROOF CURB. I COORDINATE WITH BUILDING OWNER TO MAINTAIN ROOF WARRANTY. REFER TO pRO� / KI I ARCHITECTURAL AND STUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION 5'S / roopery IA I REGARDING INSTALLATION. 4t� �G 4 N�F r� CP J �'ss s�E'� / \ (020) / v F , ' , oMN° L _ _ ___ _ - - s ' .,1 RTU-2 I��.-� I�_II — ERTJ.G¢ .71 - - - - _ _' �., 0 .... Imo'_=J _.___. _... 7 DATE -.37-z4,/1 EXP1RATi0N�1T / / / / K.\\. / , \ O RTU-1 , REVISIONS: — L ISSUE FOR BID/PERMIT 06/06/2017 a / , F.:-071 \ \ \/ / P I R.' _r+. EF-1 0 CO) ! ..,_,1 C C CI I I DRAWING BY: 7 I I1 DATE: AUGUST 2, 2017 —] _ i - _ _ - _ - — JOB NUMBER: 2016285.50 SI, L I ( EXIST TITLE: PORTLAND "RENOVATIONS" fil e�i OUTLINE OF CLEAN ROOM SPACES i MECHANICAL DEMO/INSTALL e, BELOW FOR REFERENCE N o PARTIAL ROOF PLANS I SHEET NUMBER: - D - - - - _ . _ ._ - - - - ,t�-.-.. E o g M- 1 .2 A.... I ! I ( MECHANICAL INSTALLATION PARTIAL ROOF PLAN j 1 tiII M-1.2 SCALE:1/4"=1'-O" N �j c �Jh I C M E S' ---,---4,-...----4-4-4,-,e X53 `� Vj Y4 il g RELIEF t 200 AIR CFM RTU-2 "-- - _ RTU-1 /7 KETED NOTE ti F 1iW iW ! F 1 1 IP CVS ACCESS l ACCESS I ACCESS ACCESS ACCESS I ACCESS O °O.4. SECTION0 SECTION D O L SECTION c�4/6„, SECTION SECTION D Q T SECTION SMOKE DETECTOR INSTALLED BY MECHANICAL CONTRACTOR. 'LS / EF-1 c/kS / F,p / X I E HOOD • F�0 X I E L HOOD \� �/ %( ELECTRIC L R 770 O/C ELECTRIC L R I HealthINLET HEATING S I OA 910 CFM INLET HEATING Sl/1/\ OA 650 AIR COIL CFM AIR COIL , CFM o m � 11j U07 UN N r BTD-1 p I- . . . . . . . . . . . . . . . . . . . . . . . . STORE NUMBER RHC-106 CFM CFM CFM CFM CFM 3.1 kW 600 1— 600 0f —f,7761. 875 - CORAM, INC. • R r 7358 S W DURHAM RD. 411 CENT CFM r CFM ps. I PORTLAND, OR 97224 • VD VD 900 2,010 y 110 '1 r 1,900 rZ VDI— VDD.- CFM VD I- 900 DM TYPE 1FR 630 CFM 280 CFM PLENUM R RHC-102 �R RNC-101 LIjimi RHC-100 I 55F 55F 10.0 kW I!-�J 1.2 kW 21.1 kW PROJECT (3) ® (2) ® 1 -� i �/ CFM CFM 390 1 I I C8 PROJEC 0106369 405 CFM 290 CFM 2,350 1,312 CFM EACH EACH I IHEPA/FFUI IHEPA/FFUI NEWT SA NEWT SA NEW,SA NEW,SA NEWT SA NMI SA I NEWYSA NEWT SA I I NEW SA NEW►SA NEWYSA NEWYSA NEWISA I ARCHITECT OF RECORD 01,215 CFM 0580 CFM i 87 NEPA FFU IHEPA/FFUI IHEPA/FFUI IHEPA/FFUI IHEPA/FFUI IHEPA/FFUI 87NEPA FFU IHEPA/FFUI I IHEPAIFFUI I HEPA/FFU I NEPA FFU IHEPA/FFUI I HEPA/FFUl CEILING 0392 CFM 0392 CFM 0392 CFM 0392 CFM 0392 CFM 0392 CFM I CEILING ®250 CFM 0250 CFM I ®380 CFM 0380 CFM 0380 CFM 0380 CFM 0380 CFM I - G. PRESSURE ROOM-10_5i ANTE ROOM-106i i i i i i I fIA i i i i 1,263 CFM TOTAL 596 CFM TOTAL 109.5 SQFT 91.5 SOFT HTO RTU-1I • 70 ACH 40 ACH T TO RHC-102 TO RHC-101 I I TO RHC-100 L— I RG-1 VD I I VENT TO VENT TO VENT TO VENT TO VENT TO 30 ACH 51 ACH 390 CFM I 42 ACH ROOM ROOM ROOM ROOM ROOMI RTU-2 T� RHC-106 507 SQ. FT. I 74 SQ. FT. I 415 SQ. FT. 4 _i__, 4 4 RTU-2 rI BSC PREP ROOM-102 ANTE ROOM-101 I CLEAN ROOM-100 BAKER BAKER BAKER BAKER � EXHAUST HOOD RG� 1 + VD I ++ +++ EDGEGARD EDGEGARD EDGEGARD EDGEGARD HOOD UNIT VD VD I I VD VF VF VF VF NU-AIRE VD (2) RG-1 RG-2 RG-1 RG-1 SG-404 7 600 CFM MODEL 7(2)RG-03 140 140 140 �� I_• 140 150 150 150 656 CFM i I 150 150 110 CFM J 875 CFM 150 425-200 875 CIF' �` 252 CFM CFM CFM CFM RG- 0F3 i`"'� CFM CFM CFM CFM • CFM CFM �' CFM BSC ' CONSULTANT: EACH t i i 300 CFM � 1 i i t � i 1 i \ - . FLOOR I J ! - - FLOOR ' AI I I I ! I -� OP TA AP TA _ - J I AP T_A DP TA -. _- _� ___ _W_ - __ i +0.05 WC {MIN.) +D.05 WC � , ,.., +0.03" WC (MIN.) +0.03" WC (MIN.) (MIN.) IStantec (-1-- LEGEND 111 GRANT AVENUE SUITE 201 1 RTU- 1 & RTU-2 AIR FLOW SCHEMATIC M-2.0 SCALE:NONE SUPPLY AIR EA EXHAUST AIR ENDICOTT, NY 13760 Tel. (607)-321-6100 — — RETURN AIR SA SUPPLY AIR www.stantec.com PROJECT#191001405 TRANSFER AIR RA RETURN AIR - - EXHAUST AIR OA OUTSIDE AIR I\f\il OPPOSED BLADE DAMPER TA TRANSFER AIR —1 VOLUME DAMPER (VD) BTD BUBBLE TIGHT DAMPER Mg ELECTRIC DUCT REHEAT COIL _ } SHIPPING/ SECURE STORAGE-129 SEAL: WAREHOUSE .v4 PF20,:•615,6> 130/131 G�S� ,,t N .. O4 150 150 `* ‘ "P CFM CFM � E FLOOR t t f OkGCY1 . ERT 3•G' LSP TA Iv - +0.05" WC (MIN.) gRAT10M DA1E: -- °" OPTA - - - - - - - ® -_ ..-.. - -_ - - - +0.05 WC (MIN.) REVISIONS: ' ' 0 0y....,____v_ 0 1A ISSUE FOR BID/PERMIT 06/06/2017 1 li' t ;_-V M*I. I �r,; :� �.wc MIN II eie, 0.037 0.05 1 WC MI p•03" ,/,, WC MIN. i,.-..., B' ILI ; ite A.w. y_cmiN. rEl i. , .,4_ ,,,:,(-":‘,),, • y/L'N‘c C MiN. 'I 0.05" L NJ, 0I : WC MIN. I I ..\,,s00:: ' a 7i I I ; l ( DRAWING BY: I ' ! 0, ' I I [ \ DATE: AUGUST 2, 2017 0, \ GENERAL NOTE VVV 05-'I. 4 JOB NUMBER: 2016285.50 i1 WC MIN4 r CASCADE PRESSURIZATION AIRFLOWS SHOWN ARE TARGET VALUES FOR BALANCING. THE N 61 1BALANCING CONTRACTOR SHALL ADJUST AIRFLOWS AS REQUIRED TO ACCOMPLISH TITLE: PORTLAND RENOVATIONS -- DIFFERENTIAL PRESSURES INDICATED IN PRESSURIZATION PLAN. A� / \ I'` 1 l MECHANICAL AIR FLOW/DIAG. r cc N \ _ AND PRESSURIZATION PLAN �` @ .# II?) lr ( ' SHEET NUMBER: - M-2 .O Y�� L .,...` moi ill (--2- MECHANICAL PARTIAL FIRST FLOOR - PRESSURIZATION PLANC M rS""`..�.._.�...�._..�,.�A 0 n EE M-2.0 SCALE:1/8"=1'-0" N t'2 g �i I ROOF TOP UNIT SCHEDULE TAG AREA MANUFACTURER MODEL NUMBER DESIGN RETURN CONDENSER FAN OUTSIDE RELIEF SUPPLY FAN RELIEF FAN DX COOLING ELECTRIC REHEAT COIL FILTERS ELECTRICAL WEIGHT NOTES RTU HALF COUPLING NUMBER SERVED SUPPLY AIR AIR AMBIENT AIR AIR AIRESP TSP MOTOR MOTOR COIL TC SC EAT EAT LAT LAT COIL VELOCITY TEMP. RISE (3) DRAIN CONNECTION CLEANOUT PLUG 4IPCVS (CFM) (CFM) TEMP. (DEG. F) (CFM) (CFM) (IN WG) HP kW (MBH) (MBH) DB (T) WB ('F} DB (T) WB (T) (FPM) kW FLA ('F} PRE-FILTER FINAL FILTER VOLTS PHASE Hz MCA MOCP 111 1 RTU-1 COMPOUNDING SUITE ENGINEERED AIR FW1O2/K/O/MV/H/UVC 2,910 2,460 95 650 200 1.5 3.4 3.22 (2) © .19 1 106.6 91.1 71.3 57.5 44.9 44.3 409 11.0 13.8 10.8 2" MERV-8 4" MERV-13 460 3 60 46.0 50.0 3,400 1,2,3,4,5,6,7,9 RTU-2 NEG. PRESSURE RMS ENGINEERED AIR FW84/K/O/MV/UVC 910 0 95 910 0 2.5 4.2 1.44 N/A 1 57.2 39.2 91.8 72.4 56.2 55.5 342 14 17.57 44 2" MERV-8 4" MERV-13 460 3 60 56.6 60 3,200 1,2,3,4,5,8,9 r - NOTES: 2 28.8 13.2 56.2 55.7 44.2 44.2 467 1. UNIT INFORMATION PROVIDED FOR REFERENCE; UNITS PURCHASED BY OWNER. -).__r Health 2. COOLING COIL DATA IS BASED ON R-410A REFRIGERANT. 3. PROVIDE WITH 2" PLEATED - 30% EFF. PRE-FILTER SECTION AND 85% FINAL FILTER (PRIOR TO REHEAT). 4. PROVIDE REHEAT COIL FOR DEHUMIDIFICATION CYCLE. 5. PROVIDE ROOF CURB. Q r--;k- ITO ROOF 7. MAXIMUM 6. PROVIDE SUPPTH LYLAIR FLOWFAN. USED FOR RTU-1 SELECTION - 3,200 CFM. (MIN. DROP DRAIN STORE NEER ` 8. MAXIMUM SUPPLY AIR FLOW USED FOR RTU-2 SELECTION - 1,000 CFM. CORAM, INC. 9. SCHEDULED AIR FLOWS PROVIDED FOR UNIT SIZING. FOR BALANCING REFER TO DRAWING M-2.0 (PN /2) + 1" MIN. LEG 7358 S W DURHAM RD. (PN = 8.14") 1 PORTLAND, OR 97224 PROJECT TYPE PHARMACY' LOW WALL RETURN GRILLE SCHEDULE NOTES: ° ELECTRIC REHEAT COIL SCHEDULE ME PM 1. EXTERNAL DRAIN PIPING, INCLUDING TRAP FOR CS PROJECT NUMBER: 0106369 TAG TYPE MANUFACTURER MODEL QUANTITY SIZE MATERIAL NOTES CONDENSATE IS REQUIRED FOR ALL UNITS. • TAG AREA SERVED BASIS OF DESIGN MODEL TOTAL EAT LAT DUCT SIZE VELOCITY (FPM) TOTAL ELECTRICAL NOTES NUMBER NUMBER W x H OF REDUCING PIPE SIZE AND NON-CONFORMANCE NUMBER MANUFACTURER NUMBER CFM DB DB (W" x H") kW (IN) CONSTRUCTION TO THESE DETAILS WILL HINDER CONDENSATE p�u {'F) ('F) MIN. DESIGN VOLTS PHASE Hz " " 5 REMOVAL FROM DRAIN PAN OF AHU. ARCHITECT OF RECORD RG-1 LOW WALL RETURN GRILLE PRICE 630FF-SM-L-1-612-HL 6 24 x24 ALUMINUM 1, 2, 3, 4, 2. BASED ON BASIS OF DESIGN AHU. FINAL RHC-100 CLEAN ROOM INDEECO QUZ-K-U8 1,900 50 85 20" x 14" 320 977 21.1 460 3 60 1 RG-2 LOW WALL RETURN GRILLE PRICE 630FF-SM-L-1-B12-HL 1 12"x24" ALUMINUM 1, 2, 3, 4, 5 DIMENSION TO BE DETERMINED DURING CONSTRUCTION. RHC-102 PREP ROOM INDEECO QUZ-K-U8 900 50 85 18" x 14" 340 514 10.0 460 3 60 1 RG-3 LOW WALL RECIRC GRILLE - NPR ANTE PRICE 630FF-SM-L-1-B12-HL 3 16X16 ALUMINUM 1, 2, 3, 4, 5 RHC-101 ANTE ROOM INDEECO QUZ-K-U8 110 50 85 12" x 6" 210 220 1.2 460 3 60 1 NOTES: I RTU DRAIN PAN PIPING D ETAI L • RHC-106 NPR ANTE ROOM INDEECO QUZ-K-U8 280 50 85 10" x 8" 250 504 3.1 460 3 60 1 M-2.1 SCALE: N.T.S. 1. PROVIDE WITH POWDER COATED FINISH IN BRIGHT WHITE. ....--- NOTES: 2. REFER TO PLANS FOR CFMs. 1. PROVIDE WITH SCR CONTROL PACKAGE, DISCONNECTING CONTACTORS, AIR PRESSURE SWITCH, TRANSFORMER CLASS II, DOOR INTERLOCK 3. REFER TO DETAIL ON M-2.1 FOR FIT-UP. DISCONNECT SWITCH (NON-FUSED), 24V WALL THERMOSTAT, INSULATED CONTROL PANEL, HINGED LID. 4. PROVIDE WITH E MERV-8 DAMPERPLEAED FILTER OPTION ( ) 5. PROVIDE OPPOSED BLADE SIMILAR TO PRICE VCS3AL. FAN FILTER UNIT SCHEDULE (POWERED TERMINAL) EXHAUST FAN SCHEDULE TAG LOCATION SERVICE MODEL DESIGN TOTAL FAN MOTOR ELECTRICAL NOTES TAG AREA MANUFACTURER MODEL QUANTITY MAXIMUM STATIC PRESSURE INLET ELECTRICAL NOTES NUMBER NUMBER CFM STATIC RPM HP - NUMBER SERVED NUMBER CFM TYPE/SIZE INLET DOWN MIN. MOTOR MOTOR VOLTS PHASE Hz FLA (IN WG) VOLTAGE PHASE Hz CONSULTANT: (IN WG) (IN WG) (IN WG) TYPE WATTS EF-1 ROOF 4' BSC CUE-099-B-1/6 770 0.5" 1,336 1/6 115 1 60 1, 2 FFU-1 CLEANROOM SPACES ENVIRCO MAC 10 2x4 LEDC RSRE 18 850 1.0 0.5 0.2 DUCTED ECM 250 115 1 60 2.75 1, 2, 3, 4, 5, 6, 7 NOTES: NOTES: 1. BASIS OF DESIGN MANUFACTURER: GREENHECK 2. INCLUDE HORIZONTAL MOUNT EXHAUST DAMPER AND ROOF CURB. C$Stantec 1. UNIT FURNISHED BY OWNER AND INSTALLED BY THIS CONTRACT. 2. PROVIDE POWDER COAT WHITE PAINT FINISH FOR HOUSING AND SCREEN. 3. PROVIDE UNIVERSAL CONTROL CARD. VANE RUNNER Stantec 4. PROVIDE ROOM SIDE REPLACEABLE MOTOR ASSEMBLY, BAFFLE, AND 99.99% AT 0.3 MICRON FILTER, 5. ROOM SIDE 1/8" FNPT CHALLENGE PORTS: CONVENIENT AEROSOL CHALLENGE AND NEPA FILTER TESTING. / 111 GRANT AVENUE SUITE 201 6. REMOTE SPEED CONTROLLER MOUNTED IN PREP ROOM. rte! - ENDICOTT, NY 13760 7. REMOVE PREFILTER PRIOR TO INSTALLATION. a° BUBBLE TIGHT DAMPER SCHEDULE Tel. (607)-tante3216100 �4 0 1"R TAG LOCATION SERVICE MODEL DESIGN TOTAL MOTOR ELECTRICAL NOTES www.stantec.com PROJECT#191001405 HANGER RODS // � / 444 NUMBER NUMBER CFM STATICHP (IN WG) VOLTAGE PHASE Hz ROD POSITIONING NUT STEEL ANGLE BLADE STOP SOLID BANDS INSULATION 2"R ABOVE SECURE HANDLE WITH SET SCREW BOLT TO DUCT VARIES ♦� BTD-1 STORAGE 104 4' BSC "PSD" 770 0.5" 8.5 VA 115 1 60 1, 2 DEVELOPER: ■■II■•i•tu■ •■■■■■■■■■• - �` 900 NOTES: ALIGN HANDLE WITH 1 1/8" SMALL DOUBLE VANE 1. BASIS OF DESIGN MANUFACTURER: RUSKIN - STANDARD CONSTRUCTION EXCEPT FOR �' _ BLADES AND AXLES. MI •_. ,1444.....DAMPER BLADE DUCT { } GALVANIZED FRAMES, 2. BELIMO SPRING TO BE TWO POSITION "FAIL CLOSED" ACTUATOR WITH INTEGRAL LIMIT BLADE POSITION I SWITCHES. MODEL AFBUP-S OR EQUAL. LOCKNUT '_ [ VANE RUNNER 1 1/4- CLEARANCE - in a•■■iu■■u■s ■•■•••■•••i no SAME GAUGE 12"MAX ALL-AROUND frii-ala. Ell111111111111 1111111111111111 / AS DUCT BEARING FITTING .4FIAL, ,_` 77 77 BEARING TO DUCT BLIND RIVETS SUPPORT ANGLE °' ..i m m (OR WELD STUD) TYPE A TYPE BLLI T 1111 cc 2"R ROTATION (90 DEG) qL a � SEAL: ENSURE BOLTS CLEAR BLADE, DUCT WIDTH ROD DIAMETER TYPE SUPPORT ANGLE MAX. SPACING 4"R : 1\/ r��D PRo� 2' STAND-OFF BRACKET 2" OR INSTALL THEM IN OPPOSING " " / / / �4, tc.Pai N i. BOLT TO DUCT 1 CORNERS AWAY FROM BLADE UP TO 24" USE 1"x1/8" A NONE 4'-O" O.C. � PES /j/ ROTATION '� 90° - 25" TO 36" 3/8" B 1 1/2"x1 1/2"x1/8" 8'-O" O.C. 2 1/4" /�%' /�- (TYP) VARIES OREGON '513/8" DIA. THREADED ROD 37" TO 48" 3/8" B 2"x2"xi/$" $'-o" Q.C. _ LARGE DOUBLE VANE �' . t STEEL CLAMP, BOLT TO 25" 16 GA. STEEL BLADE BLADE, PROVIDE AN 49" TO 60" 3/8" B 2"x2"x3/16" 6'-O" O.C. ADDITIONAL ANTI-SUP BOLT / -I • -1 !EXPIRATION DATE: lv-3o-moA NOTES: THRU THE ROD 61" TO 84" 3/8" B 2"x2"x 1/4" 6'-O" O.C. 1. DAMPERS FOR ROUND DUCTS SHALL BE SIMILAR TO THE DAMPER SHOWN ABOVE. (3.- DUCT-TURN INSTALLATION DETAIL 2. ENSURE THAT FULL 90' DAMPER BLADE MOVEMENT IS UNOBSTRUCTED. SELECT FOR 1/2" MAX. " Q 3. FOR DUCT HEIGHTS MORE THAN 12", PROVIDE FACTORY-FABRICATED OPPOSED BLADE DAMPERS. ABOVE 84" 3/8" B 6'-O" O.C. M-2.1 SCALE: N.T.S. o DUCT DEFLECTION AT DES. LD - = 0 Z REVISIONS: MANUAL DAMPER 8"-_,/ 10 ISSUE FOR BID/PERMIT 06/06/2017 i (ADJUSTABLE SINGLE-BLADE BALANCING TYPE) 1-1/2"x5/16"x2"N0.16 w M-2.1 SCALE: N.T.S. DUCTWORK HANGER DETAIL AND SCHEDULE �✓ M-2.1 SCALE: N.T.S. GAUGE ZEE FRAME, MITERED 2"x3/8" NO.16 GAUGE --- �-- .-- AND WELDED AT CORNER RUBBER GASKET ANGLE FRAME , MITERED HlNGE-� FASTENED TO FRAME AND WELDED AT CORNERS - WHERE GREATER DIMENSION / FACCESSIS OVER 31 MAKE ANGLE LOUVER 1" MIN. ON TOP , OPENING.L�,,..,.,,,,,, 2" 3/4" _ / /// WALL OR PARTITION AND BOTTOM , „rya..,; s, _ x ' - / INSULATION ADJUSTABLE SIDE OF DUCTS a 1" PLEATED - ,,,Air , ELBOW RINGS N0.20 GA. MERV 8 FILTER / DUCT N 14 GA. SHEET METAL SLEEVE MAIN DUCT ,�., WELD GALV. PANEL STRIKE nN. n HINGE SASH FASTENE' OPPOSED BLADE -/ rem . 1.111( ( 10 /BALANCE I -- SASH LOCK TYPE _ N FOR DUCTS OVER 5 SQcr. .FT. DAMPER PRICE MODEL / # CROSS-SECTIONAL AREA �� SEAL ALL 630FF-SM-*-1-HL-B12 7.1 AROUND EQUAL TO / * = s oR L, - / DRAWING BY: 1 REQ'D BRANCH DEPENDING ON - rn 7DUCT DIA. c 1/4"WELD -- 1" //// TUREIJ BCOPENINGAJ1" 1/4"WELD OVERALL LENGTH = /N DATE; AUGUST 2, 2017 .b w SIDE OF DUCT - / JOB NUMBER: 2016285.50 1" MIN. ON TOP 1 4" BRANCH DUCT SQUEEZE TIGHT _ FASTENER .n a, AND BOTTOM WIDTH, BUT MIN. 4" 4� ` I 1/4" STUD ' RADIUS ELBOW it PANEL SAME GAUGE WITH SQUARE ��E: PORTLAND "RENOVATIONS" ▪ o 70000 MAIN - WING NUTAS DUCTWING NUTTHROATN. • • c - DUCT RUBBER GASKET FASTENED MOUNT GREECE MECHANICAL DETAILS N CAULK ALL AROUND TO OPENING FACE 12" AND SCHEDULES AT 1'-O" A.F.F. ANCHOR SLEEVE TO WING NUT TYPE WALL OR PARTITION -� FRAMING AS REQUIRED 11111 ,BRANCH DUC Ill Q'© FIRE DAMPER ACCESS AND WITH SUITABLE SHEET NUMBER: g$ ANCHORAGE ,� e SEAL ALL DIMENSIONS DUCTS UP TO 5 SQ.FT. FLOOR a CROSS-SECTIONAL AREA /7// 1 b AROUND M-2 . 1 . .. 6' " (Th LOW WALL RETURN DUCT PENETRATION THROUGH WALL DETAIL 5 TYPICAL BRANCH TAKE-OFF FITTING DETAIL e DUCTWORK7 c•MME s: A II II E M-2.1 SCALE: N.T.S. ACCESS PANEL INSTALLATION DETAIL INSTALLATION DETAIL .- M-2.1 SCALE: N.T.S. SCALE: N.T.S. =c `� M-2.1 �� M-2.1 SCALE: 1 1 2"=1'-O"