Loading...
Report (160) .7-4 * S`''' . -LAQ-rAt‘°14(v)F- 1.. ) .R,,.� 7409 SW Tech Center Dr,Ste.145 •+,yen Tigard,OR 97223 410111'. Ph:503-443-3799 Fax:503-620-2748 rrsnve,,rr 503.443.3749 Special Inspection Final Report Date: 9-5-18 Job# 18-7899 I Permit#BUP2017-00180 Mail To: Project: MISSION HOMES NW DURHAM SQUARE BLDG 2 PO BOX 1689 7520 SW DURHAM RD LAKE OSWEGO,OR 97035 TIGARD,OR 97224 JOB#18018 1 To Whom It May Concern: ACS Testing,Inc.attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed For the following: Anchors—Holddowns 1 Concrete Construction Steel Construction Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications,and the applicable codes and standards for the jurisdiction. -11-?4et-a-A esAA--- Approved by: Bob Brown/President BB/sa Pts,���� y ATI" j"I'otidit, be ;V(�tion(9l#F At, I-'} IJl1ernati it.,i Ai.u! .cast:fL.. �,ei-,ic ACCREDITED