Loading...
16460 SW 72ND AVE unified Industrial D _ PAGE f sewerage este V agency g " disciia e J_ _ _ OF 3 155 N. First Ave.,Suite 270, Hillsboro,Or.,97124 rg _ _ 503 648-8621 l.a Applicant Business Name: Belt Tech Permit No: 13.-..139,. ; 1.b Business/Industrial Park: Pac Trust Center Monitoring ❑ 2. Address of Premises Discharging Wastewater Nonmonitoring ❑ Street: 16460 SW 72nd Avenue Renewable Yes E No ❑ City: Tigard Zip: 97224 Initial ❑ Renewal ❑ SIC No. 3t.,469 3. Assessor's Map anc Tax Lot Number: 251 13AA #800 Jurisdiction City: T Y :r;.,` 4. Mailing Address (if different from above) U.S.A. ❑ Street: Treatment Plant: City: Zip: Durham 5. Persons to be Contacted About this Permit: (Primary) Name: Russell Iwanachuk Title: President Phone: 620-3570 (Alternate) Name: Title: Phone: (Billing) Name: Russell Iwanachuk Title: President Phone: 620-3570 6. Method Used to Compute Industrial Sewer Bill (plus commercial fixture count for domestic sewage use): A. ❑ Wastewater consumption or discharge B. ❑ Wastewater strength 7. Effective Date: 12/01/91 Expiration Date: 12/01/96 8. Owner's Representative (. Print Name w-.)��, �� �.-a`t.�-r.� t�tc �-.,. Title V <,- � � � Signature '� �._ � Date _ 9. Agency Representative Signature Title Date ! _ i AUTHORIZATION - The above named applicant is hereby authorized to discharge wastewater to the public sewer subject to said applicant's compliance with the Agency's Ordinance No. 9, appropriate R & 0's and Page 2 of this permit and payment of the following fees and charges: Remit to Tigard 10. Fees: A. Permit Fee . .Invoiced $ s _ $ B. Connection Charge $ $ C. Plan Review Fee $ $ D. Additional Capacity Fee $ $ Total $ $ ❑ Paid Rev. 2/90 WHITE - USA, YELLOW - Industry, PINK - City, BLUE - Accounting, GREEN - WQL Industn I PSE unified - - sewerage este J 1 -enc 2 a g " disc is _ J_ _ OF 3 155 N. First Ave.,Suite 270, Hillsboro, Or.,97124 �e _ 503 648-8621 Business Name Belt Tech Permit No: 111-139-1 11. Requirements for Industrial Permit Compliance (If box is checked, that requirement is applicable.) See explanation on reverse side. A. ❑Prior to the 10th of each month, submit monthly monitoring test data to the Agency on approved forms. B. /❑".Report any changes (permanent or temporary) to the premises or operations that significantly change the quality or volume of the wastewater discharge or deviates from the terms and conditions under which this permit is granted. C. Special Requirements: In the months of June & December test the PH of the water in the cooling tub. Submit pH results to the Agency. D. Applicable Regulations: Agency Local Limits E. ®Discharge Limitations (Only items checked are applicable.) See Penalties and Charges on reverse side. ELEMENT OR DAILY MONTHLY ELEMENT OR DAILY MONTHLY CONSTITUENT STORET UNIT MAXIMUM AVERAGE CONSTITUENT STORET UNIT MAXIMUM AVERAGE COD (T) 340 mg/L Cadmium 1027 mg/L COD (T) 340 lbs. Chrome (+6) 1032 mg/L X pH 400 Range `�� , Chrome (T) 1034 mq/L TDS 515 mg/L Copper (T) 1042 mg/L TDS 515 lbs. Lead (T) 1051 mq/L TSS 530 mg/L Manganese (T) 1055 mg/L TSS 530 lbs. Manganese (T) 1055 lbs. Oil & Grease 556 mg/L Manganese (S) 1056 lbs. Cyanide (T) 720 mg/L Nickel (T) 1067 mg/L Sulfide (T) 745 mg/L Silver (T) 1077 mg/L Sulfate 945 mg/L Zinc (T) 1092 mg/L Sulfate 945 lbs. `+ Flow 50050 MGD Fluoride 951 mg/L Mercury (T) 71900 mg/L Fluoride 951 lbs. Arsenic (T) 1002 mg/L Cyanide(W/D) 718 mg/L 12. Time schedule for compliance (See explanation on reverse side.) Due Date * Biannual sampling required (June and December ) Rev. 2/90 WHITE - USA, YELLOW - Industry, PINK - City, BLUE - Accounting, GREEN - WQL PERMIT EXPLANATIONS ITEM EXPLANATION 11. Discharge Limitations: Only those items checked must be monitored as required by permit and reported each month, or as directed, to the Agency on an "Industrial User Self-Monitoring Report" form. The report must be postmarked by the 10th of the month following the month being reported to avoid penalty. 12. Time Schedule for Compliance: Time frame in which items listed should be installed or corrected as a condition of the Discharge Permit. INDUSTRIAL WASTEWATER DISCHARGE PERMIT LIMITATIONS--PENALTIES AND CHARGES: When an industrial user is issued a wastewater discharge permit, the user is limited to a specific amount of discharge measured in volume (total monthly discharge volume divided by 30 days) or strength loading. A specific concentration (or mass) amount for certain wastewater constitiuents may also be listed as a discharage requirement/limitation. For industrial users whose monthly average discharge, daily maximum discharge, or for any calendar month exceeds the amounts or limitations allowed by the discharge permit, the following procedure and penalties shall be followed and imposed, respectively: a) First Offense - For the first calendar month in which discharge permit amounts or limitations are exceeded as above-described, a written warning shall be issued stating that if such practice continues, the user will be penalized and may be required to purchase additional discharge capacity or may be required to increase its pretreatment capabilities. b) Second, Third and Fourth Offenses - For the second, third, and fourth calendar months within twelve months of a first offense in which discharge permit amounts or limitations are exceeded as above-described, the user shall be assessed the graduated penalties listed in Table 2 of the current Rates and Charges Resolution & Order. c) Fifth Offense - If discharge permit amounts or limitations are exceeded for a fifth calendar month (within the twelve-month period following the fourth offense) , the user shall be charged for additional discharge capacity and/or be required to install additional pretreatment facilities to increase its pretreatment capabilities. The user shall also be assessed the penalties listed in Table 2. If the user fails to pay for such additional capacity charges and/or fails to submit a schedule for pretreatment improvements within 10 days of receipt of notice of the same, the Agency may cut off sewer and/or water service to the industrial user. Thereafter, if such pretreatment improvements are not constructed in a timely fashion, as determined by the Agency, the Agency shall have the right, with 10-day advance notice to user, to cut off sewer and/or water service to the user. If any industrial user fails, upon demand by the Agency, to supply up-to-date, accurate and complete self-monitoring reports and records, the discharge amount of such user for any calendar month may, in the discretion of the Agency, be deemed to be the water consumption of such user.