Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans
M EC2017 - 00034 GENERAL NOTES ALL NOTES INCLUDED HEREIN ARE MADE PART OF EACH AND ALL MECHANICAL, ELECTRICAL AND PLUMBING SECTIONS OF WORK. 11 1. REFER TO LANDLORD'S SPECIFICATIONS AND TENANT DESIGN CRITERIA FOR NECESSARY INFORMATION AND COORDINATION WITH OTHER TRADES. M-Engineering 2. THE ABBREVIATION LSD&C WHEREVER IT APPEARS IN THE DRAWINGS, SHALL REFER TO "LBRANDS DESIGN AND CONSTRUCTION". ANY REFERENCE 750 Brooksedge Blvd. TO TENANT, BRAND SPECIFIC VICTORIA'S SECRET, ETC.) OR FURNISHED BY ANY OF THE ABOVE REFERS TO LSD&C. Westerville, Ohio 43081 phone:614.839.4639 3. ANY DISCREPANCY BETWEEN LSD&C DRAWINGS AND TENANT CRITERIA, LSD&C DRAWINGS SHALL TAKE PRECEDENCE. fax:614.839.2222 www.mengineering.us.com 4. THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC TO THE EXTENT THAT ALL INSTALLED ITEMS AND LOCATIONS ARE NOT EXACTLY PLACED AND ARE NOT TO BE SCALED. 5. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELATED PERMITS AND INSPECTION FEES. GRILLE, REGISTER, AND DIFFUSER SCHEDULE �,��¢s w OP , 4 4 6. BEFORE COMMENCING ANY WORK, CONTRACTORS SHALL REVIEW THE LATEST NATIONAL, STATE AND LOCAL CODE REQUIREMENTS INCLUDING MARK \ SD-1 / SD-2 SD-3 \ SD-4 41 SD-5 4 f I 10,/, LANDLORD CRITERIA AND PERFORM THE WORK IN STRICT ACCORDANCE WITH THESE. IN CASE OF CONFLICT THE STRICTER REQUIREMENTS WILL MANUFACTURER ILIMIEWA TITUS TITUS MEIMINIIIIMEMINA6881 SPE 9 PREVAIL MODEL _ OMNI _ OMNI TMSA `+, i " _, OMNI __ OMNI ` . NECK SIZE (L"XW") �L P .i= SEE PLAN SEE PLAN � 1'�' ©, P ,lj- -� 7. NO ADDITIONAL COMPENSATION SHALL BE MADE FOR ANY CHANGE ORDERS DUE TO CONTRACTOR'S FAILURE TO VISIT THE JOBSITE AND/OR FRAME SIZE (L"XW") �, ' 24X24 24X24 MIVAIMMIEFAM �; PREDETERMINE ALL EXISTING CONDITIONS BEFORE SUBMITTING HIS BID. FRAME TYPE 1 I LAY-IN LAY-IN IMBIl i'�rit1M 4' '9 Y f 7 \9q �Oc A. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO SUBMITTING A BID. FOR THE PURPOSE FINISH* MEM6 TITUS '26 TITUS 26 � Lfi �7, ;1� cFrOSH1 N.�'O OF SURVEYING EXISTING CONDITIONS, WHICH MAY AFFECT THE WORK TO BE DONE UNDER THIS SECTION, ANY DISCREPANCIES SHALL BE NOISE CRITERIA LEVEL W <30 <30 <30 W <30 -- <30 IMMEDIATELY REPORTED TO THE GENERAL CONTRACTOR, LSD&C OR THE LANDLORD'S FIELD REPRESENTATIVE FOR CLARIFICATION. ACCESSORIES , 7 2,6 2 ,©„©, E1 TION DAA - }NOTES FMIIME 1 1 rAmEmitummim B. AFTER BID, ANY QUESTIONS RELATING TO SPECIFIC M, E, OR P ISSUES ARE TO BE DIRECTED AS RFI'S THROUGH THE LSD&C PROJECT MARK \ SD-6 / SD-7 SD-8 SD-9 \ SD-10 / MANAGER. MANUFACTURER ,®, TITUS TITUS TITUS kmiamwA C. SHOULD THE SPACE HAVE BEEN INACCESSIBLE FOR INSPECTION CONTRACTOR MUST INDICATE SO ON HIS BID. MODEL _ 300RS _ OMNI OMNI OMNI _ TDC - Z O 'd NECK SIZE (L"XW") ."X6"- SEE PLAN SEE PLAN SEE PLAN 9" Warn 8. THE GENERAL CONTRACTOR'S FIRE SPRINKLER SUBCONTRACTOR SHALL DESIGN AND INSTALL FIRE SPRINKLER SYSTEM CONFORMING TO LANDLORD'S FRAME SIZE (L"XW") 8 �' 12"X12" 12"X12" 24"X24" 1111BNEM _ Cci CO CRITERIA, TENANT'S REQUIREMENTS AND PER LOCAL CODES AND NFPA STANDARDS. FRAME TYPE ®jI LAY-IN LAY-IN LAY-IN TYPE Avian Ci) I- L{j FINISH* MFAE1L6 TITUS ;26 TITUS ,84 TITUS ;84 MEE 67:3 (.) .-c0 .47): 9. THE CONTRACTOR, WITHIN FIFTEEN (15) DAYS OF THE AWARD OF THE CONTRACT, SHALL SUBMIT TO THE OWNER, SIX (6) COPIES OF A NOISE CRITERIA LEVEL <30 ' <30 <30 <30 W' <30 1M COMPLETE LIST OF MATERIALS AND EQUIPMENT PROPOSED FOR THE JOB INCLUDING ALL DATA, PART NUMBERS, RATING CAPACITY, SIZE, ACCESSORIES P,.' 4,6 4,6 2,6 , 4,6 , Q DIMENSIONS, ELECTRICAL DATA, GRADE, MANUFACTURER, AND ANY OTHER DESCRIPTIVE DATA FOR ALL EQUIPMENT OR SYSTEMS THAT DEVIATE NOTES 'AMAMI 1 1 1 / 6 1 CtCQ FROM SPECIFIED ITEMS. ANY DELAYS OR COSTS DUE TO THESE DEVIATIONS, WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. MARK \ SD-11 SD-12 \ SD-13 I 2, 10. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISPOSAL OF ALL UNUSED OR ABANDONED MATERIALS AND EQUIPMENT, AND ITS REMOVAL OFF MANUFACTURER ,®A TITUS MEI-2MZ E co TAM HE LANDLORD'S PREMISES. MODEL TDC AM TDC ft, TDC NECK SIZE 9"X9" "O 9" 20 11. OWNER RESERVES THE RIGHT TO HAVE CONSTRUCTION REVIEWED BY AN OUTSIDE CONSULTANT PRIOR TO ACCEPTANCE OF THE PROJECT. FRAME SIZE (L"XW") NEM 12"X128 �i � 0:5 O • 0 12. EACH CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP RELATED TO HIS WORK FOR A MINIMUM PERIOD OF ONE YEAR FROM FINISH*TYPE FRAME �AMan SAT THE DATE WHICH THE OWNER ACCEPTS THE PROJECT. THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER OR TENANT SHALL CORRECT �1 �6 TITUS 84 Cr� � � p ANY DEFECTS IN MATERIALS OR WORKMANSHIP DURING THIS GUARANTEE PERIOD. NOISE CRITERIA LEVEL ! <30 1M <30 _ <30 1M ACCESSORIES I 4,6 , 4,6 V 4,6illir n 13. EACH CONTRACTOR SHALL BE RESPONSIBLE AND ENSURE A CLEAN INSTALLATION ESPECIALLY IN EXPOSED CEILING AREAS. THE FINAL APPROVAL NOTES I 6 1 6 V 6 1 NM 1565 d. OF THIS WORK WILL BE ISSUED BY LSD&C PROJECT MANAGER. LD-1 A LD-2 MARK 1 LD-3 „ ,�, 14. PROVIDE ONE SETS OF AS-BUILT DRAWINGS INTO PLAN TUBE AND ONE BOUND SETS OF ALL OPERATIONS MANUALS, DIAGRAMS, SERVICE MANUFACTURER k PRICE AL PRICE A CONTRACTS AND GUARANTEES IN BINDER TO STORE MANAGER. A REPORT PREPARED IN ACCORDANCE WITH MECHANICAL SPECIFICATIONS BY AN MODEL W, AS210 Amok AS210 ,-_ AS220 _ 0 INDEPENDENT AIR BALANCE CONTRACTOR, HIRED BY GC, MUST BE INCLUDED IN THE CLOSE-OUT PACKAGE. NECK SIZE (L"XW") MEL: P P i .- 'D FRAME SIZE (L"XW") MEW SLOTS MEW SLOTS may" SLOT W C J W -0 O HVAC GENERAL NOTES FRAME TYPE TYPA 2P Ma 2P TYPE,2P a -c FINISH* .11111L PR, MIEM PRAMIFAM 0 a C 1. THESE PLANS MAY BE USED FOR CONSTRUCTION ONLY AFTER APPROVAL IS OBTAINED FROM THE BUILDING DEPARTMENT MECHANICAL PLAN NOISE CRITERIA LEVEL W. <30 ®_ <30 __ <30 H E - CHECK DIVISION AND THAT DIVISION'S STAMPED APPROVAL AND AUTHORIZED SIGNATURE APPEAR ON THE PLANS. ACCESSORIES r�,�, 111/ 8 ' (I) i- 2. COORDINATE ALL WORK WITH ALL TRADES INCLUDED BUT NOT LIMITED TO ELECTRICAL, PLUMBING, FIRE PROTECTION AND STRUCTURAL NOTES I �I SIREaI CONTRACTORS. INSTALL ALL WORK TO CLEAR NEW AND EXISTING ARCHITECTURAL AND STRUCTURAL MEMBERS. NO ITEM SUCH AS PIPE, DUCT, MARK \ /\ RG-2 / RG-3 RG-4 ETC. IS TO COME IN CONTACT WITH ANY EQUIPMENT. MANUFACTURER `®AILMEHEW, TITUS TITUS `�A MODEL _ 355RL _- 355RL AM 355RL 50F - 355RL ' JUN ) 3 2017 3. REFER TO ARCHITECTURAL DRAWINGS FOR DEMOLITION WORK. NECK SIZE (L"XW") Mt`E[+TMMIEZ ' +,. 10"X10" 22"X22" itarg CITY OF ,I(,ARD EXISTING FAN TERMINAL UNIT SCHEDULE FRAME SIZE (L"XW") MTIMMU NAI 24"X24" , 4. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT FIXTURE LOCATION. _ MARK (FPVAV-#) 1 2 3 4 5 FRAME TYPE �1�'yCCI 1� LAY-IN LAY-IN �, � BU1LD1NGDIVIS ON 5. CONTRACTOR SHALL PROVIDE CUT SHEETS TO LSD&C FOR ALL EQUIPMENT AND DEVICES FURNISHED BY THE CONTRACTOR THAT DEVIATE FROM TRANS PACKAGE NUMBER NS NS NS NS NS FINISH* �a ____1.6 \6 TITUS ;26 TITUS ;26 MME 6 SPECIFIED ITEM FOR REVIEW AND APPROVAL PRIOR TO THE PURCHASE OF ANY SUCH EQUIPMENT OR DEVICES. MODEL VSEF1407 VSEF1407 VSEF1407 VSEF1407 VSEF1407 NOISE CRITERIA LEVEL W. <30 '_ <30 I. <30 <30 _ <30 FAN SIZE 0750 07SQ 075Q 075Q 07SQ V V � 7 ACCESSORIES 6 6 W a .E _ dz ..�o_ 4^ 6mr� as " NOTES r �� 2,5 1 W Z u, W � W z a -Q W. Z 6. HVAC CONTRACTOR IS RESPONSIBLE TO INQUIRE WITH THE LANDLORD'S REPRESENTATIVE ON ANY SMOKE EVACUATION SYSTEM IN USE AT THE INLET SIZE 14" DIA. A 14" DIA. 14" DIA. 14" D1A. 14 DIA. 6 0 i p C-a w 6,y, MALL AT THE TIME OF THE BID. IF THE SAID SYSTEM IS NOT ADEQUATELY DESCRIBED ON THE DRAWINGS, THE MECHANICAL CONTRACTOR IS MAXIMUM PRIMARY AIR FLOW (CFM) 2700 f 3\ 1920 2000 2500 s 1300 Z r 8 ,=, N= g MARK \ RG-6 /\ RG-7 / RG-8 \ RG-9 /\ RG-10 A 6 a= t N a W xe. RESPONSIBLE TO INFORM THE GENERAL CONTRACTOR AND INCLUDE THE COST AS A SEPARATE LINE ITEM IN THE BID. NO ADDITIONAL MONEYS MINIMUM AIR FLOW (CFM) 810 600 600 750 540 MANUFACTURER ,�AL�� TITUS I'�A,�A N W 2 0' z 0 -. - - = W 2 SHALL BE AWARDED FOR TIE-IN REQUIREMENTS TO A LANDLORD'S SMOKE EVACUATION SYSTEM THAT IS IN EXISTENCE AT THE TIME OF THE BID, FAN PERFORMANCE 1 E 6 O 0 =o t1 5 ?m 0 _ WITHOUT HAVING IDENTIFIED A SEPARATE LINE ITEM FOR THE SMOKE EVACUATION SYSTEM AT THE TIME OF THE BID. MODEL ML 355RL _M�AM 355RL -��_ _ . Z a Y N W ,r. -k rte. <W =wz a. < O„ 0' MAXIMUM AIR FLOW {CFM) 2700 1920 2000 2500 1300 NECK SIZE (L"XW") �ti [+=�Z = 10"X10" �Z�+s=�t ►T� Las.z = ,oW ,_ -} ,- 0 ,3 W EXTERNAL STATIC (IN W.C.) 0.5 0.5 0.5 0.5 0.5 FRAME SIZE (L"XW") �'Z;s ''• 12"X12" j'F `i ."' v = W W Q ~V g1 v, 7. ACCESS TO ALL COMPONENTS AND EQUIPMENT MUST BE PROVIDED TO MEET CODE AND SERVICE/MAINTENANCE EASE. ��=� ���� 6 Z o = <. a``. .- _ 4 0= " FAN MOTOR HP 1 1 1 1 1 1 1�____ LAY-IN ____ ____ � = =ZOO ` O O "_ M 2t.-2 „ .a.n = N J � ..W ,NQ W ^ o � W ELECTRIC HEAT .. FRAME TYPEW=.z E C m 6 ZP. N 5 w o m 8. PRIOR TO STARTUP OF HVAC EQUIPMENT, MECHANICAL CONTRACTOR WILL CONFIRM WITH ONE OF THE LISTED HVAC MANUFACTURER FINISH* MOME.6 �i 6 TITUS 84 _____Tm�y �rm REPRESENTATIVES THAT CORRECT POWER FOR EQUIPMENT HAS BEEN PROVIDED TO LSD&C PROVIDED HVAC UNITS AND HAS BEEN TURNED ON POWER INPUT (WATTS) 3000 3000 3000 3000 5000 NOISE CRITERIA LEVEL _ <30 __ <30 <30 WY <30 <30 a 2 i L9 2 °° ^0 a a a 6 -� ¢ z z Or =o < =eeEi (BTU/HR) ACCESSORIES I�'I 6 , 6 I 2,6 \I 6 , .. ...„T, ,,, d. 2 _-_ FOR A MINIMUM OF 24 HOURS. LSD&C RESERVES THE RIGHT TO CHECK CONSTRUCTION COMPLIANCE WITH PLANS AND SPECIFICATIONS. SHOULD HEAT OUTPUT10,239 10,239 10,239 10,239 17,065 W 4W a o. .-- „0.2 a � wWa = ,v _oma THE OWNER FIND CORRECTIVE WORK TO BE NECESSARY, HE WILL NOTIFY CONTRACTOR OF SUCH WORK IN WRITING AND EXPECT COMPLIANCE STAGES 1 1 1 1 1 NOTES I 1I 2 _ I w_ F FI, ,, E _ L.,,,,. . d PERFORMED WITH DUE DILIGENCE. IF ANY CORRECTIVE WORK IS DEEMED TO BE NECESSARY, THE COST OF REINSPECTIONS WILL BE BORNE BY ELECTRICAL a W Q W =16 w s. UE- 2 o VOLTS/0/HZ (WIRES) 208/3/60 208/3/60 208/3/60 _ 208/3/60 208/3/60 =MUM \ / EAG-2 \ / W-r°.,0 0 ~ ce 0 THE CONTRACTOR. THE MECHANICAL CONTRACTOR WILL THEN ENSURE THAT THE EQUIPMENT IS POWERED FOR A MINIMUM OF 24 HRS BEFORE MARK W o 7 0 1- , 0,,,- , 6 = FAN MOTOR AMPS (VOLTS/0) 6.6 6.6 6.6 6.6 6.6 , , &®, ,�, N a p a o`€0 START-UP. MANUFACTURER TITUS V,V, c. ,, N W.. .- V, ,0" ,1 ELECTRIC HEATER AMPS (VOLTS/0) 8.34 8.34 8.34 8.34 13.89 MODEL _ 355RL _ _ 355RL _ 355RL _ 355RL _ NI w6�" a W9. IF WORK IS REQUIRED BY LSD&C IN ORDER TO IMPROVE, CHANGE OR CORRECT A!R CONDITIONING OPERATIONAL CONDITIONS DUE T0: PART ` O zZ'� W ~z =_MALFUNCTION, WARRANTY OR OTHER INABILITY TO PROVIDE THE COMFORT CONDITIONS REQUIRED BY THE STORE, CONTRACTOR SHALL BE MCA (AMPS) 18.68 18.68 18.68 18.68 24.36 NECK SIZE (L"XW") �L+ + m EIR 10"X1 O" �NU a O 0 . '=FRAME SIZE (L"XW"112"X12" ~ m te0 w T W� .8,_ L) .. DIRECTED BY LSD&C TO ADDRESS THIS WORK INA TIMELY MANNER. IF IT BECOMES EVIDENT THAT THE CONTRACTOR CANNOT ACCOMPLISH THE ABBREVIATIONS-MECHANICAL MOCP (AMPS) 25 25 25 25 35 MIIIR MEM= .•,,,- 4 ,,, N W m= , N a O Z c,..9 `±' =._. = r X N TASK, THEN AFTER 72 HOURS OF WRITTEN NOTICE THE OWNER MAY, AT HIS DISCRETION, TAKE OVER SUCH WORK AND BACK CHARGE THE APPROX. WEIGHT (LBS) 175 175 175 175 190 FRAME TYPE Vi'j © `1'��1� LAY-1N �;�,��I�j,_ .6.2.4c.,, - -4 = -=o W. '5. - FINISH* �1�l6 WA 6 TITUS #84 ME146 1aooF IncetQ7w " Q=W CONTRACTOR FOR ANY CORRECTIVE WORK THAT WAS REQUIRED DUE TO LACK OF PERFORMANCE, WORKMANSHIP AND/OR ADHERENCE TO PLANS AABC AMERICAN AIR BALANCE COUNCIL FPM FEET PER MINUTE OA OUTDOOR AIR ACCESSORIES 1-2 1-2 1-2 1-2 1-2 Q 2= W= Z 2 °Z= V 'a "2 `,~ 2 AFF ABOVE FINISH FLOOR FPS FEET PER SECOND OAT OUTDOOR AIR TEMPERATURE NOISE CRITERIA LEVEL - <30 <30 <30 <30 _ _ -41.-..9n8.g. `7'5 a E5220.1 = _ 13 0 0 AND SPECIFICATIONS. NOTES 1 1 1 1 1 N _; g _n 2 4 N = ge W 9�;„, AHU AIR HANDLING UNIT FV FACE VELOCITY OBD OPPOSED BLADE DAMPER ACCESSORIES C"S" INDICATES STANDARD; "0" INDICATES OPTIONAL): ACCESSORIES V , 1,6 , 1,6 /�\ ‘;'`Ac.›.-EF, ',.} o=a 0 c, `'o E �` _ `' W W O O h7 W- O O c-'GY W = ._O W l` J APD AIR PRESSURE DROP OD OUTSIDE DIMENSION OR DIAMETER .W z o r o W r a W W= d olu O m W 10. UPON COMPLETION OF THE WORK, CONTRACTOR SHALL VERIFY THE PROPER WORKING ORDER OF THE SYSTEM(S) AND MAKE ANY ADJUSTMENTS NOTES I I 2,5 I \ ASHRAE AMERICAN SOCIETY OF HEATING, GAL GALLONS OPNG OPENING 1. S-FACTORY PROVIDED DISCONNECT SWITCH. AS REQUIRED. REFRIGERATING AND AIR GALV GALVANIZED 2. S-FACTORY PROVIDED CONTROL TRANSFORMER. ACCESSORIES: `- p 11. PROVIDE FILTER CHANGES THROUGHOUT CONSTRUCTION AS REQUIRED FOR ALL HVAC EQUIPMENT. PROVIDE FILTER CHANGES AT LEAST TWICE CONDITIONING ENGINEERS GC GENERAL CONTRACTOR P PUMP NOTES: 1. OBD-OPPOSED BLADE DAMPER. 011 V) MONTHLY ONCE STARTED, PRIOR TO TEST AND BALANCE, AND LASTLY, PRIOR TO MERCHANDISING. ANY EQUIPMENT OR DUCTWORK THAT BECOMES GPM GALLONS PER MINUTE PD PRESSURE DROP 1. REFER TO CONTROL WIRING SCHEMATICS FOR ANY FIELD INSTALLED CONTROL DEVICES NOT FACTORY INSTALLED. 2. LQD-LOCKING QUADRANT VOLUME DAMPER (PROVIDED BY MECHANICAL CONTRACTOR). SEE MECHANICAL SPECIFICATIONS SECTION Y h SOILED DUE TO A LACK OF FILTER CHANGES, AS DETERMINED SOLELY BY THE LSD&C PROJECT MANAGER, SHALL BE CORRECTED ON BEHALF OF BDD BACK DRAFT DAMPERS PLBG PLUMBING 233300.D.1. D IZ r rn THE CONTRACTOR AND CHANGES BILLED TO THE CONTRACTOR. BHP BRAKE HORSEPOWER HO HEAD PSI POUNDS PER SQUARE INCH 3. CFD-RUSKIN MODEL CFD OR CFDR FIRE DAMPER WITH VOLUME CONTROL. • N BLDG BUILDING HP HORSEPOWERul 4. YRD-YOUNG'S REGULATOR REMOTE DAMPER WITH CABLE CONTROL SYSTEM (MODEL 5020-CC) (PROVIDED BY MECHANICAL 12. NOTES TO EQUIPMENT SCHEDULES USE THE WORDS "FURNISH" AND "PROVIDE". WHERE THE WORD "FURNISH" IS USED, SOME FIELD BOD BOTTOM OF DUCT HTR HEATER RA RETURN AIR CONTRACTOR). t0 BOP BOTTOM OF PIPE HVAC HEATING VENTILATING AND AIR RG RETURN GRILLE G`(� +{Vz 1� l INSTALLATION IS REQUIRED BY THE CONTRACTOR. WHERE THE WORD "PROVIDE" IS USED, NO FIELD INSTALLATION IS REQUIRED AS THE DEVICES 5. ASPI-INSULATED ENGINEERED LINEAR SLOT PLENUM FOR CONCEALED MOUNTING PROVIDED BY FACTOfft OR ACCESSORIES ARE FURNISHED AND INSTALLED BY THE MANUFACTURER AS PART OF THE EQUIPMENT WHEN SHIPPED. BTUH BRITISH THERMAL UNIT PER HOUR CONDITIONING RH RELATIVE HUMIDITY 6. TRM-RAPID MOUNT FRAME FOR GYPSUM CEILINGS. ((, rty of Tigard NI' HWR HOT WATER RETURN RPM REVOLUTIONS PER MINUTE 7. FURNISH WITH TYPE WW ENDCAPS AND PATTERN CONTROLLERS. CAP CAPACITY HWS HOT WATER SUPPLY 13. UNLESS OTHERWISE SPECIFIED, CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, LABOR AND SUPERVISION NECESSARY TO COMPLETE THE CD CEILING DIFFUSER OR CONDENSATE SA SUPPLY AIR VAV TERMINAL UNIT SCHEDULE d 8. FURNISH WITH RB220 SIGHT BAFFLE, TYPE WW ENDCAPS, AND PATTERN CONTROLLERS. APP oved Plans/ CD HEATING, VENTILATING AND AIR CONDITIONING WORK IN ACCORDANCE WITH THE SPECIFICATIONS AND STANDARDS AS OUTLINED HEREIN. SEE DRAIN ID INSIDE DIAMETER SANS SENSIBLE MARK {VAV-#} 1 2 By 40,tik� Date C [ • RESPONSIBILITY SCHEDULE ON SHEET M04.O1. CFM CUBIC FEET PER MINUTE IN INCH SF SUPPLY FAN TRANE PACKAGE NUMBER D19 D19 - r " CHWR CHILLED WATER RETURN SMACNA SHEET METAL AND AIR CONDITIONING MANUFACTURER TRANE TRANE NOTES: ; �j ( ` r 14. MECHANICAL CONTRACTOR SHALL FIELD MEASURE EXISTING ROOF CURB(S) FOR CURB ADAPTER(S), WHERE APPLICABLE, AND SHALL SUPPLY CHINS CHILLED WATER SUPPLY KW KILOWATT CONTRACTORS NATIONAL • CD 4 DIMENSIONS TO LSD&C HVAC SUPPLIER PRIOR TO START OF CONSTRUCTION. MODEL VCCF008 VCCF008 1. 4-WAY DIFFUSER (UNLESS 1-WAY, 2-WAY OR 3-WAY AS INDICATED ON PLAN). IMEZ:- `-]•_ i • y • I CO2 CARBON DIOXIDE ASSOCIATION 2. INSTALL BLADES FACING THE BACK OF STORE CABINET OR WALL. (( C,y INLET SIZE 8 8 z CONTR CONTRACTOR LL LANDLORD SP STATIC PRESSURE 3. GC TO FIELD PAINT DIFFUSERS TO MATCH CEILING OR WALL WITH ENAMEL FINISH. REVISION IO p La 15. ALL HEATING VENTILATING AND AIR CONDITIONING EQUIPMENT SHALL BE CLEARLY IDENTIFIED WITH TENANTS NAME, SPACE NUMBER AND UNIT MAXIMUM AIR FLOW (CFM) 250 120L V 1 1�J W COP COEFFICIENT OF PERFORMANCE L LONG SQ SQUARE 4. PROVIDE WITH GYP BOARD FRAME. L..1 i~ O DESIGNATION AND SHALL BE STENCILED 1N 4" HIGH BLACK LETTERS. CWR CONDENSER WATER RETURN LB POUND SQ FT SQUARE FEET MINIMUM AIR FLOW (CFM) 0 0 _ 5. MC SHALL PROVIDE SQUARE TO ROUND ADAPTOR. 0 CC C7 et a CWS CONDENSER WATER SUPPLY LD LINEAR DIFFUSER SS STAINLESS STEEL ACCESSORIES 1-3 1-3 6. BORDER TYPE 3 IS LAY-IN STYLE. PATTERN TYPE G2 IS 2-WAY ADJACENT THROW PATTERN FOR SQUARE U z W 16. FURNISH AND INSTALL ALL NEW DUCTWORK INCLUDING INSTALLATION OF OWNER SUPPLIED PLENUM BOOTS, SUPPLY AIR DIFFUSERS, AND RETURN LF LINEAR FEET NOTES 1 1 DIFFUSERS. PATTERN A3 ISA 3-WAY THROW PATTERN. INSTALL DIFFUSERS SO THROW IS AWAY FROM i Q w AIR GRILLES. (SEE AIR DEVICE SCHEDULE ON THIS SHEET). DB DRY BULB,DECIBEL LWT LEAVING WATER TEMPERATURE TEMP TEMPERATURE ACCESSORIES ("S" INDICATES STANDARD; "0" INDICATES OPTIONAL): NEAREST WALLS. 0 a. (. Q DEG DEGREE TSP TOTAL STATIC PRESSURE 1. S-FACTORY PROVIDED DISCONNECT SWITCH. Ill A. LALL ABELING APPLIES.ALL BE NEW AND OF COMMERCIAL GRADE AND BEAR UNDERWRITER'S LABORATORY AND UNION LABELS WHERE SUCH DDIA DIAMETER WG DRAWING MAX THOUSAND BTU PER HOUR MAXIMUM TMP T THERMOSTAT L 2, S-FACTORY PROVIDED CONTROL TRANSFORMER. OFFICE COPY w w p DX DIRECT EXPANSION MCA MINIMUM CIRCUIT AMPACITY 3. S-FACTORY FURNISHED HEATING/COOLING CHANGEOVER SENSOR. COUj O B. ALL PLENUMS SHALL BE FABRICATED FROM GALVANIZED SHEET METAL OF THE APPROPRIATE GAUGE AND BE INSULATED WITH A MINIMUM OF MECH MECHANICAL UC UNDERCUT NOTES: * FINISH REFERENCE: TITUS #26 IS WHITE; TITUS #84 IS BLACK; PRICE #B12 IS WHITE; PRICE #B17 IS BLACK O 1" THICK, 0.75 LB/CU.FT. DENSITY FIBERGLASS INSULATION WITH ALUMINUM FOIL BACKED VAPOR BARRIER. EA EXHAUST AIR MFR MANUFACTURER UH UNIT HEATER 1. REFER TO CONTROL WIRING SCHEMATICS FOR ANY FIELD INSTALLED CONTROL DEVICES NOT FACTORY INSTALLED. _ <La v EAG EXHAUST AIR GRILLE MOCP MAXIMUM OVER CURRENT LION UNLESS OTHERWISE NOTED C. WHERE DESIGNATED, BRANCHES FROM MAIN LOW VELOCITY TRUNK DUCTWORK SHALL BE FURNISHED WITH SPLITTERS, DAMPERS OR SIMILAR EAT ENTERING AIR TEMPERATURE PROTECTIONCD g J BALANCING DEVICES IN ACCORDANCE WITH THE STANDARDS OF SMACNA. EC ELECTRICAL CONTRACTOR MTD MOUNTED VAV VARIABLE AIR VOLUME -J EER ENERGY EFFICIENCY RATIO MTR MOTOR VENT VENTILATION,VENTILATOR < coz r‘) E D. ALL DUCTS FOR FINAL CONNECTION TO DIFFUSERS SHALL BE CLASS 1. UL LISTED (SL 181) FLEXIBLE AIR DUCT NOT TO EXCEED 4'-O" IN EF EXHAUST FAN VFD VARIABLE FREQUENCY DRIVE 0 CV LENGTH (THERMAFLEX, GLASFLEX, OR APPROVED EQUAL). EFF EFFICIENCY NEBB NATIONAL ENVIRONMENTAL VTR VENT THRU ROOF • Z 8 EOD ELECTRICALLY OPERATED DAMPER BALANCING BUREAU NTS VS/PINKB ,52 cc E. SUPPLY AND RETURN DUCTWORK SHALL BE LINED AND WITH CODE COMPLYING BLANKET INSULATION. ACOUSTICAL LINER MAY BE PROVIDED. ESP EXTERNAL STATIC PRESSURE N.C. NORMALLY CLOSED W WATT EXHAUST AND VENTILATION FAN SCHEDULE AIR DEVICE SCHEDULE- B z cr) I- z ALL MATERIALS SHALL COMPLY WITH N.F.P.A. 90A AND 90B. SEE SPECIFICATIONS ON SHEET M05.01. EWT ENTERING WATER TEMPERATURE N.I.C. NOT IN CONTRACT WB WET BULB 05N-110101 i- OO-SICHD 02/22/201, (n N.O. NORMALLY OPEN WG WATER GAUGE MARK (EF-#) 1 0 C� Q o O U F. HANGER WIRES, DUCT STRAPS, FASTENING DEVICES, ETC. SHALL BE FASTENED TO THE STEEL JOISTS AND/OR BEAMS ABOVE. DO NOT ATTACH F FAHRENHEIT N/A NOT APPLICABLE WPD WATER PRESSURE DROP MANUFACTURER FANTECH _ ii Z i Q i ANY SUCH ITEMS DIRECTLY TO FLOOR SLABS, PIPING, OTHER DUCTWORK, ELECTRICAL CONDUITS OR THE ROOF DECK ABOVE. FCU FAN COIL UNIT WT WEIGHT MODEL FG 6 _ FLA FULL LOAD AMPS NTS NOT TO SCALE TYPE INLINE FAN X CO Z G. ADDITIONAL FIRE DAMPERS SHOULD BE INSTALLED AS REQUIRED BY ANY APPLICABLE CODES AND/OR JURISDICTIONAL AUTHORITIES. FLEX FLEXIBLE DRIVE TYPE DIRECT i- 0 CD En U PERFORMANCE NATIONAL ACCOUNTS HVAC SUPPLIER GENERAL NOTES o - '� 0° a cc a 2 oti 17. SEAL AROUND PIPES AND DUCTS PENETRATING FIRE SEPARATIONS WITH LISTED AND APPROVED FIRE SEAL MATERIAL. ONLY LISTED AND AIR FLOW (CFM) 240 A a > in a_ o cn o 0 APPROVED SEALANTS AND METHODS FOR THE SPECIFIC USE WILL BE PERMITTED. -� MANUAL VOLUME DAMPER EXT. STATIC (IN W.C.) 0.35 SUPPLY AIR DIFFUSER _is FAN SPEED (RPM) 2,542 HVAC EQUIPMENT NOTED HAS BEEN PREPURCHASED BY L-BRANDS STORE DESIGN & CONSTRUCTION. WITHIN THE FIRST WEEK OF REVISIONS: 18. MECHANICAL CONTRACTOR SHALL INSTALL TEMPERATURE SENSORS AND AS SHOWN ON THE PLAN (VERIFY LOCAL CODES. IF PLAN LOCATION IS CFSD ELECTRICAL NOT ACCEPTABLE, IMMEDIATELY CONTACT LSD&C PROJECT MANAGER FOR DIRECTION.) COMBINATION FIRE/SMOKE DAMPER _ CONSTRUCTION, THE GENERAL CONTRACTOR OR THEIR MECHANICAL SUBCONTRACTOR SHALL NOTIFY SUPPLIER VIA EMAIL. REQUIRED BY: DATE ---- VOLTS/0/HZ 120/1/60 A, OWNER REVISIONS 03.08. E FAN MOTOR WATTS 122 THE EMAIL SHALL STATE THE PHONE NUMBER, EMAIL ADDRESS AND DELIVERY ADDRESS OF THE CONTACT PERSON RESPONSIBLE FOR 19. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL FULLY PRESSURE CHECK AND CHARGE ALL REFRIGERANT SYSTEMS (IF REQUIRED). -�' FIRE DAMPER APPROX. WEIGHT (LBS) 15 SCHEDULING AND RECEIVING THE HVAC EQUIPMENT AND ACCESSORIES. EQUIPMENT AND ACCESSORIES ARE TO BE SHIPPED BY ANY SPECIAL LEASE UNE REVISION 7 05.16.17 RETURN AIR GRILLE eo SHIPPING INSTRUCTIONS REQUIRED OR REQUESTED. ALLOW A MINIMUM OF TWO WEEKS AFTER CONSTRUCTION STARTS FOR DELIVERY UNLESS rD SERVES _ RESTRO.OM RESTROOI REVISION 06.02.17 20. THE CONTRACTOR SHALL ENGAGE THE SERVICES OF AN INDEPENDENT, AIR/WATER BALANCING COMPANY THAT IS A NEBB CERTIFIED CONTRACTOR AUTOMATIC BACKDRAFT DAMPER ACCESSORIES 1 SPECIAL ARRANGEMENTS ARE MADE PRIOR TO THE START OF CONSTRUCTION. OR HAS AN AABC CERTIFIED TEST & BALANCE ENGINEER. THIS COMPANY SHALL PERFORM THE BALANCING OF AIR/WATER SYSTEM(S) AND MAKE ANY REQUIRED ADJUSTMENTS TO ENSURE PROPER WORKING ORDER. UPON COMPLETION, THE BALANCING COMPANY SHALL PROVIDE A COMPLETE • ELECTRONICALLY OPERATED DAMPER NOTES 1,2 GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL SHIPPING COST INCURRED IF DELIVERY IS REQUIRED PRIOR TO THE ACCESSORIES ("S" INDICATES STANDARD; "0" INDICATES OPTIONAL): STANDARD TWO WEEKS SCHEDULED. SYSTEM REPORT. ACCESS PANEL �� +� UNDERCUT DOOR 1. S-BACKDRAFT DAMPER 2. S-DISCONNECT PLUG. IF THIS INFORMATION IS NOT SENT TO NATIONAL ACCOUNT SUPPLIER, THEN THE EQUIPMENT AND ACCESSORIES WILL BE SHIPPED IN ACCORDANCE WITH THE PURCHASE ORDER DATE AND INSTRUCTIONS ISSUED BY LSD&C AND THE GENERAL CONTRACTOR SHALL BE co CARBON DIOXIDE SENSOR NOTES: RESPONSIBLE FOR UNLOADING AND STORAGE OF EQUIPMENT UNTIL SUCH TIME AS REQUIRED FOR INSTALLATION ON PROJECT. EXHAUST AIR REGISTER 1. INTERLOCK WITH LIGHTS. O HUMIDISTAT 2. DISCONNECT SWITCH PROVIDED BY EC. IF OWNER'S REPRESENTATIVE IS PERFORMING START UP, THEN GC AND/OR MECHANICAL CONTRACTOR MUST COORDINATE WITH MANUFACTURER REP. 2 WEEKS PRIOR TO CONSTRUCTION END DATE. S OR R LINEAR DIFFUSER " :LA R=RETURN Q TEMPERATURE SENSOR DATE ISSUED: S=SUPPLY, 12/30/1 6 T THERMOSTAT TRANE CONTACT INFORMATION. DESIGNED BY: MCR DRAWN BY: MCR NEW DUCTWORK CHECKED BY: JAH X-0 DUCT SMOKE DETECTOR JODY SOWERS ROLLAND SCOTT JOHN D'AGOSTINO SCOTT DAVIS TRANE TECHNICAL SUPPORT,PRIMARY TRANE TECHNICAL EQUIPMENT SUPPORT PROJECT MANAGER AND EXISTING DUCTWORK TO REMAIN POINT OF CONNECTION EMAIL: J50WERS®TRANE.COM SUPPORT,SECONDARY EMAIL: JOHN.DAGOSTINOOTRANE.COM HVAC COMMISSIONING �' �' L PHONE NO: 866.415.2499 EMAIL: ROLLAND.SCOTTOTRANE.COM PHONE NO: 866.415.2499 EMAIL: SCOTT.DAVISOTRANE.COM r7Z,--,4 EXISTING DUCTWORK TO BE REMOVED PHONE NO: 866.415.2499 PHONE NO: 866.415.2499 NOTES A N D 'WVWV- FLEXIBLE AIR DUCT 4'-O" MAX. SCHEDULES NOTE: (N)=NEW, (R)=RELOCATED, (E)=EXISTING DRAWING NUMBER: NTS NTS NTS NTS MMECHANICAL GENERAL NOTES ABBREVIATIONS AND SYMBOLS LEGEND MECHANICAL EQUIPMENT SCHEDULES NATIONAL ACCOUNTS INFORMATION A t 1 , 't OOH-M0101-A00-NOTE OOH-M0101400-NOTE 02/22/16 OOH-MO101-.�00-ECHO 8/26/1 CION-M0101-E03-SGHD 08/26/1.4 08/26/15 0 INSTALL TEMPERATURE AND CARBON DIOXIDE SENSORS AT 48" AFF. TEMPERATURE SENSOR SHALL BE KELE ST-BP SERIES FLUSH MOUNT, PAINTED TO 17 - •' ' •• • • • • : : • • . MATCH ADJACENT FINISHES. SEE SHEET M04.01 FOR RESPONSIBILITY SCHEDULE. 113 ••: : :. : • ' , :: " .. " .." .. • / II INSTALL SUPPLY/RETURN AIR SMOKE DETECTOR IN DUCT. INTERLOCK TO SHUT DOWN UNIT ON SIGNAL FROM FIRE ALARM SYSTEM. SEE SHEET 1104.01 FOR { , .: • ' ' RESPONSIBILITY SCHEDULE. n 19 '. :, . - . . ,, .•., " •." •, , ,. •: : . . . .. . ,,. M-Engineering 3 TENANT CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF ALL HVAC EQUIPMENT. COORDINATE WITH LANDLORD ENGINEER PRIOR TO BID AND CONSTRUCTION. ~' • 0.116 00 d1.0 • - 750 Brooksedge Blvd. ® EXTEND EXHAUST DUCT UP THROUGH ROOF. PROVIDE A ROOF JACK, STORM COLLAR, AND ALL-WEATHER CAP. '• .• .. • • I.•. Westerville, Ohio 43081 phone:614.839.4639 O INSTALL GRILLE ABOVE TI IE CEILING OF THE SALES SPACE, APPROX. 12' 8" AFF TO BOTTOM OF GRILLE. j . • • •-. • . - • . • : • fax:614.839.2222 vvww.mengineering.us.com a ACCESS PANEL BY GC IN THIS LOCATION FOR ACCESS TO EQUIPMENT ABOVE CEILING. REFER TO ARCHITECTURAL PLANS. IgI CONNECT NEW SUPPLY DUCT TO LANDLORD'S EXISTING MAIN SUPPLY DUCTWORK. FIELD VERIFY LOCATION AND SIZE OF EXISTING MAIN SUPPLY DUCTWORK PRIOR TO ROUGH-IN. 0 INSTALL SUPPLY AIR TEMPERATURE SENSOR IN DUCT. SEE SHEET M04.01 FOR RESPONSIBILITY SCHEDULE. a Ee• '4> / w t"` Q �� O , • •" . • • , �4 6081131'1r F_ 0 RETURN AIR THROUGH OPENING IN BACK OF VALANCE ABOVE CABINET. REFER TO ARCHITECTURAL PLANS. IP 0 4, PROVIDE RETURN AIR GRILLE DUCT BOOT FOR REDUCED SOUND AND LIGHT TRANSMISSION. CONSTRUCT BOOT FROM 1" DUCT BOARD WHERE ALLOWED BY `� •q ID LANDLORD. SEE DETAIL E/M03.01 FOR ADDITIONAL CONSTRUCTION INFORMATION. Y 7. -Q` 11 AIR DEVICE TO BE USED FOR ACCESS TO EQUIPMENT LOCATED ABOVE CEILING. THIS CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT A MINIMUM .\__ UNOBSTRUCTED FREE AREA OF 3-FEET VERTICALLY AND 4 FEET HORIZONTALLY IN ALL DIRECTIONS AROUND EQUIPMENT IS MAINTAINED TO ALLOW FOR EXPIRATION D:4 INSTALLATION AND MAINTENANCE OF EQUIPMENT. IF THIS FREE AREA CAN NOT BE OBTAINED CONTACT THE LSD&C PROJECT MANAGER IMMEDIATELY. 1 12 PROVIDE YOUNG REGULATOR CABLE CONTROLLED BALANCING DAMPER, BOWDEN CABLE CONTROL KIT, CONTROL WIRE AND CASING, OR LSD&C APPROVED EQUAL. INSTALL CABLE CONTROLLER IN CEILING NEAR DIFFUSER, IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, OR OTHER APPROVED LOCATION. TYPICAL OF ALL INACCESSIBLE MANUAL VOLUME DAMPERS LOCATED ABOVE GYP. BOARD CEILINGS OR DAMPERS WHICH ARE OTHERWISE INACCESSIBLE. REFERENCE DETAIL F/M03.1 FOR ADDITIONAL INFORMATION. GO Z O C3) . C") • : : •: • :: a •: : — C") N. 14 - . . .. I- '4.d. 6 : ..: :• • •; : • n 1..1 . 7:1) rr D 12 16 DUCTWORK BETWEEN TERMINAL UNIT AND LANDLORD'S DUCTWORK SHALL BE MEDIUM PRESSURE. fX O r N Co U = X NTS Z = 1 MECHANICAL PLAN KEYNOTES _ v D • 03/27/15 ct5 r ` V 0 CS ? o °� 1- J > Q Z Sin 21 Sil 0 &ci ;4-. v? a4. -1 lis co I 1 i immCD a Et J O I l DM LANDLORD'S MAIN SUPPLY DUCT I I U J/ 3 PERSON MANAGER OFFICE 12 SD-7 / 1 0OFFICE 10 TO REMAIN UNCHANGED. FIELD 12Q CFM VERIFY EXACT SIZE AND LOCATION. I{ J W K 1 O"X 1 O" R /'' L�\ 12 SD-7 1 _ I (-34D 1103'01 RG-3 250 CFM 1$ AA,. r fl .. - - -7, A IVAV-2eiro __ -- - Riol iiimt 1 ...iwir.,....onrit,.....zr..-iviii— - ....J.._ _ _ 7-414Sil IO r IIr r /f/ G-$ Ziz 10 O" ,' t/ Q 10"X1 O" 10 W a m o=o /: \\ I rill.. I �x� � � ��. ov��� z rryy j wag omTg W+ 'aa f i L _ _ L I I 0,, O W OOwy0.'6 C m J .O 6 . --W p 0 1 VAV-1IL1P I I � I II d SD-8 CoQ oW� W x� =- — I 100IM IM 1 CFM 12 .,WK _ �_ `-' adF ` - - - - -- - _ - _ = - _ - - = = p VEST I _IAV I am = i r.„-2wa Immo El 4t1 !3 w I. II 0 ww"'z zoo~� o ma = n / • U FPVAV-2 I II a r ia o ~ 0Ww,D " NV ^^ 4 ZZUO_ uZ3 Q 1_ W _Z „ ._L� ZZj Qrmy m � � �� ? m = O = U6 !°�"0::� Zr ! ,' IAlts IIuwt- 4 z i=ce N �� Z W I © ;Si Oil;'' 1 II � BL KEIL a gg 8 m,,on' -,, ,,,,- =. . sC 01111117N� SD-9 101/0 10"f� SD-9 fl i H p o oce 4 �1 _ 300 CFM A 300 CFM - T a w 6 2-`","E-U 8 a i n .) ,-.1g ,- . W II I O W W I-W W C$S U .-V, CG p �, y� f MOS.®1 r a c�w IIA AIL o o a ll WQ II I I a in 'a -__ = S^ V, =W 4 O H J O h .j, II SD-2 II II II 320 CFM II I I I RG-8 7 t0"x10" to a s F Q o= z :43 5' .....4e, II 5 ...= n c, ■ f V9 VI W w Vf . N IF II I _ -2 /.�• .__ - I I I 1 Li.<W 6 ce .(0 ~~7 P 4 Q F-6 C 11 11 II II 100 if i __ X �', T I I 1 100 CFM r-(;) 2 .: ,,,g,:.� a 0o �z, ce P� �aiTFN 1a"� 10" SD-2 II I1 I I III I itlq-i fWQ2o! = E oo O z O N V ,y,.-. g= U 4{•• g W V I C 320 CFM II Izmir i Al is m 16 i u c v 'o Q o m 2# o- 1- x o g E I II P ��Ii TN -w.ERg = oo 6 Em66?Ac� 1! 11 fl I I II OW ©a � � W} aiW= aW � �U� a < x o.w i • z W is a r o x 1--ace.cula c..11-1a m I II = i II - i N - v, o II _ lr II II N _ II i � = II X II © M1 , Il I rROOM #1 II 0) • Nii II I 11 I I (.-- --,---------\\\ VSL 1 I II � >n I I ROOM #2 I II IIt r II r co II II RELOCATED VSL 2 ' I I! -- .,,,.II .1 ..a.4 X - - p N '13‘/AV ® 4-°V/ /// I !- ,iA IP 11 0 14"0I 300 CFM 10" 101'0 300 CFM \X,`\.‘"\ i Cr) 4' 20"X16" 13 ' I1- Ila 00-010 %Tr — 1103.01 — i — — 0 LO Liu = La O I o QV 24"X24'° 6 — RELOCATED LL's ' 0 1--- ea LI I p� 0 ® RG-B 0Y w 10"0 c 10"0 SD-2 L FPVAV I I U z -' 320 CFM ® ,_ �� o .4:( w ""--... SD-2 ›.:, \ 320 CFM _ , , , \ . � 1 , - - 14"� 16 � All111111/7/ .� Q � � w O I /' 140 24"X r1iq. I� Ci) LU l 16 - 1 ) F rere o o Ld a ��O rC VI 10"� 10"� � CO 3I a � o CV N ' w. X ,,,, •Itt C° z M 1 Lj- c•-.1 241 a 11-SIT-9 �' SD-9 • Z f9 300 CFM 300 CFM o CC 0 Z (///41 i i= i— _ 44 N X _ a © C� aoa ND r •• W E]rt-2\ Li. I I I 1 w = � mz FE - - - w 111CWjI- 4iXc-) F -1 - - — QcoQEt 14:::13 (E-7), ix Ii O II ; ,� ilan E ce a O> � � ciio � G' " II II 1103.01 I II II 1 ` II 11 I II r TYP REVISIONS: I 1 II 1 71'4°71 " " REQUIRED BY: DATE 10"� 10"011::Z:: SD-9 I ! T 10 X10 10 OWNER REVISIONS 03.08.17 1.4 0 a " " Il 1 �- 11 I 1a 0 10 0 300 CFM 1 � i1 > 1 44 = ›.] , III 1 i SD-B ® © LEASE UNE REVISION 05.16.17 -� �• I II I IOD cFM �[ `� i �/ , — �� RESfROON REVISION 06.02.17 II — , r€ 4 SD-2 SD-2 II II SD-9 I 6"O 1 1f 11 II II 320 CFM 0 320 CFM II I 300 CFM II II T7'P I II II II t 1 F il " II II II 1103.01 III 14 16Ao0 t— II II r I TrP — - _ -- " ■ - 11 _ „,, ` sI,, I s 1 FPVAV-1 I I II ` II 1�=—UL _ _ —�I I ® 1 lim - - - - - - - p — — — — p I (---36 DATE ED: DESIGNED U BY: 12/30/1 MCR LANDLORD'S MAIN SUPPLY DUCT DRAWN BY: MCR TO REMAIN UNCHANGED. FIELD VERIFY EXACT SIZE AND LOCATION. I I N CHECKED BY: JAH MECHANICAL _ 'Ilirill PLAN QI • NOTE: NOTE: I-1W ANY EXISTING DEMISING WALL OPENINGS ARE TO REMAIN. SEE ARCHITECTURAL DRAWINGS FOR CEILING HEIGHTS " VERIFY ALL FIELD CONDITIONS PRIOR TO BID” a z - DRAWING NUMBER: " .i/) MECHANICAL PLAN o 0 INSTALL TEMPERATURE AND CARBON DIOXIDE SENSORS AT 48" AFF. TEMPERATURE SENSOR SHALL BE KELE ST-BP SERIES FLUSH MOUNT, PAINTED TO 17 • •• • •• •. • • • . • -.• - . MATCH ADJACENT FINISHES. SEE SHEET M04.01 FOR RESPONSIBILITY SCHEDULE. _ 0 INSTALL SUPPLY/RETURN AIR SMOKE DETECTOR IN DUCT. INTERLOCK TO SHUT DOWN UNIT ON SIGNAL FROM FIRE ALARM SYSTEM. SEE SHEET M04.01 FOR .. • .• • - : :•:. -- RESPONSIBILITY SCHEDULE. 1110r 1 . : ,: . . •: • . . . •:: •: . . .. :•. - .. • • . ... M-Engineering 03 TENANT CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF ALL HVAC EQUIPMENT. COORDINATE WITH LANDLORD ENGINEER PRIOR TO BID AND CONSTRUCTION. ATLEAST 15' FROM SUPPLY OPENINGS. FIELD VERIFY LOCATION WITI I LANDLORD. 750 Brooksedge Blvd q • : ... Westerville, Ohio 43081 CCVVJJ phone:614.839.4639 0 - •' .. •• - 'f • • f ' ." • . • • . • 21 INSTALL MONITORING CONTROLLER AT IFS. SEE SHEET M04.01 FOR RESPONSIBILITY SCHEDULE. fax:614.839.2222 www.m e ngineering.us.com 0 ACCESS PANEL BY GC IN THIS LOCATION FOR ACCESS TO EQUIPMENT ABOVE CEILING. REFER TO ARCHITECTURAL PLANS. 0 - ••• .. . -. . :•:' •• . .•• •. .: • INSTALL SUPPLY AIR TEMPERATURE SENSOR IN DUCT. SEE SHEET M04.01 FOR RESPONSIBILITY SCHEDULE. ,sip PROP6 S� Q INSTALL MONITORING SENSOR AT 48" AFF. SEE SHEET M04.0 FOR RESPONSIBILITY SCHEDULE. e'� 4.1%°111164, J� Ate 60818PE r'. 0 RETURN AIR THROUGH OPENING IN BACK OF VALANCE ABOVE CABINET. REFER TO ARCHITECTURAL PLANS. cc % CID PROVIDE RETURN AIR GRILLE DUCT BOOT FOR REDUCED SOUND AND LIGHT TRANSMISSION. CONSTRUCT BOOT FROM 1" DUCT BOARD WHERE ALLOWED BY '' 1* LANDLORD. SEE DETAIL E/M03.O1 FOR ADDITIONAL CONSTRUCTION INFORMATION. • .,: + 11 AIR DEVICE TO BE USED FOR ACCESS TO EQUIPMENT LOCATED ABOVE CEILING. THIS CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT A MINIMUM i sy�c6 OSH1 P '' • UNOBSTRUCTED FREE AREA OF 3-FEET VERTICALLY AND 4 FEET HORIZONTALLY IN ALL DIRECTIONS AROUND EQUIPMENT IS MAINTAINED TO ALLOW FOR INSTALLATION AND MAINTENANCE OF EQUIPMENT. IF THIS FREE AREA CAN NOT BE OBTAINED CONTACT THE LSD&C PROJECT MANAGER IMMEDIATELY. EXPIFtA "E. 12 PROVIDE YOUNG REGULATOR CABLE CONTROLLED BALANCING DAMPER, BOWDEN CABLE CONTROL KIT, CONTROL WIRE AND CASING, OR LSD&C APPROVED EQUAL. INSTALL CABLE CONTROLLER IN CEILING NEAR DIFFUSER, IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, OR OTHER APPROVED LOCATION. TYPICAL OF ALL INACCESSIBLE MANUAL VOLUME DAMPERS LOCATED ABOVE GYP. BOARD CEILINGS OR DAMPERS WHICH ARE OTHERWISE INACCESSIBLE. REFERENCE DETAIL F/M03.1 FOR ADDITIONAL INFORMATION. CO ° t) CI LOCATION OF ELECTRICAL AND CONTROL PANELS. DO NOT ROUTE DUCTWORK OR PIPING ABOVE THIS AREA. I— g't 15 INSTALL HEATING/COOLING CHANGEOVER TEMPERATURE SENSOR IN DUCT. SEE SHEET M04.01 FOR RESPONSIBILITY SCHEDULE. U O d 2 DUCTWORK BETWEEN TERMINAL UNIT AND LANDLORD'S DUCTWORK SHALL BE MEDIUM PRESSURE. 7:3O co co (I) 2 x NTS z MECHANICAL PLAN KEYNOTES D 0 0 • //----.\ r W 03i27715 U 4101 \M. N.5 N.9 7-Q) CF-D 0 H 06 >,. 8 glsii. CDz g 71.6 r (!) a_ Ti: W � ( tv � I 1 I I I I 121 ..... . . W ,, c 1 J O a), � ! I I I v) ~ 1- ' • Er • _, u - - — ❑ — — — — — p — — -- - — 0 — — — — '❑ — — — JZ A ., G a m O Z 0 , ~ az Wo. w Pazae W w W T Z Z D Q < I 2 ..,,,E .-0 I w R W x W m tO Z r W 0 Z � I 1 eel I I I Z�;ETc� W �� �_ ~ z �on > ,= =- m H W =,.., / C © 3w t F tt 2 = f=a a 00s Q SD 7 EVA - - - - - _ — = _ — W: 7 = =u22 Ite o < -,QN / 1 /////f/./0/. RG-4 T- nZ 22rr , 1250 CFM #1 t L� II II Il fls W�Wa � � VdaQw �1 RG-3 _ RG-3 RG-3 RG-3 4 a F W W y Q oI� o W �,wawazc°§o = _ " n IT- ,1f1 //j��\ „ f ? I- O Will L I ,, .fes II II I �' if `j 17.0� 'U _mg0<<: i Z Z V SD-3 11 I!1—Z O• ZI GB•-B I zP oZ I ce_ o �^ 4 f Al I� 40 1 11�. p W O 6.$ w C7 ili!il,�Ir1IIt 5`' '�' a(� �r (, lV I — ate.H- L fn 1 W U O d ,1, 0 JJJ ` r �,wazQUF�z rt SD 2 SD-2 x Id rc o �,1 SD-7 I I ��'W � =W L.J.r CJ W U) '-. d W P8 V W H SD-7 SD-7 12 330 CFM 330 CFM W Q= o w.s N=gI 14, 1 12 SD-7 ALCOVE B 12 75 CFM 12 50 CFM 75.;FM �- �� 10"p 1a" -/ W o 0 1 Oa CFM ►— � II w= w w,,, 4 1- fn o F s �. �. �:. �a . az. I II m o s HC�I 1� Z tg W 6 g. ,! _ Ii �1!?7 , = ? I 11 . F.5 W ®�a W Z SD-3 �, 225 CFM ALCOVE C O,t_ ALCOVE AII w w © ---7 q�l — I II 0— W Z .-� m �Z l _ .1 �.. IL. - C II 1L Zf°O N.- W 00t1r4S 111 �W r01....10 _. „ 402 I - `_ II F le - j - � gwOW F,WO�OW x.3300 rto3.ol �I _ A t -I� 1IL IFR 4f II FR " II FR 22� " II , Il I _ TYP II II 8 II li ll T O�Q V . eezc�,g. 4w , .= t I I I I I ! ! / 11 CxOeGW = n x= = a1- Ox -. m . d � .� Il u _ � _ AF�tie2 Il !I .oaf-= V ,-Q5Wz � 14 ff F. /6 � Wn � U 4p� 1) FR 7C I f r � � � lly / II III o W �xWW �wcao = gym M ! O W=0 d h V 0.H U d ee 4 . .-Q..4 w 0 U H s z W w m II I I II 11 i I! v-- 0 U FR 6D FR vE I �► R NI r - _ -R,G,,-3-� T ir, ii - I N cno �I RG-3 RG-3 �-' r b RG-3 RG-3 RG-3 RG-31 I f1 I O h 6". I II II 11 • lL r t I I I 1NI � � � � r- A T 1� 11 I 11 II 1 1 grim 8"O —Y\1 ono I II B II 14"X14" SD-3 - - - - - - - - � - - — - - - - ��aL� � VPAV-4 r�o�.ol 17 Lei 300 CFM 7 RG 9 SD-2 T II SD-2 i0 10"o 10"o 1 I 340 CFM M .r >/ 350 CFM �� it� � -- BREAK i 1 1 1 = P .I!R►. C 4ROOM . 1— , , _ —�, r - - — �0 - - rr,, - - -� - rr 10 loll ■,, - - LC) LIU zo W SD-3 1 I I - 10"0 I I 1 O_E�.4 /�'ii ' C a t 225 CFM 1 - 20X16" � QW ` s _ 0 O "0 1 ROOM #4 _/ BEAUTY ROOM #3 RE/LOCATED W P J PROLE SING ®; p BRA SALONV %A CO 11.1 o CD a �. SD-9 I 350 CFM I s 1 z CC W RELOCATED HPOA WOMEN'S 'Et' . TOCK EAG-2 ��di SD-9Xt_ 1 z ccCI) oJFPVAV � � -120 CFM � 340 CFM � �� F- 0 � J 5 RG-4 1 10"0 44: ") g N 0 I i' / c _ n I 1N4I I Z FPVAV-5 WA_ - / 11 0 Q O� .0 ! // II 10mo s IX 1 CI I �r �, / RELOCATED © ? 3 I Q W RG-3 �� ! C 3 .--c7 ;Z a " J � FPVAV _ a '• QS � UP �� i0 � © 4 v U w � THROUGH ROOF \ ' XI r• — < 00 UQ tY = a tn [LO c�jw ". ! SD-3 HALL AY S SD-9 ‘\,, , �' IIIN �' N � =i,i ' 225 CFM 10"� 10" — 8"O \ -' RG-9 350 CFM � ' 1 REVISIONS: �I, � Frix16" NilelNI I I II REOUIRED BY: DATE 0 D L 8"�I I I r r /7781,0 —8" — "� II -©�4 I SD-2 11 11 OWNER REVISIONS 03.08.17 i� F2)0-11 �, 11 330 CFM II Mmol EF u / SD-12 12 i' II 11 II A LEASE UNE REVISION 05.16.17 11 D- VEST 112 220 CFNE 220 CFM JLel 1 — EP 1 SD-7 I *• 1 ►� I Iii-` 1 -. ::?: kto _ A RESTON REVISION 06.02.17 Li - t oD CFM B #2 7oloL T _ L ;_ _ _X 10"0 1 owls ► III I I f I I • 12 2201CFM Il \M03.01 OHO - II II MEN'S -� CASHWRAP II 11 330 CFM 1 0 II II �< II r •- r II 4 II II II II 4,,/ II II I 1_A202CFM - - LI --� f I '1 ' / 1 � I 1 II I s I L — J t — I I 1 r Q FPVAV-3s r DATE ISSUED:II - ii - - • - - - --- — — — — — — — — - - — I _ © 0 -I _ DESIGNED BY: 12/30/16 r— MCR E DRAWN BY: MCR \ I f I \ I I 1 N CHECKED BY: JAH �N MECHANICAL �� 111: PLAN NOTE: NOTE: H W ANY EXISTING DEMISING WALL OPENINGS ARE TO REMAIN. SEE ARCHITECTURAL DRAWINGS FOR CEILING HEIGHTS " VERIFY ALL FIELD CONDITIONS PRIOR TO BID" -� DRAWING NUMBER: 1/4" = 1'-0" (�,(�I) (i,(�)'1 7)MECHANICAL PLAN A ril E \ 14 Or CAP M-Engineering 750 BJoltsedge Blvd. WesterllOhio 43081 >� phon64.839.4639 'O fax: 1839.2222 I -N www.megieering.us.com FLASHING BY G.C. Pitot."IL , N'' , ROOF it �cGW ....6 0818PE ,j'7 lim41/4' ' '.' i �yfG��YosHl�•�'� DUCT SUPPORT FASTENED TO NEAREST ROOF EXpiRATION .rE, STRUCTURAL MEMBER. SIZE .4: co:1 PER SMACNA GUIDELINES. EXH. DUCT e. •r O M ID Uo !i,..ci.f\S FROM RESTROOM E� I— cli 1" = 1' O" Z , m C (i) 2, i' EXHAUST AIR DUCT ASSEMBLY DETAIL 00D-M0301-D00-EXDT a • 0q/13/13ai 0 0 O .. >+ o c:1BEAD TO SECUR Z FLEX DUCT. Sb 0i11::) LIJ -0 r CTANGULAR TO Ll CD ROUND ADAPTER =, ai WITH 1/2" 3LB UJ c LINER. BREAK FOR ix -.-I s O 1111 11 111111111 STRENGTH. ©..............1 E-- N � 6" STARTER COLLAR V) 1E I� NI • T- "> TI .iP,',.L:1)- 4:1"10) 4" MIN. WHERE o w STRUCTURE ALLOWS 4111111"/ =6 r CZE. W W W L.Z r, Z co V -1 a�. � t!L;L O E y w� z p SEAL TO GRILLE AND Z gIiII a 0 m m=111117:44441ist (4) x 0 3 1- =o F,N o� w i 6 Q a‹Q � a, }z t J DIFFUSER REGI c. ,S o Y=o , � z�U j 2 oaoc � mNE3 KQ- .1A � , / o-c—o ay m.. Z W V O [Yi.6.4 Q. 7 a S�='& CJ al X Q:O 58;c! a _ d b'1.1 N dwU O d G' d C V O c.w ♦-h . W~ L 3 d U p W 'U w��,W � .,,E7'(2 U W Y IX O D - TED GRILLE DETAIL W _� = N�). # ,n. ,n a Z0 a 03 V - ,,,R = Vl Vl� C Q N �O yOj N O D,.1= Z g g ,/1.q e,U O W . w 00D-M0301-000-GRIL -.cA-O ci ~" = Z'' ~ 'n .~o V 08/26 VW�� m � Ugp 2 . 1- = _ • a g o W L= L11=o o= a Ww JIWgw{ J .-g ,- o4nzN = LOCKING QUADRANTYOUNG REGULATOR MODEL 5020CCDuct Main — Transitions Duct Main - Take—offs ..Ha ,jNCHwm ,oz e, x a tiawxa x aaROUND DAMPER (830ACC FOR RECTANGULAR) w /' \ ::::: = D - Z :: : :::/ \\\` E5RIGID DUCTWORK INSULATED PER114 --EXTENDED SPECIFICATIQNS ` 45 U a�d3 ADJUSTMENT HANDLE .c : xi V d a ,-< C v1 0 V ?W V1 11.- - DUCT STRAP AND FOIL TAPE10111111 CV p r RIGID 90 ELBOW RECTANGULAR DUCT tO BM �� ■ N rAIR Flaw � � DUCT STRAP AND FOIL TAPE AIR FLOW ORANGE FLAG *� CONCENTRIC TRANSITION RECTANGULAR TO ROUND GROUND TO ROUND *� 0 FLEXIBLE DUCTWORK NO LONGER A 0 - MAX. 45' DIVERGING, 1971 1 " ■ FLEXIBLE CASING THAN 3'-O" 60' CONVERGING AND WIRE y (30'-0" MAXIMUM) ____+_._ RECTANGULAR DUCT 0 iit RACK & PINION > AIR FLOW MEDIUM PRESSURE e loom 1- OPERATOR MIW�� Lf) LLJO rii;41.PP__.-.;-(0EMAIN DUCT Q 0 CONICAL FITTING, SEAL 0Cr Id W 4111111111 � !)::: -----1 , AIRTIGHT W/ MASTIC v z �� CEILING DIFFUSER ROUND DUCT ULai Q MOUNTING CLIP � SOCKET WRENCH 1q1145' 11111 LIU 0 w O CONCEALED REGULTOR KIT - IFBRANCH DUCT VAV BOX COIii rn NOTE: LOCATE NEAR REMOVABLE DIFFUSER OR GRILLE 0 - MAX. 30' (EXCEPT 45' IS 0 FOR REMOTE DAMPER ADJUSTMENT ro 0 I N� PERMITTED AT ROUND TO FLAT OVAL). Q w o TRANSITION RECTANGULAR TO RECTANGULAR RECTANGULAR TO ROUND a 0 COORDINATE EXACT LOCATION OF CEILING MOUNTED COa CONCEALED REGULATOR WITH ARCHITECT PRIOR TO @ECCENTRIC WHEN SHOWN TAPS TO VAV TRUNK ONLY C� Cn J INSTALLATION. ■' Q CO M O N Z � Z0 m YOUNG REGULATOR REMOTE DAMPER NTS F DUCT DETAILS NTS B o CC 0 00D-110301-F00-0AMP 12/11/13 NOTE: USE PLAN AS GUIDE TO FITTING TYPE. 00D440301-B00-DUCT 10/4/16 0 l' Q CD iO r W C) PROVIDE VOLUME DAMPER ASSEMBLY IN O Z 3 I p w ROUND DUCT ACCORDANCE WITH SPECIFICATION 233300.D.1. Z I N m Z a REFERENCE M02.XX FOR LOCATION. 1- 0 (f W DAMPER HANDLE TO BE PROVIDE RIGID 2 PIECE ROUND ELBOW WITH 1.5 -, mem 114 0000 Q 0 __ o INSTALLED MAXIMUM OF RADIUS RATIO WHERE CLEARANCES ALLOW. ix > in 0_ O U Cl) y SUPPORT FROM STRUCTURE ABOVE 3'-O" ABOVE CEILING. WHERE CLEARANCES ARE RESTRICTED PROVIDE o_ 0) (/) v) C -1 i ELBOW WITH RADIUS RATIO OF 1.0. REVISIONS: -, -� SECURELY TAPE VINYL FLEX DUCT TO SHEET REQUIRED BY: DATE METAL W/ MIN. OF (2) CONTINUOUS WRAPS OF A MINER REVISIONS 03.0a.17 16" LONG ORANGE $ DUCT TAPE. STRAP CLAMP OVER FLEX DUCT /////////////////////////////////////////// MARKER TAPE INSULATION & VINYL TO SHEET META!_. TAPE A CEASE LINE REVISION 05.16.17 / ATTACHED TO DAMPER INSULATION TO DUCT TO FORM A GOOD SEAL. / 1" TO IDENTIFY LOCATION. A - RESTROOM REVISION 06.02.17 / DUCT BOARD 8" LONG SHEET METAL SECTION SECURED TO INSULATED FLEXIBLE DIFFUSER COLLAR W/ MIN. (3) SHEET METAL 10" / SOUND BOOT TO � -.. 3'-0" / MATCH SIZE OF CONNECTION (MIN SCREWS, DUCT TAPE AND MASTIC. / GRILLE 4 FT., MAX. 8 FT.). • ill TRANSITION FROM DUCT SIZE TO DIFFUSER / FIRE DAMPER WHEREIINECK SIZE AS NECESSARY. / INDICATED ON PLANS. INSULATE DIFFUSER BACKPAN WHEN RETURN IS / /•/ FULLY DUCTED. / / IIIIP!A THERMAL INSULATING BLANKET REQUIRED FOR ** / / _ FIRE RATED CEILINGS ONLY. / idit DATE ISSUED: 12/30/16 / / DESIGNED BY: MCR / / TITUS MODEL "DB" CEILING MOUNTING FRAME FOR GYP. BD. DRAWN BY: MCR DIRECTIONAL BLOW APPLICATION TITUS MODEL TRM. 1 '-' -� s PLATE CLIPPED ON CHECKED BY: JAH DIFFUSER RODS. CEILING RETURN AIR GRILLE SEE NOTE BELOW. NOTE: ALL DIFFUSERS ARE 4-WAY BLOW UNLESS NOTED M E C H A N I C A L SUPPLY AIR DIFFUSER OTHERWISE. PROVIDE OPTIONAL DIRECTIONAL BLOW, TITUS DETAILS (LAY-IN FRAME) MODEL "DB" TO CONVERT DIFFUSER FROM STANDARD 4-WAY TO 1-WAY, 2-WAY OR 3-WAY BLOW AS DESIGNATED ON PLANS BY SHADED AREA. ** 10" OR AS CLEARANCE ALLOWS WITH MANUAL VOLUME DAMPER DRAWING NUMBER: 1 1/2" = 1c0" NTS / �� ��`'IIP RETURN GRILLE SOUND BOOT DETAIL E CEILING DIFFUSER MOUNTING DETAIL A '; `L' � „..„...„ 00D-110301-E00-GRIL 06/26/15 00D-110301-A00-DIFF 02/22/16 - EXISTING FAN POWERED VARIABLE AIR VOLUME (FPVAV) A T TERMINAL UNITS WITH ELECTRIC HEAT NETWORK WIRING AND NOTE TO CONTRACTOR SEQUENCE M-Engineering ITEM(S) NOT SHOWN ON ANY OF THE RESPONSIBILITY SCHEDULES 750 Brooksedge Blvd. ARE THE RESPONSIBILITY OF THE CONTRACTOR. Westerville, Ohio 43081 CONTINUED 18/2 COMMUNICATION CABLE 18/2 COMMUNICATION CABLE phone:614.839.4639 ON J/M04.01 c fax:614.839.2222 www.mengineering.us.com EXISTING EXISTING 0 O EQUIPMENT ° EQUIPMENT ° 0 EXISTING QU EQUIPMENT POWER /!!T POWER ///T 0 FPVAV-2 //! �o `y �O Fs BY OTHERS FPVAV O�- BY OTHERS FUC2102 BY OTHERS FPVAV-3 LOCAL AREA REQUIREMENTS `� �� A 03u4e 19 18/3 CABLE-----c---, 18/3 CABLE- = 18/3 CABLE YES NO YES NO ttr4 b081 PE 9< ❑ ® 1. SMOKE EVACUATION ❑ I,►.1 5. SPECIAL CURB HEIGHT REQUIREMENTS G' ❑ 0 2. CARBON DIOXIDE MONITORING ❑ ® 6. TEN MILE COASTAL PROXIMITY jt C ,q Air ZONE SUPPLY ZONE SUPPLY ZONE SUPPLY ❑ 3. HURRICANE ZONE ❑ ►1 7. OTHERS,I.E.METHANE,CARBON MONOXIDE,SOUND ,5�'` yr SENSOR AIR SENSOR AIR SENSOR AIR ❑ �� 4. SEISMIC ZONE SENSITIVE,ETC.DESCRIPTION... ''§7}/0S1-1111,.4 SENSOR SENSOR SENSOR C +'"uir. 1 i 18/2 COMMUNICATION CABLE ABBREVIATIONS, RESPONSIBILITY SCHEDULESGr) o 18/2 COMMUNICATION CABLE 18/2 COMMUNICATION CABLE Z C'7 • N M ) AC HVAC EQUIPMENT SUPPLIER GC GENERAL CONTRACTOR © c" I. ° EXISTING EXISTING AHJ AUTHORITY HAVING JURISDICTION LC LANDLORD CONTRACTOR Ln 00BAS BUILDING AUTOMATION SYSTEM LD LIGHTING PACKAGE DISTRIBUTORici :::::::$ r ' ° EQUIPMENT ° EQUIPMENT EC ELECTRICAL CONTRACTOR LL LANDLORD U CD ;I-- POWER ///T FPVAV-4 POWER ///T FPVAV-5 FAC FIRE ALARM CONTRACTOR LSD&C LIMITED STORE DESIGN&CONSTRUCTION D 0 I- ciC T BY OTHERS UC210 BY OTHERS UC210 MC MECHANICAL CONTRACTOR 18/3 CABLE c 18/3 CABLE v) E >< Z E LLR1 _ I © C • ZONE SUPPLY ZONE SUPPLY SENSOR AIR SENSOR AIR NEW VARIABLE AIR VOLUME (VAV) SENSOR SENSOR C °'�U U• o DESIGN WEATHER PARAMETERS NETWORK WIRING AND SEQUENCE T MONITORING aill R3 71. CONTROLLER (1) 12 4 City Name Portland AT IFS :) W -a 7,7) Location Oregon 23 1 ( __.......... 24V /�i © _ Latitude .. 45.6 Deg. 18/2 COMMUNICATION CABLE 18/2 COMMUNICATION CABLE CONTINUEDG.1 Longitude -__. 122.6 Deg. t ON E/004.01 W ,�_ C Elevation __ .39.0 ft COMMUNICATION FRONT END 18/2 COMMUNICATION CABLE 18/2 COMMUNICATION CABLE J c Summer Design Dry -Bulb __ 90.0 °F _ Summer Coincident Wet-B.ulb 67.0 °F VAV-1 VAV-2 TERMINATE NETWORK WIRES ON THE 18/3 CABLE---c-'17-- 0 N Q Summer Daily Range _ __ 21.6 °F UC210 0 UC210 LIGHTING CONTROLLER NETWORK a) a) Winter Design Dry -Bulb 22.0 °F0 T TERMINALS LOCATED IN THE IFS ) TD - Winter Design Wet -Bulb 18.4 °F POWER POWER /// Atmospheric Clearness Number _ 1.05 BY OTHERS BY OTHERS ELECTRICAL PANEL SYSTEM. _ (/) l- (- Average Ground Reflectance 0.20 Soil Conductivity 0.800 BTU/(hr ft-°F) ZONE ZONE Local Time Zone(GMT+1-N hours) __ 8.0 hours 18/3 CABLE �a 18/3 CABLE-c SENSOR SENSOR Corsider Daylight Savings Time __ No Simulation Weather Data noneN/A (CASHWRAP) (FITTING RN) Current Data is . 2001 ASHRAE Handbook ❑ - NOTES: Design Cooling Months. January to December ZONE HEATING/ ZONE HEATING/ (1) ALL WIRE SHALL BE 18/3 UNLESS OTHERWISE INDICATED. SENSOR COOLING SENSOR COOLING HVAC LOAD CALCULATIONS CHANGEOVER CHANGEOVER (2) NUMBER OF CABLES FURNISHED BY HVAC SUPPLIER IS INDICATED BY NUMBER OF TICK MARKS ACROSS THE LINE. SENSOR SENSOR (3) PURPLE 18/2 WIRE IS FURNISHED BY HVAC SUPPLIER AND IS PLENUM RATED. 0 (4) SCHEMATIC IS FOR REFERENCE ONLY, AT TIME OF CONSTRUCTION, THE HVAC SUPPLIER WILL PROVIDE A COMPLETE DIAGRAM FOR 'c w _z r A ~ . G { W -{Z ¢ A INSTALLATION. SEE RESPONSIBILITY SCHEDULES, THIS SHEET, FOR A LIST OF ALL COMPONENTS AND SENSORS REQUIRING FIELD W 8. _ E " "{ INSTALLATION. ''&'"E;-,,F, W �a+V'n � v0.ici`'a� � E+ ��z o o. o o Q E� F n a d f# c m W„m p_ 2,-.6.-, Air System Sizing Summary for Total NON-FAN POWERED VARIABLE AIR VOLUME (VAV) SEQUENCE OF OPERATIONS it o"~ , _ z Project Name: 164203V5 Washington SQ 12120f2016 .w, = 3 5 Z 1, 4 m a= FAN POWERED VAV (FPVAV) SEQUENCE OF OPERATIONS U= W o ! "N Prepared by: M Engineering 10:50AM °` == 8 ^ ���r... `x.a�wz o �a�" P MANUFACTURER SHALL FURNISH AND/OR INSTALL ALL NECESSARY CONTROL DEVICES TO ACCOMPLISH THE FOLLOWING SEQUENCE OF 228% 6 2" W 2 U o' G OPERATION (REFER TO RESPONSIBILITY SCHEDULE FOR FIELD INSTALLATION REQUIREMENTS): MANUFACTURER SHALL FURNISH AND/OR INSTALL ALL NECESSARY CONTROL DEVICES TO ACCOMPLISH THE FOLLOWING SEQUENCE OF <o©o o { 4 ec 0.- .- ' -=‘,. ' c',. {a s' =$U O .O- U t.Z Z a Air System Information OPERATION (REFER TO RESPONSIBILITY SCHEDULE FOR FIELD INSTALLATION REQUIREMENTS): HVAC RESPONSIBILITY SCHEDULE =~` u _WC =Q m a N Air System Name Total Number of zones __ 1 DURING OCCUPIED HOURS THE VARIABLE AIR VOLUME TERMINAL UNIT DAMPER SHALL MODULATE TO MAINTAIN THE SPACE TEMPERATURE. FOR S'.5. -. F, „ ,g d a 6 E- Equipment Class __ UNDEF Floor Area 10436.0 ft2 UNITS WITH HEAT/COOL CHANGEOVER CONTROL, THE DAMPER SHALL MODULATE TO MAINTAIN THE SPACE TEMPERATURE, REVERSING DAMPER DURING OCCUPIED HOURS THE VARIABLE AIR VOLUME TERMINAL UNIT FAN SHALL BE ENERGIZED AND DAMPER SHALL MODULATE TO MAINTAIN m_e~ g c.'N n m = =E Z 4 0 Air System Type VAV Location Portland,Oregon OPERATION AS REQUIRED BASED ON ZONE DEMAND AND THE TEMPERATURE OF THE PRIMARY SUPPLY AIR. THE SPACE TEMPERATURE. FURNISHED BY INSTALLED OR PERFORMED BY RE-USE m{ & 41Tc" o U 7 _ w27-5% .e! ITEM EXISTING N/A REMARKS { tt ,c Q.o ,, y Sizing Calculation Information LSD&C LANDLORD CONTR. LANDLORD CONTR. OTHER W 7 W a ,O 1- r =o o 2 S g IF THE SPACE TEMPERATURE DROPS ONE DEGREE BELOW SETPOINT AND THE DAMPER IS AT MINIMUM POSITION, THE UNIT'S ELECTRIC HEAT a W 2 P A U a "-o L THE TERMINAL UNIT DAMPER SHALL FULLY CLOSE UPON A SIGNAL FROM THE FIRE ALARM SYSTEM. SHALL ENERGIZE. THE HEAT WILL REMAIN ON UNTIL THE SPACE TEMPERATURE IS SATISFIED. ROOFING CUT & PATCH, INSULATED • HIRE LANDLORD APPROVED `fi w> " --a`=n y o r g a C Calculation Months Jan to Dec Zone CFM Sizing Peak zone sensible loadf o 0.-m. 2 g ` 8 5 TOE KICK & CURB LEVELING. ROOFING CONTRACTOR ,W a a =o O { - F SizingData _ Calculated Space CFM Sizing Individual peak space loads N W z = o= 0 = 6-Kw y 9 p DURING THE UNOCCUPIED SCHEDULE, THE DAMPER SHALL CLOSE. THE DAMPER SHALL OPEN IF UNOCCUPIED COOLING SETPOINT IS REACHED. THE TERMINAL UNIT DAMPER SHALL FULLY CLOSE AND THE FAN SHALL DEENERGIZE UPON A SIGNAL FROM THE FIRE ALARM SYSTEM. DUCT SMOKE DETECTOR FAC MC POWER WIRING PROVIDED BY FAC P c o g Fc`_ _.k, Central Cooling Coil Sizing Data SETPOINTS: DURING THE UNOCCUPIED SCHEDULE, THE DAMPER SHALL CLOSE AND FAN HEATER WILL DEENERGIZE. THE DAMPER SHALL OPEN AND THE / SMOKE SYSTEM ACCESSORIES, - 5 m -o-a- d =-{5 FAN SHALL ENERGIZE IF UNOCCUPIED COOLING SETPOINT IS REACHED. THE FAN AND HEATER SHALL ENABLE IF UNOCCUPIED TEMPERATURE • UNLESS FACTORY INSTALLEDc.3" -.06-',, p B=_®m o. W Total coil load 32.2 Tons Load occurs at Jun 2100 OCCUPIED HEATING: 70'F COOLING: 74'F IS 2'F BELOW UNOCCUPIED SETPOINT. FAN AND HEATER SHALL STOP WHEN SETPOINT IS REACHED. ETC. =. ...-.. , a 9~ =o a o , Total coil load 385.9 MBH OA DB 1 WB 76.5/62.9 °F ° Z y'A° `� 3'"2 ._ UNOCCUPIED HEATING: 60'F COOLING: 85'F DIFFUSERS AND GRILLES LD MC "- "¢ °` ~" J Sensible coil load 326.8 MBH Entering DB/WE __ 95.0 170.3 °F o z =W 2 - = z o o cs o z el z~ 2 Coil CFM at Jun 2100 7975 CFM Leaving DB 1 WB 57.0 I 54.8 °F SETPOINTS: _ a a o._ W Max _ 11 ,7 o 0 block CFM at Ju1600 10419 CFM Coil ADP _ 52.8 °F m W W" o �, `" o o °` �'" _ W Sum ofpeak zone CFM 10419 CFM Bypass Factor _ 0.100 DIFFUSERS/GRILLES FIRE 622-38 2 2-3 " E3 a " o x W~ S yp OCCUPIED HEATING: 70'F COOLING: 74W MC MC o W a Ii F E3).-i_. w's 8 F rc a Y Sensible heat ratio 0.847 Resulting RH 58 % UNOCCUPIED HEATING: 60'F COOLING: 85'F DAMPERS W = xo S m=_W y d U d LL { a F- ft2/Ton .. 324.5 Design supply temp 57.0 °F WALL FIRE DAMPERS • r- o 0 BTUI(hrft2) _ 37.0 Zone Tstat Check 1 of 1 OK C) - I Water flow @ 10.0°F rise __. 77.22 gpm Max zone temperature deviation 0.0 °F COMBINATION FIRE/SMOKE • 0r... DAMPERS Q r Q) ■ CV Preheat Coil Sizing Data LOW PRESSURE DUCTWORK MC MC ot ul RECTANGULAR TO ROUND DUCT • i to Max coil load 209.3 MBH Load occurs at __ Jan 2100 ADAPTER r Coil CFM at Jan 2100 7508 CFM Ent. DB/Lvg DB 69.2/9S.O °F Max coil CFM _. 10419 CFM HIGH/MEDIUM PRESSURE MC MC Water flow @ 20.0'Fdrop 20.94 gpm DUCTWORK Q Supply Fan Sizing Data DUCT SUPPORTS MC MC ' , Actual max CFM at Jul 1600 10419 CFM Fan motor BHP 0.00 BHP SEISMIC BRACING • Q 4 Standard CFM 10405 CFM Fan motor kW 0.00 kW Actual max CFMffL= 1.00 CFM/ft2 Fan static 0.00 in wg - c...)HURRICANE WIND BRACING • o DUCT HEATER(S) c.1 a Cd • Q CC 0- NC La IIII 0 C.) z4, Zone Sizing Summary for Total UNIT HEATER(S) • a Project Name: 164203VS Washington SQ 12/20/2016 INLINE AND CEILING EXHAUST LU Prepared by: M Engineering 10:50AM FAN(S) LD MC O w ROOF AND WALL MOUNTED CO !LI IX © O) EXHAUST FAN(S) AND CURB • W O p Air System Information 4 Q Air System Name Total Number of zones 1 r EquipmentClass _.......... UNDEF Floor Area 10436.0 ft2 EXHAUST FAN ROOF CURB •• = Or CD Air System Type _ VAV Location Portland,Oregon FAN POWERED VARIABLE AIR VOLUME (FPVAV) BOX RESPONSIBILITY SCHEDULE TOILET EXHAUST DUCTWORK �, 0 6f) J Sizing Calculation Information WALL OR ROOF CAP MC MC � Z M FURNISHED BY INSTALLED OR PERFORMED BY RE-USE PIPING AND PIPING APPURTENANCES Q O N ITEM LSD&C LANDLORD CONTR. LANDLORD CONTR. OTHER EXISTING N/A REMARKS (CIRCUIT SETTERS, ETC.) MC MC Z N. rn DESIGN COOLING DESIGN HEATING SERIES ARRANGEMENT FAN POWERED VAV 0 0 Z COOLING DATA AT Jun 2100 HEATING DATA AT DES HTG BOX (WITH HEAT AND NO HEAT OPTIONS) • BALANCE CONTRACTOR REPORT GC AABC OR NEBB CERTIFIED i= I- _ 44, . ..cc 0 COOLING OA DT31 WB 76:5°F 162.9°F HEATING OA DB/WB 22.0°F 118.4°F Sensible Latent Sensible Latent NON-FAN POWERED VAV BOX • AS-BUILT DRAWINGS MC re Z 0 0 U w - W ZONE LOADS Details (BTUIhr) (BTU/hr) Details (BTUIhr) (BTU/hr) • FAN POWERED BOX ELECTRICAL LANDLORD REQUIRED TEMPERATURE HIRE LL REQUIRED CONTRACTOR z - I Z a.. 0 Window& Skylight Solar Loads 0 ft2 0 - 0 ft2 - - DISCONNECT AC AC CONTROL SYSTEM COMPONENTS MC MC WHEN REQUIRED BY LL = NICO g Wall Transmission 0 ft2 0 - 0 ft2 0 - NON-FAN POWERED BOX TEMPERATURE CONTROL SYSTEM WIRE HIRE LI REQUIRED CONTRACTOR v, i- 0 W �; z v Roof Transmission 10436 ft2 2316 - 10436 ft2 60389 - ELECTRICAL DISCONNECT • FOR LL REQUIRED SYSTEM MC MC WHEN REQUIRED BY LL -J Q pip o f Window Transmission 0 ft2 0 - 0 ft2 0 - _ _ COMPONENTS > u, c10 it ) Skylight Transmission 0 ft2 0 - 0 ftz 0 - BAS CONTROLLER WITH AC AC YOUNG REGULATOR W/ BOWDEN MC MC o_rx > Cn N O- ti) c INTEGRATED ACTUATOR CABLE - Door Loads 0 ft2 0 - 0 ft2 0 - SUPPLY AIR TEMPERATURE LOCKING QUADRANT VOLUME REVISIONS: Floor Transmission oft= 0 - o ft2 0 - FAN POWERED VARIABLE AIR VOLUME (FPVAV) & VARIABLE AIR VOLUME (VAV) SENSOR AC MC DAMPER MC MC REQUIRED BY: DATE Partitions 0 ft2 0 - 0 ft2 o - BOX RESPONSIBILITY SCHEDULEHEATING/ AL Ceiling 0 ft2 o - 0 ft2 0 - COOLING CHANGEOVER • PNEUMATIC TUBING MC MC OWNER REVISIONS 03.08.17 Overhead Lighting 1745 W 3835 - 0 0 - FURNISHED BY INSTALLED OR PERFORMED BY RE-USE TEMPERATURE SENSOR • e TEASE LINE REVISION 05.16.17 Task Lighting 18257 W 55898 - 0 0 - ITEM EXISTING N/A REMARKS SPACE TEMPERATURE SENSORS AC MC FIRE ALARM SHUTDOWN RELAY FAC FAC WHERE APPLICABLE FOR FIRE g g LSD&C LANDLORD CONTR. LANDLORD CONTR. OTHER ALARM SYSTEMS A RESTROOM REVISION 06.02.17 Electric Equipment 4970 W 15972 - 0 0 - - Peo la 168 61736 59745 0 0 0 SERIES ARRANGEMENT FAN POWERED VAV CALL HVAC EQUIPMENT RELIEF AIR DAMPER AND p BOX (WITH HEAT AND NO HEAT OPTIONS) • TERMINAL UNIT COMMISSIONING AC AC SUPPLIER ACTUATOR • Infiltration - 0 0 - 0 0 - - Miscellaneous - 10809 4609 - 0 0 NON-FAN POWERED VAV BOX AC MC LANDLORD UNIT CONTROLLER • HIRE LANDLORD DESIGNATED RELIEF AIR FAN OR RETURN AIR • Safety Factor 10%/10% 15057 6435 10% 6039 0 CONTROLS CONTRACTOR FAN >>Total Zone Loads - 165623 70790 - 66428 0 FAN POWERED BOX ELECTRICAL LANDLORD SPACE TEMPERATURE HIRE LANDLORD DESIGNATED DISCONNECT • SENSOR/THERMOSTAT • CONTROLS CONTRACTOR SMOKE EVACUATION • Zone Conditioning - 151261 70790 - 10030 0 _ _ Plenum Wall Load 0% 0 0 0 - NON-FAN POWERED BOX ADDITIONAL LANDLORD CONTROL HIRE LL DESIGNATED CONTROL OUTSIDE AIR INTAKE Plenum Roof Load 70% 5404 - 0 0 - ELECTRICAL DISCONNECT AC AC SYSTEM COMPONENTS MC MC CONTRACTOR FOR LL EMS TIE IA HOOD/LOUVER WITH DAMPER • Plenum Lighting Load 30% 1786 - 0 0 - BAS CONTROLLER WITH AC AC MONITORING SPACE AC MC OUTSIDE AIR INTAKE DAMPER • DATE ISSUED: 12/30/16 Return Fan Load 7975 CFM 0 - 2311 CFM 0 - INTEGRATED ACTUATOR TEMPERATURE SENSOR ACTUATOR Ventilation Load 1769 CFM 2002 -11771 693 CFM 23159 0 SUPPLY AIR TEMPERATURE • MONITORING CARBON DIOXIDE • RELIEF AIR HOOD OR LOUVER WITH DESIGNED BY: M C R • Supply Fan Load 7975 CFM 0 - 2311 CFM 0 - SENSOR SENSOR • DAMPERR-BALANCED BACKDRAFT DAMPER DRAWN BY: M C R Space Fan Coil Fans - 0 - - 0 - HEATING/COOLING CHANGEOVER DAMPERS FOR FIELD BUILT CHECKED BY: JAH Duct Heat Gain/Loss 0% 0 - 0% 0 - TEMPERATURE SENSOR AC MC MONITORING HUMIDITY SENSOR • ECONOMIZER • >>Total System Loads - 160453 59019 - 33189 0 MONITORING ONLY CONTROLLERS WITH ANALOG INSTALL MONITORING DAMPER ACTUATORS FOR FIELD MECHANICAL Central Cooling Coil - 326838 59045 - _94703 0 SPACE TEMPERATURE SENSORS AC MC INPUTS AND COUIIUNICAION CAPABILITY AC MC CONTROLLER AT IFS BUILT ECONOMIZER Preheat Coil - -166385 - - 127891 - CALL HVAC EQUIPMENT AS REQUIRED FOR MONITORING 1�p p� �+ >> Total Conditioning - 160453 59045 .. 33189 0 TERMINAL UNIT COMMISSIONING AC AC SUPPLIER CONTROL TRANSFORMERS MC MC DEVICES OUTSIDE AIR DAMPER •- E S P Itl�►7 B I L I T Y Key: Positive values are clg loads Positive values are htg loads CONTROL SYSTEM WIRE FOR CONTROL SYSTEM WIRE FOR SCHEDULES Negative values are htg loads Negative values are clg loads SYSTEM COMPONENTS AC MC FINAL CONN. BY MC SYSTEM COMPONENTS AC MC FINAL CONN. BY MC OUTSIDE AIR DAMPER ACTUATOR • DRAWING NUMBER: NTS NTS NTS NTS M r� HVAC LOAD CALCULATIONS NETWORK WIRING AND SEQUENCE NETWORK WIRING AND SEQUENCE HVAC RESPONSIBILITY SCHEDULES {,(•�'1 �•N J E A 1 �, Iii ° 00D-M0401-N00-LOAD 00D-M0401-.100-SCHD 00D-M0401-E03-SCHD 000-1A0401-A00-SCHD ° 10/31/2014 10/05/201 10/08/201 10/05/201 SECTION 230000: BASIC MECHANICAL REQUIREMENTS c. DIFFUSERS, GRILLES AND REGISTERS. . • ` ' % • • % 4. A. NOTE 1,.,,��T HICK-I SUL-ATIO d. TEMPERATURE CONTROLS. a. • • • : _ ■ 2.ALL b. ELEVATION. ` 1. THE ABBREVIATION LSD&C WHEREVER IT APPEARS IN THESE MECHANICAL DRAWINGS AND/OR SPECIFICATIONS SHALL REFER TO LIMITED DUCTWORK, ROOF OPENINGS AND CAPS NECESSARY TO PROVIDE A COMPLETE TOILET EXHAUST SYSTEM SHALL BE FURNISHED AND 1 0 STORE DESIGN AND CONSTRUCTION". ANY REFERENCE TO TENANT'S PROJECT MANAGER OR FURNISHED BY ANY OF THE ABOVE REFERS TO INSTALLED BY THIS CONTRACTOR. (t) • - • • • • - ' b • " ' p Neering LSD&C. O. . . , . • • • : - : :, • . • : • . o : : NOT LESS THAN 1' TO 10 FEET. 7dge Blvd. 2. DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION t .. . _ ; - Wehio 43081 SECTIONS, APPLY TO THIS AND THE OTHER SECTIONS OF DIVISION 15. (2) • ' c. ' ° p .839.4639 3.THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF ; % , . • ' : : • d• • • . ` • - • • • • • L::::11:%39 2222 WORK AND IS RESPONSIBLE FOR THE COORDINATION OF THIS WORK AND THE WORK OF HIS SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. 2` _ • • • ' - •• = wwwrrng.us.com IT 1S THIS CONTRACTOR'S RESPONSIBILITY TO PROVIDE HIS SUBCONTRACTORS WITH A COMPLETE SET OF BID DOCUMENTS. • •• • , • - • • • - • • , : - - . • • ; . • . • • C. i , . • - • - • . _ • : - 46 4. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND INSPECTION OF THIS WORK TO COMPLY WITH THE LSD&C �E SCHEDULE AND THE PROJECT COMPLETION DATE. 3, • (1) • - , - ., A. aPO�IN ,S.V5. HIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO DETERMINE CONDITIONS AFFECTING THE WORK ANY ITEMS WH CH • • - - _ _ _ ' ' '_ ' I -k ARE NOT COVERED IN THE BID DOCUMENTS OR ANY PROPOSED SUBSTITUTIONS SHALL BE LISTED SEPARATELY AND QUALIFIED IN THE ` `` ` . ' ` - ' ' ''' 6O$ SPE �r CONTRACTORS BID. SUBMITTAL OF BID SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND ANY MODIFICATIONS WHICH • - '' d • " - 2 : ' ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE SITE DOES NOT RELIEVE THE P. (11 - - . _ ; , ; . ; • 2 PIPING CONTRACTOR OF RESPONSIBILITY IN PERFORMANCE OF HIS WORK. 1. •' : . . - . - " • • • - - - - : : • - ; . : . , : : - : • 9� 6.REFER TO RESPONSIBILITY SCHEDULE ON SHEET M04.01 OF THIS SET FOR INFORMATION IN REGARD TO RESPONSIBILITY OF WORK OR ITEMS WHICH , , _ , - ' - _ C . F • • ■• - ,, • • • ,' , �y 1 . 17 . p MAY AFFECT THE BID. • . , ■ ; ; - . . TSF • 0¢ : . YOSFII irk.' 3 : . B. GENERAL REQUIREMENTS • • • - : - . ,s : - ; ; . . _ . , . . _ e' .. . , s _• ■ [EXPIRATION : ] 1. THIS CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS = • ' ; • s % % ' [1) ' ` ' NECESSARY TO PROVIDE A COMPLETE MECHANICAL SYSTEM AS SHOWN ON THE DRAWINGS, CALLED FOR 1N THE SPECIFICATIONS, AND AS • ' - - .. - - • b. , . . ; • • - • : . ` • :• • • • : • ; • _• . . . :, • • : - i " • : - , . REQUIRED BY JOB CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY THE LANDLORD OR LSD&C SHALL BE PROVIDED BY THIS - • " - - ' CONTRACTOR. CLOSELY COORDINATE THE ENTIRE INSTALLATION WITH THE LANDLORD AND THE LSD&C PROJECT MANAGER, AS REQUIRED. Q. FINAL HVAC INSPECTIONS , ; : a ` 2.THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL t ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, LSD&C SHALL HAVE AN INDEPENDENT HVAC CONTRACTOR INSPECT THE f, , - •• • • , • O? BE FURNISHED AND INSTALLED EVEN THOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN FINISHED HVAC INSTALLATION UPON COMPLETION FOR COMPLIANCE WITH THE PLANS, SPECIFICATIONS AND CODES, THE INSTALLING 3'INSTALLATION z O CONTRACTOR WILL BE RESPONSIBLE TO BRING ALL ITEMS REPORTED BY THE INDEPENDENT HVAC CONTRACTOR UP TO PLANS ANDN CY3 (1! ' ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK, AND WHICH IS SPECIFICATION REQUIREMENTS. - a• - • ' USUALLY INCLUDED IN WORK OF SIMILAR CHARACTER, SHALL BE FURNISHED AND INSTALLED AS PART OF CONTRACT. ; • • • % •-- SECTION 230500: COMMON WORK RESULTS FOR HVAC ' . . ' ' • ' ' ` 1:25 © r 3. WHERE'THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES OR THE LANDLORD'S TENANT CRITERIA, THE CONTRACTOR - • • �, IS RESPONSIBLE FOR FURNISHING AND INSTALLING THE SYSTEM WITH THE MORE STRINGENT REQUIREMENTS AS DESIGNED AND DESCRIBED ON A. HANGERS ` • = b. • - • ' ' "'` '' D O " THESE DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. • r 1. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C-CLAMPS WITH RETAINING CLIPS, CHANNELS, HANGER : • c. _ ; ; % _ Ct (p 4. ALL WORK IN THIS SECTION SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING, AND RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK. g' • - a, ' ` ' ` uj REPAIRING. THIS CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT SERVICE ACCESS TO ALL EQUIPMENT. • - • 2.HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, BUT NOT TO PIPING. HANGING FROM METAL DECK IS NOT (1) . • ` • _ , • . ' • • . - s, X . . 5. ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING GOOD CONSTRUCTION PRACTICES, PERMITTED, HANGERS MUST BE ATTACHED TO UPPER CHORD OF BAR JOIST, WHERE INTERFERENCES OCCUR, AND IN ORDER TO SUPPORT 6.UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS, AND EQUIPMENT INCLUDING ALL COMPONENTS THEREOF SHALL BE NEW DUCTWORK OR PIPING, THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DOMI - ' ' Z UNDERWRITER'S LABORATORIES/UNDERWRITER'S LABORATORIES OF CANADA LISTED AND LABELED AND SIZED IN CONFORMITY WITH • NOT INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, AND OTHER EQUIPMENT. HANGER TYPES AND INSTALLATION METHODS ARE ALSO 2 • : c - ; - - • %• ' % • % O REQUIREMENTS OF STATE/PROVINCE AND LOCAL CODES, WHICHEVER IS MORE STRINGENT. SUBJECT TO LANDLORD CRITERIA. d , , : - - ., : . : • 0 0 3. ALL--MISULATIO a r 3. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE OUTER DIAMETER OF INSULATION. INSTALL 6" LONG SPLIT O 7. THIS CONTRACTOR SHALL DO ALL CUTTING, CHASING AND CHANNELING REQUIRED FOR ANY WORK UNDER THIS DIVISION. CUTTING SHALL HAVE CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. CT5 PRIOR APPROVAL BY LSD&C PROJECT MANAGER AND THE LANDLORD. ALL PATCHING SHALL BE BY G.C. AND SHALL MATCH THE SURROUNDING 4• . . ! ,: e. • : - - 7 g 1� SURFACES. 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI-ELECTRICALLY SEPARATED. Z C. - • f• - • % ; ; rr� In B. THE MECHANICAL CONTRACTOR SHALL MAKE ALL FINAL MECHANICAL CONNECTIONS AS REQUIRED FOR A COMPLETE AND OPERATING SYSTEM. B. VIBRATION ISOLATION DEVICES -• •• • % % % Sili V a. THE MECHANICAL CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR TO CONTACT LSD&C'S DESIGNATED COMPANY (EMS) FOR 1• SPRING VIBRATION ISOLATION DEVICES SHALL BE FURNISHED AND INSTALLED IN ALL SUPPORTS BETWEEN VIBRATING EQUIPMENT (FANS, AIR • , . - • - : - - , • : • ; . • ;_ ; . _ , ; , . - 4.RISPEETIAN- START-UP. (REFER TO SHEET M01,01). HANDLERS, ETC.) AND STRUCTURE. ISOLATORS TO BE SIZED ACCORDING TO LOAD WITH A MIN. 1" DEFLECTION. VIBRATING EQUIPMENT HUNG •... - - - • je:.) a C0 FROM STRUCTURE SHALL BE ISOLATED WITH RUBBER AND SPRING DEVICES. VIBRATING EQUIPMENT SUPPORTED FROM FLOOR OR DECK SHALL :,' ` • C CODES • : •• . , BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. : • : : . ' -• : - . . : ; • • ; • . - ; w 1. ALL WORK SHALL CONFORM TO THE LANDLORDS' CRITERIA, THE STATE'S/PROVINCE'S, COUNTY'S, CITY'S AND LOCAL CODES AND ORDINANCES, , •• • • • : . : : • •• • • • 2.EXAMINE DEAD LOAD AND OPERATING LOAD CONDITIONS WHEN SELECTING DEVICES. ADJUST FOR PROPER ALIGNMENT AND LOADING. AVOID It J O SAFETY AND HEALTH CODES, NFPA/NFPAC CODES, ENERGY CODES AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. THIS 'GROUNDING" THE ISOLATOR. CD CONTRACTOR SHALL INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THIS CONTRACTOR SHALL SECTION 230800: COMMISSIONING OF HVAC SECTION 233100: HVAC DUCTS AND CASINGS Q O CCLa)ANY CHANGES REQUIRED BY CODES IN THE BID AND IF THESE CHANCES ARE NOT INCLUDED IN THE BID, THEY MUST BE QUALIFIED AS 3.CHECK HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE AND AT THE UPPER AND LOWER ATTACHMENTS TO N A. DETAILED HVAC COMMISSIONING INFORMATION IS INCLUDED IN THE LSD&C SITE MANUAL PROVIDED TO THE CONTRACTOR AT THE START OF A SEPARATE LINE [TEM [N THE BID. AFTER CONTRACT IS AWARDED, CHANGE ORDERS FOR INCREASED COSTS DUE TO CODE ISSUES WILL NOT STRUCTURES, DUCTS, EQUIPMENT, ETC. THE PROJECT. A. METAL DUCTWORK F- N BE ACCEPTED BY LSD&C. (!) I- i- 1. NO FIBERGLASS DUCT ALLOWED (RETURN AIR GRILLE BOOTS MAY BE DUCT BOARD WHERE ALLOWED BY LANDLORD). 4.CONSULT MANUFACTURER FOR APPLICATION DATA. B. MANUFACTURER WILL CONTACT THE CONTRACTOR EARLY IN THE PROJECT TO SET PRELIMINARY DATES FOR HVAC INSPECTION, D. LICENSES, PERMITS, INSPECTIONS & FEE$ C. TESTING. ADJUSTING, AND BALANCING COMMISSIONING AND HVAC CONTROLS COMMISSIONING. 2• NO DUCTWORK SHALL BE FABRICATED PRIOR TO JOB SITE VISIT AND APPROVAL BY THE GENERAL CONTRACTOR. A SHOP DRAWING MUST BE 1. THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS, AND FEES REQUIRED OR RELATED TO HIS WORK. C. WORK REQUIRED PRIOR TO HVAC INSPECTION / COMMISSIONING (TO BE COMPLETED BY MECHANICAL SUBCONTRACTOR) SUBMITTED INDICATING CONSTRUCTION METHODS FROM DESIGN AND MUST BE APPROVED BY LSD&C'S PROJECT MANAGER PRIOR TO 1. TESTING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE MADE BY AN INDEPENDENT CONTRACTOR WHO ISA CURRENTLY LICENSED FABRICATION OR INSTALLATION. 2• FURNISH TO THE LSD&C'S PROJECT MANAGER ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT COMPLETION OF ASSOCIATED AIR BALANCING COUNCIL MARC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NESS( BALANCING CONTRACTOR, NO OTHER 1• CONNECT AND BLEED CONDENSATE DUCTWORK NATURAL GA H PROJECT, BALANCE REPORTS WILL BE ACCEPTED. ALL BALANCING WORK MUST BE COMPLETE AND DONE IN ACCORDANCE WITH THE MOST RECENT S, CHILLED WATER PIPING, AND/OR CONDENSER WATER PIPING. 3.EXCEPT AS OTHERWISE INDICATED, FABRICATE AND INSTALL RECTANGULAR AND ROUND DUCTWORK WITH GALVANIZED STEEL, IN ACCORDANCE STANDARDS OF THEIR SOCIETY AND ASA MINIMUM SHALL INCLUDE THE INFORMATION AS SHOWN IN THE AIR BALANCE REVIEW CHECKLIST IN 2• CHARGE HVAC SYSTEMS WITH REFRIGERANT FOLLOWING MANUFACTURERS' GUIDELINES AND INSTRUCTIONS. COLD WEATHER CONDITIONS WITH SMACNA "HVAC DUCT CONSTRUCTION STANDARDS" OF THE LATEST EDITION, WHERE OTHER CODES ARE ENFORCED, (1E. UMC, BOCA, E. TRADE NAMES, MANUFACTURERS AND SHOP DRAWINGS THE GC PROJECT MANUAL. PAYMENT OF ALL COSTS FOR TESTING AND BALANCING SHALL BE INCLUDED IN THE BID. HOWEVER, IT WILL BE REQUIRE SPECIFIC PROCESSES, CONTACT MANUFACTURER FOR TECHNICAL SUPPORT, ETC.) USE THE MOST STRINGENT CODE FOR DUCT CONSTRUCTION STANDARDS. 1. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT SHALL BE THE G.C. THAT WILL CONTRACT DIRECTLY WITH THE AIR BALANCING COMPANY. 3. CONNECT POWER TO THE HVAC EQUIPMENT FOR A MINIMUM OF 24 HOURS. 4•EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT DUCT SYSTEMS TO THE FOLLOWING PRESSURE CLASSIFICATIONS: USED ASA MINIMUM FOR THE BASE BID. MANUFACTURERS CONSIDERED AS AN EQUAL OR BETTER IN ALL ASPECTS TO THAT SPECIFIED WILL 2, FINAL TESTING, ADJUSTING AND BALANCING REPORT MUST BE COMPLETE AND SUBMITTED WITH FINAL CLOSE-OUT DOCUMENTS TO LSD&C 1 N BE SUBJECT TO APPROVAL IN WRITING BY LSD&C'S PROJECT MANAGER THROUGH SHOP DRAWING SUBMITTAL PROCESS FOR ACCEPTANCE WEEK PRIOR TO MERCHANDISING DATE. a. IN COLD WEATHER SITUATIONS, DO NOT OPERATE THE UNITS PRIOR TO COMMISSIONING( a. SUPPLY DUCTS: 2° W.G., POSITIVE G a W 1:..~ G. = W O In g H z - _ x - zU dr zW HWW WOEXPENSE. � '� WPRI R T IN TAL 1 H. THE E F ANY UNAUTHORIZED EQUIPMENT SHALL BE REPLACED AT THE CONTRACTOR 5 � _ _ � � WO O S LAT O US 0 p. HVAC EQUIPMENT SHOULD BE STARTED UP EARLY IN THE RROJEGT, COORDINATE EARLY STAT UP OF EQUIPMENT WITH THE MANUFACTURER. b. RETURN AND EXHAUST DUCTS: 2' W.G., NEGATIVE Ii Z�, W a W = o 3 Z 3. THE HVAC CONTRACTOR SHALL BE PRESENT FOR AIR BALANCE TO VERIFY ACCESSIBILITY TO ALL DEVICES, VERIFY ALL OPERATING a `� _ E a o a x- V2. GENERAL CONTRACTOR SHALL SUBMIT ALL EQUIPMENT AND DEVICES TO LSD&C PROJECT MANAGER FOR APPROVAL. SUBMISSIONS SHALL BE K `-' o 00 w o o '' a c' EXCEPT WHERE OTHERWISE INDICATED, USE DUCT SEALANTS OF THE FOLLOWING PRESSURE CLASSIFICATIONS: = N ~ J w i = a 2 - 0MADE EARLY ENOUGH IN PROJECT TO ALLOW FOUR 141 WORKING DAYS FOR LSD&C PROJECT MANAGER'S REVIEW WITHOUT CAUSING DELAYS SEQUENCES AHD INSTALL NEW FILTERS IN ALL UNITS JUST PR10R TO THE AIR BALANCE. THE COMPLETE AIR BALANCE SHALL TAKE PLACE E. THE GC MAY BE BACK CHARGED FOR ADDITIONAL AC SITE VISITS BEYOND THE FIRST THREE (3) NECESSARY TO DOCUMENT THE RESOLUTION W O= ' m= = o ,-- W W 2 OR CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL BEAR THE STAMP AND/OR THE SIGNATURE OF THE GENERAL CONTRACTOR AND WITH OUTSIDE AIR DAMPERS IN MINIMUM POSITION, EXCEPT A5 NOTED OTHERWISE, HVAC CONTRACTOR SHALL ALSO INSTALL A NEW SET OF OF THE HVAC PUNCHLIST ITEMS. o W 2 _ W =FILTERS ONE DAY PRIOR TO MERCHANDISING. " W~ W = ,_ =EA z U en LjTHE SUBCONTRACTOR SHOWING THAT THEY HAVE REVIEWED AND CONFIRMED THAT THE SUBMITTALS ARE IN CONFORMANCE WITH THE c, SUPPLY DUCTS: CLASS B - 3 W.G. ,�a o W =o a m W��e� � azo r en � F. HVAC COMMISSIONING PROCESS ° W g W `� ,m -c_ ci o=° N CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS HAVE BEEN TAKEN. 4.BALANCE LANDLORD MEDIA QUANTITIES TO WITHIN 5% OF THAT INDICATED ON THE DRAWINGS. ANY REQUIRED CHANGES IN SHEAVES, BELTS d. RETURN AND EXHAUST DUCTS: CLASS C - 2 W.G. a .. 0 o-W.W o , H, Ili d i/1= - Q d lr H ~ V4 O� O F. GUARANTEE OR PULLEYS NEEDED TO ACHIEVE SPECIFIED FLOW RATES SHALL BE PERFORMED BY THE HVAC CONTRACTOR WITH NO ADDITIONAL COST TO 1. VISIT 1: HVAC EQUIPMENT START UP - CONTRACTOR SHALL HAVE THE MECHANICAL AND ELECTRICAL SUBCONTRACTOR ON SITE DURING THE IN ACCORDANCE WITH THESE CONSTRUCTION AND SEALANT PRESSURE CLASSIFICATIONS, MAXIMUM DUCT AIR LEAKAGE WILL NOT EXCEED 5% Z W 4 0 ,10 ...,,,% c.,_ W , ^ _ .10 W o LSD&C, HVAC IN AND COMMISSIONING. BUDGET 5 HOURS FOR THE HVAC INSPECTION AND COMMISSIONING. (NOTE: THESE HOURS ARE TO BE AS REQUIRED FOR FINAL AIR BALANCE APPROVAL. _"''2 = C' ,,,03 a _ E, 1. THIS CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER HIS CONTRACT AND SHALL MAKE GOOD, REPAIR OR USED FOR THE COMPLETION OF THE COMMISSIONING PROCESS ONLY• ADDITIONAL HOURS WILL NOT BE APPROVED FOR WORK THAT WAS IN W -u.9 v JJ a W o 5. ALL CONTROL SEQUENCES SHALL BE TESTED (INTERLOCKED EQUIPMENT, SMOKE DETECTORS, SMOKE EVACUATION, ECONOMIZER, ETC,) AND = o Z 0 .-,=., 2„, .- , �W o W SCOPE AND NOT COMPLETED PRIOR TO THE COMMISSIONING PROCESS.( 4.ROUND DUCTWORK SHALL BE GALVANIZED STEEL WITH SPIRAL LOCKSEAM CONSTRUCTION FOR ALL SIZES 14" DIAMETER AND LARGER. ROUND a c.a m H ,t <E REPLACE AT HIS OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY BE DISCOVERED WITHIN A PERIOD OF 12 OPERATING STATUS RECORDED IN THE BALANCE REPORT. MONTHS FROM THE PATE OF ACCEPTANCE ON WRITING( OF THE INSTALLATION 8Y LSD&C'S PROJECT MANAGER. EXTENDED WARRANTIES ARE DUCTWORK SIZES 13" DIAMETER AND SMALLER MAY BE SNAP-LOCK CONSTRUCTION. ALL SNAP-LOCK SEAMS SHALL BE SEALED AS `"" �' Z W" W , a Z a. CONTRACTOR TO COMPLETE AND EMAIL, OR FAX, THE HVAC EQUIPMENT STAT UP SURVEY TO MANUFACTURER PRIOR TO THE HVAC DESCRIBED [N THESE SPECIFICATIONS. ROUND FITTINGS SHALL BE GALVANIZED STEEL WITH SPOT WELDED AND BONDED CONSTRUCTION. 4= _ "` `-' " ' = AS SPECIFIED WITH INDIVIDUAL EQUIPMENT. 6• AIR BALANCING CONTRACTOR IS TO CONFIRM OVERRIDE OF MINIMUM OUTSIDE AIR INTAKE UPON CO2 MONITORING CONFIRMATION. FOR CO2 STARTUP, W ,_ L, a W•-.a '- W .9 2 MONITORING CONTACT, SEE CONTACT INFORMATION ON SHEET M01,02. a" . w" J" U Q W 2, THE EQUIPMENT MANUFACTURER SHALL GUARANTEE AND PROVIDE A 12 MONTH GUARANTEE TO LSD&C FROM THE DATE OF ACCEPTANCE. THIS 5. ROUND SPIRAL GALVANIZED STEEL DUCTWORK MAY BE USED IN PLACE OF RECTANGULAR DUCTWORK [N HORIZONTAL APPLICATION WHEN L,.- - - . o a`=o " o Y a b. MANUFACTURER COORDINATES THE HVAC EQUIPMENT COMMISSIONING. CONTRACTOR IS RESPONSIBLE FOR COMMUNICATING SCHEDULE DATE W L _:x a �"J tic... CONTRACTOR SHALL WARRANTY THE INSTALLATION OF THIS EQUIPMENT AND WILL BE RESPONSIBLE FOR ANY DAMAGE AND/OR MALFUNCTION 7, THREE COPIES OF THE BALANCE REPORT SHALL BE SUBMITTED THROUGH THE GENERAL CONTRACTOR TO LSD&C FOR APPROVAL, THE ABOVE CEILING CLEARANCES PERMITS AND EQUIVALENT FREE AREA IS MAINTAINED, WITH THE FOLLOWING EXCEPTION ALL SUPPLY AND _ a 4 Z ©a < o - 0 0 CAUSED BY THE INSTALLATION. THIS CONTRACTOR SHALL NOT BEAR ADDITIONAL WARRANTIES BEYOND A COMPLETE WORKING SYSTEM. GENERAL CONTRACTOR SHALL VERIFY THE COMPLETENESS OF THE REPORTS PRIOR TO SUBMITTING TO LSD&C. SUBMIT ONE COPY OF FINAL CHANGES TO MANUFACTURER AND SUBCONTRACTORS. RETURN DUCTWORK WITHIN 15 FEET OF THE AIR HANDLER MUST BE RECTANGULAR AND INTERNALLY LINED. ONCE A TRANSITION IN THE ="' W N =W • Q- W= Z o H M a c' CJ O ,V, K W VI DIRECTION OF THE AIRFLOW TO SPIRAL HAS BEEN DONE, DUCT WILL NOT BE ALLOWED TO REVERT TO RECTANGULAR. WHERE ROUND DUCT ~ - cn pot.' z v9 ~ ~' = • APPROVED AIR BALANCE REPORT TO MALL GENERAL MANAGER. C. PROVIDED THERE ARE NO HVAC INSTALLATION ISSUES SYSTEMS SHALL BE STARTED FOR TEMPORARY OPERATION ON LOCAL CONTROL. •� G. RECORD DRAWINGS - SUBSTITUTION WILL TAKE PLACE, SUBMIT A SKETCH AND CHART SHOWING EQUIVALENT ROUND CONVERSIONS OF RECTANGULAR DUCTWORK `` W a m "d . W L" ,- .T3' Z V r= O ,xW ,V, = =.- • J d. IF THERE ARE HVAC INSTALLATION PUNCHLIST ITEMS, THE GC MUST CORRECT THEM AND RESCHEDULE COMMISSIONING WITH TO LSD&C PROJECT MANAGER'S FOR APPROVAL PRIOR TO FABRICATION OR INSTALLATION. ,T g 4 w ,,,, ,„..,, ,E 3 8. THE BALANCING CONTRACTOR SHALL PERFORM ALL APPLICABLE TESTING AND BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED o a r,W , a.N 1. THIS CONTRACTOR SHALL MAINTAIN ONE SET OF DRAWINGS ON THE JOB SITE UPDATED WEEKLY TO RECORD ALL DEVIATIONS FROM ON THESE DRAWINGS. ALL SYSTEMS UNABLE TO BE COMPLETELY BALANCED AT THE TIME OF ORIGINAL BALANCE MUST BE BALANCED IN MANUFACTURER. c.;''' -=`6:2, oW - _ m o W a W � zr �� ,- zin .- �.n z pa y. CONTRACT DRAWINGS, SUCH AS: 6.INSTALL FACTORY MANUFACTURED DOUBLE THICKNESS TURNING VANES IN RIGHT ANGLE ELBOWS IN MAIN DUCT PER LATEST EDITION OF •W a,-c- . -.0 W o W` =W FUTURE AT NO ADDITIONAL EXPENSE TO LSD&C THE BALANCING CONTRACTOR SHALL RECHECK ANY ITEMS THAT LSD&C DEEMS NECESSARY o ?z W,.=- = =o =_ o= _, 2. VISIT 2: HVAC CONTROLS COMMISSIONING - THE CONTROLS COMMISSIONING IS PERFORMED BY THE MANUFACTURER IN CONJUNCTION WITH THE SMACNA. AT NO ADDITIONAL COST TO LSD&C. Z ••c .-0o W s a a _ _ fl a. LOCATION OF CONCEALED RIPING VALVES AND DUCTS. GENERAL CONTRACTOR AND THE MECHANICAL AND ELECTRICAL SUBCONTRACTORS. ALLOW FOR 4 HOURS TO COMPLETE THE CONTROLS a o.-0 W a Z ,2- 0 W 2 D. VA & COMMISSIONING. (NOTE: THESE HOURS ARE TO BE USED FOR THE COMPLETION OF THE COMMISSIONING PROCESS ONLY. ADDITIONAL HOURS 7• INSTALL RIGID ROUND AND RECTANGULAR METAL DUCT WITH SUPPORT SYSTEMS INDICATED IN SMACNA STANDARDS, SUPPORT HORIZONTAL E o a ~ _ m _. a_ N 0 a W N, � c.,a a cs 40 - 3 = -5,., 5 =M b. REVISIONS, ADDENDUM, AND CHANGE ORDERS. `''`�"'" � � � "o" � `e `� _ � WILL NOT BE APPROVED FOR WORK THAT WAS IN SCOPE AND NOT COMPLETED PRIOR TO THE COMMISSIONING PROCESS:) FOLLOW THE _ ' N W U V - DUCTS WITHIN 2 FEET OF EACH ELBOW AND WITHIN 4 FEET OF EACH BRANCH INTERSECTION USING DOUBLE STRAP HANGERS ON EACH SIDE E W= € Et " W'- a w= a w c - C 2 0 � CL c, SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS, APPROVED EQUIPMENT SUBSTITUTIONS, AND CONTRACTOR'S 1• • - ' , • - • ' : 2. ; • ' . : % ' • • • - : • o ' ' ` ' ' ` '' . CONSTRUCTION DRAWINGS AND MANUFACTURER'S DETAILS AND DRAWINGS DURING THE INSTALLATION F THE HVA CONTROL EQUIPMENT. OF FITTING. SUPPORT VERTICAL DUCTS ATA MAXIMUM INTERVAL OF 16 FEET AND AT EACH FLOOR. NO WOOD SHALL BE USED TO SUPPORT n r v d 4 • d < N O U H . W N COORDINATION WITH OTHER TRADES. , . • • , • • : a : : -, - . 0 0 C 0 TROL EQU T. PROVIDEAND SEISMIC ASREQUIRED BY STATE/PROVINCE AND LANDLORD. D - OR BRACE DUCTS. SWAY S SMC BRACING Q STA E/PROVINC LOCAL CODES OR BY ; a. CONTRACTOR TO COMPLETE AND EMAIL, OR FAX, THE CONTROLS COMMISSIONING SURVEY TO MANUFACTURER PRIOR TO THE CONTROL N O 2. AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL, THIS CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS • • COMMISSIONING. 8• WHERE DUCTS PASS THROUGH ROOFS AND FLOORS, PROVIDE AS MINIMUM 1-1/22X1-1/2"X1/8" STEEL ANGLE FRAMES AT EACH SIDE OF 0 .- I AND CERTIFY THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON, FAILURE TO KEEP THESE RECORDS WILL ALLOW LSD&C TO DIRECT 2• • • • ' , • • . - ; : : : : - : • % - a . % , • ' ', OPENING. THE ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES SHALL BE CAULKED WITH SILICONE SEALANT OR FIREPROOFED AS O Y i` r b. CONNECT THE HVAC CONTROLS TO AN OPERATIONAL ANALOG PHONE LINE OR ETHERNET CONNECTION TO ALLOW COMMUNICATION. IF REQUIRED BY ASSEMBLY FIRE RATING. r N THE GENERAL CONTRACTOR TO PROVIDE THESE RECORDS AT HIS EXPENSE PRIOR TO FINAL PAYMENT. • - '' - ' •' � N NECESSARY, UTILIZE SITE FAX LINE TO CONNECT TO THE CONTROLS MODEM IN THE IFS PANEL. 9.ALL JOINTS AND SEAMS SHALL BE SEALED WITH 2° WIDE, GLASS-FIBER-FABRIC REINFORCED TAPE. JOINTS ALSO SHALL BE RIVETED OR N H. DISCREPANCIES IN DOCUMENTS 3. - - :, :: ; : . : . . ; 1 1 • , • --, . ; . • e - • : ; : • ; : • i ; -, c, CONTACT MANUFACTURER AT THE SCHEDULED TIME FOR THE CONTROLS COMMISSIONING. CONNECTED WITH SHEET METAL SCREWS. LIQUID SEALANTS BY UNITED MCGILL CORP., DOW CORNING, MIRACLE ADHESIVES AND SUREBOND 1. DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION AND INTENT OF THE INC. WILL BE ACCEPTED IN LIEU OF TAPE. Ig co, MECHANICAL SYSTEMS. WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER TRADES CONFLICT OR ARE UNCLEAR, 4• % % % ` % ` % ' `: ' , d. PROVIDED THERE ARE NO OPEN ISSUES, VISIT. 2 IS COMPLETE. IN THE EVENT THERE ARE OPEN ITEMS, THE GC MUST CORRECT THEM AND ADVISE THE GENERAL CONTRACTOR IN WRITING, PRIOR TO SUBMITTAL OF BID. THE GENERAL CONTRACTOR IS RESPONSIBLE TO ADVISE • : c • • • RESCHEDULE THE CONTROLS COMMISSIONING. 10. SOFT ELASTOMER BUTYL GASKET WITH ADHESIVE BACKING SHALL BE USED TO SEAL FLANGED JOINTS. 44. LSD&C'S PROJECT MANAGER, IN WRITING, OF VARIATIONS TO CONTRACT DOCUMENTS PRIOR TO SUBMISSION OF BID. OTHERWISE, LSD&C - : . • 3 - A FINAL INSPECTION OF THE HVAC EQUIPMENT AND CONTROL INSTALLATION. THE 11.D TTRANSITIONSCD 5, - • , ; ,- - ; •- • , - - ; - - : •• . VISIT 3: FINAL HVAC INSPECTION THIS VISIT IS TO DO 0 S LATION. H UC SHALL NOT EXCEED 30 DEGREES SLOPE EXCEPT AS SPECIFICALLY NOTED OTHERWISE. PROJECT MANAGER'S INTERPRETATION OF CONTRACT DOCUMENTS OR CONDITIONS SHALL BE FINAL WITH NO ADDITIONAL COMPENSATION . ' • . .` a • a . ; a. -• • : ; - - : ; - i • • ;. . CONTRACTOR IS RESPONSIBLE FOR HAVING THE MECHANICAL SUBCONTRACTOR AND THE ELECTRICAL SUBCONTRACTOR ON SITE DURING THE PERMITTED. FINAL INSPECTION. BUDGET 4 HOURS FOR THE FINAL INSPECTION. THIS VISIT MUST TAKE PLACE PRIOR TO CONSTRUCTION COMPLETION. THE 12. PROVIDE ACCESS TO ALL MOTORIZED DAMPERS, FIRE DAMPERS, CONTROLS, AND OTHER ITEMS IN DUCTWORK THAT REQUIRE SERVICE OR • SECTION 230700: HVAC INSULATION FOLLOWING ITEMS MUST BE COMPLETED PRIOR TO THE INSPECTION: INSPECTION. IF THE ACCESS PANEL LOCATION IS EXPOSED TO THE SALES AREA, IT MUST BE APPROVED BY LSD&C'S PROJECT MANAGER ill I. PHASING REQUIREMENTS PRIOR TO INSTALLATION. IN HARD CEILINGS, LAY-IN SUPPLY AND RETURN AIR DIFFUSERS, GRILLES AND REGISTERS WITH PLASTER FRAMES MAY 0 1. THIS CONTRACTOR IS TO INCLUDE IN HIS BID ALL NECESSARY SERVICE REQUIRED TO KEEP THE OPERATING PHASE OF THE STORE'S HVAC, A. DUCTWORK INSULATION (1) THE GC MUST COMPLETE TRANE'S SITE VISIT #3 SURVEY PRIOR TO THE VISIT BEING SCHEDULED. BE USED AS ACCESS LOCATIONS WHEN WITHIN 3'-0' OF DEVICE. PLUMBING AND SPRINKLER SERVICE IN OPERATION. CONTRACTOR MUST SCHEDULE IN WRITING WITH LSD&C'S PROJECT MANAGER AND THE 1. FURNISH AND INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH (2) HVAC SYSTEM INSTALLATION IS COMPLETE - NO OPEN P NCH T EM EXCEPT FOR POSSIBLY THE PERMANENT PHONE LINE 13. ALL DUCTWORK SHALL BE INSTALLED WITH INSIDE CLEAR DIMENSIONS AS NOTED ON DRAWINGS. WHERE DUCTWORK SIZE IS LARGER THAN s Z 2 U LIS ITEMS O OS � w LANDLORD ONE WEEK PRIOR TO ANY SHUT DOWN OF THE HVAC, PLUMBING OR FIRE PROTECTION SYSTEMS. RECOGNIZED INDUSTRY PRACTICES. INSULATION MUST COMPLY WITH NFPA/NFPAC 90A. CONNECTED DEVICE (IE. VAV BOX, DIFFUSER, REGISTER) SMOOTH DUCT TRANSITIONS ARE TO TAKE PLACE JUST PRIOR TO DEVICE WO -, J. DEMOLITION (3) AIR BALANCE IS COMPLETE. NOTE: AIR BALANCE IS IN THE CONTRACTOR'S SCOPE OF WORK. CONNECTION. SEE MECHANICAL DRAWINGS FOR DETAIL. Q 0 2, ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND SMOKE DEVELOPED RATING OF NO HIGHER THAN 500 CC 1. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING WORK AND THE DEMOLITION PROVIDED WHEN TESTED IN ACCORDANCE WITH ASTM E 84-05, OR AS REQUIRED BY LOCAL CODES. b. THE CONTRACTOR IS RESPONSIBLE FOR COMMUNICATING SCHEDULE DATE CHANGES FOR THE FINAL INSPECTION. B. MEDIUM PRESSURE DUCT Ili Ne Z w BY THE GENERAL CONTRACTOR. COORDINATE WITH THE GENERAL CONTRACTOR ANY EXISTING EQUIPMENT REQUIRED TO BE LEFT INTACT. 3• DUCTWORK SHALL BE INSULATED ACCORDING TO THE ENERGY CODE ADOPTED BY LOCAL AHJ, IT IS THE CONTRACTOR'S RESPONSIBILITY TO c. FILTERS ARE TO BE REPLACED DURING THIS VISIT. FILTERS ARE TO BE PROVIDED BY THE CONTRACTOR AND SHALL BE ON SITE WHEN THE 1, WHERE DUCTWORK IS SPECIFICALLY NOTED AS MEDIUM PRESSURE, IT SHALL BE CONSTRUCTED IN ACCORDANCE WITH SMACNA STANDARDS a O Q CONFIRM CODE AND PROVIDE ADEQUATE INSULATION AS INDICATED BELOW (WITHIN ASSUMED PARAMETERSLTHIS SPEC DOES NOT INCLUDE TRANS TECHNICIAN ARRIVES. FORA PRESSURE RATING OF 4 INCHES WATER COLUMN MINIMUM OR GREATER AS REQUIRED BY LANDLORD. 2•THIS CONTRACTOR SHALL INCLUDE, AND WILL BE HELD RESPONSIBLE FOR, THE REMOVAL OF ALL EXISTING HVAC UNITS, HYDRONIC PIPING, REQUIREMENTS FOR DUCTWORK LOCATED WITHIN A VENTILATED ATTIC OR OUTSIDE. IN SUCH INSTANCES, REFER DIRECTLY TO CODE ADOPTED LLI _1 !(} REFRIGERANT RECAPTURE, EXHAUST FANS, ETC. AND ASSOCIATED ROOF CURBS HOT TO BE REUSED ON THIS PROJECT, UNLESS SPECIFICALLY d. WHEN COMPLETE AND ALL OPEN CONTRACTOR HVAC ISSUES ARE RESOLVED A CONTROL NUMBER IS ISSUED BY THE MANUFACTURER. IT IS 2. ALL GAUGES AND REINFORCEMENT MUST MEET WITH THE LATEST EDITION OF SMACNA STANDARDS FOR MEDIUM PRESSURE DUCT AND WITH W 0 NOTED OTHERWISE. CONTRACTOR MUST VERIFY WITH THE LANDLORD ALL PRESUMED ABANDONED EQUIPMENT, PIPES, AND DUCTWORK PRIOR TO BY LOCAL AHJ. RECORDED INSIDE THE CONTROL PANEL DOOR IN THE IFS ELECTRICAL PANEL AND ON THE FINAL VISIT CHECK LIST. (X a a) THE LANDLORDS CRITERIA. W THE PACE OR ON THE ROOF NOT T REMOVAL. ROOF CURBS SHALL BE REMOVED AND THE ROOF PATCHED, ALL EXTRANEOUS ITEMS IN H S a RECTANGULAR SUPPLY AND RETURN AIR DUCTS - PLENUM/DUCTED RETURN AIR SYSTEM: DUCT SIZES SHOWN ON DRAWINGS ARE INSIDECO (C W 0 APPLICABLE TO THE NEW WORK MUST BE REMOVED AND ROOF/WALL/FLOOR PATCHED/REPAIRED TO MATCH EXISTING STRUCTURE. EXISTING CLEAR DIMENSIONS. ALL RECTANGULAR DUCTWORK (SUPPLY AND RETURN) SHALL BE INTERNALLY INSULATED TO THICKNESS LISTED BELOW. e. IN THE EVENT THERE ARE OPEN ITEMS, THE CONTRACTOR MUST CORRECT THEM AND RESCHEDULE THE FINAL INSPECTION WITH THE 3.CONNECTIONS TO THE LANDLORD'S MEDIUM PRESSURE DUCTWORK SHALL BE MADE WITH 'LO-LOSS' SADDLE TEE TAPS OR AS OTHERWISE IX O IF NEEDED AND BELTS PULLEYS GC IS RESPONSIBLE FOR REPLACEMENT OF SHEAVES, , , . ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND LINER 15 TO HAVE A COATED SURFACE EXPOSED TO AIRSTREAM TO PREVENT EROSION. APPLY ADHESIVES AND MECHANICAL FASTENERS MANUFACTURER. REQUIRED BY THE LANDLORD. < Q LaCD SEALED BELOW OR WITHIN FLOOR OR WALL LEVEL WHEN THEY ARE NOT TO BE REUSED IN THIS PROJECT, IF REQUIRED BY LANDLORD OR AS RECOMMENDED BY SMACNA AND THE MANUFACTURER TO PREVENT LINER SEPARATION FROM THE DUCT, ALL ADHESIVES SHALL BE f• THE HVAC CONTROL NUMBER WILL BE ISSUED AT THE END OF THE VISIT PROVIDED THERE ARE NO UNRESOLVED HVAC PUNCHLIST ITEMS. C7 O CODES, ABANDONED PIPING AND/OR DUCTWORK MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION PRIOR TO BID LOW VOC TYPE. ALL TRANSVERSE EDGES TO BE COATED WITH ADHESIVE. LINED DUCTWORK DOES NOT NEED TO BE WRAPPED UNLESS 4.ALL OTHER ITEMS FROM METAL DUCTWORK SPECIFICATION SECTION APPLY TO THIS SECTION, WITH THE EXCEPTION THAT ALL MEDIUM CO 0 N J AND INCLUDE IN BID PROPOSAL. g. THE TRANE TECHNICIAN WILL WRITE THE HVAC CONTROL NUMBER ON THE STICKER INSIDE THE WR CONTROLS PANEL (IFS PANEL) AND ON PRESSURE DUCTWORK MUST BE WRAPPED WITH INSULATION, NOT LINED. ■+ J REQUIRED BY MALL. THE FINAL VISIT CHECK LIST. CDZ M a Py LL D K. SLEEVES (1) 2007 & 2010 ASHRAE 90.1, 2009 IECC, 2012 IECC, 2009, 2010 OREGON ENERGY CODE, AND 2012 WASHINGTON STATE ENERGY CODE: SECTION 233300: AIR DUCT ACCESSORIES 0 N h. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL 3RD PARTY COMISSIONING/REVIEW REQUIRED BY CODE. >r 0 N. 1. THIS CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND PROVIDE 1" THICK, 1.5 LB/FT^3, MINIMUM INTERNAL LINER (CONDUCTIVITY :0.26 0 751F; R-4,0) A. FLEXIBLE CONNECTIONS Z 0■+� Z cp THROUGH ITS RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES THAT PENETRATE V Z b. RECTANGULAR SUPPLY AND RETURN AIR DUCTS - DUCTED RETURN AIR SYSTEM: DUCT SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR SECTION 230800: INSTRUMENTATION AND CONTROL FOR HVAC 1. FLEXIBLE COLLARS SHALL BE FURNISHED AND INSTALLED IN ALL CONNECTIONS BETWEEN VIBRATING EQUIPMENT (FANS, AIR HANDLERS, ETC.) PC' THE FLOOR, WHICH SHALL EXTEND 2 ABOVE THE FLOOR. CONTRACTOR MUST COORDINATE THROUGH THE LANDLORD ANY CORE DRILLING OR DIMENSIONS. ALL RECTANGULAR DUCTWORK (SUPPLY AND RETURN) SHALL BE INTERNALLY INSULATED TO THICKNESS LISTED BELOW. LINER A. V t)RK RESPONSIBILITY AND DUCTS OR CASINGS. ALSO, FURNISH AND INSTALL FLEXIBLE CONNECTIONS WHERE DUCTS CROSS BUILDING EXPANSION JOINTS. 4 CUTTING OF OPENINGS IN MASONRY FLOORS OR WALLS. IS TO HAVE A COATED SURFACE EXPOSED TO AIRSTREAM TO PREVENT EROSION. APPLY ADHESIVES AND MECHANICAL FASTENERS AS 0 0 Ill CL' Q 0 O U " RECOMMENDED BY SMACNA AND THE MANUFACTURER TO PREVENT LINER SEPARATION FROM THE DUCT. ALL TRANSVERSE EDGES TO BE 1, LSD&C HVAC SUPPLIER WILL FURNISH N 2. FLEXIBLE CONNECTIONS SHALL BE CONSTRUCTED OF NEOPRENE-COATED FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FLEXIBILITY TO ,,-- 2. ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND/OR FLOORS SHALL BE FIRE SEALED WITH CALCIUM SILICATE, SILICONE RTV" NECESSARY CONTROL DEVICES TO THE FIELD. FOR ALL DEVICES N07 FACTORY INSTALLED, 1T WILL BE O z W ALLOW FOR MOVEMENT AND PREVENT THE TRANSMISSION OF VIBRATION. w FOAM, "3M" FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAIN THEIR FIRE RATING. COATED WITH ADHESIVE. LINED DUCTWORK DOES NOT NEED TO BE WRAPPED UNLESS REQUIRED BY MALL. THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO INSTALL. Z = Z a C. 3. SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BE STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH (1) 2007 & 2010 ASHRAE 90.1, PROVIDE 1" THICK, 1.5 LB/FT '3, MINIMUM INTERNAL LINER (CONDUCTIVITY :0.26 0 75'F; R-4.0 MIN.) FOR ALL B. FLEXIBLE AIR DUCT v CO � a EDGES. F OTHER THAN MASONRY PARTITIONS THROUGH SUSPENDED CEILINGS OR FOR CONCEALED VERTICAL PIPING SLEEVES SHALL BE SUPPLY AIR DUCTWORK AND FIRST 15'-0' OF THE RETURN AIR DUCTWORK. W GES FOR _ _ 1. FLEXIBLE AIR DUCT SHALL BE i" INSULATED GLASS 1, UL/ULC LISTED AND RATED FOR THE OPERATING PRESSURE OF THE SYSTEM. DUCT w u3 U I- W � O • • • • - ' ' ` ' - CONSTRUCTION MATERIAL (PLASTIC, CLOTH, ALUMINUM) MUST ADHERE TO LOCAL CODES AND LANDLORD'S REQUIREMENTS AND BE INCLUDED p �� Q co Q ct O (I7 Q •NO. 22 U.S.G. GALVANIZED STEEL MINIMUM. � - - ' (2) 2009 IECC, 2012 IECC, 2012 WASHINGTON STATE ENERGY CODE AND 2010 OREGON ENERGY CODE, PROVIDE 1.5" THICK (2• ALSO L. SCOPE OF WORK ACCEPTABLE), 1.5 LB/FT^3, MINIMUM INTERNAL LINER (CONDUCTIVITY :0.17 0 75"F; R-6.0 MIN.) A. • AS SUCH IN THE BID, cL a o J 1• • • : ; • : - e 2. FLEXIBLE AIR DUCT SHALL BE ATTACHED PER DETAILS ON THE DRAWINGS. FLEXIBLE AIR DUCT MAY ONLY BE USED IN VERTICAL 1. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, 4• ALL OUTDOOR AIR (ROUND, OVAL, AND RECTANGULAR) AND ROUND/OVAL SUPPLY AIR DUCTWORK SHALL BE EXTERNALLY INSULATED A5 • ' ;_ _ APPLICATIONS. REVISIONS: REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE HVAC INDICATED: ` REQUIRED BY; DATE SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT 2• PIPING 3.FLEXIBLE DUCT SHALL NOT EXTEND OVER 8'-0" IN LENGTH AT ANY ONE LOCATION. WHERE LANDLORD HAS SHORTER LENGTH RESTRICTIONS, Q OWNER REVISIONS 03,06.17 BE LIMITED TO THE FOLLOWING: a. PLENUM AND DUCTED RETURN AIR SYSTEMS:. ALL OUTDOOR AIR (ROUND, OVAL, AND RECTANGULAR) AND ROUND/OVAL SUPPLY AIR COMPLY WITH LANDLORD REQUIREMENTS• DUCTWORK SHALL BE EXTERNALLY INSULATED WITH A DUCT WRAP WITH VAPOR BARRIER. REFER TO THICKNESS BELOW. VAPOR BARRIER a. -• : • • , ; ; ; - - , - . a ; © LEASE UNE REVISION 05.16.17 a. HVAC UNITS, ALL RELATED EQUIPMENT AND ACCESSORIES (UNLESS NOTED OTHERWISE). IS TO BE MAINTAINED THROUGHOUT DUCT SYSTEM. ALL JOINTS MUST BE OVERLAPPED AND TUCKED SO THAT NO INSULATION FIBER IS • C. SUPPLY AIR TAKE-OFF FITTINGS VISIBLE. EXTEND DUCTWORK INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS AND OTHER PENETRATIONS. - - , ; • ; • : : - ; . , A RESTROOM REVISION 06.07.17 L DUCTWORK, FITTINGS, DAMPERS, AND INSULATION. 1. FURNISH AND INSTALL CONICAL, TAPERED OR 45 DEGREE SADDLE TAKEOFFS FROM MAIN DUCTWORK TO ROUND BRANCHES. INSTALLATION 11) 2007 AND 2010 ASHRAE 90.1, 2009 AND 2012 INTERNATIONAL ENERGY CODE, 2010 OREGON ENERGY CODE PROVIDE A MINIMUM OF 2' 1 I SHALL BE PER SMACNA LATEST EDITION. c• HYDRONIC PIPING. (AS APPLICABLE, REFER 70 PLANS). THICK, 1.0 LB/FT-3 (R:7.6, R:6.1 INSTALLED) DUCT WRAP WITH VAPOR BARRIER. • + . ' - • " ' REQUIRED; D. DAMPERS d. REFRIGERANT PIPING (AS APPLICABLE, REFER TO PLANS). 12) 2012 WASHINGTON STATE ENERGY CODE: b. • • • - . - • ; . : • 1. WHERE DESIGNATED, FURNISH AND INSTALL ROUND BALANCING DAMPERS. PROVIDE MINIMUM 20 GAUGE GALVANIZED STEEL FRAME AND BLADES e. CURBS, ROOFING, AND STEEL FRAMING FOR SUPPORT (AS APPLICABLE, REFER TO PLANS). (a) SUPPLY AND RETURN AIR ROUND AND OVAL DUCTWORK INSULATION: ROUND/OVAL SUPPLY AND RETURN AIR DUCTWORK SHALL BE WITH MINIMUM 3/8 SQUARE STEEL AXLE, AND MOLDED SYNTHETIC BEARINGS (EQUIVALENT TO RUSKIN MODEL MDRS25) WITH MANUAL LOCKING f, TESTING ADJUSTING AND BALANCING. EXTERNALLY INSULATED WITH A MINIMUM OF 2" THICK DUCT WRAP, 1.0 LB/FT^3 (INSTALLED R-6.1). c• • • . • - �. POSITION REGULATOR WITH STANDOFF (EQUIVALENT TO DURO DYNE MODEL KR). g. KEEPING A RECORD SET AND PREPARE AS-BUILT DRAWINGS. Ib1 OUTSIDE AIR DUCTWORK INSULATION FOR UNITS SUPPLYING LESS THAN 2800 CFM; ALL OUTDOOR AIR (ROUND, OVAL, AND : ; : ; . ; - • • ' , ' • " ' - ' ' ' ' 2. WHERE DESIGNATED, FURNISH AND INSTALL RECTANGULAR VOLUME DAMPERS. PROVIDE MINIMUM 16 GAUGE GALVANIZED STEEL CHANNEL ^ - " • - % ... - ; • : ; ": - % ` ' . - . • • o- • FRAME, 16 GAUGE GALVANIZED STEEL BLADES, MINIMUM 1/2" HEXAGONAL AXLE, MOLDED SYNTHETIC BEARINGS, WITH 3/8' SQUARE PLATED 2.BEFORE STARTING WORK, THIS CONTRACTOR SHALL VISIT THE JOB SITE AND EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND RECTANGULAR) DUCTWORK SHALL BE EXTERNALLY INSULATED WITH A MINIMUM OF 2-1/2' THICK DUCT WRAP, 0.75 LB/FT 3 [INSTALLED R-7.11. • :; • . : : . ;,,. , , : . STEEL CONTROL SHAFT (EQUIVALENT TO RUSKIN MODEL CD351 MAXIMUM BLADE WIDTH SHALL NOT EXCEED 6". LINKAGES KAGES SHALL BE ELECTRICAL PLANS AND SPECIFICATIONS 70 SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE HVAC SYSTEM, - - ; • % - CONCEALED IN THE FRAME. CONTROL SHAFT SHALL EXTEND BEYOND FRAME AND DUCT COVERING TO A LOCKING QUADRANT WITH DATE ISSUED: 1 2/30/1 6 MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. - ic) OUTSIDE AIR DUCTWORK INSULATION FOR UNITS SUPPLYING MORE THAN 2800 CFM: PROVIDE TWO LAYERS OF 2.5' THICK, 2.25 d. , , : , _ : •; • - , - : - . - ; - - • : : • ,• - : • ii _ • .. • _ • I ADJUSTABLE LEVER (EQUIVALENT TO DURO DYNE MODEL K-41 WITH STANDOFF. DESIGNED BY: MCR 3.RELOCATION OF EXISTING DUCT MAINS OR BRANCHES TO MEET STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL. LB/FT^3, EXTERNAL BOARD INSULATION (CONDUCTIVITY 0.24 0 75'F; R-20.81, 3. OPERATING HANDLES ON ALL DAMPERS SHALL BE TAGGED WITH A MINIMUM 18' LONG ORANGE MARKER TAPE AND SHALL BE INSTALLED FAR DRAWN BY: MCR - ' • , % % % % % - f ENOUGH AWAY FROM DUCT TO ENSURE IT FULLY AND COMFORTABLY CLEARS THE INSULATION WHEN TURNED. M. HVAC EQUIPMENT 3, 4. WHERE ACCESS TO BALANCING DAMPER IS RESTRICTED A REMOTE DEVICE MANUALLY OPERATED SHALL BE USED. UNITS SHALL BE ORDERED CHECKED BY: JAH 1• PRIMARY HEATING AND AIR CONDITIONING UNITS ARE TO BE FURNISHED BY LSD&C AS SCHEDULED UNLESS NOTED OTHERWISE. REFER TO 1• ` • ; • : ` ' ' : - : ` ' ' • ' ' . ' '' ' ' PLANS FOR REQUIREMENTS. ALL EQUIPMENT SHALL INCLUDE A FIVE (5) YEAR COMPRESSOR AND TEN (10) YEAR HEAT EXCHANGER WARRANTY. • •`' % ' " ''` a • • ,• . , . , _ , ; • • • • • , • ;; TREWEEKSBEFORE INSTALLATION TO ALLOW FOR DELIVERY LEAD TIME, THREE 0 STA • • • . . . ; • : : . • - . • : ; - • ; MECHANICAL 2, ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT AND • • % E. FIRE/SMOKE DAMPERS OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN. ,,• , - . • • • • - : • • . • - . - : " ii • ::° : *:• i - b, , • • • • : : % 1. FURNISH AND INSTALL PRIMARY FIRE DAMPERS WHERE INDICATED OR REQUIRED BY CODES. DAMPERS SHALL BE DESIGNED FOR HORIZONTAL OR SPECIFICATIONS - VERTICAL FLOW OF AIR AS REQUIRED. FIRE DAMPERS SHALL BE UL/ULC LABELED AND MEET ALL CODE REQUIREMENTS. 3. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. • • _ a. PER-ASHRAE-907-1-2007:-" 2. FIRE DAMPERS SHALL HAVE THE BLADES OUT OF THE AIRSTREAM AND A 165 DEGREE F FUSIBLE LINK, TYPE B, AS MINIMUM. FURNISH AND N. EQUIPMENT FURNISHED BY WAITED STORE DESIGN AND CONSTRUCTION . . (11 • • C. • - - - _ ' ' _ • " INSTALL ACCESS DOORS AS NECESSARY. 1 THE FOLLOWING EQUIPMENT IS FURNISHED BY LSD&C AND INSTALLED BY THIS CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE. REFER ` • ' N NUMBER: ` ' : % • ' % : :,' : = ;. ; •; • ;• - , - , • ,; : ; ; . 3.FURNISH AND INSTALL ALL NECESSARY FRAMING AND SLEEVES FOR DAMPER MOUNTING PER UL/ULC AND CODE REQUIREMENTS. DRAWING TO RESPONSIBILITY SCHEDULE AND PLANS FOR APPLICABILITY. _ _ a. HVAC UNITS. - . • • I • 4.FIRE/SMOKE DAMPERS SHALL BE FURNISHED AND INSTALLED WITH ELECTRIC POWERED MECHANISM. COORDINATE WITH ELECTRICAL 4 di (2) - d % CONTRACTOR FOR POWER REQUIREMENTS r • - IREMENT I1 `�� �I Ib. TOILET EXHAUST FANS. • , : . ., • - . . - - • .. . . . J