16460 SW 72ND AVE unified Industrial D _ PAGE
f sewerage este
V
agency
g " disciia e J_ _ _ OF 3
155 N. First Ave.,Suite 270, Hillsboro,Or.,97124 rg _ _
503 648-8621
l.a Applicant Business Name:
Belt Tech Permit No: 13.-..139,. ;
1.b Business/Industrial Park: Pac Trust Center Monitoring ❑
2. Address of Premises Discharging Wastewater Nonmonitoring ❑
Street: 16460 SW 72nd Avenue Renewable Yes E No ❑
City: Tigard Zip: 97224 Initial ❑ Renewal ❑
SIC No. 3t.,469
3. Assessor's Map anc Tax Lot Number: 251 13AA #800 Jurisdiction
City: T Y :r;.,`
4. Mailing Address (if different from above) U.S.A. ❑
Street: Treatment Plant:
City: Zip: Durham
5. Persons to be Contacted About this Permit:
(Primary) Name: Russell Iwanachuk Title: President Phone: 620-3570
(Alternate) Name: Title: Phone:
(Billing) Name: Russell Iwanachuk Title: President Phone: 620-3570
6. Method Used to Compute Industrial Sewer Bill (plus commercial fixture count for domestic sewage use):
A. ❑ Wastewater consumption or discharge B. ❑ Wastewater strength
7. Effective Date: 12/01/91 Expiration Date: 12/01/96
8. Owner's Representative
(.
Print Name w-.)��, �� �.-a`t.�-r.� t�tc �-.,. Title V <,-
� � �
Signature '� �._ � Date _
9. Agency Representative
Signature Title Date ! _ i
AUTHORIZATION - The above named applicant is hereby authorized to discharge wastewater to the public sewer
subject to said applicant's compliance with the Agency's Ordinance No. 9, appropriate R & 0's and Page 2
of this permit and payment of the following fees and charges:
Remit to Tigard
10. Fees: A. Permit Fee . .Invoiced $ s _ $
B. Connection Charge $ $
C. Plan Review Fee $ $
D. Additional Capacity Fee $ $
Total $ $ ❑ Paid
Rev. 2/90 WHITE - USA, YELLOW - Industry, PINK - City, BLUE - Accounting, GREEN - WQL
Industn I PSE
unified - -
sewerage este J 1 -enc 2
a
g " disc is _ J_ _ OF 3
155 N. First Ave.,Suite 270, Hillsboro, Or.,97124 �e _
503 648-8621
Business Name Belt Tech Permit No: 111-139-1
11. Requirements for Industrial Permit Compliance (If box is checked, that requirement is applicable.)
See explanation on reverse side.
A. ❑Prior to the 10th of each month, submit monthly monitoring test data to the Agency on approved forms.
B. /❑".Report any changes (permanent or temporary) to the premises or operations that significantly change the
quality or volume of the wastewater discharge or deviates from the terms and conditions under which this
permit is granted.
C. Special Requirements: In the months of June & December test the PH of the water
in the cooling tub. Submit pH results to the Agency.
D. Applicable Regulations: Agency Local Limits
E. ®Discharge Limitations (Only items checked are applicable.) See Penalties and Charges on reverse side.
ELEMENT OR DAILY MONTHLY ELEMENT OR DAILY MONTHLY
CONSTITUENT STORET UNIT MAXIMUM AVERAGE CONSTITUENT STORET UNIT MAXIMUM AVERAGE
COD (T) 340 mg/L Cadmium 1027 mg/L
COD (T) 340 lbs. Chrome (+6) 1032 mg/L
X pH 400 Range `�� , Chrome (T) 1034 mq/L
TDS 515 mg/L Copper (T) 1042 mg/L
TDS 515 lbs. Lead (T) 1051 mq/L
TSS 530 mg/L Manganese (T) 1055 mg/L
TSS 530 lbs. Manganese (T) 1055 lbs.
Oil & Grease 556 mg/L Manganese (S) 1056 lbs.
Cyanide (T) 720 mg/L Nickel (T) 1067 mg/L
Sulfide (T) 745 mg/L Silver (T) 1077 mg/L
Sulfate 945 mg/L Zinc (T) 1092 mg/L
Sulfate 945 lbs. `+ Flow 50050 MGD
Fluoride 951 mg/L Mercury (T) 71900 mg/L
Fluoride 951 lbs. Arsenic (T) 1002 mg/L
Cyanide(W/D) 718 mg/L
12. Time schedule for compliance (See explanation on reverse side.) Due Date
* Biannual sampling required (June and December )
Rev. 2/90 WHITE - USA, YELLOW - Industry, PINK - City, BLUE - Accounting, GREEN - WQL
PERMIT EXPLANATIONS
ITEM EXPLANATION
11. Discharge Limitations: Only those items checked must be monitored as
required by permit and reported each month, or as directed, to the Agency on
an "Industrial User Self-Monitoring Report" form. The report must be
postmarked by the 10th of the month following the month being reported to
avoid penalty.
12. Time Schedule for Compliance: Time frame in which items listed should be
installed or corrected as a condition of the Discharge Permit.
INDUSTRIAL WASTEWATER DISCHARGE PERMIT LIMITATIONS--PENALTIES AND CHARGES:
When an industrial user is issued a wastewater discharge permit, the user is
limited to a specific amount of discharge measured in volume (total monthly
discharge volume divided by 30 days) or strength loading. A specific
concentration (or mass) amount for certain wastewater constitiuents may also be
listed as a discharage requirement/limitation. For industrial users whose
monthly average discharge, daily maximum discharge, or for any calendar month
exceeds the amounts or limitations allowed by the discharge permit, the following
procedure and penalties shall be followed and imposed, respectively:
a) First Offense - For the first calendar month in which discharge
permit amounts or limitations are exceeded as above-described, a written warning
shall be issued stating that if such practice continues, the user will be
penalized and may be required to purchase additional discharge capacity or may be
required to increase its pretreatment capabilities.
b) Second, Third and Fourth Offenses - For the second, third, and
fourth calendar months within twelve months of a first offense in which discharge
permit amounts or limitations are exceeded as above-described, the user shall be
assessed the graduated penalties listed in Table 2 of the current Rates and
Charges Resolution & Order.
c) Fifth Offense - If discharge permit amounts or limitations are
exceeded for a fifth calendar month (within the twelve-month period following the
fourth offense) , the user shall be charged for additional discharge capacity
and/or be required to install additional pretreatment facilities to increase its
pretreatment capabilities. The user shall also be assessed the penalties listed
in Table 2. If the user fails to pay for such additional capacity charges and/or
fails to submit a schedule for pretreatment improvements within 10 days of
receipt of notice of the same, the Agency may cut off sewer and/or water service
to the industrial user. Thereafter, if such pretreatment improvements are not
constructed in a timely fashion, as determined by the Agency, the Agency shall
have the right, with 10-day advance notice to user, to cut off sewer and/or water
service to the user.
If any industrial user fails, upon demand by the Agency, to supply
up-to-date, accurate and complete self-monitoring reports and records, the
discharge amount of such user for any calendar month may, in the discretion of
the Agency, be deemed to be the water consumption of such user.