Loading...
Correspondence (29) co 'tuJ1cc-ic- S't cLair lah tX vvyvvs,.cla rcssmfmny.c m Special Inspection & Materials Testing Final Summary Report September 4,2018 Tigard-Tualatin School District 6960 SW Sandburg St. Tigard, OR 97223 Project: TTSD Templeton CORE SI-MT 9500 SW Murdock St Tigard, OR 97224 Permit No.: BUP2018-00086 This is to certify that special inspection & material testing were performed, per the 2014 Oregon Structural Specialty Code (OSSC). Inspections were performed for the following scopes of work at the subject address which required special inspection and which Clair was employed to inspect: Structural Steel Fabrication Structural Steel Erection Proprietary Anchors Based upon Clair observation and written report of this work, it is my judgment that the inspected work was performed, to the best of my knowledge, in accordance with approved plans and applicable workmanship provisions of the 2014 OSSC. Respectfully Submitted, f Lif David Tilton Technical Director Cc: City of Tigard Clair File 1565-003 NISHKIAN DEAN CONSULTING AND STRUCTURAL ENGINEERS September 4, 2018 Beth Cantrell DECA Architecture Inc. 935 SE Alder St. Portland, OR 97214 Reference: Templeton Elementary School—Seismic Upgrades PERMIT No.: BUP 2018-00086 NDI Project No.:31699.00 Dear Beth, Subject: Structural Observation-FINAL REPORT In accordance with the 2014 Oregon Structural Specialty Code, Section 1702 we have performed structural observation for this project. Based on those observations, and Clair Company, Inc. "Special Inspection Final Summary Letter", September 4, 2018, we believe that the above referenced project structure was constructed in general compliance with the approved plans and specifications. Sincerely, NISHKIAN DEAN way Aigned by Robert A Aman ON C=US, Robert A.Amanggrob kon corn Q-Ns190an Dean h CN=Robert A. Aman Oats:2018.09.04 11'.00'.46-07'00' ......................... Robert Aman, P.E.,S.E. Associate Cc: Contractor: GNC Construction Brent Vinsonhaler<brent@gncconstruction.org> Doug Bray<doug@gncpdx.com> Special Inspector: Clair Company, David Tilton <dtilton@claircompany.com> Construction Manager: Angela Caffery, DAY CPM I 1pdx-fsl l nd-filestore l projects)nd31699 templeton es seismic upgrade101 admin 11.1 letters)final letters)nd31699 templeton es-final acceptance letter 2018xxxx.docx 1022 SW Salmon Street, Suite 300, Portland, OR 97205 '(503) 274-1843 FAX(503) 273-5696