Correspondence (29) co 'tuJ1cc-ic- S't
cLair
lah tX
vvyvvs,.cla rcssmfmny.c m
Special Inspection & Materials Testing
Final Summary Report
September 4,2018
Tigard-Tualatin School District
6960 SW Sandburg St.
Tigard, OR 97223
Project: TTSD Templeton CORE SI-MT
9500 SW Murdock St
Tigard, OR 97224
Permit No.: BUP2018-00086
This is to certify that special inspection & material testing were performed, per the 2014 Oregon
Structural Specialty Code (OSSC). Inspections were performed for the following scopes of work at the
subject address which required special inspection and which Clair was employed to inspect:
Structural Steel Fabrication Structural Steel Erection
Proprietary Anchors
Based upon Clair observation and written report of this work, it is my judgment that the inspected work
was performed, to the best of my knowledge, in accordance with approved plans and applicable
workmanship provisions of the 2014 OSSC.
Respectfully Submitted,
f
Lif
David Tilton
Technical Director
Cc: City of Tigard
Clair File 1565-003
NISHKIAN DEAN
CONSULTING AND STRUCTURAL ENGINEERS
September 4, 2018
Beth Cantrell
DECA Architecture Inc.
935 SE Alder St.
Portland, OR 97214
Reference: Templeton Elementary School—Seismic Upgrades
PERMIT No.: BUP 2018-00086
NDI Project No.:31699.00
Dear Beth,
Subject: Structural Observation-FINAL REPORT
In accordance with the 2014 Oregon Structural Specialty Code, Section 1702 we have performed
structural observation for this project. Based on those observations, and Clair Company, Inc.
"Special Inspection Final Summary Letter", September 4, 2018, we believe that the above
referenced project structure was constructed in general compliance with the approved plans
and specifications.
Sincerely,
NISHKIAN DEAN
way Aigned by Robert A Aman
ON C=US,
Robert A.Amanggrob kon corn
Q-Ns190an Dean h CN=Robert A.
Aman
Oats:2018.09.04 11'.00'.46-07'00'
.........................
Robert Aman, P.E.,S.E.
Associate
Cc: Contractor: GNC Construction
Brent Vinsonhaler<brent@gncconstruction.org>
Doug Bray<doug@gncpdx.com>
Special Inspector: Clair Company, David Tilton <dtilton@claircompany.com>
Construction Manager: Angela Caffery, DAY CPM
I 1pdx-fsl l nd-filestore l projects)nd31699 templeton es seismic upgrade101 admin 11.1 letters)final letters)nd31699 templeton es-final acceptance letter
2018xxxx.docx
1022 SW Salmon Street, Suite 300, Portland, OR 97205 '(503) 274-1843 FAX(503) 273-5696