Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (54)
M EC2017 - 00034 GENERAL NOTES ALL NOTES INCLUDED HEREIN ARE MADE PART OF EACH AND ALL MECHANICAL, ELECTRICAL AND PLUMBING SECTIONS OF WORK. r 11 1. REFER TO LANDLORD'S SPECIFICATIONS AND TENANT DESIGN CRITERIA FOR NECESSARY INFORMATION AND COORDINATION WITH OTHER TRADES. M-Engineering 2. THE ABBREVIATION LSD&C WHEREVER IT APPEARS IN THE DRAWINGS, SHALL REFER TO "LBRANDS DESIGN AND CONSTRUCTION". ANY REFERENCE 750 Brooksedge Blvd. TO TENANT, BRAND SPECIFIC VICTORIA'S SECRET, ETC.) OR FURNISHED BY ANY OF THE ABOVE REFERS TO LSD&C. Westerville, Ohio 43081 { phone:614.839.4639 3. ANY DISCREPANCY BETWEEN LSD&C DRAWINGS AND TENANT CRITERIA, LSD&C DRAWINGS SHALL TAKE PRECEDENCE. fax:614.839.2222 www.mengineering.us.com 4. THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC TO THE EXTENT THAT ALL INSTALLED ITEMS AND LOCATIONS ARE NOT EXACTLY PLACED AND ARE NOT TO BE SCALED. RECEIVED EIVED 5. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELATED PERMITS AND INSPECTION FEES. GRILLE, REGISTER, AND DIFFUSER SCHEDULE 6. BEFORE COMMENCING ANY WORK, CONTRACTORS SHALL REVIEW THE LATEST NATIONAL, STATE AND LOCAL CODE REQUIREMENTS INCLUDING MARK SD-1 SD-2 SD-3 SD-4 SD-5 JAN 10 2017 LANDLORD CRITERIA AND PERFORM THE WORK IN STRICT ACCORDANCE WITH THESE. IN CASE OF CONFLICT THE STRICTER REQUIREMENTS WILL MANUFACTURER TITUS TITUS TITUS TITUS TITUS CITY OF TIGARD PREVAIL. MODEL OMNI OMNI TMSA OMNI OMNI BUILDING DIVISION NECK SIZE (L"XW") S. P SEE PLAN SEE PLAN S. P S. P 7. NO ADDITIONAL COMPENSATION SHALL BE MADE FOR ANY CHANGE ORDERS DUE TO CONTRACTOR'S FAILURE TO VISIT THE JOBSITE AND/OR FRAME SIZE (L"XW") 24 , 4" 24"X24" 24"X24" 12 , 2" 24 , 4" PREDETERMINE ALL EXISTING CONDITIONS BEFORE SUBMITTING HIS BID. FRAME TYPE • N LAY-IN LAY-IN • N N A. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO SUBMITTING A BID. FOR THE PURPOSE FINISH* TI S 6 TITUS #26 TITUS #26 TI S ; 6 TI S ',4 OF SURVEYING EXISTING CONDITIONS, WHICH MAY AFFECT THE WORK TO BE DONE UNDER THIS SECTION, ANY DISCREPANCIES SHALL BE NOISE CRITERIA LEVEL <30 <30 <30 <30 <30 IMMEDIATELY REPORTED TO THE GENERAL CONTRACTOR, LSD&C OR THE LANDLORD'S FIELD REPRESENTATIVE FOR CLARIFICATION. ACCESSORIES 2 2,6 2 2 2 NOTES 1 1 1 1 1 B. AFTER BID, ANY QUESTIONS RELATING TO SPECIFIC M, E, OR P ISSUES ARE TO BE DIRECTED AS RFI'S THROUGH THE LSD&C PROJECT MARK SD-6 SD-7 SD-8 SD-9 SD-10 MANAGER. MANUFACTURER TITUS TITUS TITUS TITUS TITUS C. SHOULD THE SPACE HAVE BEEN INACCESSIBLE FOR INSPECTION CONTRACTOR MUST INDICATE SO ON HIS BID. " fl - n n MODEL 300RS OMNI OMNI OMNI TDC n Z Z O 0 .4:tNECK SIZE (L,.XW") X6 SEE PLAN SEE PLAN SEE PLAN 9 / o CV M 8. THE GENERAL CONTRACTOR'S FIRE SPRINKLER SUBCONTRACTOR SHALL DESIGN AND INSTALL FIRE SPRINKLER SYSTEM CONFORMING TO LANDLORD'S FRAME SIZE 11-"XW") 8 :" 12"X12" 12"X12" 24"X24" 12', 2" CRITERIA, TENANT'S REQUIREMENTS AND PER LOCAL CODES AND NEPA STANDARDS. FRAME TYPE SU?:•CE LAY-IN LAY-IN LAY-IN TYPE G2 W H '4. Lti FINISH* TI S 6 TITUS #26 TITUS #84 TITUS #84 TI S '46 7:5 U r 9. THE CONTRACTOR, WITHIN FIFTEEN (15) DAYS OF THE AWARD OF THE CONTRACT, SHALL SUBMIT TO THE OWNER, SIX (6) COPIES OF A NOISE CRITERIA LEVEL <30 <30 <30 <30 <30 COMPLETE UST OF MATERIALS AND EQUIPMENT PROPOSED FOR THE JOB INCLUDING ALL DATA, PART NUMBERS, RATING CAPACITY, SIZE, ACCESSORIES 1 4,6 4,6 2,6 4,6 Q DIMENSIONS, ELECTRICAL DATA, GRADE, MANUFACTURER, AND ANY OTHER DESCRIPTIVE DATA FOR ALL EQUIPMENT OR SYSTEMS THAT DEVIATE NOTES 3 1 1 1 6 Et 'I FROM SPECIFIED ITEMS. ANY DELAYS OR COSTS DUE TO THESE DEVIATIONS, WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. MARK 5D-11 SD-12 5D-13 H ui 10. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISPOSAL OF ALL UNUSED OR ABANDONED MATERIALS AND EQUIPMENT, AND ITS REMOVAL OFF K MANUFACTURER TITUS TITUS TITUS � � � THE LANDLORD'S PREMISES. MODEL TDC TDC TDC NECK SIZE (L"XW") 9" •" / :"O 9"X9" / 8"0 9" '" / ;"o 0 20 • 11. OWNER RESERVES THE RIGHT TO HAVE CONSTRUCTION REVIEWED BY AN OUTSIDE CONSULTANT PRIOR TO ACCEPTANCE OF THE PROJECT. FRAME SIZE IL"XW") 12 , 2" _ 12"X12" 12 , 2" cO U ( ) 0 12. EACH CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP RELATED TO HIS WORK FOR A MINIMUM PERIOD OF ONE YEAR FROM FRAME TYPE TYPE J A3 TYPE 3 / G2 TYPE A3 • 0 THE DATE WHICH THE OWNER ACCEPTS THE PROJECT. THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER OR TENANT SHALL CORRECT FINISH* TI S 6 TITUS #84 TI S ;;4 �., 0 ANY DEFECTS IN MATERIALS OR WORKMANSHIP DURING THIS GUARANTEE PERIOD. NOISE CRITERIA LEVEL <30 <30 <30 Z � � 3 ACCESSORIES 4,6 4,6 4,6 r ry 13. EACH CONTRACTOR SHALL BE RESPONSIBLE AND ENSURE A CLEAN INSTALLATION ESPECIALLY IN EXPOSED CEILING AREAS. THE FINAL APPROVAL NOTES 6 6 6 L.► d' OF THIS WORK WILL BE ISSUED BY LSD&C PROJECT MANAGER. MARKMANUFAC_TURER PRICE PRICE PRICE LD-1 LD-2 LD-3 _ Li) 0. .,4: 14. PROVIDE ONE SETS OF "AS-BUILT" DRAWINGS INTO PLAN TUBE AND ONE BOUND SETS OF ALL OPERATIONS MANUALS, DIAGRAMS, SERVICE Q �y CONTRACTS AND GUARANTEES IN BINDER TO STORE MANAGER. A REPORT PREPARED IN ACCORDANCE WITH MECHANICAL SPECIFICATIONS BY AN MODEL AS210 AS210 AS220 �. INDEPENDENT AIR BALANCE CONTRACTOR, HIRED BY GC, MUST BE INCLUDED IN THE CLOSE-OUT PACKAGE. NECK SIZE (L"XW") _ S. P S. P .E G) FRAME SIZE (L" XW") 4' X (2 SLOTS'4' X (2 SLOTS 4' X (1 %" SLOT �R (1:::) W W J O HVAC GENERAL NOTE FRAME TYPE TYP' 2P TYP' 2P TYP' 2P -C FINISH* PR E #:17 PR E #:12 PR E #:17 a a) CD- 1. THESE PLANS MAY BE USED FOR CONSTRUCTION ONLY AFTER APPROVAL IS OBTAINED FROM THE BUILDING DEPARTMENT MECHANICAL PLAN NOISE CRITERIA LEVEL _ <30 <30 <30 HL CHECK DIVISION AND THAT DIVISION'S STAMPED APPROVAL AND AUTHORIZED SIGNATURE APPEAR ON THE PLANS. - ACCESSORIES 4,5,7 4,5,7 8 () 1- I- NOTES 2. COORDINATE ALL WORK WITH ALL TRADES INCLUDED BUT NOT LIMITED TO ELECTRICAL, PLUMBING, FIRE PROTECTION AND STRUCTURAL MARK RG-1 RG-2 RG-3 RG-4 RG-5 CONTRACTORS. INSTALL ALL WORK TO CLEAR NEW AND EXISTING ARCHITECTURAL AND STRUCTURAL MEMBERS. NO ITEM SUCH AS PIPE, DUCT, ETC. IS TO COME IN CONTACT WITH ANY EQUIPMENT. MANUFACTURER TITUS TITUS _ TITUS TITUS TITUS MODEL 355RL 355RL 355RL 50F 355RL 3. REFER TO ARCHITECTURAL DRAWINGS FOR DEMOLITION WORK. - NECK SIZE (L"XW") •"X10 "X1 ' 10"X10" 22"X22" "X1' EXISTING FAN TERMINAL UNIT SCHEDULE FRAME SIZE (L"XW") 24 2" 2" 12"X12" 24"X24" 24 2" 4. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT FIXTURE LOCATION. MARK (FPVAV-#) 1 2 3 4 5 FRAME TYPE • N N LAY-IN LAY-IN SU'.•CE 5. CONTRACTOR SHALL PROVIDE CUT SHEETS TO LSD&C FOR ALL EQUIPMENT AND DEVICES FURNISHED BY THE CONTRACTOR THAT DEVIATE FROM TRANE PACKAGE NUMBER NS NS NS NS NS FINISH* TI S ; 6 S 6 TITUS #26 TITUS #26 TI S "6 SPECIFIED ITEM FOR REVIEW AND APPROVAL PRIOR TO THE PURCHASE OF ANY SUCH EQUIPMENT OR DEVICES. MODEL VSEF1407 VSEF1407 VSEF1407 VSEF1407 VSEF1407 NOISE CRITERIA LEVEL <30 <30 <30 <30 <30 _ FAN SIZE 07SQ 0750 0750 0750 0750 ACCESSORIES 6 6 N = d Li-d c. r g E e W t z i 6. HVAC CONTRACTOR IS RESPONSIBLE TO INQUIRE WITH THE LANDLORD'S REPRESENTATIVE ON ANY SMOKE EVACUATION SYSTEM IN USE AT THE14" 14" NOTES 2 2 2 5 2 ,_W 's= = W ,,, t.-2..,3„, ' INLET SIZE 14" DIA. DIA. DIA. 14" DIA. 14" DIA. te_ w , - W = . 20„, MALL AT THE TIME OF THE BID. IF THE SAID SYSTEM IS NOT ADEQUATELY DESCRIBED ON THE DRAWINGS, THE MECHANICAL CONTRACTOR IS MAXIMUM PRIMARY AIR FLOW (CFM) 2700 2000 2000 2600 1800 s c - 12 w A ,W o o w'ng a RESPONSIBLE TO INFORM THE GENERAL CONTRACTOR AND INCLUDE THE COST AS A SEPARATE LINE ITEM IN THE BID. NO ADDITIONAL MONEYS MARK RG-6 RG-7 RG-8 RG-9 RG-10 = = o m T# F_. a o o MINIMUM AIR FLOW (CFM) 810 600 600 780 540 W Q O MANUFACTURER TITUS TITUS TITUS TITUS TITUS O W o =W w FAN PERFORMANCE - ""~ '5 =l = ` 6,' SHALL BE AWARDED FOR TIE-IN REQUIREMENTS TO A LANDLORD'S SMOKE EVACUATION SYSTEM THAT 1S IN EXISTENCE AT THE TIME OF THE BID, Q a o W WITHOUT HAVING IDENTIFIED A SEPARATE LINE ITEM FOR THE SMOKE EVACUATION SYSTEM AT THE TIME OF THE BID. MAXIMUM AIR FLOW (CFM) 2700 2000 2000 2600 1800 MODEL 355RL 355RL 355RL 355RL 355RL .S• : Q W.W= Q „ n n " " W 2 W 4 V -g7W - V-3 O N NECK SIZE (L XW") X1 "X2 10 X10 X1 "X2 _ 7. ACCESS TO ALL COMPONENTS AND EQUIPMENT MUST BE PROVIDED TO MEET CODE AND SERVICE/MAINTENANCE EASE. EXTERNAL STATIC (IN W.C.) 0.5 0.5 0.5 0.5 0.5 FRAME SIZE IL"XW") 24 , 2" - 24 , 4" 12"X12" 24 , 2" 24 , 4" ...c,=00 = .c a o -. , -.' 2 ,., 2 Nt=W 5 - =6 O = i- n U FAN MOTOR HP 1 1 1 1 1 _6 " � = 'ln0 Q - 6-N6 ELECTRIC HEAT FRAME TYPE N N LAY-IN N N o- = C'W W= S315'2625 8. PRIOR TO STARTUP OF HVAC EQUIPMENT, MECHANICAL CONTRACTOR WILL CONFIRM WITH ONE OF THE LISTED HVAC MANUFACTURER = 2 x o m R- _ R FINISH* �TI S ; 6 TI S 6 TITUS #84 TI S '�4 TI S �4 W = 1- ' -< , " `N REPRESENTATIVES THAT CORRECT POWER FOR EQUIPMENT HAS BEEN PROVIDED TO LSD&C PROVIDED HVAC UNITS AND HAS BEEN TURNED ON POWER INPUT (WATTS) 3000 3000 3000 3000 5000 0- o 2 o ~ Q W NOISE CRITERIA LEVEL <30 <30 <30 <30 <30 0 j'm u -' 2 F- `_ o FOR A MINIMUM OF 24 HOURS. LSD&C RESERVES THE RIGHT TO CHECK CONSTRUCTION COMPLIANCE WITH PLANS AND SPECIFICATIONS. SHOULD HEAT OUTPUT (BTU/HR) 10,239 10,239 10,239 10,239 17,065 a ,, En a o t,, '' ,9F, '.7, 1,7,a 6.x R ACCESSORIES 2 6 6 2,6 6 0 w a m o x « o `,e, R Y o THE OWNER FIND CORRECTIVE WORK TO BE NECESSARY, HE WILL NOTIFY CONTRACTOR OF SUCH WORK IN WRITING AND EXPECT COMPLIANCE STAGES 1 1 1 1 1 NOTES 2 2 2 2 2 a= , E W u o 2 W d i o PERFORMED WITH DUE DILIGENCE. IF ANY CORRECTIVE WORK IS DEEMED TO BE NECESSARY, THE COST OF REINSPECTIONS WILL BE BORNE BY ELECTRICAL 'W o a =We, „ o V O g VOLTS/0/HZ (WIRES) 208/3/60 208/3/60 208/3/60 208/3/6D 20$/3/60 �2 ,2 .-3.m . a'-2 n U g J d THE CONTRACTOR. THE MECHANICAL CONTRACTOR WILL THEN ENSURE THAT THE EQUIPMENT IS POWERED FORA MINIMUM OF 24 HRS BEFORE MARK RG-11 EAG-1 EAG-2 EAG-3 0-_ o .-3 .U . a L,o-= o �,,,wa � aaoa aoW�, � START-UP. FAN MOTOR AMPS (VOLTS/0) 6.6 6.6 6.6 6.6 6.6 MANUFACTURER TITUS TITUS - TITUS _ TITUS_ ,� En U, ,., a" Q N ^J o .g, En ,$) K. ,� ELECTRIC HEATER AMPS (VOLTS/t3) 8.34 8.34 8.34 8.34 13.89 MODEL 355RL 355RL 355RL 355RL Q o . ..- 8 . 8,3 o --.4°.^ .-A r x o 9. IF WORK 1S REQUIRED BY LSD&C IN ORDER TO IMPROVE, CHANGE OR CORRECT AIR CONDITIONING OPERATIONAL CONDITIONS DUE TO: PART NECK SIZE (L"XW") _ " " " a-Z . („ „ . .c, . W c, o 7 MALFUNCTION, WARRANTY OR OTHER INABILITY TO PROVIDE THE COMFORT CONDITIONS REQUIRED BY THE STORE, CONTRACTOR SHALL BE MCA (AMPS) _ 18.68 18.68 18.68 18.68 24.36 X1' + X1 i 10X10 X1' w w m a a re FRAME SIZE (L XW") 12 2 12 2 12 X12 12 2 L 8 W w U „ n n n n n x..o >- wz W U DIRECTED BY LSD&C TO ADDRESS THIS WORK IN A TIMELY MANNER. IF IT BECOMES EVIDENT THAT THE CONTRACTOR CANNOT ACCOMPLISH THE ABBREVIATIONS-MECHANICAL MOCP (AMPS) - 25 - 25 - 25 25 35 s . + W N -(a o o w. `" ,,4 a N AT HIS DISCRETION, TAKE OVER SUCH WORK AND BACK CHARGE THE APPROX. WEIGHT (LBS) 175 175 175 175 190 FRAME TYPE • N N LAY-IN N -_ W =t;-1,- c°= = 4 L,0 4 TASK, THEN AFTER 72 HOURS OF WRITTEN NOTICE THE OWNER MAY, s W wa,�, E a � �c �a CONTRACTOR FOR ANY CORRECTIVE WORK THAT WAS REQUIRED DUE TO LACK OF PERFORMANCE, WORKMANSHIP AND/OR ADHERENCE TO PLANS AABC AMERICAN AIR BALANCE COUNCIL FPM FEET PER MINUTE OA OUTDOOR AIR ACCESSORIES 1-2 1-2 1-2 1-2 1-2 FINISH* TI S ' 6 TI S ' 6 TITUS #84 TI 5 ' 6 =,,,,,-�'a°` Q e W `'`^ x = coo ,n 0 ,a w, ,n :g.-V4-1 ; z z,_,z - z z z c� o z AFF ABOVE FINISH FLOOR FPS FEET PER SECOND OAT OUTDOOR AIR TEMPERATURE NOTES 1 1 1 1 1 NOISE CRITERIA LEVEL <30 <30 <30 <30 0 g ,1 p - g . . -4 :i-F - P o g AND SPECIFICATIONS. -- o o o � a U o -4 # i o u Y W� . AHU AIR HANDLING UNIT FV FACE VELOCITY OBD OPPOSED BLADE DAMPER ACCESSORIES ("S- INDICATES STANDARD; "O" INDICATES OPTIONAL): ACCESSORIES 1,6 1,6 1 W W w W o o s1, W m o o g er W = -_'nW APD AIR PRESSURE DROP OD OUTSIDE DIMENSION OR DIAMETER &W o c'W S n _ w S a I- o= a _ W 10. UPON COMPLETION OF THE WORK, CONTRACTOR SHALL VERIFY THE PROPER WORKING ORDER OF THE SYSTEM(S) AND MAKE ANY ADJUSTMENTS 1. 5-FACTORY PROVIDED DISCONNECT SWITCH. NOTES 2 2,5 2,5 2,5 =0*--,ce a 1- .4 ,4o0 2 tc 0 R w-W _ AS REQUIRED. ASHRAE AMERICAN SOCIETY OF HEATING, GAL GALLONS OPNG OPENING REFRIGERATING AND AIR GALV GALVANIZED 2. S-FACTORY PROVIDED CONTROL TRANSFORMER. ACCESSORIES: 11. PROVIDE FILTER CHANGES THROUGHOUT CONSTRUCTION AS REQUIRED FOR ALL HVAC EQUIPMENT. PROVIDE FILTER CHANGES AT LEAST TWICE CONDITIONING ENGINEERS GC GENERAL CONTRACTOR P PUMP R NOTES: 1. OBD-OPPOSED BLADE DAMPER. CD , 0 GPM GALLONS PER MINUTE PD PRESSURE DROP 1. REFER TO CONTROL WIRING SCHEMATICS FOR ANY FIELD INSTALLED CONTROL DEVICES NOT FACTORY INSTALLED. 1� I` 1 MONTHLY ONCE STARTED, PRIOR TO TEST AND BALANCE, AND LASTLY, PRIOR TO MERCHANDISING. ANY EQUIPMENT OR DUCTWORK THAT BECOMES 2. LOD-LOCKING QUADRANT VOLUME DAMPER (PROVIDED BY MECHANICAL CONTRACTOR). SEE MECHANICAL SPECIFICATIONS SECTION SOILED DUE TO A LACK OF FILTER CHANGES, AS DETERMINED SOLELY BY THE LSD&C PROJECT MANAGER, SHALL BE CORRECTED ON BEHALF OF BDD BACK DRAFT DAMPERS PLBG PLUMBING 233300.D.1. . ,. 01 THE CONTRACTOR AND CHANGES BILLED TO THE CONTRACTOR. BHP BRAKE HORSEPOWER HD HEAD PSI POUNDS PER SQUARE INCH ., "' 3. CFD-RUSKIN MODEL CFD OR CFR FIRE DAMPER WITH VOLUME CONTROL. • ��„�` N BLDG BUILDING HP HORSEPOWER 4. YRD-YOUNG'S REGULATOR REMOTE DAMPER WITH CABLE CONTROL SYSTEM (MODEL 5020-CC PROVIDED BY MECHANICAL O�'oct`15� ' , 12. NOTES TO EQUIPMENT SCHEDULES USE THE WORDS "FURNISH" AND "PROVIDE". WHERE THE WORD "FURNISH" IS USED, SOME FIELD BOD BOTTOM OF DUCT HTR HEATER RA RETURN AIR CONTRACTOR). ) { �'�6r,„,'"�' 3 .t.. (0I INSTALLATION IS REQUIRED BY THE CONTRACTOR. WHERE THE WORD "PROVIDE" IS USED NO FIELD INSTALLATION IS REQUIRED AS THE DEVICES BOP BOTTOM OF PIPE HVAC HEATING VENTILATING AND AIR RG RETURN GRILLE r ' BTUH BRITISH THERMAL UNIT PER HOUR CO"'OITIONING RH RELATIVE HUMIDITY 5. ASPf-INSULATED ENGINEERED LINEAR SLOT PLENUM FOR CONCEALED MOUNTING PROVIDED BY FACTORY. � � 3�gP ,.,,�." OR ACCESSORIES ARE FURNISHED AND INSTALLED B' THE MANUFACTURER AS PART OF THE EQUIPMENT WHEN SHIPPED. 6. TRM-RAPID MOUNT FRAME FOR GYPSUM CEILINGS. " C HWR HOT WATER RETURN RPM REVOLUTIONS PER MINUTE 7. FURNISH WITH TYPE WW ENDCAPS AND PATTERN CONTROLLERS. j 13. UNLESS OTHERWISE SPECIFIED, CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, LABOR AND SUPERVISION NECESSARY TO COMPLETE THE CAP CAPACITY Hwy HOT WATER SUPPLY 8. FURNISH WITH RB220 SIGHT BAFFLE, TYPE WW ENDCAPS, AND PATTERN CONTROLLERS. HEATING, VENTILATING AND AIR CONDITIONING WORK IN ACCORDANCE WITH THE SPECIFICATIONS AND STANDARDS AS OUTLINED HEREIN. SEE CD CEILING DIFFUSER OR CONDENSATE SA SUPPLY AIR VAV TERMINAL UNIT SCHEDULE _ ,r CD RESPONSIBILITY SCHEDULE ON SHEET M04.01. DRAIN ID INSIDE DIAMETER BENS SENSIBLE MARK (VAV-#) 1 2 3 ` ' ,; ;4:\ D`. CFM CUBIC FEET PER MINUTE IN INCH SF SUPPLY FAN TRANE PACKAGE NUMBER D19 D19 D19 r ;'�A , ,� 14. MECHANICAL CONTRACTOR SHALL FIELD MEASURE EXISTING ROOF CURB(S) FOR CURB ADAPTER(S), WHERE APPLICABLE, AND SHALL SUPPLY CHWR CHILLED WATER RETURN SMACNA SHEET METAL AND AIR CONDITIONING NOTES: �.YrD �, MANUFACTURER TRANE TRANE TRANE 0 -7.; yk CHINS CHILLED WATER SUPPLY KW KILOWATT CONTRACTORS NATIONAL MODEL VCCF00$ VCCF008 VCCF008 1. 4-WAY DIFFUSER (UNLESS 1-WAY 2-WAY OR 3-WAY AS INDICATED ON PLAN). ' DIMENSIONS TO LSD&C HVAC SUPPLIER PRIOR TO START OF CONSTRUCTION. CO2 CARBON DIOXIDE ASSOCIATION 2. INSTALL BLADES PAGING THE BACK OF STORE CABINET OR WALL. ■ '� ~ INLET SIZE 8 8 8 r ' r CONTR CONTRACTOR LL LANDLORD SP STATIC PRESSURE 120 250 3. GC TO FIELD PAINT DIFFUSERS TO MATCH CEILING OR WALL WITH ENAMEL FINISH. VI) III 1 Z w 15. ALL HEATING VENTILATING AND AIR CONDITIONING EQUIPMENT SHALL BE CLEARLY IDENTIFIED WITH TENANT'S NAME, SPACE NUMBER AND UNIT MAXIMUM AIR FLOW )CFM) 250 0 Lu DESIGNATION AND SHALL BE STENCILED IN 4" HIGH BLACK LETTERS. COP COEFFICIENT OF PERFORMANCE L LONG SQ SQUARE - 4. PROVIDE WITH GYP BOARD FRAME. w R- O CWR CONDENSER WATER RETURN LB POUND SQ FT SQUARE FEET MINIMUM AIR FLOW (CFM) a o 0 5. MC SHALL PROVIDE SQUARE TO ROUND ADAPTOR. 0 CC < Q a- CWS CONDENSER WATER SUPPLY LD LINEAR DIFFUSER SS STAINLESS STEEL ACCESSORIES 1-3 1-3 1-3 6. BORDER TYPE 3 IS LAY-IN STYLE, PATTERN TYPE G2 IS 2-WAY ADJACENT THROW PATTERN FOR DARE Y w 16. FURNISH AND INSTALL ALL NEW DUCTWORK INCLUDING INSTALLATION OF OWNER SUPPLIED PLENUM BOOTS, SUPPLY AIR DIFFUSERS, AND RETURN LF LINEAR FEET NOTES 1 I 1 1 DIFFUSERS. PATTERN A3 ISA 3-WAY THROW PATTERN. INSTALL DIFFUSERS SO THROW IS AWAY W OF TIGARD r 4 w AIR GRILLES. (SEE AIR DEVICE SCHEDULE ON THIS SHEET). DB DRY BULB,DECIBEL LWT LEAV NG WATER TEMPERATURE TEMP TEMPERATURE ACCESSORIES ("S- INDICATES STANDARD; "0" INDICATES OPTIONAL): NEAREST WALLS. REVIrVED FQR CO COMPLIANC g 0 a (-7-4E DEG DEGREE TSP TOTAL STATIC PRESSURE S-FACTORY PROVIDED DISCONNECT SWITCH. A. ALL MATERIAL SHALL BE NEW AND OF COMMERCIAL GRADE AND BEAR UNDERWRITER'S LABORATORY AND UNION LABELS WHERE SUCH DIA DIAMETER MAX MAXIMUM TSTAT THERMOSTAT 1. Approved: .. I _ UJ p J 0 2. S-FACTORY PROVIDED CONTROL TRANSFORMER. LABELING APPLIES. DWG DRAWING MBH THOUSAND BTU PER HOUR TYP TYPICAL OTC: s �\ � k� O w O 3. S-FACTORY FURNISHED HEATING/COOLING CHANGEOVER SENSOR. CO cn DX DIRECT EXPANSION MCA MINIMUM CIRCUIT AMPACITY _ CC W p B. ALL PLENUMS SHALL BE FABRICATED FROM GALVANIZED SHEET METAL OF THE APPROPRIATE GAUGE AND BE INSULATED WITH A MINIMUM OF MECH MECHANICAL UC UNDERCUT NOTES: * FINISH REFERENCE: TITUS #26 IS WHITE; TITUS 184 IS BLACK; PRICE #B12 IS WHITEp X 1.7 ' , �W F-y`' ` - Yi, LC 0 1" THICK, 0.75 LB/CU.FT. DENSITY FIBERGLASS INSULATION WITH ALUMINUM FOIL BACKED VAPOR BARRIER. EA EXHAUST AIR MFR MANUFACTURER UH UNIT HEATER 1. REFER TO CONTROL WIRING SCHEMATICS FOR ANY FIELD INSTALLED CONTROL DEVICES NOT FACTORY INSTALLED. A.drew, = /1 Yds.' 1, Q < w ,- EAG EXHAUST AIR GRILLE MOCP MAXIMUM OVER CURRENT UON UNLESS OTHERWISE NOTED Suite ;, =t p C. WHERE DESIGNATED, BRANCHES FROM MAIN LOW VELOCITY TRUNK DUCTWORK SHALL BE FURNISHED WITH SPUTTERS, DAMPERS OR SIMILAR EAT ENTERING AIR TEMPERATURE PROTECTION B - �` Date: 0V) J BALANCING DEVICES IN ACCORDANCE WITH THE STANDARDS OF SMACNA. EC ELECTRICAL CONTRACTOR MTD MOUNTED VAV VARIABLE AIR VOLUME }: ,���aa EER ENERGY EFFICIENCY RATIO MTR MOTOR VENT VENTILATION,VENTILATOR - Ch z N) L_, D. ALL DUCTS FOR FINAL CONNECTION TO DIFFUSERS SHALL BE CLASS 1. UL LISTED (SL 181) FLEXIBLE AIR DUCT NOT TO EXCEED 4'-O" IN EF EXHAUST FAN VFD VARIABLE FREQUENCY DRIVE 1 0 LENGTH (THERMAFLEX, GLASFLEX, OR APPROVED EQUAL). EFF EFFICIENCY NEBB NATIONAL ENVIRONMENTAL VTR VENT THRU ROOF NTS Z C7 N EOD ELECTRICALLY OPERATED DAMPER BALANCING BUREAU AIR DEVICE SCHEDULE-VS/PINK B � cc O � � E. SUPPLY AND RETURN DUCTWORK SHALL BE LINED .MID WITH GODS COMPLYING BLANKET INSULATION. ACOUSTICAL LINER MAY BE PROVIDED. ESP EXTERNAL STATIC PRESSURE N.C. NORMALLY CLOSED W WATT EXHAUST EXHAUST AND VENTILATION FASCHEDULEI- _ ALL MATERIALS SHALL COMPLY WITH N.F.P.A. 90A AND 90B. SEE SPECIFICATIONS ON SHEET M05.01. EWT ENTERING WATER TEMPERATURE N.I.C. NOT IN CONTRACT WB WET BULB 05N-M01101-B00-SCHD p2�a2�201, st N ix N.O. NORMALLY OPEN WG WATER GAUGE MARK (EF-#) _ 1 ,. M Q ( Q 0 p U F FAHRENHEIT N/A NOT APPLICABLE WPD WATER PRESSURE DROP MANUFACTURER FANTECH 0 3 r •• w F. HANGER WIRES, DUCT STRAPS, FASTENING DEVICES, ETC. SHALL BE FASTENED TO THE STEEL JOISTS AND/OR BEAMS ABOVE. DO NOT ATTACH - Li- Z w ANY SUCH ITEMS DIRECTLY TO FLOOR SLABS, PIPING, OTHER DUCTWORK, ELECTRICAL CONDUITS OR THE ROOF DECK ABOVE. FCU FAN COIL UNIT WT WEIGHT MODEL FG 6 �, z p TO OFFICE COPY '2 co z a FLA FULL LOAD AMPS NTS NOT ,0 SCALE TYPE INLINE FAN G. ADDITIONAL FIRE DAMPERS SHOULD BE INSTALLED AS REQUIRED BY ANY APPLICABLE CODES AND/OR JURISDICTIONAL AUTHORITIES. FLEX FLEXIBLE DRIVE TYPE DIRECT CE iv 0_ �} U i- Ili ONLY LISTED AND Lii PE AIR R FLOWN(CFM) 240 co O_ Ct 0. - U 17. SEAL AROUND PIPES AND DUCTS PENETRATING FIRE SEPARATIONS WITH LISTED AND APPROVED FIRE SEAL MATERIAL NATIONAL ACCOUNTS HVAC SUPPLIER GENERAL NOTES o0 a co Q 0 U w APPROVED SEALANTS AND METHODS FOR THE SPECIFIC USE WILL BE PERMITTED. - ----1 MANUAL VOLUME DAMPER EXT. STATIC (IN W.C.} D.35 0- cn ci J 18. MECHANICAL CONTRACTOR SHALL INSTALL TEMPERATURE SENSORS AND AS SHOWN ON THE PLAN VERIFY LOCAL CODES. IF PLAN LOCATION 1SX SUPPLY AIR DIFFUSER cFSD FAN SPEED (RPM) 2,542 HVAC EQUIPMENT NOTED HAS BEEN PREPURCHASED BY L-BRANDS STORE DESIGN & CONSTRUCTION. WITHIN THE FIRST WEEK OF REVISIONS: ( COMBINATION FIRE/SMOKE DAMPER ELECTRICAL CONSTRUCTION, THE GENERAL CONTRACTOR OR THEIR MECHANICAL SUBCONTRACTOR SHALL NOTIFY SUPPLIER VIA EMAIL. REQUIRED BY: DATE NOT ACCEPTABLE, IMMEDIATELY CONTACT LSD&C PROJECT MANAGER FOR DIRECTION.) - - VOLTS/0/HZ 120/1/60 Fa -- 19. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL FULLY PRESSURE CHECK AND CHARGE ALL REFRIGERANT SYSTEMS (IF REQUIRED). FIRE DAMPER SCHEDULING AND RECEIVING THE HVAC EQUIPMENT AND ACCESSORIES. EQUIPMENT AND ACCESSORIES ARE TO BE SHIPPED BY ANY SPECIAL RETURN AIR GRILLE APPROX. WEIGHT tLBS) 122 15 THE EMAIL SHALL STATE THE PHONE NUMBER, EMAIL ADDRESS AND DELIVERY ADDRESS OF THE CONTACT PERSON RESPONSIBLE FOR BD FAN MOTOR WATTS SERVES RE5TROOM SHIPPING INSTRUCTIONS REQUIRED OR REQUESTED. ALLOW A MINIMUM OF TWO WEEKS AFTER CONSTRUCTION STARTS FOR DELIVERY UNLESS 20. THE CONTRACTOR SHALL ENGAGE THE SERVICES OF AN INDEPENDENT, AIR/WATER BALANCING COMPANY THAT IS A NEBB CERTIFIED CONTRACTOR AUTOMATIC BACKDRAFT DAMPER ACCESSORIES 1 SPECIAL ARRANGEMENTS ARE MADE PRIOR TO THE START OF CONSTRUCTION. OR HAS AN AABC CERTIFIED TEST & BALANCE ENGINEER. THIS COMPANY SHALL PERFORM THE BALANCING OF AIR/WATER SYSTEM(S) AND MAKE ANY REQUIRED ADJUSTMENTS TO ENSURE PROPER WORKING ORDER. UPON COMPLETION, THE BALANCING COMPANY SHALL PROVIDE A COMPLETE 40> ELECTRONICALLY OPERATED DAMPER NOTES 1,2 GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL SHIPPING COST INCURRED IF DELIVERY IS REQUIRED PRIOR TO THE ACCESSORIES ("5" INDICATES STANDARD; "0" INDICATES OPTIONAL): STANDARD TWO WEEKS SCHEDULED. SYSTEM REPORT. ACCESS PANEL Ey4-1-- UNDERCUT DOOR ACCESSORIES S-BACKDRAFT DAMPER 2. - S-DISCONNECT PLUG. IF THIS INFORMATION IS NOT SENT TO NATIONAL ACCOUNT SUPPLIER, THEN THE EQUIPMENT AND ACCESSORIES WILL BE SHIPPED IN • ACCORDANCE WITH THE PURCHASE ORDER DATE AND INSTRUCTIONS ISSUED BY LSD&C AND THE GENERAL CONTRACTOR SHALL BE co CARBON DIOXIDE SENSOR NOTES: RESPONSIBLE FOR UNLOADING AND STORAGE OF EQUIPMENT UNTIL SUCH TIME AS REQUIRED FOR INSTALLATION ON PROJECT. EXHAUST AIR REGISTER 1. INTERLOCK WITH LIGHTS. HUMIDISTAT 2. DISCONNECT SWITCH PROVIDED BY EC. IF OWNER'S REPRESENTATIVE IS PERFORMING START UP, THEN GC AND/OR MECHANICAL CONTRACTOR MUST COORDINATE WITH MANUFACTURER REP. 2 WEEKS PRIOR TO CONSTRUCTION END DATE. 5 OR R LINEAR DIFFUSER s TEMPERATURE SENSOR DATE ISSUED: 12/30/16 - -1 S=SUPPLY, R=RETURN TRANE CONTACT INFORMATION DESIGNED BY: MCR Q THERMOSTAT DRAWN BY: MCR NEW DUCTWORK CHECKED BY: JAH Q DUCT SMOKE DETECTOR JODY SOWERS ROLLAND SCOTT JOHN D'AGOSTINO SCOTT DAVIS _ TRANE TECHNICAL SUPPORT,PRIMARY TRANE TECHNICAL EQUIPMENT SUPPORT PROJECT MANAGER AND E C H A N r C A L __._ __ EXISTING DUCTWORK TO REMAIN POINT OF CONNECTION EMAIL: JSOWERSOTRANE.COM OM SUPPORT,SECONDARY EMAIL: JOHN.DAGOSTINOOTRANE.COM HVAC COMMISSIONING PHONE NO: 866.415.2499 EMAIL: ROLLAND.SCOTTOTRANE.COM PHONE NO: 866.415.2499 EMAIL: SCOTT.DAVISOTRANE.COM PHONE NO: 866.415.2499 PHONE NO: 866.415.2499 NOTES AND A�tl D "W":0,4 EXISTING DUCTWORK TO BE REMOVED WNW- FLEXIBLE AIR DUCT 4'-O" MAX. SCHEDULES I - - - NOTE: (N)=NEW, (R)=RELOCATED, (E)=EXISTING DRAWING NUMBER: NTS NTS NTS NTS ME ABBREVIATIONS AND SYMBOLS LEGEND MECHANICAL EQUIPMENT SCHEDULES E NATIONAL ACCOUNTS INFORMATION A / '•�" o 411 MECHANICAL GENERAL. NOTES N J � � 00N-M0101-J00-NOTE 42/22/16 OON-J1i10101-J00-LGND &/26/15 00N-M0101-E03-8CHD OB/26/i4 00N-M0101-A00-NOTE OS/2//15 Ol INSTALL TEMPERATURE AND CARBON DIOXIDE SENSORS AT 48" AFF. TEMPERATURE SENSOR SHALL BE KELE ST-BP SERIES FLUSH MOUNT, PAINTED TO 17 ... .. ' •• .. .., • : • _ , - • - • : - •• • : : • • • - MATCH ADJACENT FINISHES. SEE SHEET M04.01 FOR RESPONSIBILITY SCHEDULE. U INSTALL SUPPLY/RETURN AIR SMOKE DETECTOR IN DUCT. INTERLOCK TO SHUT DOWN UNIT ON SIGNAL FROM FIRE ALARM SYSTEM. SEE SHEET 1404.01 FOR aD •• • • • • : :•:. RESPONSIBILITY SCHEDULE. 11 Or lq ;:! :: • . " .. .•:, " •.• . . .. :. • . . - -•• M-Engineering O TENANT CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF ALL HVAC EQUIPMENT. COORDINATE WITH LANDLORD ENGINEER PRIOR TO BID AND CONSTRUCTION. -- • - • • -• - - • V:. 750 Brooksedge Blvd. 04 EXTEND EXHAUST DUCT UP THROUGH ROOF. PROVIDE A ROOF JACK, STORM COLLAR, AND ALL-WEATHER CAP. ••• .• • ... - , Westerville, Ohio 43081 phone:614.839.4639 ,. .. , . : .. 21 - - . - ',I. • . " . • •: . ' :. • fax:614.839.2222 www.mengineering.us.cam © ACCESS PANEL BY GC IN THIS LOCATION FOR ACCESS TO EQUIPMENT ABOVE CEIUNG. REFER TO ARCHITECTURAL PLANS. ® CONNECT NEW SUPPLY DUCT TO LANDLORD'S EXISTING MAIN SUPPLY DUCTWORK. FIELD VERIFY LOCATION AND SIZE OF EXISTING MAIN SUPPLY DUCTWORK PRIOR TO ROUGH-IN. 13 INSTALL SUPPLY AIR TEMPERATURE SENSOR IN DUCT. SEE SHEET 1,104.01 FOR RESPONSIBILITY SCHEDULE. :" - Oq RETURN AIR THROUGH OPENING IN BACK OF VALANCE ABOVE CABINET. REFER TO ARCHITECTURAL PLANS. 10 PROVIDE RETURN AIR GRILLE DUCT BOOT FOR REDUCED SOUND AND LIGHT TRANSMISSION. CONSTRUCT BOOT FROM 1" DUCT BOARD WHERE ALLOWED BY LANDLORD. SEE DETAIL E/M03.01 FOR ADDITIONAL CONSTRUCTION INFORMATION. 11 AIR DEVICE TO BE USED FOR ACCESS TO EQUIPMENT LOCATED ABOVE CEIUNG. THIS CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT A MINIMUM UNOBSTRUCTED FREE AREA OF 3-FEET VERTICALLY AND 4 FEET HORIZONTALLY IN ALL DIRECTIONS AROUND EQUIPMENT IS MAINTAINED TO ALLOW FOR INSTALLATION AND MAINTENANCE OF EQUIPMENT. IF THIS FREE AREA CAN NOT BE OBTAINED CONTACT THE LSD&C PROJECT MANAGER IMMEDIATELY. 12 PROVIDE YOUNG REGULATOR CABLE CONTROLLED BALANCING DAMPER, BOWDEN CABLE CONTROL KIT, CONTROL WIRE AND CASING, OR LSD&C APPROVED EQUAL. INSTALL CABLE CONTROLLER IN CEIUNG NEAR DIFFUSER, IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, OR OTHER APPROVED LOCATION. TYPICAL OF ALL INACCESSIBLE MANUAL VOLUME DAMPERS LOCATED ABOVE GYP. BOARD CEILINGS OR DAMPERS WHICH ARE OTHERWISE INACCESSIBLE. REFERENCE DETAIL F/MO3.1 FOR ADDITIONAL INFORMATION. Z 14 - M L'` . . .. .. . .. . . . 15 .. - - CI DUCTWORK BETWEEN TERMINAL UNIT AND LANDLORD'S DUCTWORK SHALL BE MEDIUM PRESSURE. 71:13 D O Ce ris (f} 2 X NTS Z MECHANICAL PLAN KEYNOTES D 0 E • 03/27/15 — -- (•) U O a:5 • 0 0 0 0 Q .� Z 3 2' Lumi - chi 4 (!) o- W -a Ii 1401) :� W c IoI i- H I / / I LANDLORD'S MAIN SUPPLY DUCT I I I // MEN 1 S MEN'S ✓ TO REMAIN UNCHANGED. FIELD Iii, EAG-2 4 EAG-2 VERIFY EXACT SIZE AND LOCATION. moons L -- ' -120 CFM F: � -120 CF - '/z__, ld f - _ _ _ _ �� _ _ _ - _ _ — — - ,4r •• — �_- api• SD-2 tI �� — 1f■:1 — II _ I ■ — — — ©v �� �80 CFM ►�r � .i;i�iJ71SeliiIIIN �••• — — — ■� 34 _,..., �_ 4..� RG-8 10"X10" 10 IM: 1 -DL:. z </'-.'1-� __ % ray■j '� ZdAu_5_10.mifrl 1 \ II _ `�' ���' WO to ,< m.,-<ZZJJ •• I 1 N �O_/ZdN TYP / I 1 i \ 11 i ,:li 7 - ' Z ...1 O_ Wi� <d Z i- VO,,, Z. D �■xw! ��. �`". � I III ! i ��d= t� WC�ZZM03.01„` i� 1' 1 1 II I I ;�_ � o�0go_ _ _ _ — _ = 8"� UP- - _ _ � \kei ME , 1I I II I 100 CFM 12 � �c3W _�_i'x <d kg <p0�+ <THR• H ROOF �,� r ' s < =W= a .• °..o. '■_ y N N W_ • • •�!� �� T . .■I,_111111tttl II FP W 3 W d' V �"�O OW/ mm .�0 .. 1 ," I Nia S V U j N�� ` ♦ 8 #1I '- � � '. � Z "1."CZ O Wry<fdiidOP r� i ,� • � BO3@~O y <1-�2• m .�. Z <la: d 1O-W j Z j SD-9 0 10 0 10 SD-9 300 CFM A d<WOru W2Wc. �< Mf�Af 30D CFM • < Ma � &x4�o coUr�a = I 1 N�y�pV t d O LW.1 W O W< fl :(514)EilO/ ' '1 1 rOC N OOW +1/7:jOWZSD-2 SD-2 � �cW�a � ° zo0 � 320 CFM 320 CFM I1 RG-8 'ii 1 O 2.1'1g3� MW= _.- p ��,Iod ^, 10"X1Q" 10 y Q(?<W V O W _ W � kilitliiilliN W �� 11 �► -- t � �z _, .zc**%En c" o=o ;OS �� I •i • ►•1� 1 ! N SO@ filyOWgWH yiER�.ysi % I I II I W<�<W � (6:v1 I! dYW�W � a _.. • 1 ONO 1 Q"0 1///.1 • I I 11 1411:::111 , SD— Kteloce Ir W W '� O W Z 11 1 czzozz zc)zzv'� oz _~ '^ I I II 100 CFM 12 X<tv0 RWp9-o< zg Lc5a d -— rr 1 0da,tid Nim g=O�UN .11 ,.“. -„, ..,P Zt/ - t I - , _ �,F,i Z J �, O.'SU W0f ����� moi' p O a3' d —`JI , I a. SJ <i +t .[N O [d • .�-=▪ VI i♦ N 6.t-W S C.W (l'O.VtOa!@< (1 I I I { (' 'L 17 T- a- r N f// i • G II i I i I I QRoP , ` �. tNIRELOCATED I M/I I f • f ,Zp 1 T"" ,1/449;.&"1" 41-ft- ..-.."° f N FPVAV �� i M- r of = :. i I MI 11•1111111111111=IN 4 , • -,.0I ' °1/4 f M -111 NJ II so 14"� ct SD_g 10'0 10"0 SD-9 1� 1'1 ' e��' 30O CFM 300 CFM 0 ci.144.4":OA -.� __ Milk 20 Xt6 IINk 0 Irrillm nil 8 • III 11 ,ii �/cATP151���� — � — — — 7' — — Mo3.01 -'- 9 ^�'/r .. W0 ce / i I OV m " " !LJ RELOCATED ALJ 'rY P LE �C7� �, a���� ! � � 24 X24 6 = � I �� ca a C 11111 11.11_� SD-2 I 10' 1O"� 0 �MIA SD-2 I M I ROOM #I RG-8 i I (� � a � � ♦ 320 CFM OOV" (i) Lai Z La11 1 figi = inililL .1- .I i��7 � " /.�f"?!� % � Z � Q W 117 .1 iI 14 16 �� , 1 O / 24 X16lial ( 1 1614"01111 ����� /� 2 CO �, o •.-- 7 Zce 0 10-0 10-, N #2 • I3 .3 -' X ROOM 2 Z 0.4 4 x �� co z M __. R\■ /� I Q N I I }- SD-9 I mow SD-9 I .. — Z ~ h 3 �� 11 300 CFM 300 CFM 0 0 Z O t.- S 4. ce 0 � 300 -,-..m■sem oImmi Z_ ." W -La S I I f I I r i • � = tn � � 4% W W co U f - - � W co 0 tt? U1-' r�..�_� ;.�._% .."1 4 0o Q O in a I E > ? � Di2 son s, !_ i M03.01 1E1111- 11N i 1 i .�� REVISIONS: 411 t4"1� - 1 I SD-9 I k RG-8 jl � 10"X10" 10_...., REQUIRED BY: DATE 10' 1O'O 10'O 10"O300 CFM ii' me 04, II SD-8 itirttillM, 7IND� �� 4 AIIIIIIIIEIOA�� i ,, 1111 100allikI. I II 72 1 SD-2 SD-2 SD-9 I 6'O320 CFM �j 320 CFM 300 CFM11 .116 MO M03.01 FA ID TMP 1 14"0 m o l minim 1 ilimin 0 FPVAV-1 i 6' . :C — - — — jI= _ — — - - - �; - - - - - - 41:1 I - - 36 DATE ISSUED: 12/30/1 6 r' - DESIGNED BY: M CR LANDLORD'S MAIN SUPPLY DUCT DRAWN BY: MCR TO REMAIN UNCHANGED. FIELD CHECKED BY: JAH l I VERIFY EXACT SIZE AND LOCATION. I I N -_ MECHANICAL _ _ PLAN UI NOTE: NOTE: --1Ilk " VERIFY ALL FIELD CONDITIONS PRIOR TO BID" Q Z. . ANY EXISTING DEMISING WALL OPENINGS ARE TO REMAIN. SEE ARCHITECTURAL DRAWINGS FOR CEILING HEIGHTS 2 :I DRAWING NUMBER: 1/4" - 1'-3" l r ., 9 rMECHANICAL PLAN A IM 4 O INSTALL TEMPERATURE AND CARBON DIOXIDE SENSORS AT 48" AFF. TEMPERATURE SENSOR SHALL BE KELE ST-BP SERIES FLUSH MOUNT, PAINTED TO 10 " •' :• ', ` : .• MATCH ADJACENT FINISHES. SEE SHEET M04.01 FOR RESPONSIBILITY SCHEDULE. NV . , .. .•:, G2 INSTALL SUPPLY/RETURN AIR SMOKE DETECTOR IN DUCT. INTERLOCK TO SHUT DOWN UNIT ON SIGNAL FROM FIRE ALARM SYSTEM. SEE SHEET M04.01 FOR :' •.� , ,: • - . . . 1 k 01 RESPONSIBILITY SCHEDULE. 1` ••: . .. • • .., • " . •:: " •." . . :. . . . : . . .•. M-Engineering O3 TENANT CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF ALL HVAC EQUIPMENT. COORDINATE WITH LANDLORD ENGINEER PRIOR TO BID AND CONSTRUCTION. ,- ' •. • • .• : N. : :• . 750 Brooksedge Blvd. . .. Westerville, Ohio 43081 phone:614.839.4639 a - •• -- •• - - '' �' •• •` •- • 21 INSTALL MONITORING CONTROLLER AT IFS. SEE SHEET M04.01 FOR RESPONSIBILITY SCHEDULE. fax:614.839.2222 www.mengineering.us.com lam' ACCESS PANEL BY GC IN THIS LOCATION FOR ACCESS TO EQUIPMENT ABOVE CEILING. REFER TO ARCHITECTURAL PLANS. 0 : - •• :. . '• :• : :. 0 INSTALL SUPPLY AIR TEMPERATURE SENSOR IN DUCT. SEE SHEET M04.01 FOR RESPONSIBILITY SCHEDULE. �j8 INSTALL MONITORING SENSOR AT 48" AFF. SEE SHEET M04.0 FOR RESPONSIBILITY SCHEDULE. RETURN AIR THROUGH OPENING IN BACK OF VALANCE ABOVE CABINET. REFER TO ARCHITECTURAL PLANS. . C1 PROVIDE RETURN AIR GRILLE DUCT BOOT FOR REDUCED SOUND AND LIGHT TRANSMISSION. CONSTRUCT BOOT FROM 1" DUCT BOARD WHERE ALLOWED BY LANDLORD. SEE DETAIL E/M03.01 FOR ADDITIONAL CONSTRUCTION INFORMATION. i 1 AIR DEVICE TO BE USED FOR ACCESS TO EQUIPMENT LOCATED ABOVE CEILING. THIS CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT A MINIMUM UNOBSTRUCTED FREE AREA OF 3-FEET VERTICALLY AND 4 FEET HORIZONTALLY IN ALL DIRECTIONS AROUND EQUIPMENT IS MAINTAINED TO ALLOW FOR INSTALLATION AND MAINTENANCE OF EQUIPMENT. IF THIS FREE AREA CAN NOT BE OBTAINED CONTACT THE LSD&C PROJECT MANAGER IMMEDIATELY. C1 PROVIDE YOUNG REGULATOR CABLE CONTROLLED BALANCING DAMPER, BOWDEN CABLE CONTROL KIT, CONTROL WIRE AND CASING, OR LSD&C APPROVED EQUAL INSTALL CABLE CONTROLLER IN CEILING NEAR DIFFUSER, IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, OR OTHER APPROVED LOCATION. TYPICAL OF ALL INACCESSIBLE MANUAL VOLUME DAMPERS LOCATED ABOVE GYP. BOARD CEILINGS OR DAMPERS WHICH ARE OTHERWISE INACCESSIBLE. REFERENCE DETAIL F/M03.1 FOR ADDITIONAL INFORMATION. CO gcr 0 CV CI) h. 14 LOCATION OF ELECTRICAL AND CONTROL PANELS. DO NOT ROUTE DUCTWORK OR PIPING ABOVE THIS AREA. '- W 1--- 44. 14"5 15 INSTALL HEATING/COOLING CHANGEOVER TEMPERATURE SENSOR IN DUCT. SEE SHEET M04.01 FOR RESPONSIBILITY SCHEDULE. 7 C..3 0 d• 16 DUCTWORK BETWEEN TERMINAL UNIT AND LANDLORD'S DUCTWORK SHALL BE MEDIUM PRESSURE. 3 I-- cii. .. 0 Ni (1) 2 x Z E ti MECHANICAL PLAN KEYNOTES D Ca 03/27/15 CD . 0 0 F!.) Q R 0 . ,,,, U Zdi cci (..) (-) 0 >+ p ..., Lei 21 lt ill a m 0 1 L.? •1- ;7 tca /? a CINI W -a rd ,- I I I I I a a� , W c O m J- -I i I I I I U} h- - - — b - 0 - - - - r-, - - - i - ❑ - - - j - - — — — ❑ - - - a W < N OC O 2 ,{`G.' - - Z Oa. Z Be WNW < P<ZM<� _ i.7KZO INII I ' ��W`N'=O d.t�` Opp4/ I — \ / \ \ / \ \ / 1T y \ yo 3Wz3` 3,cc/ t` RG-3 = 2SD-7 —A #� IIIIII _ _ 7 ErG-3 ® ® 50 CFM EV _ — 11 RG-3 � RG-3� w 8 1 �� dgz p�1i, , ON8ytx V o W Q . 4„,w,d v o O m O N 1 1 //, . ; ALCOVE B m -� II ,ii ` II f':, / ..c...0 Z «..0 .- = � / •"/ RG-4 _ II �' � r m �` � II II N\ � II \\ � �" I ti- -- � Q_�= � a��4= � �� � = -T- I II \ ��FR10D ` II FR IIA - ' I 0 oW3m � , � pM� 1- - - - - -t I ELECT 16-AL 7� II II SD-7 I C8-13 I -nrP I / G ro' o og 5t < -d<a< Al f r c� 12 175 CFM ! 7.�.� I --= W<ppad M~ rip p E`_�_ O p . (7 ; SD-2 " " SD-2 d O V O W U V J U O •-""O SD-3 \ ' / _ lu �75 CFM 330 CFM 330 CFM W y W d 200 CFM i.�. 12 Io 12 75 CFM 12 75 CFM w 10"0 10"0 - � W- 8 ,62 ��a=o 86-Yd o Wcv4a- ;-,: „.,tags X i X II i . wagio _ ALCOVE A 12 Too CFM ..Ffts w ►*• 5 %Q-2g ..... rl I I I or I V II - , I .,., FFpp-GG I II C) ::;m : z ::::!! ALGOVE G74 4 ' �� I __ I / — \ II II W�3<o. NpWWm/ �`Y-� O s! t. x-1-1 -_ __ It I - W<y<W <O ,�OO ca:::: : — ~ / ' . R.. . II II FR 1F / I) 11 zlec' . go .-5 ;; Z. FR ?G .r FR 6D ;:� i�i:��� FR 4C II I I 11 II !I :o Z III " " 9I II � / / �� II c II II 3c<k'c+ Wco< .. t. cg!:: pdFp Na^ OZpN<.n Zw52 s '11 \ IIII / • 14 �� II II / I ! r (I I I (i dG3d f F<OC V10 U =W4}3mI 0 fi \ / \ / (S X2 N� 2 p 117 C V W YNVOJZ — ,\ il.� 1' I OC O OC W Z W d O tR J d< I • , SD-3 II �L JI II 4. q " II II .- AM►r►, 300 CFM PROCESSING U Li U 6 . r — — -RG-3 1 _ — i i — � 'i5 CI o d�.n,�a ,,n�,� nra ,ni,•� nia al �.ni,,a, T 1 `/ 1 RG-3 RG-3 , ,RG-3 RG-3 •l RG-3 RG-3 I� I II i Ii II a• O� ' �• h rn A / r\ / \ / \ / ■ . / _� / \ r1o3.o1 1 I I I I I — m— j — — - - - ilic - - - I I II II . NI * * g 10 . V) rrr 6171 L ,4, ____ _L ______j 0, ort I I - 1 I II B II II 1, ' - - - -� - J ,� RG-3 1 VAV-1 10"X10" 10 (� - � - - - - J � _ _ - - ! _ !_._ -. _ � .-- - - -i t�1 O FPVAV-4 i r�.oi � � � o S O ��� i `'J _ SD-2 TTP 1 t SD-2 *� `�` `" VAV �''''" O 1 ©� S 1 �.3 — 0 S- , 340 CFM 340 CFM ° ti./ e �a t3 or t RG-3 I $D-7 I I SD-9 I I • .y \:% 11 FPVAV-5 \ 2 PERSON 12 250 CFM i1_ _ 350 CFM AFie4 h'/u R s0 �... STOCK ,�(� �, MANAGER _ 7 S l II - x 4ey- fi - >j ;Y' _ — = = OFFICE L 0- - - Ncro &i. 8-04_ W —REAK �, — I I - I ROOM I I I0 0 "' a s " A� " " Y W �6 �f 10"o /W0h �. sD-3 - ROOM #4 20 x1s 1� Q�1 300CFM _JI 111 Z 0111 I � BEAUTY 0 R�OCATTD W In J " W O i 10 ( - SD-9 # Cn LLI I I 11.1 I °a 370 CFM I I I ROOM # A I ©© (!7 W: O I SD-3 U cr, I I _ Q BRA SALON S 300 CFM • - t I Si}-9 I \ QL _ O [ ! 1���I lc © I • 350 CFM i CO0 J VAV © % a I�I�. VAV 0 - -' �.� I V < cn z M N .. 2 I /� 0 1 I I I I Z � h. I - /F% RELOCATED F ' z Z Q« s` _ — a O o l co ' RG-4� I fr0 rFPVAV 10"0 IQ 0 Q O lx RGA-3i _ _. �I ,J 5 t) E I I RELOCATED 0 Z .. LI F \, Mos.oi I RG-4 /- zlummi 3 m Z o� p�VAV-3 -' I_ � litre I i �0 I t,,, = t!>t � a E r,..., �� TTP _ 10°0 0W Z a M03A1 VAV-2 ' _' I l -5 r ti Q 1 0 Q �' O t!3 G TMP 010 II RG-3 l SD-9 \' aa. rn N a H 161 RG 3 II \ VEST 370 CFM ` II I >I " N. " _ [27 j #2 II 24"X16 iiiii IL 1 MULTI—USE/ I 10 xio 10 I-IALLWAY I I I III I ��� REQUIRED BY: DATE DATE I II TRAINING DM r- — — — — — — — - 1- -r -$� -8" S •:" II 7 s d SD-CFM �� SD-12v - . \ SD-12 220 CFMOFFICE220 CFM ��`� •� _ =�_�-� TRANS in3 t2 x.11►%► #It %�%���_ - II © K1 I 12 80 CFM r I I I I I I I CWS ! i ��4 Q` ''�� I 1f Cil f I10">4 10'� ,kti$ if if SD-7 ►._,� I 12 250 CFM I { — 24"X24" 6 I - VEST I '� I_`- t2 SD-12 ' I�I tt SD-2 — I _ II (I r —I -1 -1 1 i 220 GFM , F \ 330 CFM 0 II u I I I 12 120 CFM I C� •� I- y � � � �1' II II ..jilt I / IT 1 Ty II IIIIry �..,, -1J I I ii y II II I / - _ _ - ! - - - - 8 - - - -I 1---- - - - - - 1 1- - - - �_ / - dN Z • i 11 — RGFI I 1 I i i S i I - GAS�(WRAP t- — i IL_. _ _ 1 1 1 1 1 1 1 - - H II II C 1 FPVAv-3 / \- l j l / _ = �� _ _ _ - - = _ = _ �� = = = = sDATE ISSUED: 1 2/30/1 6 - - - _ :: — - — — — 0 — — - - — — — — — p❑J— — — — — ❑ ' — — — � - - - - - _ DESIGNED BY: MCR \� 1 DRAWN BY: a MAH \ I I I �� I I I I N CHECKED 8Y. I .01h. MECHANICAL I I _ PLAN U1 NOTE: NOTE: 'E LUZ 10 ANY EXISTING DEMISING WALL OPENINGS ARE TO REMAIN. SEE ARCHITECTURAL DRAWINGS FOR CEILJNG HEIGHTS " VERIFY ALL FIELD CONDITIONS PRIOR TO BID" 2 "'� DRAWING NUMBER: 114.,. : l'-0" � '� MECHANICAL (I(I _ I'(11► --- PLAN 1 7 CAP -1 , ikol M-Engineering 750 Brooksedge Blvd. Westerville, Ohio 43081 , phone:614.839.4639 `i fax:614.839.2222 N www.mengineering.us.com FLASHING BY G.C. ROOF IL • DUCT SUPPORT FASTENED TO NEAREST ROOF STRUCTURAL MEMBER. SIZE PER SMACNA GUIDELINES. EXH. DUCT coz0 a) M 1 E "4 Lei r , Q 7- FROM RESTROOM D .6 d: O T I— c 1" = 1'-0" Z EXHAUST AIR DUCT ASSEMBLY DETAIL = u. 00D-M0301-D00-EXDT O 01/13/13- — - — - ___ -- a _ U O BEAD TO SECUR tt3 FLEX DUCT. 0 r Sh..... � CTANGULAR TO Q� ROUND ADAPTER W � 111111111111111 WITH 1/2" 3L6 ra.) E el c /�� LINERSTRENGTH. BREAK. FOR E :- Q3 .J 0 6" STARTER COLLARmammomiHm (� „,•••••••004I�lll � � 1 T 1 -i �� �' w III, o 4" MIN. WHERE /�,."4.011°111111° Z a Z z = m r. P STRUCTURE ALLOWS40 ./� m<y y �_O to? O aP O SEAL TO GRILAND 5.40 W=E` r (:),z -ca ye o ° W". A. SECURE WITH MIN. ZV = W ==Zo Z oWTWO(2) SCREWS PER gW W z5 < 5 <a '4"1111N4 SIDE. O 2 Z Z=z ==C? W ZZK N..,..›- W0ioo d2 E12 .� XC : :- ~OWE nOve:1Z COW W= F- 44wG Z(. OZ '0 EInzWG ? 1 3myteW J IX 2"( c' O NUyO m # =4.1- 0 DIFFUSER/REGI `/GRILLE � WF»-Wa !*:!:ftc.: ZcOO4WQ� mU WW! a � VU _v3" 1'-0" co D TED GRILLE DETAIL ooaMO3 1-coo-GRIL t= 6 ulOa/26 JT s' , LOCKING QUADRANT YOUNG REGULATOR MODEL 5020GCDuct Main — Transitions Duct Main — Take—offs WdN<W O mQoSo < < <ROUND DAMPER (830ACC FOR RECTANGULAR) ` Woy�oo � (J,,, , 0= =z� O P < _ y ..00 . 3A000 "c3O 0po 4 N g ',7 ,4 oW=liii10 inill MinnWRIGID DUCTWORK, INSULATED PER / 45'EXTENDED SPECIFICATIONS ADJUSTMENT HANDLE y / DUCT STRAP AND FOIL TAPE '011 111.1101_fHl AIR FLOW CV + c, ..- 0 , !Z1RIGID 90' ELBOW O■ OC' .-r7 I p� fl=��� �3n r DUCT STRAP AND FOIL TAPE AIR FLOW "' ORANGE FLAG CONCENTRIC TRANSITION RECTANGULAR TO ROUND GROUND TO ROUND = 1-%a , ; FLEXIBLE DUCTWORK NO LONGER - MAX 45' DIVERGING, O sCom" ' OAiAY l~ r , x 41r11144 FLEXIBLE CASINll G � . j�� THAN 3'-O" AND WIRE 60' CONVERGING • T` OP (4 !.. k (30'-0" MAXIMUM) —1- - RECTANGULAR DUCT O -,14. ° aa, AIR FLOW MEDIUM PRESSURE ■ RACK & PINIONesis LIJ oOPERATORrMire` � W 14---tv--- � 1\- MAIN DUCT CDai ce �� CONICAL FITTING, SEALQ X I.Ia- AIRTIGHT W/ MASTIC 1•' __144 CEILING DIFFUSERMill ROUND DUCT (_) ____ MOUNTING CLIP SOCKET WRENCH 45' . WI pp �_— BRANCH DUCT o: NOTE: CONCEALED REGULTOR KIT - VAV BOX LU Wu` rn FOR REMOTE DAMPER ADJUSTMENT LOCATE NEAR REMOVABLE DIFFUSER OR GRILLE 0 - MAX. 30' (EXCEPT 45' ISA CC 61 PERMITTED AT ROUND TO FLAT OVAL). ,Ct Q w O • NOTE: r COORDINATE EXACT LOCATION OF CEILING MOUNTED D ECCENTRIC TRANSITION ("RECTANGULAR TO RECTANGULAR ©RECTANGULAR TO ROUND Ci) _ m L o CONCEALED REGULATOR WITH ARCHITECT PRIOR TO WHEN SHOWN TAPS TO VAY TRUNK ONLY 0 (n J INSTALLATION. CO M O N E. N NTS NTS E 0 h YOUNG REGULATOR REMOTE DAMPER F DUCT DETAILS B a O 00D-M0301-FOO-DAMP �'�' 12/11/13 NOTE: USE PLAN AS GUIDE TO FITTING TYPE. 00D-M0301-800-DUCT 10/4/16 0 (3 N 'x Qr- .. tV.a ROUND DUCT PROVIDE VOLUME DAMPER ASSEMBLY IN z 111 E 1 p ,it.; o ACCORDANCE WITH SPECIFICATION 233300.D.1. _ 03 Z EE REFERENCE M02.XX FOR LOCATION. vInv)(U,) °- W .. Z w La DAMPER HANDLE TO BE PROVIDE RIGID 2 PIECE ROUND ELBOW WITH 1.5 Q 03 , CC � 'D C INSTALLED MAXIMUM OF RADIUS RATIO WHERE CLEARANCES ALLOW. 'M4,.,_s 11) 0.. 0 V W o •► SUPPORT FROM STRUCTURE ABOVE 3'-O" ABOVE CEILING. WHERE CLEARANCES ARE RESTRICTED PROVIDE r��"'' V) 0- y o ELBOW WITH RADIUS RATIO OF 1.0. 41111111111M _ REVISIONS: „� ,y SECURELY TAPE VINYL FLEX DUCT TO SHEET REQUIRED BY: DATE METAL W/ MIN. OF (2) CONTINUOUS WRAPS OF 18" LONG ORANGE SIMI DUCT TAPE. STRAP CLAMP OVER FLEX DUCT 1 .////////////////////////////////;////////// MARKER TAPE0. INSULATION & VINYL TO SHEET METAL. TAPE / ATTACHED TO DAMPERS' INSULATION TO DUCT TO FORM A GOOD SEAL %`� 1" DUCT BOARD TO IDENTIFY LOCATION. -_ 8" LONG SHEET METAL SECTION SECURED TO 10" / SOUND BOOT TO INSULATED FLEXIBLE — . DIFFUSER COLLAR W/ MIN. (3) SHEET METAL . 3'-0" - %/////////r///l////////////1f///,.// / MATCH SIZE OF CONNECTION (MIN = SCREWS, DUCT TAPE AND MASTIC. 1 GRILLE 4 FT., MAX. 8 FT.). = TRANSITION FROM DUCT SIZE TO DIFFUSER / FIRE DAMPER WHERE = NECK SIZE AS NECESSARY. / / INDICATED ON PLANS. --•--. 11111 INSULATE DIFFUSER BACKPAN WHEN RETURN IS / / / FULLY DUCTED. / �(��,,t• THERMAL INSULATING BLANKET REQUIRED FOR ** / / ��J�- FIRE RATED CEILINGS ONLY. / / / L•�i .. / / I,A �..�I DATE ISSUED: 2/30/ 6 / DESIGNED BY: M C R / TITUS MODEL "DB" CEILING MOUNTING FRAME FOR GYP. BD. DIRECTIONAL BLOW APPLICATION TITUS MODEL TRM. DRAWN BY: MCR ` r —1 r S PLATE CLIPPED ON CHECKED BY: JAH DIFFUSER RODS. CEILING RETURN AIR GRILLE SEE NOTE BELOW. NOTE: ALL DIFFUSERS ARE 4-WAY BLOW UNLESS NOTED !MECHANICAL SUPPLY AIR DIFFUSER OTHERWISE. PROVIDE OPTIONAL DIRECTIONAL BLOW, TITUS DETAILS (LAY-IN FRAME) MODEL "DB" TO CONVERT DIFFUSER FROM STANDARD 4-WAY TO 1-WAY, 2-WAY OR 3-WAY BLOW AS DESIGNATED ON PLANS BY SHADED AREA. ** 10" OR AS CLEARANCE ALLOWS WITH MANUAL VOLUME DAMPER DRAWING NUMBER: 1 1/2" = 1'-0" NTS 4n, -j � .: RETURN GRILLE SOUND BOOT DETAIL CEILING DIFFUSER MOUNTING DETAIL A M ( ),- - OOD-M0301-AOO-DIFF08/26/15 02/2211 E ® EXISTING FAN POWERED VARIABLE AIR VOLUME (FPVAV) l TERMINAL UNITS WITH ELECTRIC HEAT NETWORK WIRING AND NOTE 'TO CONTRACTOR 4 SEQUENCE k 0 M-Engineering ITEM(S) NOT SHOWN ON ANY OF THE RESPONSIBILITY SCHEDULES 750 Brooksedge Blvd. ARE THE RESPONSIBILITY OF THE CONTRACTOR. Westerville, Ohio 43081 CONTINUED , 18/2 COMMUNICATION CABLE 18/2 COMMUNICATION CABLE phone:614.839.4639 ON J/M04.01 fax:614.839.2222 I www.mengineering.us.com EXISTING �° �./ EQU EQUIPMENT ° O 0 EXISTING EQUIPMENT ° a EQU PMENT POWER /1/ FPVAV-1 POWER ///T FPVAV-2 POWER ///T FPVAV-3 BY OTHERS UC210 BY OTHERS UC210 BY OTHERS UC210 LOCAL AREA REQUIREMENTS 18/3 CABLE 18/3 CABLE c'r> 18/3 CABLE n YES NO YES NO 0 ® 1. SMOKE EVACUATION 0 ® 5. SPECIAL CURB HEIGHT REQUIREMENTS -- i-• 0 ® 2. CARBON DIOXIDE MONITORING 0 ® 6. TEN MILE COASTAL PROXIMITY ZONE SUPPLY ZONE SUPPLY ZONE SUPPLY 0 Z 3. HURRICANE ZONE 0 El 7. OTHERS,I.E.METHANE,CARBON MONOXIDE,SOUND SENSOR AIR SENSOR AIR SENSOR AIR ❑ ® 4. SEISMIC ZONE SENSITIVE,ETC.DESCRIPTION... SENSOR SENSOR SENSOR 18/2 COMMUNICATION CABLE ABBREVIATIONS, RESPONSIBILITY SCHEDULES W Z ° 18/2 COMMUNICATION CABLE 18/2 COMMUNICATION CABLE 0c7 41:t AC HVAC EQUIPMENT SUPPLIER GC GENERAL CONTRACTOR -- M EXISTING EQUIPMENT EXISTING EQUIPMENT AHJ AUTHORITY HAVING JURISDICTION BAS BUILDING AUTOMATION SYSTEM LC LANDLORD CONTRACTOR LD LIGHTING PACKAGE DISTRIBUTOR0 p I"- u) ° V _ EC ELECTRICAL CONTRACTOR LL LANDLORD POWER III' FPVAV-4 POWER ///T FPVAV-5 - FAC FIRE ALARM CONTRACTOR LSD&C LIMITED STORE DESIGN&CONSTRUCTION , 0 G.BY OTHERS UC210 BY OTHERS UC210 MC MECHANICAL CONTRACTOR L U7 uni 18/3 CABLE c:::::, 18/3 CABLE--('-' (1) 2 g ❑ C • - - --- - - - - -- - - - ZONE SUPPLY ZONE SUPPLY a5 U 0 0 SENSOR AIR SENSOR AIR • NEW VARIABLE AIR VOLUME (VAV) SENSOR SENSOR 06Q DESIGN WEATHER PARAMETERS NETWORK WIRING AND SEQUENCE MONITORING Limo a d: CONTROLLER (1) 0- 4 r min City Name Portland AT IFS W tCy Location _ Oregon 0 .,_, Latitude. - 45.6 Deg. 18/2 COMMUNICATION CABLE 18/2 COMMUNICATION CABLE 18/2 COMMUNICATION CABLE CONTINUED 24V /I/ Longitude _ 122.6 Deg. CON E/M04.O1 Ui C Elevation - 39.0 ft COMMUNICATION FRONT END 18/2 COMMUNICATION CABLE 18/2 COMMUNICATION CABLE �/ -J O Summer Design Dry-Bulb _ 90.0 °F _ Summer Coincident Wet-Bulb .67.0 °F VAV-1 VAV-2 ° VAV-3 TERMINATE NETWORK WIRES ON THE 18/3 CABLE �s O I Summer Daily Range `.. 21.6 °F - ° UC210 ° UC210 ° 0 UC210 LIGHTING CONTROLLER NETWORK Q> Winter Design Dry -Bulb 22.0 °F -j- 0 -�- `�- TERMINALS LOCATED IN THE IFS I- 1- 723 Winter Design Wet -Bulb. _ 18.4 °F POWER /1/ POWER I/I POWER /// ELECTRICAL PANEL SYSTEM. 1 1 H !- Atmospheric Clearness Number _ 1.05 BY OTHERS BY OTHERS BY OTHERS U Average Ground Reflectance .0.20 Soil Conductivity _ 0.800 BTU/(hr-ft°F) ZONE ZONE Local Time Zone(GMT+/-N hours) 8.0 hours 18/3 CABLE c 18/3 CABLE c 18/3 CABLE �� SENSOR SENSOR Corsider Daylight Savings Time. _ No Simulation Weather Data noneN/A (CASHWRAP}(FITTING RM) Current Data is 2001 ASHRAE Handbook ❑ F'` r Q NOTES: Design Cooling Months January to December 11 L J_ ' ZONE HEATING/ ZONE HEATING/ ZONE HEATING/ SENSOR COOLING SENSOR COOLING SENSOR COOLING (1) ALL WIRE SHALL BE 18/3 UNLESS OTHERWISE INDICATED. HVAC LOAD CALCULATIONS CHANGEOVER CHANGEOVER CHANGEOVER (2) NUMBER OF CABLES FURNISHED BY HVAC SUPPLIER IS INDICATED BY NUMBER OF TICK MARKS ACROSS THE UNE. SENSOR SENSOR SENSOR (3) PURPLE 18/2 WIRE IS FURNISHED BY HVAC SUPPLIER AND IS PLENUM RATED. L,- ,O Z 4 SCHEMATIC IS FOR REFERENCE ONLY. AT TIME OF CONSTRUCTION, THE HVAC SUPPLIER WILL PROVIDE A COMPLETE DIAGRAM FOR s ` z O=Z { ) W x - `>ei Pi nn z -v4« INSTALLATION. SEE RESPONSIBILITY SCHEDULES, THIS SHEET, FOR A LIST OF ALL COMPONENTS AND SENSORS REQUIRING FIELD W W s = z o U o W m INSTALLATION. c.-V ,2 !z o a Q,E< o o W%6 : <OOn m5Wss) 4Or:5- Z g n F S=0 x W Lit= Air System Sizing Summary for Total NON-FAN POWERED VARIABLE AIR VOLUME (VAV) SEQUENCE OF OPERATIONS w N<o W z 0.... ...3w 2 <m P Project Name: 164203Vs Washington SQ 12/20/2016 FAN POWERED VAV (FPVAV) SEQUENCE OF OPERATIONS U 4,1<o K JZOnLa Y wmmi- W Prepared by: M Engineering 10:50AM = 8 ` g u UOUKv =".�~N Z V V C3O N MANUFACTURER SHALL FURNISH AND/OR� INSTALL ALL NECESSARY CONTROL DEVICES TO ACCOMPLISH THE FOLLOWING SEQUENCE OF a"°" z o W• w O 0 6-8 biH OPERATION (REFER TO RESPONSIBILITY SCHEDULE FOR FIELD INSTALLATION REQUIREMENTS): MANUFACTURER SHALL FURNISH AND/OR INSTALL ALL NECESSARY CONTROL DEVICES TO ACCOMPUSH THE FOLLOWING SEQUENCE OF <o 0 0 = '""!5"-<a , Z== z Air System Information OPERATION (REFER TO RESPONSIBILITY SCHEDULE FOR FIELD INSTALLATION REQUIREMENTS): HVAC RESPONSIBILITY SCHEDULE ,I, :‘,2 ,5, o W m i= m .P` Air System Name Total Number of zones - 1 DURING OCCUPIED HOURS THE VARIABLE AIR VOLUME TERMINAL UNIT DAMPER SHALL MODULATE TO MAINTAIN THE SPACE TEMPERATURE. FOR X` ~ -x m o ,~ = m E ui ment Class UNDEF Floor Area 10436.0 ft2 DURING OCCUPIED HOURS THE VARIABLE AIR VOLUME TERMINAL UNIT FAN SHALL BE ENERGIZED AND DAMPER SHALL MODULATE TO MAINTAIN "_ ,-x n o. q P UNITS WITH HEAT COOL CHANGEOVER CONTROL, THE DAMPER SHALL MODULATE TO MAINTAIN THE SPACE TEMPERATURE, REVERSING DAMPER O W°m m E= .150-2.< 2 y TypeOregonOPERATION AS REQUIRED BASED ON ZONE DEMAND AND THE TEMPERATURE OF THE PRIMARY SUPPLY AIR. THE SPACE TEMPERATURE. - FURNISHED BY INSTALLED OR PERFORMED BY RE-USE c,< f m w p 4 ~ R Air System VAV Location Portland, <W o +, ��=W� >_ Sizing Calculation InformationITEM N/A REMARKS a o o n W W OCC � �U• EXISTING L Wa = a"� _ _ ”- 'Om LSD&C LANDLORD CONTR. LANDLORD CONTR. OTHER a s=�� H w� � � Wa�� oCHC :Er_, ~lr O pr, �Uii U IF THE SPACE TEMPERATURE DROPS ONE DEGREE BELOW SETPOINT AND THE DAMPER IS AT MINIMUM POSITION, THE UNIT'S ELECTRIC HEAT ROOFING CUT & PATCH, INSULATED HIRE LANDLORD APPROVED THE TERMINAL UNIT DAMPER SHALL FULLY CLOSE UPON A SIGNAL FROM THE FIRE ALARM SYSTEM. SHALL ENERGIZE. THE HEAT WILL REMAIN ON UNTIL THE SPACE TEMPERATURE IS SATISFIED. `mzgoo z W W W &W `At' v 'm zCalculation Months Jan to Dec Zone CFM Sizing Peak zone sensible load TOE KICK & CURB LEVELING. ROOFING CONTRACTOR3 a oo ms ySizing Data Calculated Space CFM Sizing Individual peak space loads DURING THE UNOCCUPIED SCHEDULE, THE DAMPER SHALL CLOSE. THE DAMPER SHALL OPEN IF UNOCCUPIED COOLING SETPOINT IS REACHED. THE TERMINAL UNIT DAMPER SHALL FULLY CLOSE AND THE FAN SHALL DEENERGIZE UPON A SIGNAL FROM THE FIRE ALARM SYSTEM. "w < o <W0 0 W c=WWDUCT SMOKE DETECTOR FAC MC POWER WIRING PROVIDED BY FAG <"_ _ i m g nWc5< -J zaa �=3c»� EWtzz' -Central Cooling Coil Sizing Data SETPOINTS: DURING THE UNOCCUPIED SCHEDULE, THE DAMPER SHALL CLOSE AND FAN HEATER WILL DEENERGIZE. THE DAMPER SHALL OPEN AND THE " ~_ 0 om W " __'- / SMOKE SYSTEM ACCESSORIES, Eno kegW`nw. aFAN SHALL ENERGIZE IF UNOCCUPIED COOLING SETPOINT IS REACHED. THE FAN AND HEATER SHALL ENABLE IF UNOCCUPIED TEMPERATURE • UNLESS FACTORY INSTALLED W m 3< . m mm m, '`3E- WETG, oz noWW g zmcTotal coil load 32.2 Tons Load occurs at Jun 2100 OCCUPIED HEATING: 70'F COOLING: 74'F IS 2'F BELOW UNOCCUPIED SETPOINT. FAN AND HEATER SHALL STOP WHEN SETPOINT IS REACHED. =_'~ =W m = 0 W oTotal coil load 385.9 MBH OA DB/WB 76.5/62.9 °F UNOCCUPIED HEATING: 6O'F COOLING• 85'F 4mo0 z m 0o=a W m NOxsW<m<W K < V O n id 3tW 'Sensible coil load 326»8 MBH Enterin DB!WB 95.0/70.3 °F DIFFUSERS AND GRILLES LD MC O=za= = Zo=4 m 2i <z tty. m9 SETPOINTS: za<O V/U W zO,GW ,-3UebCoil CFM at Jun 210Q 7975 CFM Leavin DB/WB. 57.0/54.8 °F n a.-_ "-'_" o=_ `m =oW=yg DIFFUSERS/GRILLES FIRE m " " <8,og 2 xozs =° OW OEO n W,-1WW CL.W2inUWWm Max block CFM at Ju1600 10419 CFM Coil ADP 52.8 F MC MC .0 o -=JC_OCCUPIED HEATING: 70 F COOLING: 74 F DAMPERS d� a- <_ �5 W<%o �, WmSum of peak zone CFM 10419 CFM Bypass Factor _ 0.100 ° UNOCCUPIED HEATING: 60'F COOLING: 85'FSensible heat ratio. 0.847 Resulting RH 58 I°ft2/Ton 324.5 Design supply temp 57.0 °FC\If3WALL FIRE DAMPERSBTU/(hrf't2) .37.0 Zone Tstat Check 1 of 1 OK 16 NWater flow @ 10.0°F rise . 77.22 gpm Max zone temperature deviation .0.0 °F COMBINATION FIRE/SMOKE • �t`l� Y (\.DAMPERS C� c%"�.• L c•JPreheat Coil Sizing DataLOW PRESSURE DUCTWORK MC MC t� 1RECTANGULAR TO ROUND DUCT • r' A� i:4 � y,. �tco / Max coil load 209.3 MBH Load occurs at Jan 2100 ADAPTER44 Coil CFM at Jan 2100 7508 CFM Ent. DB/Lvg DB 69.2/%.0 °F HIGH/MEDIUM PRESSURE0 �5Max coil CFM. 10419 CFM MC MC stsWater flow @ 20.0 F drop. 20.94 gpm DUCTWORK x 1DUCT SUPPORTS MC MC • , i •,Q 4.OSupply Fan Sizing Data AY1,Actual max CFM at Jul 1600 10419 CFM Fan motor BHP 0.00 BHP SEISMIC BRACING • 3'faS � idF Standard CFM 10405 CFM Fan motor kW 0.00 kW • 1.11. i 1--, Actual max CFM/ft2 1.00 CFM/ft2 Fan static 0.00 in wg HURRICANE WIND BRACING • 1 � z W W a; oa DUCT HEATER(S) • 0 CC .z ce a le ci.J UNIT HEATER(S) • aCDa Zone Sizing Summary for Total �./ Project Name: 164203VS Washington SQ 12/20/2016 INUNE AND CEILING EXHAUST Prepared by:M Engineering 10:50AM FAN(S) LD MC LU a w p ROOF AND WALL MOUNTED • CO la W 0 as Air System Information EXHAUST FAN(S) AND CURB Ix o Air System Name Total Number of zones 1 Q Q w EquipmenClass UNDEF Floor Area 10436.0 ft2 EXHAUST FAN ROOF CURB • _ = D; Q Air System Type VAV Location Portland,Oregon FAN POWERED VARIABLE AIR VOLUME (FPVAV) BOX RESPONSIBILITY SCHEDULE TOILET EXHAUST DUCTWORK •,CO C1 Sizing Calculation Information WALL OR ROOF CAP MC MC CO z M FURNISHED BY INSTALLED OR PERFORMED BYLi. ITEM RE-USE N/A REMARKS PIPING AND PIPING APPURTENANCES 0 N LSD&C LANDLORD CONTR. LANDLORD CONTR. OTHER EXISTING (CIRCUIT SETTERS, ETC.) MC MC N�. z !fes DESIGN COOLING DESIGN HEATING SERIES ARRANGEMENT FAN POWERED VAV 0 Cr O Z °' COOLING DATA AT Jun 2100 HEATING DATA AT DES HTG BOX (WITH HEAT AND NO HEAT OPTIONS) MC • BALANCE CONTRACTOR REPORT GC AABC OR NEBB CERTIFIED i= F"' _ 4 rt COOLING OA DB/WB 76.5°F/62.9°F HEATING OA DB/WB 22.0°F/18.4°F0 Sensible Latent Sensible Latent o `'y ,�- -- W NON-FAN POWERED VAV BOX • AS-BUILT DRAWINGS MC Q O 0 ~ ZONE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) FAN POWERED BOX ELECTRICAL AC AC LANDLORD REQUIRED TEMPERATURE MC MC HIRE LL REQUIRED CONTRACTOR Z Z 3 m Z a- c Window&Skylight Solar Loads 0 ft20 - 0 ft2 - - DISCONNECT CONTROL SYSTEM COMPONENTS WHEN REQUIRED BY LL = a Wall Transmission 0 ft2 0 - 0 ft2 0 - NON-FAN POWERED BOX TEMPERATURE CONTROL SYSTEM WIRE ' HIRE LL REQUIRED CONTRACTOR v W ei; Z v • FOR LL REQUIRED SYSTEM MC MC W „a Q c� Roof Transmission 10436 ft2 2316 - 10436 ft2 60389 - ELECTRICAL DISCONNECT WHEN REQUIRED BY LL o m� 0- -- cot COMPONENTS cm Window Transmission 0 ft2 0 - 0 ft2 0 - BASCONTROLLERWITH �r u) LL O v W in Skylight Transmission 0 ft2 0 - 0 ft2 0 - INTEGRATED ACTUATOR AC AC YOUNG REGULATOR W/ BOWDEN MC MC a =s Qy p„ V) p CABLE Door Loads 0 ft2 0 - 0 ft2 0 - SUPPLY AIR TEMPERATURE LOCKING QUADRANT VOLUME REVISIONS: Floor Transmission 0 ft2 0 - 0 ft2 0 - FAN POWERED VARIABLE AIR VOLUME (FPVAV) & VARIABLE AIR VOLUME (VAV) SENSOR AC MC DAMPER MC MC REQUIRED BY: DATE Partitions 0 ft2 - °ft2 ° - BOX RESPONSIBILITY SCHEDULE HEATING/COOLING CHANGEOVER Ceiling 0 ft2 0 - 0 ft2 0 - AC MC PNEUMATIC TUBING MC MC Overhead Lighting 1745 W 3835 - 0 0 - FURNISHED BY INSTALLED OR PERFORMED BY RE-USE TEMPERATURE SENSOR Task Lighting 18257 W 55898 - 0 0 - ITEM EXISTING N/A REMARKS SPACE TEMPERATURE SENSORS AC MC FIRE ALARM SHUTDOWN RELAY FAC FAC WHERE APPLICABLE FOR FIRE LSD&C LANDLORD CONTR. LANDLORD CONTR. OTHER ALARM SYSTEMS Electric Equipment 4970 W 15972 - 0 0 - - People 168 61736 59745 0 0 0 SERIES ARRANGEMENT FAN POWERED VAV CALL HVAC EQUIPMENT RELIEF AIR DAMPER AND BOX (WITH HEAT AND NO HEAT OPTIONS) TERMINAL UNIT COMMISSIONING AC AC SUPPLIER ACTUATOR • Infiltration - 0 0 - 0 0 . Miscellaneous - 10809 4609 - 0 0 NON-FAN POWERED VAV BOX AC MC LANDLORD UNIT CONTROLLER • HIRE LANDLORD DESIGNATED RELIEF AIR FAN OR RETURN AIR • Safety Factor 10%110% 15057 6435 10% 6039 0 CONTROLS CONTRACTOR FAM , >>Total Zone Loads - 165623 70790 66428 0 FAN POWERED BOX ELECTRICAL e LANDLORD SPACE TEMPERATURE • HIRE LANDLORD DESIGNATED SMOKE EVACUATION • Zone Conditioning - 151261 70790 - 10030 0 DISCONNECT SENSOR/THERMOSTAT CONTROLS CONTRACTOR Plenum Wall Load 0% 0 - 0 0 - NON-FAN POWERED BOX AC AC ADDITIONAL LANDLORD CONTROL MC MC HIRE LANDLORD DESIGNATED OUTSIDE AIR INTAKE • Plenum Roof Load 70% 5404 - 0 0 - ELECTRICAL DISCONNECT SYSTEM COMPONENTS CONTROLS CONTRACTOR HOOD/LOUVER WITH DAMPER Plenum Lighting Load 30% 1786 - 0 0 - BAS CONTROLLER WITH MONITORING SPACE OUTSIDE AIR INTAKE DAMPER Return Fan Load 7975 CFM 0 - 2311 CFM 0 - INTEGRATED ACTUATOR AC AC TEMPERATURE SENSOR AC MC ACTUATOR • DATE ISSUED: 12/30/16 Ventilation Load 1769 CFM 2002 -11771 693 CFM 23159 0 SUPPLY AIR TEMPERATURE • MONITORING CARBON DIOXIDE RELIEF AIR HOOD OR LOUVER WITHCOUNTEDESIGNED BY: MCR Supply Fan Load 7975 CFM 0 - 2311 CFM 0 - SENSOR - SENSOR • DAMPER BACKDRAFT • DRAWN BY: MCR Space Fan Coil Fans - 0 - - 0 - HEATING/COOUNG CHANGEOVER DAMPERS FOR FIELD BUILT CHECKED BY: JAH Duct Heat Gain/Loss 0% 0 - 0% 0 - TEMPERATURE SENSOR AC MC MONITORING HUMIDITY SENSOR • ECONOMIZER • >>Total System Loads - 160453 59019 - 33189 0 - MONITORING ONLY CONTROLLERS WITH ANALOG INSTALL MONITORING DAMPER ACTUATORS FOR FIELD SPACE TEMPERATURE SENSORS AC MC MECHANICAL Central Cooling Coil - 326838 59045 - -94703 O INPUTS AND COMMUNICATION CAPABILITY AC MC • CONTROLLER AT IFS BUILT ECONOMIZER- Preheat Coil - -166385 - 127891 - CALL HVAC EQUIPMENT AS REQUIRED FOR MONITORING ^ p »Total Conditioning - 160453 59045 - 33189 0 TERMINAL UNIT COMMISSIONING AC AC SUPPLIER CONTROL TRANSFORMERS MC MC DEVICES OUTSIDE AIR DAMPER • RES P O N S I B I L I T Y Key: Positive values are clg loads Positive values are htg loads CONTROL SYSTEM WIRE FOR AC MC FINAL CONN. BY MC CONTROL SYSTEM WIRE FOR AC MC FINAL CONN. BY MC OUTSIDE AIR DAMPER ACTUATOR • SCHEDULES Negative values are htg loads Negative values are clg loads SYSTEM COMPONENTS SYSTEM COMPONENTS • DRAWING NUMBER: IIIIEZIIIIIIIINTS NTS NTS -1 HVAC LOAD CALCULATIONS NETWORK WIRING AND SEQUENCEJINETWORK WIRING AND SEQUENCE HVAC RESPONSIBILITY SCHEDULES ('t 4 �'�0 N E A M III 00D-M0401-NOO-LOAD a0D-M0401-J00-SCHD 00D410401-MO401-E03-SCHD 00D-M0401-A00-SCHD ® r 10/31/2014 10/05/201 101081201 10/05/201 GRILLES AND REGISTERS. = , : .�. 4. c. DIFFUSERS, - ' ' SECTION 230000: BASIC MECHANICAL REQUIREMENTS ' A. NOTE d. TEMPERATURE CONTROLS. a. - • :. : . b. ftfVkT101L11 Or 1. • - THE ABBREVIATION LSD&C WHEREVER IT APPEARS IN THESE MECHANICAL DRAWINGS AND/OR SPECIFICATIONS SHALL REFER TO "LIMITED ALL DUCTWORK, ROOF OPENINGS AND CAPS NECESSARY TO PROVIDE A COMPLETE TOILET EXHAUST SYSTEM SHALL BE FURNISHED AND " STORE DESIGN AND CONSTRUCTION". ANY REFERENCE TO TENANT'S PROJECT MANAGER OR FURNISHED BY ANY OF THE ABOVE REFERS TO INSTALLED BY THIS CONTRACTOR. (1) • •. . • • • - b. ' • ' . • : . ' , .. ' . M-Engineering LSD&C. .. , . . . • - . . . • , - - , , 750 Brooksedge Blvd 2.DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION 1. • . • - . . . - . _ . . - - - . . _ - . : : 1 V -1/. 1 - : 1 • IP • (21Westerville, Ohio 43081 SECTIONS, APPLY TO THIS AND THE OTHER SECTIONS OF DIVISION 15. - ' . ` C. phone:614.839.4639 3.THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF 2. ; . . ; . . _ _ ;. : • • • • d. - fax:614 839 2222 .. WORK AND IS RESPONSIBLE FOR THE COORDINATION OF THiS WORK AND THE WORK OF HIS SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. ' . • • • •• ; . • • www mengineering.us.com IT IS THIS CONTRACTOR'S RESPONSIBILITY TO PROVIDE HIS SUBCONTRACTORS WITH A COMPLETE SET OF BID DOCUMENTS. -' • • ` _ r 4.THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND INSPECTION OF THIS WORK TO COMPLY WITH THE LSD&C 0fi-HERVASf: _ SCHEDULE AND THE PROJECT COMPLETION DATE. ; • (1) • ; A. 5.THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO DETERMINE CONDITIONS AFFECTING THE WORK. ANY ITEMS WHICH ` :: -: ; - : : - i - " I I ,+ • • t ` ''' •' ''" ARE NOT COVERED IN THE BID DOCUMENTS OR ANY PROPOSED SUBSTITUTIONS SHALL BE LISTED SEPARATELY AND QUALIFIED iN THE :' • ' : ` . - = . . ` . - - • - • ' ' - - ' '• '' '• ' CONTRACTORS BID. SUBMITTAL OF BID SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND ANY MODIFICATIONS WHICH , ' ' ' , ` ' ' ' ' ' • • , • : • : - : : S. d. . • • ' - ; : ' ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO ViSIT THE SITE DOES NOT RELIEVE THE P. (1) - : . 2.PIPING CONTRACTOR OF RESPONSIBILITY IN PERFORMANCE OF HIS WORK. 6.REFER TO RESPONSIBILITY SCHEDULE ON SHEET M04.01 OF THIS SET FOR INFORMATION IN REGARD TO RESPONSIBILITY OF WORK OR ITEMS WHiCH - - . . • - MAY AFFECT THE BID. • • . - • . : ; • • . , . - - • . , . , .. . • . • ° ` B. GENERAL REQUIREMENTS : : . . ` " " .. , 2, . a. . . 1. THIS CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS ' ' • • (1) • " • • ■" _ NECESSARY TO PROVIDE A COMPLETE MECHANICAL SYSTEM AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS • ' • -. ' , : • ; ` . ; : • ' - , : ' . • b. • : • : : " := : : _ : REQUIRED BY JOB CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY THE LANDLORD OR LSD&C SHALL BE PROVIDED BY THIS • c. - • . .. . CONTRACTOR. CLOSELY COORDINATE THE ENTIRE INSTALLATION WITH THE LANDLORD AND THE LSD&C PROJECT MANAGER, AS REQUIRED. Q. FINAL HVAC INSPECTIONS 2.THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL t ASiDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, LSD&C SHALL HAVE AN INDEPENDENT HVAC CONTRACTOR INSPECT THE f. . . , . ; ; , FINISHED HVAC INSTALLATION UPON COMPLETION FOR COMPLIANCE WiTH THE PLANS, SPECIFICATIONS AND CODES. THE INSTALLING 3• Z V' BE FURNISHED AND INSTALLED EVEN THOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN CONTRACTOR WILL BE RESPONSIBLE TO BRING ALL ITEMS REPORTED BY THE INDEPENDENT HVAC CONTRACTOR UP TO PLANS AND (11 . ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK, AND WHiCH IS - a. • - : : ' : Q USUALLY INCLUDED IN WORK OF SIMILAR CHARACTER, SHALL BE FURNISHED AND INSTALLED AS PART OF CONTRACT. SPECIFICATION REQUIREMENTS. `: :• : : :. : _ , _ . • . _ _ - - _ MIM : .t. a - ::• r : : :. ,- , • •. -, ' , ,� , . • , , i ; e • • I; ;; e • i•• • : " " : ' i - i CI) I-- '''t Lri 3.WHERE THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES OR THE LANDLORD'S TENANT CRITERIA, THE CONTRACTOR SECTION 230800: COMMON WORK RESULTS FOR HVAC • : . . 1.1110 IS RESPONSIBLE FOR FURNISHING AND INSTALLING THE SYSTEM WITH THE MORE STRINGENT REQUIREMENTS AS DESIGNED AND DESCRIBED ON A. HAN B : :• - : :. b. • - • . :: • : - :. - - : + or - : • �"'� THESE DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. : ': ': .. : : t HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C-CLAMPS WITH RETAINING CLIPS, CHANNELS, HANGER _ Ce Q 4.ALL WORK IN THIS SECTION SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING, AND RODS, ETC„ NECESSARY FOR THE INSTALLATION OF WORK. g' ' • ` • ' ' C. ' . '" ' ' i " " ' ' ' `'' ' • REPAIRING. THIS CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT SERVICE ACCESS TO ALL EQUIPMENT. • • •. • - • • • • :• _, 2.HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, BUT NOT TO PIPING. HANGING FROM METAL DECK IS NOT :• • • - i • • ' • ` . - 0 -p i,;<-3 5.ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING GOOD CONSTRUCTION PRACTICES. PERMITTED. HANGERS MUST BE ATTACHED TO UPPER CHORD OF BAR JOIST. WHERE INTERFERENCES OCCUR, AND IN ORDER TO SUPPORT - • , , • - • •• - : ', 6.UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS, AND EQUIPMENT, iNCLUDtNG ALL COMPONENTS THEREOF, SHALL 8E NEW, DUCTWORK OR PIPING, THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO - ' • ' •. . ' .. • Z NOT INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, AND OTHER EQUIPMENT. HANGER TYPES AND INSTALLATION METHODS ARE ALSO 2 - ° • ` ° ' ° - • : O • UNDERWRITER'S LABORATORIES/UNDERWRITER'S LABORATORIES OF CANADA LISTED AND LABELED AND SIZED IN CONFORMITY WITH • ' ' : ' ' ' • ■ REQUIREMENTS OF STATE/PROVINCE AND LOCAL CODES, WHICHEVER IS MORE STRINGENT. SUBJECT TO LANDLORD CRITERIA. 3. • - d. . • - ; 5 {`",y ("� O 3.HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE OUTER DIAMETER OF INSULATION. INSTALL 6" LONG SPLIT - , . . ' •' •' ' - • - • • • 0, C 7. THIS CONTRACTOR SHALL DO ALL CUTTING, CHASING AND CHANNELING REQUIRED FOR ANY WORK UNDER THIS DIVISION. CUTTING SHALL HAVE CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. - W • PRIOR APPROVAL BY LSD&C PROJECT MANAGER AND THE LANDLORD. ALL PATCHING SHALL BE BY G.C. AND SHALL MATCH THE SURROUNDING _ e. • . . : • : ; Z 3 N"• SURFACES. 4.HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI-ELECTRICALLY SEPARATED. • - • • - f. , clict 8.THE MECHANICAL CONTRACTOR SHALL MAKE ALL FINAL MECHANICAL CONNECTIONS AS REQUIRED FOR A COMPLETE AND OPERATING SYSTEM. B. VIBRATION ISOLATION DEVICES C. - r s • • `. - Shimmo •/ co d' • t : - : : - . ; - a. �' a. THE MECHANICAL CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR TO CONTACT LSD&C'S DESIGNATED COMPANY (EMS) FOR t SPRING VIBRATION ISOLATION DEVICES SHALL BE FURNISHED AND INSTALLED IN ALL SUPPORTS BETWEEN VIBRATING EQUIPMENT (FANS, AIR - - ; • ; - ,: - - : , - - ; . . , : , • . . - ,.. 4.iNSPEGTI@N . - START-UP. (REFER TO SHEET M01.01). HANDLERS, ETC.) AND STRUCTURE. ISOLATORS TO BE SiZED ACCORDING TO LOAD WITH A MIN. 1" DEFLECTION. VIBRATING EQUIPMENT HUNG . • . • •5 . , . - - - . . . '. : •,: - • - - : - W CI r C. CODES FROM STRUCTURE SHALL BE ISOLATED WITH RUBBER AND SPRING DEVICES. VIBRATING EQUIPMENT SUPPORTED FROM FLOOR OR DECK SHALL : • • , : . . • a . • : r a • ; . . i i : ; •, ; a• - - ' • •. . ' • d '•'' •• mic) BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. .: • - : - • : • - : : + • - . . 1. ALL WORK SHALL CONFORM TO THE LANDLORDS' CRITERIA, THE STATE'S/PROVINCE'S, COUNTY'S, G1TY'S AND LOCAL CODES AND ORDINANCES, . .. . . . . . c . - • ` ' ` ` ' .: W •� C SAFETY AND HEALTH CODES, NFPA/NFPAC CODES, ENERGY CODES AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. THIS 2.EXAMINE DEAD LOAD AND OPERATING LOAD CONDITIONS WHEN SELECTING DEVICES. ADJUST FOR PROPER ALIGNMENT AND LOADING. AVOID • - : ' a/ --J 'GROUNDING' THE ISOLATOR. CONTRACTOR SHALL INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THIS CONTRACTOR SHALL SECTION 230800: COMMISSIONING OF HVAC SECTION 2331100: HVAC DUCTS AND CASINGS 0 a) N INCLUDE ANY CHANGES REQUIRED BY CODES IN THE BID AND IF THESE CHANGES ARE NOT INCLUDED IN THE BID, THEY MUST BE QUALIFIED AS 3.CHECK HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE AND AT THE UPPER AND LOWER ATTACHMENTS TO A. DETAILED HVAC COMMISSIONING INFORMATION IS INCLUDED IN THE LSD&C SiTE MANUAL PROVIDED TO THE CONTRACTOR AT THE START OF '- A SEPARATE LINE ITEM IN THE BID. AFTER CONTRACT IS AWARDED, CHANGE ORDERS FOR INCREASED COSTS DUE TO CODE ISSUES WILL NOT STRUCTURES, DUCTS, EQUIPMENT, ETC. THE PROJECT. A. METAL DUCTiMORK E"- I- BE ACCEPTED BY LSD&C. CI) H 4.CONSULT MANUFACTURER FOR APPLICATION DATA. t NO FIBERGLASS DUCT ALLOWED (RETURN AIR GRILLE BOOTS MAY BE DUCT BOARD WHERE ALLOWED BY LANDLORD). D. LICENSES, PERMITS, INSPECTIONS & FEES B. MANUFACTURER WILL CONTACT THE CONTRACTOR EARLY IN THE PROJECT TO SET PRELIMINARY DATES FOR HVAC INSPECTION, C. TESTING, ADJUSTING, AND BALANCING COMMISSIONING AND HVAC CONTROLS COMMISSIONING. 2.NO DUCTWORK SHALL BE FABRICATED PRIOR TO JOB SiTE VISIT AND APPROVAL BY THE GENERAL CONTRACTOR. A SHOP DRAWING MUST BE t THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS, AND FEES REQUIRED OR RELATED TO HIS WORK. SUBMITTED INDICATING CONSTRUCTION METHODS FROM DESIGN AND MUST BE APPROVED BY LSD&C'S PROJECT MANAGER PRIOR TO t TESTING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE MADE BY AN INDEPENDENT CONTRACTOR WHO ISA CURRENTLY LICENSED C. WORK REQUIRED PRIOR TO HVAC INSPECTION i COMMISSIONING (TO BE COMPLETED BY MECHANICAL SUBCONTRACTOR) FABRICATION OR INSTALLATION. 2.FURNISH TO THE LSD&C'S PROJECT MANAGER ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT COMPLETION OF ASSOCIATED AIR BALANCING COUNCIL (APIC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) BALANCING CONTRACTOR. NO OTHER t CONNECT AND BLEED CONDENSATE DUCTWORKNATURAL PROJECT. BALANCE REPORTS WILL BE ACCEPTED. ALL BALANCING WORK MUST BE COMPLETE AND DONE IN ACCORDANCE WITH THE MOST RECENT , GAS, CHILLED WATER PIPING, AND/OR CONDENSER WATER PIPING. 3.EXCEPT AS OTHERWISE INDICATED, FABRICATE AND INSTALL RECTANGULAR AND ROUND DUCTWORK WITH GALVANIZED STEEL, IN ACCORDANCE STANDARDS OF THEIR SOCIETY AND ASA MINIMUM SHALL INCLUDE THE INFORMATION AS SHOWN IN THE AIR BALANCE REVIEW CHECKLIST IN 2.CHARGE HVAC SYSTEMS WITH REFRIGERANT FOLLOWING MANUFACTURERS' GUIDELINES AND INSTRUCTIONS. COLD WEATHER CONDITIONS WITH SMACNA 'HVAC DUCT CONSTRUCTION STANDARDS' OF THE LATEST EDITION. WHERE OTHER CODES ARE ENFORCED, (IE. UMC, BOCA, E. TRADE NAMES, MANUFACTUIRER8 AND SHOP DRAWINGS THE GC PROJECT MANUAL. PAYMENT OF ALL COSTS FOR TESTING AND BALANCING SHALL BE INCLUDED IN THE BID. HOWEVER, IT WILL BE REQUIRE SPECIFIC PROCESSES, CONTACT MANUFACTURER FOR TECHNICAL SUPPORT. ETC.) USE THE MOST STRINGENT CODE FOR DUCT CONSTRUCTION STANDARDS. 1. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT SHALL BE THE G.C. THAT WILL CONTRACT DIRECTLY WITH THE AIR BALANCING COMPANY. 3.CONNECT POWER TO THE HVAC EQUIPMENT FOR A MINIMUM OF 24 HOURS. 4.EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT DUCT SYSTEMS TO THE FOLLOWING PRESSURE CLASSIFICATIONS: USED ASA MINIMUM FOR THE BASE BID. MANUFACTURERS CONSIDERED AS AN EQUAL OR BETTER iN ALL ASPECTS TO THAT SPECIFIED WALL 2,FINAL TESTING ADJUSTING AND BALANCING REPORT MUST BE COMPLETE AND SUBMITTED WITH FINAL CLOSE-OUT DOCUMENTS TO LSD&C 1 BE SUBJECT TO APPROVAL IN WRITING BY LSD&C'S PROJECT MANAGER THROUGH SHOP DRAWING SUBMITTAL PROCESS FOR ACCEPTANCE COMMISSIONING! a. SUPPLY DUCTS: 2" W.G., POSITIVE 0. . a < o=o cz PRIOR TO INSTALLATION. THE USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. WEEK PRIOR TO MERCHANDISING DATE. a. IN COLD WEATHER SITUATIONS, DO NOT OPERATE THE UNITS PRIOR TO a az WO to m,y-�<zm �� �za J o W l-�yt Ci 3.THE HVAC CONTRACTOR SHALL BE PRESENT FOR AIR BALANCE TO VERIFY ACCESSIBILITY TO ALL DEVICES, VERIFY ALL OPERATING D. HVAC EQUIPMENT SHOULD BE STARTED UP EARLY IN THE PROJECT. COORDINATE EARLY STAT UP OF EQUIPMENT WITH THE MANUFACTURER. b. RETURN AND EXHAUST DUCTS: 2 W.G., NEGATIVE '�<>n = H,i^x= W o a<¢= 4 2.GENERAL CONTRACTOR SHALL SUBMIT ALL EQUIPMENT AND DEVICES TO LSD&C PROJECT MANAGER FOR APPROVAL. SUBMISSIONS SHALL BE W O d t^ SEQUENCES AND INSTALL NEW FILTERS IN ALL UNITS JUST PRIOR TO THE AIR BALANCE. THE COMPLETE AIR BALANCE SHALL TAKE PLACE EXCEPT WHERE OTHERWISE INDICATED, USE DUCT SEALANTS OF THE FOLLOWING PRESSURE CLASSIFICATIONS: `o ~ W ,.= ,--4-,.. g z MADE EARLY ENOUGH IN PROJECT TO ALLOW FOUR (4) WORKING DAYS FOR LSD&C PROJECT MANAGER'S REVIEW WITHOUT CAUSING DELAYS E. THE GC MAY BE BACK CHARGED FOR ADDITIONAL AC SITE VISITS BEYOND THE FIRST THREE (3) NECESSARY TO DOCUMENT THE RESOLUTION 0 WITH OUTSIDE AIR DAMPERS IN MINIMUM POSITION, EXCEPT AS NOTED OTHERWISE. HVAC CONTRACTOR SHALL ALSO INSTALL A NEW SET OF w c'o ,_00.,,, _... 0 OR CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL BEAR THE STAMP AND/OR THE SIGNATURE OF THE GENERAL CONTRACTOR AND OF THE HVAC PUNCHLiST ITEMS. c. SUPPLY DUCTS: CLASS B - 3" W.G. - F'W F b z 3 t g 2 " <rn o_ FILTERS ONE DAY PRIOR TO MERCHANDISING. o..E 0 rr O o w .- .-y.- W THE SUBCONTRACTOR SHOWING THAT THEY HAVE REVIEWED AND CONFIRMED THAT THE SUBMITTALS ARE IN CONFORMANCE WITH THE HVAC COMMI8810NING PROCESS `= " '`" =W=W= " z F. d. RETURN AND EXHAUST DUCTS: CLASS C - 2" W.G. W W :1E14 G " N CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS HAVE BEEN TAKEN. 4.BALANCE LANDLORD MEDiA QUANTITIES TO WITHIN 5% OF THAT INDICATED ON THE DRAWINGS. ANY REQUIRED CHANGES IN SHEAVES, BELTS W g i _ < ~ <o' OR PULLEYS NEEDED TO ACHIEVE SPECIFIED FLOW RATES SHALL BE PERFORMED BY THE HVAC CONTRACTOR WiTH NO ADDITIONAL COST TO t VISIT 1: HVAC EQUIPMENT START UP - CONTRACTOR SHALL HAVE THE MECHANICAL AND ELECTRICAL SUBCONTRACTOR ON SITE DURING THE `Z=0 -c=z o.- . z=o a F. GUARANTEE IN ACCORDANCE WITH THESE CONSTRUCTION AND SEALANT PRESSURE CLASSIFICATIONS, MAXIMUM DUCT AIR LEAKAGE WILL NOT EXCEED 5% z W< W -- <W g LSD&C. HVAC INSPECTION AND COMMISSIONING. BUDGET 5 HOURS FOR THE HVAC INSPECTION AND COMMISSIONING. (NOTE: THESE HOURS ARE TO BE0` o . ''P m=O ,= .-E AS REQUIRED FOR FINAL AIR BALANCE APPROVAL. W z 15 E E g o g '4 2 W O m 1. THiS CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER HiS CONTRACT AND SHALL MAKE GOOD, REPAIR OR USED FOR THE COMPLETION OF THE COMMISSIONING PROCESS ONLY, ADDITIONAL HOURS WILL NOT BE APPROVED FOR WORK THAT WAS IN .0 3. = e'.6,44- .-5, .. ....0)-).5 = REPLACE AT HIS OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY BE DISCOVERED WITHIN A PERIOD OF 12 5.ALL CONTROL SEQUENCES SHALL BE TESTED (INTERLOCKED EQUIPMENT, SMOKE DETECTORS, SMOKE EVACUATION, ECONOMIZER, ETC.) AND SCOPE AND NOT COMPLETED PRIOR TO THE COMMISSIONING PROCESS.) 4.ROUND DUCTWORK SHALL BE GALVANIZED STEEL WITH SPIRAL LOCKSEAM CONSTRUCTION FOR ALL SIZES 14" DIAMETER AND LARGER. ROUND o B m N _ ` ;a Z` OPERATING STATUS RECORDED IN THE BALANCE REPORT. `--.1c"±- 4• 1"a O a“'- `3 MONTHS FROM THE DATE OF ACCEPTANCE (IN WRITING) OF THE INSTALLATION BY LSD&C'S PROJECT MANAGER. EXTENDED WARRANTIES ARE DUCTWORK SIZES 13' DIAMETER AND SMALLER MAY BE SNAP-LOCK CONSTRUCTION. ALL SNAP-LOCK SEAMS SHALL BE SEALED AS W F. d W o kv" ' L CONTRACTOR TO COMPLETE AND EMAIL, OR FAX, THE HVAC EQUIPMENT STAT UP SURVEY TO MANUFACTURER PRIOR TO THE HVAC <=W a Ce &E<a o B> AS SPECIFIED WITH INDIVIDUAL EQUIPMENT. 6.AIR BALANCING CONTRACTOR IS TO CONFIRM OVERRIDE OF MINIMUM OUTSIDE AIR INTAKE UPON CO2 MONITORING CONFIRMATION. FOR CO2 STARTUP. DESCRIBED IN THESE SPECIFICATIONS. ROUND FITTINGS SHALL BE GALVANIZED STEEL WITH SPOT WELDED AND BONDED CONSTRUCTION. W W a REQ=9 �, o MONITORING CONTACT, SEE CONTACT INFORMATION ON SHEET MOt02. a in, t2 "11114'1 o ~1240 2.THE EQUIPMENT MANUFACTURER SHALL GUARANTEE AND PROVIDE A 12 MONTH GUARANTEE TO LSD&C FROM THE DATE OF ACCEPTANCE. THIS 5.ROUND SPIRAL GALVANIZED STEEL DUCTWORK MAY BE USED IN PLACE OF RECTANGULAR DUCTWORK IN HORIZONTAL APPLICATION WHEN <w 4 0 a 8 '6120:6 CONTRACTOR SHALL WARRANTY THE INSTALLATION OF THIS EQUIPMENT AND WILL BE RESPONSIBLE FOR ANY DAMAGE AND/OR MALFUNCTION b. MANUFACTURER COORDINATES THE HVAC EQUIPMENT COMMISSIONING. CONTRACTOR IS RESPONSIBLE FOR COMMUNICATING SCHEDULE DATE ABOVE CEILING CLEARANCES PERMITS AND EQUIVALENT FREE AREA IS MAINTAINED, WITH THE FOLLOWING EXCEPTION; ALL SUPPLY AND 3 W a N <a z o o < 0 3 c a 7. THREE COPIES OF THE BALANCE REPORT SHALL BE SUBMITTED THROUGH THE GENERAL CONTRACTOR TO LSD&C FOR APPROVAL. THE CHANGES TO MANUFACTURER AND SUBCONTRACTORS. V1,1 ,� C iR N yam.,< I- N -' O y, < CAUSED BY THE INSTALLATION. THIS CONTRACTOR SHALL NOT BEAR ADDITIONAL WARRANTIES BEYOND A COMPLETE WORKING SYSTEM. GENERAL CONTRACTOR SHALL VERIFY THE COMPLETENESS OF THE REPORTS PRIOR TO SUBMITTING TO LSD&C. SUBMIT ONE COPY OF FINAL RETURN DUCTWORK WITHIN 15 FEET OF THE AIR HANDLER MUST BE RECTANGULAR AND INTERNALLY LINED. ONCE A TRANSITION IN THE o ,i W W ���� � !!!7: : FH��c �APPROVED AIR BALANCE REPORT TO MALL GENERAL MANAGER. c. PROVIDED THERE ARE NO HVAC INSTALLATION ISSUES SYSTEMS SHALL BE STARTED FOR TEMPORARY OPERATION ON LOCAL CONTROL. DIRECTION OF THE AIRFLOW TO SPIRAL HAS BEEN DONE DUCT WILL NOT BE ALLOWED TO REVERT TO RECTANGULAR. WHERE ROUND DUCT < m < azRECORD DRAWING$ .gym J . W.=_O'• SUBSTITUTION WILL TAKE PLACE, SUBMIT A SKETCH AND CHART SHOWING EQUIVALENT ROUND CONVERSIONS OF RECTANGULAR DUCTWORK _ __8.THE BALANCING CONTRACTOR SHALL PERFORM ALL APPLICABLE TESTING AND BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED d. IF THERE ARE HYAC INSTALLATION PUNCHLIST ITEMS, THE GC MUST CORRECT THEM AND RESCHEDULE COMMISSIONING WITH TO LSD&C PROJECT MANAGER'S FOR APPROVAL PRIOR TO FABRICATION OR INSTALLATION. d=sa@ d =.`z =1. THIS CONTRACTOR SHALL MAINTAIN ONE SET OF DRAWINGS ON THE JOB SITE UPDATED WEEKLY TO RECORD ALL DEVIATIONS FROM 3<W., m <_= WON THESE DRAWINGS. ALL SYSTEMS UNABLE TO BE COMPLETELY BALANCED AT THE TIME OF ORIGINAL BALANCE MUST BE BALANCED IN MANUFACTURER. - - H o> W = 2 0 W=W r,CONTRACT DRAWINGS, SUCH AS: 6.INSTALL FACTORY MANUFACTURED DOUBLE THICKNESS TURNING VANES IN RIGHT ANGLE ELBOWS IN MAIN DUCT PER LATEST EDITION OF `_`W " ` B =WFUTURE AT NO ADDITIONAL EXPENSE TO LSD&C THE BALANCING CONTRACTOR SHALL RECHECK ANY ITEMS THAT LSD&C DEEMS NECESSARY HO ; Ho=AT NO ADDITONAL COST TO LSD&G. 2.ViSIT 2: HYAC CONTROLS COMMISSIONINQ - THE CONTROLS COMMISSIONING IS PERFORMED BY THE MANUFACTURER IN CONJUNCTION WITH THE SMACNA. R =oz __ o <`;~ g a. LOCATION OF CONCEALED PIPING VALVES AND DUCTS. 3<k'O ;-.6261.-2 =3 3 0 GENERAL CONTRACTOR AND THE MECHANICAL AND ELECTRICAL SUBCONTRACTORS. ALLOW FOR 4 HOURS TO COMPLETE THE CONTROLS <�, g O d f-O W. O Z]H U W ~ W N b. REVISIONS, ADDENDUM, AND CHANGE ORDERS. D. VALVE& COMMISSIONING. (NOTE: THESE HOURS ARE TO BE USED FOR THE COMPLETION OF THE COMMISSIONING PROCESS ONLY, ADDITIONAL HOURS 7. INSTALL RIGID ROUND AND RECTANGULAR METAL DUCT WITH SUPPORT SYSTEMS INDICATED IN SMACNA STANDARDS. SUPPORT HORIZONTAL2.4„,,,...880 .%)z <o a.-3 ,,,.. ,..,12._ __ W x 0 0�-Z C W S O WILL NOT BE APPROVED FOR WORK THAT WAS IN SCOPE AND NOT COMPLETED PRIOR TO THE COMMISSIONING PROCESS.) FOLLOW THE DUCTS WITHIN 2 FEET OF EACH ELBOW AND WITHIN 4 FEET OF EACH BRANCH INTERSECTION USING DOUBLE STRAP HANGERS ON EACH SIDE L'r n.rx < i<N o U =W N i c. SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS, APPROVED EQUIPMENT SUBSTITUTIONS, AND CONTRACTOR'S t • ' , . - _ : : : . . : : : : • • . • V • : ` • • - • , CONSTRUCTION DRAWINGS AND MANUFACTURER'S DETAILS AND DRAWINGS DURING THE INSTALLATION OF THE HVAC CONTROL EQUIPMENT. OF FITTING. SUPPORT VERTICAL DUCTS ATA MAXIMUM INTERVAL OF 16 FEET AND AT EACH FLOOR. NO WOOD SHALL BE USED TO SUPPORT COORDINATION WITH OTHER TRADES. - • , • • • :t• ; . -, - ' t - , - - - . . .. - : • . - • - ' -i . • ' - OR BRACE DUCTS. PROVIDE SWAY AND SEISMIC BRACING AS REQUIRED BY STATE/PROVINCE AND LOCAL CODES OR BY LANDLORD. r a. CONTRACTOR TO COMPLETE AND EMAIL, OR FAX, THE CONTROLS COMMISSIONING SURVEY TO MANUFACTURER PRIOR TO THE CONTROL � o 2.AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL, THiS CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS _ • • - COMMISSIONING. 8.WHERE DUCTS PASS THROUGH ROOFS AND FLOORS, PROVIDE AS MINIMUM 1-1/2"X1-1/2"X1/8" STEEL ANGLE FRAMES AT EACH SIDE OF eL0'�`4 0w- I AND CERTIFY THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON. FAILURE TO KEEP THESE RECORDS WILL ALLOW LSD&C TO DIRECT 2 - • • OPENING. THE ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES SHALL BE CAULKED WITH SILICONE SEALANT OR FIREPROOFED AS *�43 THE GENERAL CONTRACTOR TO PROVIDE THESE RECORDS AT HIS EXPENSE PRIOR TO FINAL PAYMENT. - : - •' . b. CONNECT THE HVAC CONTROLS TO AN OPERATIONAL ANALOG PHONE LINE OR ETHERNET CONNECTION TO ALLOW COMMUNICATION. iF REQUIRED BY ASSEMBLY FiRE RATING. ��, NECESSARY, UTILIZE SITE FAX LINE TO CONNECT TO THE CONTROLS MODEM IN THE IFS PANEL 0 PetaaPes N H. DISCREPANCIES IN DOCUMENTS 3• , ' • • •. - ' - :, - : Thi . ii : _ • : • . . • - • 9.ALL JOINTS AND SEAMS SHALL BE SEALED WITH 2" WIDE, GLASS-FIBER-FABRIC REINFORCED TAPE. JOINTS ALSO SHALL BE RIVETED OR 't� �`�' an : • 4 - ; : - - : ; - : ,. c. CONTACT MANUFACTURER AT THE SCHEDULED TIME FOR THE CONTROLS COMMISSIONING. CONNECTED WiTH SHEET METAL SCREWS. LIQUID SEALANTS BY UNITED MCGiLL CORP., DOW CORNING, MIRACLE ADHESIVES AND SUREBOND .# '"R `'ie• 1 t DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION AND INTENT OF THE ` - ` - INC. WILL BE ACCEPTED IN LIEU OF TAPE. 7i �� + ?E O MECHANICAL SYSTEMS. WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER TRADES CONFLICT OR ARE UNCLEAR, 4. ' • , ' : '. : : : : : : : • • , d. PROVIDED THERE ARE NO OPEN ISSUES, VISIT. 2 IS COMPLETE. IN THE EVENT THERE ARE OPEN ITEMS, THE GC MUST CORRECT THEM AND 4. SAN'ADVISE THE GENERA). CONTRACTOR IN WRITING, PRIOR TO SUBMITTAL OF BiD. THE GENERAL CONTRACTOR IS RESPONSIBLE TO ADVISE - • • . t - ; -+ - ; . RESCHEDULE THE CONTROLS COMMISSdONING. 10. SOFT ELASTOMER BUTYL GASKET WITH ADHESIVE BACKING SHALL BE USED TO SEAL FLANGED JOINTS. illit 0 LSD&C'S PROJECT MANAGER, IN WRITING, OF VARIATIONS TO CONTRACT DOCUMENTS PRIOR TO SUBMISSION OF BID. OTHERWISE, LSD&C 5. _: - : • - _ 3.VISIT 3: FINAL HVAC INSPECTION - THIS VISIT IS TO DOA FINAL INSPECTION OF THE HVAC EQUIPMENT AND CONTROL INSTALLATION. THE 1t DUCT TRANSITIONS SHALT. NOT EXCEED 30 DEGREES). SLOPE EXCEPT PROJECT MANAGERS INTERPRETATION OF CONTRACT DOCUMENTS OR CONDITIONS SHALL BE FINAL WITH NO ADDITIONAL COMPENSATION EG a S 0 E E C T AS NOTED OTHERWISE. ',4 a CONTRACTOR IS RESPONSIBLE FOR HAVING THE MECHANICAL SUBCONTRACTOR AND THE ELECTRICAL SUBCONTRACTOR ON SITE DURING THE • 1 2' PERMITTED. FINAL INSPECTION. BUDGET 4 HOURS FOR THE FINAL INSPECTION. THIS VISIT MUST TAKE PLACE PRIOR TO CONSTRUCTION COMPLETION. THE 12. PROVIDE ACCESS TO ALL MOTORIZED DAMPERS, FIRE DAMPERS, CONTROLS, AND OTHER ITEMS IN DUCTWORK THAT REQUIRE SERVICE OR • , �Y n L PHASING REQUIREMENTS SECTION 230700• HVAC INSULATION FOLLOWING ITEMS MUST BE COMPLETED PRIOR TO THE INSPECTION: INSPECTION. IF THE ACCESS PANEL LOCATION iS EXPOSED TO THE SALES AREA, IT MUST BE APPROVED BY LSD&C'S PROJECT MANAGER �� ••-'o'��P t� A. DUCTWORK INSULATKIN PRIOR TO INSTALLATION. IN HARD CEILINGS, LAY-IN SUPPLY AND RETURN AIR DIFFUSERS, GRILLES AND REGISTERS WITH PLASTER FRAMES MAY 0 �� / ��,i t THIS CONTRACTOR IS TO INCLUDE IN HIS BID ALL NECESSARY SERVICE REQUIRED TO KEEP THE OPERATING PHASE OF THE STORE'S HVAC, (1) THE GC MUST COMPLETE TRANE'S SITE VISIT #3 SURVEY PRIOR TO THE VISIT BEING SCHEDULED. BE USED AS ACCESS LOCATIONS WHEN WITHIN 3'-O" OF DEVICE. - PLUMBING AND SPRINKLER SERVICE IN OPERATION. CONTRACTOR MUST SCHEDULE IN WRITING WITH LSD&C'S PROJECT MANAGER AND THE t FURNISH AND INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH (2) HVAC SYSTEM INSTALLATION iS COMPLETE - NO OPEN PUNCHLIST ITEMS EXCEPT FOR POSSIBLY THE PERMANENT PHONE LINE. 13. ALL DUCTWORK SHALL BE INSTALLED WITH INSIDE CLEAR DIMENSIONS AS NOTED ON DRAWINGS. WHERE DUCTWORK SIZE iS LARGER THAN Z V LANDLORD ONE WEEK PRIOR TO ANY SHUT DOWN OF THE HVAC, PLUMBING OR FIRE PROTECTION SYSTEMS. RECOGNIZED INDUSTRY PRACTICES. INSULATION MUST COMPLY WITH NFPA/NFPAC 90A. CONNECTED DEVICE (IE. VAV BOX, DIFFUSER, REGISTER) SMOOTH DUCT TRANSITIONS ARE TO TAKE PLACE JUST PRIOR TO DEVICE LO W •• 0 -2 (3) AIR BALANCE IS COMPLETE. NOTE: AIR BALANCE IS IN THE CONTRACTOR'S SCOPE OF WORK. w st O J. DEMOLITION 2.ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAN 50 CONNECTION. SEE MECHANICAL DRAWINGS FOR DETAIL. ra a cc t THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING WORK AND THE DEMOLITION PROVIDED WHEN TESTED IN ACCORDANCE WITH ASTM E 84-05, OR AS REQUIRED BY LOCAL CODES. b. THE CONTRACTOR IS RESPONSIBLE FOR COMMUNICATING SCHEDULE DATE CHANGES FOR THE FINAL INSPECTION. B. MEDIUM PRESSURE DUCT r b, Z w BY THE GENERAL CONTRACTOR. COORDINATE 1MTH THE GENERAL CONTRACTOR ANY EXISTING EQUIPMENT REQUIRED TO BE LEFT INTACT. 3,DUCTWORK SHALL BE INSULATED ACCORDING TO THE ENERGY CODE ADOPTED BY LOCAL AHJ. IT IS THE CONTRACTOR'S RESPONSIBILITY TO c. FILTERS ARE TO BE REPLACED DURING THIS VISIT. FILTERS ARE TO BE PROVIDED BY THE CONTRACTOR AND SHALL BE ON SITE WHEN THE t WHERE DUCTWORK IS SPECIFICALLY NOTED AS MEDIUM PRESSURE, IT SHALL BE CONSTRUCTED IN ACCORDANCE WITH SMACNA STANDARDS CL O 4 2.THIS CONTRACTOR SHALL INCLUDE, AND WILL BE HELD RESPONSIBLE FOR, THE REMOVAL OF ALL EXISTING HVAC UNITS, HYDRONIC PIPING, CONFIRM CODE AND PROVIDE ADEQUATE INSULATION AS INDICATED BELOW (WITHIN ASSUMED PARAMETERSI.THIS SPEC DOES NOT INCLUDE TRANE TECHNICIAN ARRIVES. FORA PRESSURE RATING OF 4 INCHES WATER COLUMN MINIMUM OR GREATER AS REQUIRED BY LANDLORD. CI ` inREQUIREMENTS FOR DUCTWORK LOCATED WITHIN A VENTILATED ATTIC OR OUTSIDE. IN SUCH INSTANCES, REFER DIRECTLY TO CODE ADOPTED REFRIGERANT RECAPTURE, EXHAUST FANS, ETC. AND ASSOCIATED ROOF CURBS NOT TO BE REUSED ON THIS PROJECT, UNLESS SPECIFICALLY BY LOCAL AHJ. d. WHEN COMPLETE AND ALL OPEN CONTRACTOR HVAC ISSUES ARE RESOLVED A CONTROL NUMBER IS ISSUED BY THE MANUFACTURER. IT IS 2.ALL GAUGES AND REINFORCEMENT MUST MEET WITH THE LATEST EDITION OF SMACNA STANDARDS FOR MEDIUM PRESSURE DUCT AND WITH W w 0 NOTED OTHERWISE. CONTRACTOR MUST VERIFY WITH THE LANDLORD ALL PRESUMED ABANDONED EQUIPMENT, PIPES, AND DUCTWORK PRIOR TO RECORDED INSIDE THE CONTROL PANEL DOOR IN THE IFS ELECTRICAL PANEL AND ON THE FINAL VISIT CHECK LIST. REMOVAL ROOF CURBS SHALL BE REMOVED AND THE ROOF PATCHED. ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF NOT THE LANDLORD'S CRITERIA. W O a)a. RECTANGULAR SUPPLY AND RETURN AIR DUCTS - PLENUM/DUCTED RETURN AIR SYSTEM: DUCT SIZES SHOWN ON DRAWINGS ARE INSIDECO ILLIo •- APPLICABLE TO THE NEW WORK MUST BE REMOVED AND ROOF/WALL/FLOOR PATCHED/REPAIRED TO MATCH EXISTING STRUCTURE. EXISTING t TO HANS. ALL RECTANGULAR DUCTWORK (SUPPLY AND RETURN) SHALL BE INTERNALLY INSULATED TO THICKNESS LISTED BELOW. eIN HAVE A COATED SURFACE EXPOSED TO AIRSTREAM TO PREVENT ERASION. APPLY ADHESIVES AND MECHANICAL FASTENERS IF. THE EVENT THERE ARE OPEN ITEMS, THE CONTRACTOR MUST CORRECT THEM AND RESCHEDULE THE FINAL INSPECTION WITH THE 3.CONNECTIONS TO THE LANDLORD'S MEDIUM PRESSURE DUCTWORK SHALL BE MADE WITH 'LO-LOSS" SADDLE TEE TAPS OR AS OTHERWISE LL' O ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND LINER IS TO HA CLEAR D MANUFACTURER. GC IS RESPONSIBLE FOR REPLACEMENT OF SHEAVES, PULLEYS, AND BELTS, NEEDED. REQUIRED BY THE LANDLORD. Q "tt W O SEALED BELOW OR WITHIN FLOOR OR WALL LEVEL WHEN THEY ARE NOT TO BE REUSED IN THIS PROJECT. IF REQUIRED BY LANDLORD OR AS RECOMMENDED BY SMACiA AND THE MANUFACTURER TO PREVENT LINER SEPARATION FROM THE DUCT. ALL ADHESIVES SHALL BE f. THE HVAC CONTROL NUMBER WiLL BE ISSUED AT THE END OF THE VISIT PROVIDED THERE ARE NO UNRESOLVED HVAC PUNCHLIST ITEMS. O CODES, ABANDONED PIPING AND/OR DUCTWORK MUST BE REMOVED TO POiNT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION PRIOR TO BID 4,ALL OTHER ITEMS FROM METAL DUCTWORK SPECIFICATION SECTION APPLY TO THIS SECTION, WITH THE EXCEPTON THAT ALL MEDIUM CO a J LOW VOC TYPE. ALL TRANSVERSE EDGES TO BE COATED WITH ADHESIVE. LINED DUCTWORK DOES NOT NEED TO BE WRAPPED UNLESS PRESSURE DUCTWORK MUST BE WRAPPED WITH INSULATION, NOT LiNED, n •-. AND INCLUDE IN BID PROPOSAL. REQUIRED BY MALL. g. THE TRANE TECHNICIAN WILL WRITE THE HVAC CONTROL NUMBER ON THE STICKER INSIDE THE WR CONTROLS PANEL (IFS PANEL) AND ON THE FINAL VISIT CHECK LIST. - CO Z M (11 K. SLEEVES 2007 & 2010 ASHRAE 90. SECTION 233300: AIR DUCT ACCESSORIESQ O cV 1; 2009 IECC, 2012 IECC, 2009, 2010 OREGON ENERGY CODE, AND 2012 WASHINGTON STATE ENERGY CODE: h. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL 3RD PARTY COMISSIONING/REYIEW REQUIRED BY CODE. h t THIS CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND PROVIDE 1' THICK, t5 LB/FT"3, MINIMUM INTERNAL LINER (CONDUCTIVITY :0.26 0 75'F; R-4.0) A. FLEXIBLE CONNECTIONS .. Z 0THROUGH iTS RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES THAT PENETRATE b. RECTANGULAR SUPPLY AND RETURN AIR DUCTS - DUCTED RETURN AIR SYSTEM: DUCT SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR SECTION 230000: INSTRUMENTATION AND CONTROL FOR HVAC t FLEXIBLE COLLARS SHALL BE FURNISHED AND INSTALLED IN ALL CONNECTIONS BETWEEN VIBRATING EQUIPMENT (FANS, AIR HANDLERS, ETC.) O rn THE FLOOR, WHICH SHALL EXTEND 2 ABOVE THE FLOOR. CONTRACTOR MUST COORDINATE THROUGH THE LANDLORD ANY CORE DRILLING OR DIMENSIONS. ALL RECTANGULAR DUCTWORK (SUPPLY AND RETURN) SHALL BE INTERNALLY INSULATED TO THICKNESS LISTED BELOW. LINER AND DUCTS OR CASINGS. ALSO, FURNISH AND INSTALL FLEXIBLE CONNECTIONS WHERE DUCTS GROSS BUILDING EXPANSION JOINTS. i'-= ~0 (.5 V C4 " CUTTING OF OPENINGS IN MASONRY FLOORS OR WALLS. A. WORK RESPONSIBILITY •c( O p r iS TO HAVE A COATED SURFACE EXPOSED TO AIRSTREAM TO PREVENT EROSION. APPLY ADHESIVES AND MECHANICAL FASTENERS AS 2.FLEXIBLE CONNECTIONS SHALL BE CONSTRUCTED OF :NEOPRENE-COATED FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FLEXIBILITY TO c., 2.ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND/OR FLOORS SHALL BE FIRE SEALED WITH CALCIUM SILICATE, SILICONE 'RTV' RECOMMENDED BY SMACNA AND THE MANUFACTURER TO PREVENT LINER SEPARATION FROM THE DUCT. ALL TRANSVERSE EDGES TO BE t LSD&C HVAC SUPPLIER WILL FURNISH NECESSARY CONTROL DEVICES TO THE FIELD. FOR ALL DEVICES NOT FACTORY INSTALLED, IT WILL BE O � 7 ., •. w FOAM, '3M" FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAIN THEIR FIRE RATING. COATED WITH ADHESIVE. LINED DUCTWORK DOES NOT NEED TO BE WRAPPED UNLESS REQUIRED BY MALL THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO INSTALL ALLOW FOR MOVEMENT AND PREVENT THE TRANSMISSION OF VIBRATION. Z Immo Z m z ce 3.SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BE STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH (1) 2007 & 2010 ASHRAE 90.1, PROVIDE 1" THICK, 1.5 LB/FT�3, MINIMUM INTERNAL LINER (CONDUCTIVITY :0.26 0 75"F; R-4.0 MIN.) FOR ALL B. FLEXIBLE AIR DUCT e-- 0f/7 W •• ci EDGES. FOR OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS, OR FOR CONCEALED VERTICAL PIPING, SLEEVES SHALL BE SUPPLY AIR DUCTWORK AND FIRST 15.0 OF THE RETURN AIR DUCTWORK. : : _ t FLEXIBLE AIR DUCT SHALL BE 1' INSULATED CLASS 1, UL/ULC LISTED AND RATED FOR THE OPERATING PRESSURE OF THE SYSTEM. DUCT w �fI U H w X C.) NO. 22 U.S.G. GALVANIZED STEEL MINIMUM. CONSTRUCTION MATERIAL (PLASTIC, CLOTH, ALUMINUM) MUST ADHERE TO LOCAL CODES AND LANDLORD'S REQUIREMENTS AND BE INCLUDED --2 > a tat)} . a V W ca (2) 2009 )ECC, 2012 IECC, 2012 WASHINGTON STATE ENERGY CODE AND 2010 OREGON ENERGY CODE, PROVIDE 1.5" THICK (2" ALSO L. SCOPE OF WORK ACCEPTABLE), 1.5 LB/FT'3, MINIMUM INTERNAL LINER (CONDUCTIVITY :0.17 0 75•F; R-6.0 MIN.) A. AS SUCH IN THE BID. a. O N i.. N o t • . c : : : • 2.FLEXIBLE AIR DUCT SHALL BE ATTACHED PER DETAILS ON THE DRAWINGS. FLEXIBLE AiR DUCT MAY ONLY BE USED IN VERTICAL 1. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, 4.ALL OUTDOOR AIR (ROUND, OVAL, AND RECTANGULAR) AND ROUND/OVAL SUPPLY AIR DUCTWORK SHALL BE EXTERNALLY INSULATED AS , , - . '_ : _ _ APPLICATIONS. REVISIONS: REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE HVAC INDICATED: ` REQUIRED BY: DATE SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT 2.PIPS- 3.FLEXIBLE DUCT SHALL NOT EXTEND OVER 8'-0" IN LENGTH AT ANY ONE LOCATION. WHERE LANDLORD HAS SHORTER LENGTH RESTRICTIONS, BE LIMITED TO THE FOLLOWING: a. PLENUM AND DUCTED RETURN AIR SYSTEMS: ALL OUTDOOR AIR (ROUND, OVAL, AND RECTANGULAR) AND ROUND/OVAL SUPPLY AIR COMPLY WITH LANDLORD REQUIREMENTS. DUCTWORK SHALL BE EXTERNALLY INSULATED WITH A DUCT WRAP WiTH VAPOR BARRIER. REFER TO THICKNESS BELOW. VAPOR BARRIER a. HVAC UNITS, ALL RELATED EQUIPMENT AND ACCESSORIES (UNLESS NOTED OTHERWISE). IS TO BE MAINTAINED THROUGHOUT DUCT SYSTEM. ALL JOINTS MUST BE OVERLAPPED AND TUCKED SO THAT NO INSULATION FIBER IS C. SUPPLY AIR TAKE-OFF FITTINGS b. DUCTWORK, FITTINGS, DAMPERS, AND INSULATION. VISIBLE. EXTEND DUCTWORK INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS AND OTHER PENETRATIONS. .. • ', , : = +� + • 1. FURNISH AND INSTALL CONICAL, TAPERED OR 45 DEGREE SADDLE TAKEOFFS FROM MAIN DUCTWORK TO ROUND BRANCHES. INSTALLATION 111 2007 AND 2010 ASHRAE 90.1, 2009 AND 2012 INTERNATIONAL ENERGY CODE, 2010 OREGON ENERGY CODE: PROVIDE A MINIMUM OF 2' 1 t ' _' _' _ '_' _ SHALL BE PER SMACNA LATEST EDITION. c. HYDRONIC PIPING. (AS APPLICABLE, REFER TO PLANS). THICK, tO LB/FT"`3 (R:7.C, R:6.1 INSTALLED) DUCT WRAP WITH VAPOR BARRIER. • ` ` ` ' ' d. REFRIGERANT PiPING (AS APPLICABLE, REFER TO PLANS). D. DAMPERS (2) 2012 WASHINGTON STATE ENERGY CODE: b. • • . a . . • t WHERE DESIGNATED, FURNISH AND INSTALL ROUND BALANCING DAMPERS. PROVIDE MINIMUM 20 GAUGE GALVANIZED STEEL FRAME AND BLADES a. CURBS, ROOFING, AND STEEL FRAMING FOR SUPPORT (AS APPLICABLE, REFER TO PLANS). ` ' ' '' - • . (a) SUPPLY AND RETURN AIR ROUND AND OVAL DUCTWORK INSULATION: ROUND/OVAL SUPPLY AND RETURN AIR DUCTWORK SHALL BE . ._ a _ WITH MINIMUM 3/8 SQUARE STEEL AXLE, AND MOLDED SYNTHETIC BEARINGS (EQUIVALENT TO RUSKIN MODEL MDRS25) WITH MANUAL LOCKING a I. TESTING, ADJUSTING, AND BALANCING. EXTERNALLY INSULATED WITH A MINIMUM OF 2' THICK DUCT WRAP, 1.0 LB/FT�3 (INSTALLED R-6.1). c' A a a _ , • _ POSITION REGULATOR WITH STANDOFF (EQUIVALENT TO DURO DYNE MODEL KR). g. KEEPING A RECORD SET AND PREPARE AS-BUILT DRAWINGS. (b) OUTSIDE AIR DUCTWORK INSULATION FOR UMTS SUPPLYING LESS THAN 2800 CFM: ALL OUTDOOR AIR (ROUND, OVAL, AND • ' ' ' ` 2.WHERE DESIGNATED, FURNISH AND INSTALL RECTANGULAR VOLUME DAMPERS. PROVIDE MINIMUM 16 GAUGE GALVANIZED STEEL CHANNEL • : : : : - ; - .5; • FRAME, 16 GAUGE GALVANIZED STEEL BLADES, MINIMUM 1/2' HEXAGONAL AXLE, MOLDED SYNTHETIC BEARINGS, WITH 3/8" SQUARE PLATED 2.BEFORE STARTING WORK, THIS CONTRACTOR SHALL VISIT THE JOB SITE AND EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND RECTANGULAR) DUCTWORK SHALL BE EXTERNALLY INSULATED WITH A MINIMUM OF 2-1/2' THICK DUCT WRAP, 0.75 LB/FT 3 . • _ ; (INSTALLED R-7.11. ' " ` '" ' ,- ti'"' '• '• STEEL CONTROL SHAFT (EQUIVALENT TO RUSKIN MODEL CD35). MAXIMUM BLADE WIDTH SHALL NOT EXCEED 6'. LINKAGES SHALL BE - ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE HVAC SYSTEM, , ' - • • • CONCEALED IN THE FRAME. CONTROL SHAFT SHALL EXTEND BEYOND FRAME AND DUCT COVERING TOA LOCKING QUADRANT WITH � MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. (c) OUTSIDE AIR DUCTWORK INSULATION FOR UNITS SUPPLYING MORE THAN 2800 CFM: PROVIDE TWO LAYERS OF 2.5" THICK, 2.25 d. , . ; , : -• • • ' ' ` ' ' ADJUSTABLE LEVER (EQUIVALENT TO DURO DYNE MODEL K-4) WITH STANDOFF. DATE ISSUED: 12/30/16 3.RELOCATION OF EXISTING DUCT MAINS OR BRANCHES TO MEET STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL LB/FT"3, EXTERNAL BOARD INSULATION (CONDUCTIVITY 0.24 0 75'F; R-20.8). , • •' : ' . DESIGNED BY: M C R : ` : : 3.OPERATING HANDLES ON ALL DAMPERS SHALL BE TAGGED WITH A MINIMUM 18" LONG ORANGE MARKER TAPE AND SHALL BE INSTALLED FAR M C R ' : • ENOUGH AWAY FROM DUCT TO ENSURE IT FULLY AND COMFORTABLY CLEARS THE INSULATION WHEN TURNED. DRAWN BY: M. HVAC EQUIPMENT B. � � � CHECKED BY: JAH - t PRIMARY HEATING AND AIR CONDITIONING UNITS ARE TO BE FURNISHED BY LSD&C AS SCHEDULED UNLESS NOTED OTHERWISE. REFER TO 1• : ` : ` : : ' • 3. 4.WHERE ACCESS TO BALANCING DAMPER IS RESTRICTED, A REMOTE DEVICE, MANUALLY OPERATED SHALL BE USED. UNITS SHALL BE ORDERED THREE WEEK BEFORE INSTALLATION A PLANS FOR REQUIREMENTS. ALL EQUIPMENT SHALL INCLUDE A FIVE (5) YEAR COMPRESSOR AND TEN (10) YEAR HEAT EXCHANGER WARRANTY. . : •• ' a • •,. . . , TO ALLOW FOR DELIVERY LEAD TIME. 2.ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT AND • • . - : , • , a • ; :• ;" . . • ` . . ' ' '' • ' '' FIRE/SMOKE DAMPERS • MECHANICAL E. OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN. ::• _ , . • . • . -, : - a: :: , : : : ., b. • • ` • • • + • •-, - - • - - - - - t FOR HORIZONTAL OR SPECIFICATIONS : �: : - , • _ • `, -� : ` � : : : + FURNISH AND INSTALL PRIMARY FIRE DAMPERS WHERE INDICATED OR REQUIRED BY CODES. DAMPERS SHALL BE DESIGNED 3.EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. ` ' - '•' • - ' ' - • - - VERTICAL FLOW OF AIR AS REQUIRED. FIRE DAMPERS SHALL BE UL/ULC LABELED AND MEET ALL CODE REQUIREMENTS. . • . . -: : • : N. EQUIPMENT FURNISHED BY LIMITED STORE DESIGN AND CONSTRUCTION a' 2.FIRE DAMPERS SHALL HAVE THE BLADES OUT OF THE AIRSTREAM ANDA 165 DEGREE F FUSIBLE LINK, TYPE B, AS MINIMUM. FURNISH AND (1) - c. a •• . . a - . - , • a • . - - r r : ; NECESSARY. INSTALL ACCESS DOORS AS t THE FOLLOWING EQUIPMENT IS FURNISHED BY LSD&C AND INSTALLED BY THIS CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE. REFER - - - : : ' : : DRAWING NUMBER: TO RESPONSIBIUTY SCHEDULE AND PLANS FOR APFLICABIUTY. I' • • -: `' ` ` " .. ' ' ' • • ` _ - 3.FURNISH AND INSTALL ALL NECESSARY FRAMING AND SLEEVES FOR DAMPER MOUNTING PER UL/ULC AND CODE REQUIREMENTS. a. HVAC UNITS. ' 4.FIRE/SMOKE DAMPERS SHALL BE FURNISHED AND INSTALLED WITH ELECTRIC POWERED MECHANISM. COORDINATE WITHELECTRICAL rillFt21 . , , , /S SHE SM D!N II` d, : . . : , . • - . : ; . • : : - : :: : , - - , . CONTRACTOR FOR POWER REQUIREMENTS ��'�� t� �I.��T - . - . . � � � �- b. TOILET EXHAUST . ANS. .. . . . . , , we-n*1N- . a ' - r : : • . • . • I. • _ . . . : . • ., ..,�/ m - - - a_ _ _ - - - _ _ -- - __ - - _ -