Report (161) �
��\�j��
�
��� `+
�� ^j� �� \ ,
7409 SW Tech Center Dr,Ste.145.--)
,111411
Tigard,OR 97223
Ph:503-443-3799 Fax:503-620-2748
503.+43.379 — Special Inspection
Final Report
Date: 9-5-18 Job# 18-7898
Permit#BUP2D17-001B1
Mail To: Project:
MISSION HOMES NW DURHAM SQUARE BLDG 1
POBOX 1G89 7520 SW DURHAM RD
LAKE OGVVEGO.OR97O35 TIGARD, OR 97224
JOB#C18017
To Whom It May Concern:
ACS Testing, Inc. attests that their inspectors performed special inspection(s)on a continuous and/or
Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed
For the following:
Anchors—Adhesive
Anchors-Holddowns
Concrete Construction
Masonry
Steel Construction
Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf
of ACS that work was performed to the best of my knmw|edga, in accordance with approved plans,
specifications,and the applicable codes and standards for the jurisdiction.
Approved by: - ~- '
Bob Brown/President
BB/so
flePPN
ibris - i', bv d
ACCREDITED