PFI2018-00212 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12018-00212 13125 SW SEG3 Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 2018 Parcel: EG3880 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: SEG 3880/3881 /3882. Install circuitry for 17-60 LED Yarmouth. PGE Job M2509681. Owner: FEES Description Date Amount PHONE: Contractor: NORTHWEST EARTHMOVERS INC PO BOX 1609 SHERWOOD, OR 97140 PHONE: 503-625-3100 FAX: 503-625-3108 Applicant: JOSE GRAJEDA 10800 SW AVERY STREET TUALATIN, OR 97062 PHONE: 503-672-5602 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12018-00212 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02 -WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced; with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue) and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District) and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7.00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9.00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work. Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name> at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, anc survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general, will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI—Utilities 21 -OTHER Applied Notice RECEIVED City of Tigard AUG 13 2018 a PUBLIC WORKS —ENGINEERING CITY OF TIGARD PLAN NING/ENGIN EERING Public FacilityImprovement (PFI Permit TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) TYPE 1–Franchise Utility Work Check one: V Utilities ❑Sidewalk/driveway approach ❑ Street improvements performed by NWN, PGE Detailed description: Install Circuitry for 17-60 LED Yarmouth and/or utility agency. ❑ TYPE 2—Sidewalk/Driveway/Sewer PGE Job M2509681 Work performed for the purpose of: • Sidewalk installation or repair. • Driveway approach installation Property address/location(s): and/or repair SW ROY ROGERS RD & SW BULL MOUNTAIN RD Tigard, OR 97224 • Sanitary sewer lateral installation 00j 8 Z 3 Ot3 n and/or main line tap Applicant: Portland General Electric El TYPE 3—Full scale Development PP Work performed with Land use Address: 10800 SW Avery St. approval which includes any of City/state: Tualatin, OR Zip: 97062 the following: Phone: Email: preregcoord@pgn.com • Subdivisions or Partitions Contact name: Jose Grajeda Phone: 503-672-5602 • Street widening • Mainline installation for Sanitary Northwest Earhmovers sewer, Storm sewer, Tigard water Contractor: and/or Tigard Water Seance Area CCB#: 62761 Expiration: Address: 13600 SW Calbreath Dr SUBMIT COMPLETEDAPPLICATIONTO: City/state: Sherwood, OR Zip: 97140 City of Tigard 503-572-3863 mmadison@nwearthmovers.com Planning/Engineering Phone: Email: @ 13125 SW Hall Blvd. Contact name: Mike Madison Phone: 503-572-3863 Tigard,OR 97223 Applications for"minor work in right-of-way" only may be emailed to: Engineer: NSA romMermits_.tiga�rd_or.gov Address: 'in City/state: Zip: Phone: Email: Case No.: ZO ff-iO212 Contact name: Application submittal fee(.007%of Engineer's Estimate) $ Estimated value of work is required(if over$5,000):$ 91,778.23 Additional fees: $ (within the public right-of-way) Application accepted: 12 Is work related to a LAND-USE DECISION? ❑ Yes No By: Date: If so,please specify (MLP,SDR,SUB, etc.) case #: Application reviewed: By: hA• '---) Date• Is work related to a BUILDING PERMIT? ❑ Yes No Applicant notified: If so,please specify(BUILDING PERMIT)case#: By: Date: I:\ENG\PermitApplications\pfi_application Rev.10/16/2017 City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of4 APPLICANTS NOTE: Person specified as "Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. * With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised Utilities are not required to obtain the owners signature on the application BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate any:recorded deed restrictions that may be attached to or imposed upon the subject 12rol2em. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. A- Aroun Xaybanha 08/10/2018 Applicant/AutlYbrized Agent's signature Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 • Page 2 of4 DEVELOPMENT ENGINEERING FEES FOR STAFFUSE' ONLY Public Facility Improvement(PFI)Permit: DETAILED SUBMITTAL REQUIREMENTS APPLICATION FEE Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/ DRIVEWAY AND UTILITY PERMIT FEE CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the right of way) Engineer's estimate X 5%(less$300.00 minimum submittal fee) Sketch Engineer's estimate X 2%Plan Review (including information below) ❑ Dimensions WATER SYSTEM FEE ❑ Street Name Part 3: All public water system improvements ❑ Site Address Engineer's estimate X 12% FULL SCALE DEVELOPMENT PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements) There will be no permit fee charged,or assurance required for the following types of work: Design Plans • Sidewalk repair(less than 20 lineal feet) (G sets,24x3G or 22x34) • Relocate or replace mailbox ❑ Cover—Site,'Vicinity,Abbreviation,Legend • Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.) • Weep hole repair ❑ Street(Plan,Profile) • Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile) • Lawn sprinkler system installation or repair ❑ Water Quality Facilities • Street tree pruning or planting ❑ Grading • Planter strip landscape maintenance ❑ Landscaping/Tree Plan • Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,Sanitary,Water,Signage,Street Lights,etc) ❑ Details Note: A cash/bond assurance maybe ❑ Traffic Sight Distance required per TMC 15.04.140. ❑ Signing and Striping (customer deposit) ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(pro)ect land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval ❑ Engineers Construction Estimate PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of4 SAMPLE SKETCH: Edge of Pavement Ditch --imp` Streetlight � I , I T r o 15 oscry ja LTi n e Existing House r� I Existing I >i Driveway . a i CI R I � �• I I .I I �I 4!I R O IU I I � " IU �s L . oI I Existing Shop Powerpole I I • o , 2 i ------- property Lin,-e ------_--- I I I Fire Hydrant(FH) I I � � Scale: 1"=30' I � � I � I I . I i ! MINIMUM SKETCH REQUIREMENTS (Put"N/A" if Not Applicable): North arrow Property lines & dimension Slope of property Street &street name(s) Existing building, structures Utility&street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water,storm) PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SSI Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of4 91 77> I I' SW BOTANY BAY LANE I � 78 " I 79p Do.' Dop ' K4D X�1r1I ,I 11 !! ' � '� L -�•__'____� I ' - -y - // 7 1---- ' II ro PD L .f a ---- i/ - `' 195 `T1}919 If i� -ta G. -s, �a-es , 6 i 2tlN k` r Imo=- i 175 f a 89y ; gqm r ""!i 17 TRACT PJ ti '( PD hP7�t I TRACT W 1 _-_ Is. I 176 z Ju I r VT G6 TRACT Y II SW ROCKHAMPTON IAfiE I I I 'i TRACT. 1 I ,�,�y I;� I'R ; 231 r SW ADELAIDE LANE (a sip '�Rh 1 f 177 12A2h 24 �240M r23�A 238 :237: 276 x235. 234 233 1232 i.lr l 1 BB VS VS y.� & ; �r_e fsi Is,YOI J.l JbL •77 ds ' nVS .1 TRACTV las .i&L 183 fez 179 r ` -JbL HS Jbl /:,/t / I \\ 'tC.�x Alti'° •161e 180 1 dB A 25 i ;111JJJ 1a-v5 Des sLrc ,a-es �a-es ices- be V 1 F5l iia , 131' 1 I-21- -- -'T -�-- `-�--\---e VPD-2Z '�0' •� ��- _- '10-'- - -. - 77I Vi-Y12 2]B -__1_•- -_• ____- 7N _ II17 K-221,20•r 20'1 067 \K q SW BULL MOUNTAIN ROAD sK-213 rPL-214 20, y n-745 a �' `,� 20-1 -- --.._-n 747 - 4 j 1 {K-218 K-219 'I \7p1-751 (C.R.NO.2621 n-z61t I 1/ r Nr I 1 PL-759 �K-758 PL-711 F I�j n-2.1 I I{( II 20'\ 1 95' .- -! TO' A 111' 20 \ -` 1 -241 l,__- IL-756 PL-755 PL-251 117'II It 757 t _ -_ ---__-139--_- - - A \ 1� _-_--. 6- F K-Ta? 133 - -_ 70 rt-233 __-_ N-732 -_��r , \ _��- -_.. -- _ -x_________ _ _^ '1?_______ 11 Vf 735 Vr_771 �` \ ' �. -� N-230 N-7� K-778 yr-TT) -r--_ �E 00, i Vr-225 -.____--. VT 250 1�7 �____ Vi 260 'T_226 -►r Sn 8 STUB Pt-253 LIGHTING LEGEND 2 PIECE FIBERGLASS COMPOSITE POLE CONSTRUCTION NOTES: SLCST (COMPOSITE) MTII a wuLT wiisaroe Trm LLRaLEss oTIRR1NSE SIEOFIED) AAA.I �� I .REraereowcourpoo AI INSTALL FID AL-TX ST Li CIRCUIT IN 43-SCH40 NC T-.•r T o--1"'• 1 V 1.CUSTOMER TO FROVR)E ALL TRENCIMG.BACKFRLMG.CONDUIT.Ela0W5.JI..CTIOR CONDUIT.PROVIDED a INSTALLED BY CUSTOMER BOXES,vAlAT3 AND TADS,DONT MSE TRENCH YIITN OAS TRENCH'a. •rs.P "' N RICHES DEEP ANO 30 ARCHES VIDE.MEASURED FROM MALT INSTALL"M C1.1-M Si LT CMCUn M N•'SCNM IVC CONDW.PROVIDED 6 INSTALLED BY CUSTOAER 2 ILM[STNNBY CREW IS REWNtEO FOR OPENNf KL ENERG¢ED POE VA11LT5 THINK .MICTION BO%E5,ARD EOtiMENTFACIlr1E5.NCLLDNG COIIECl1ON OR N41ALLA/10N W =_ E a CONTACT SERVICE COORDINATOR /rENTro L GILL all BEFORE YOU DIG Q CVSiOMFR INSTALLED IIlO ar Lr SECONDARY VAIIIi OF CONDUTS AND PULL STANDBY SERVICE caoaDRIArDN AT SO15x36T0O �- c-. •.,� SAFETY TO SCNEDIILE A PGE STANDBY CREW- FO•-NKv Arm�M+DuI'N}HrnON n�M N Uw REQUIRES YOU i0 FOLLOW ICES.DOTTED , F' s.ceaii K vti Nor+nT.ut... 111E OREGON Unlm'NOTIFICATION CENTER. , INSTALL IPV LEDLEOTFR BUCR y r p p�r�f writ TRFwcv n mm uraHUFo N ].ALL POE COKKICTORS TO BE NSTALLEO IN OINY.SCtEDUIE An.ELECIRICAt M F.MMa� '1' f iB�J S I O NIIES Mf SA FORn/N OAR 95T-OOL0010 ON 11"1 FIBERGLASS POLE(75'MTG NGTI WRN IRADE WRM NYLON RAI STRINGS CONDUITS SR LBS.1EST SERVICE[aOROiYlE1f 9y2-Op1-0090 1'011 ANY pBTAM COBS OF 6'ANS'ARM CONNECT 710 VOLTS PGE TO OET VERnE TIE S�AND NUMBER OF CONOIATS RE011REO 301-223-8700 OR B00- FUME TGE TO IROVIDE BOTTOM nFCE OR 1-nECE MIifTAM 13 VERTICAL INCHES AND 24 MDI820NTAL ARCHES CLEARANCE BETVIEEN T;,"; RUTS BY CALLING rW OREGON[TnLrP• OAS ANp OTTER UTlRES.ALL ELBaVI3 a NDN A SMALLER TO BE 38INCH RADIUS. V li1GTgIl CENTER AMMSTMigN a(303-737-NBIJ POLE INSTALL BY CUSTOMER RDD STEEL OA PGE APPROVEDfBERGL�IS$BENDS ARE REQUIRED FOR RIRIS OF _ - STREET LIGHTING NOTICE 151 FEET OR LONGER OR FOR ANY LENGTH RUN WITH MORE TWIN 1BO DEGREES ''-' 10 RFOVFST U'Rm LOCATES CALL THE OREGON INSTALL 60W YARTMDUrH BUCK N BENDS.PVC SCM:E UM AE BE1D5 ARE AOCEPfABLE FORRIRIS OF t50FEETOR tH15 STREETLIGHT DESIGN BY OTHERS RM.wMel'F blIOW. ON I6'1057 TO/OFCORAINE ALUM ANCHOR BASE �1BEESS-TNEMAXMLRA TOTAL BENDS M ANY CONDUIT RLIN Et 2T0 DEGREES.ALL PGE DOES NOi ACCEPT DESIGN RESPOMIMLITY IlTllm NOnFIC 1T1pN CENTER,Bn AT LEAST /OLE BUCR,CONNECT 240 VOLTS iUR�T11ER pEieLL3_CTORY JIM REFER TO LETTER OF RE5/(AJSIBIIffY EOR '� 2 BUSINESS DAYS PRIOR TO EXCAVATION. Call W.NR It"ft ® PGF 10 PROVIDE 20R-LB-4 CONCRETE BASE . yy CONCRETE FOOTNG3 NEED TO M NSTALIEDw H TOP OF BASE r.W,„ rrw,r..F ..r._. - PGE CONSTRUCTION RAWIN AND GROUND RODS FWSNTOCLRlBISDEWALK ; NYDEVWTk�/FROMTHE DE9GNMUST AS—BUILT VERIFICATION 8 NESC VIOLATIONS CORRECTED FOR DUS/OMER i0 INSTALL AT THE SAME NINE AS THE CONDUIT S. TOAER RESPON58]LE POPERbCRE.CROS ALL CROSS SIN MVST EXTENO N^N�"•+'FF+r ly rePreFenh FIELD COnsfrrr� � PAcs will le Installed in planle/.trlp WASA MREDDFFROM L�OGR TY LRE.CP.OSSMGS i0 BF IE NGES DEEP. 607TOM M E POLE INSTALLATION This d«umenl--fatly wHFcno.+u F-1131En1LENENTS:1101 H 111 r11.DEHSHr PGL,Lr H. 111,11 N—a—rte Foreman: Date: OR SCHEDULE-C WITH A MECHANICAL CONNECTION;CEPTA.OK OR LINE MECHANIC 11 CONNECTION PRODUCT AS AN ALTER NATIVE TO HOPE DUCT.HDPE SHALL MEET THE AwRr.a..r+A+..M A.P� `s iriRtiR.F JUNCTION BOX INSTALLATIONS General Foreman: RFOUREMEMS OF PG�3411 'T LC205tS(AVAILABLE ON RFOUEST FROM PGE PROJF i wl�i�I�•s.oA•Ar�••Nr •+"�'FN� Date: MANAGEIIpO FOR SAFETY REASONS rHE d1CT SMALL BE BUCK VRIH TWEE EOWLLY SPACE P+PPPy�,,,,,. FOR STREET LIGHTING FXTRIIDEDRED STRpES(WIACNISA SPEpFlLAT10N RE0UIREMENTI MANDREL TEST OF �� •A^F ,F CONTACT PGE FOR APPROVED MANUFACTLIREF: an required for field comfrvction changes.) HDPE PR'E ISREQUrRED r1FTERIN3T11L1-ATk1N WITH PGE INSPECTOR PriESENT. a mAw assuRt POP�AI,PIRPMKJIL ,.. 19rL eR.BEixra.IsuLRwN SDPM'ENG REVIEW: ASBUILT BY DESIGNER: 7,TRANITRON.ETR►ADBARE D.� D 'nSTO99 INSTALLED MTIPPAIDTOAS gINDICATED OxICATDE IN DUAL ITOEKMPRlL GRAMIFfOFl BIRIPAR ��`^""""""^`A•. 054MI8 MS 107OMF M2509681 DATE: SCALE: ACCOIMf: AW1} B NO trn.�+e-�FIOI a.ALL PGE TRANSFORMERS TO G NSTALlEO a FEET f�FR 1RIE CorRe TLBLE ,e' POLYGON WLH LLC I CRY OF TIGARD/ROSHAK RIDGE BuItING wAuoRovERNNNGANDAFEET(I.�p F NOTE: PGE TRANSFORMERS MUST BE VRTMN 1 B FEET OF.!MOVEABLE AREA. CE'rERvrEo er P�iE ALWAYS MAMTAN t6 FEET CLEAItANCE N FRONT OF ALL rRANSFORMERs. PGE TO PROVIDE CONCRETE BASES AND GROUND RODS FOR H. RACqSTEELBARRERPOSITS ARE REOLRREOARWNDTR.WSFORNERSTIMTNLEERPOSED CUSTOMER TO INSTALL AT THE SAME TIME AS THE CONDUIT "j— FEW_ ,ROGERS .SIZE 17x22 TO VEMIClE3. CSrM A90.LT-CLI PGE tOOPTbNAI ST Li POLE rF F�I,pr 19.Aa Fl(P fF NT LOT PMBLIc vrlrrY EASEMENT v.UE1 To BE a FEET r NN SW ROY ROGER5 RD d SW BLXL M XWrAIN RD.,BEAVERTON,OR 97224 FEE*(PREFERIEEq NOTE: 11.CONSI.IT YRTN POE REPRESENTATIVE 2 WEEKS BEFORE STARTING MAN POWER PGE TO PAOVfDE BOTTOM PIECE OF POLE EOR CUSTOMER DESCRI►I/ON TRENCIRRN•FORAMECOAr3TRMTMN FERENCE.WMIDEDMTMSCONFERENCE 'arJ1 ARF'PVO FAF;IORY afMS WILL.BE ERCAVATOR,PGE,TELCO,CATV,AND OAS Install Circuit for 19-60W LED Yaitmouth Post Top A-TO-4-70LEO Leotek-COn-0M 249V TO INSTALL A7 THE SAME TIMEAS THE CONDUITR"�n` w >:oRlwPcOREEa 12.CUSTOMER NSMLTSANDELBOW CONFIGUPATDNS ALLCONDUIT V. 0.10VAD tYdlfN MSTMUTIONS Ml1Si BE INSPECTED BY PGE PRDR TO BACKFILLING.WHEN YOU ARE COUNTY WORT wRH $HEf/ READYFORFGETOIN ECT RAFTER INSTALUTDNISC WETe CALL SoPI.7 51E6 rJP 1EW a'OF COMPACTED OREn3FAtt 9I3AIEMAREA: AucwUPTO7WDRRMGDAYFORINSPFrCP111�.cuR. INSTALL30AMPFUSESINSECONDARYPEDESTALSORSECONDARY yrMMLnBA«Fu �yE11� WASH co �I-07A MEA19Agc 1 OFI ICER TD TIE PD[ELICTIBR:BBRIHOOLIM4 M 110019M FOR SPECM REOIRIIE1AWM M fK�ILE soX UM CREW CENTER DFSFGN BY PHONE(303) oRAwN BY ,� N��� VAULTS(WHICHEVER 15 ST LT POINT OF ATTACHMENT)FOR EACH 11 ■ IFR IdI.SrANDARD LARDER. 22D sY nvm OR JOSE GRAIEDA 672-5602 PENKA TAMILOVA wr LL AN PABTTOrrEdISTOLER STREET LIGHT PER T&D CONSTRUCTION STANDARD LC-11550 a.LKR10N. 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGMS RESERVED Page 106 2011 Edition Diversion into a Continuous Left Turn Lane Diagram 430 Diagram 430 shows work in the travel lane(s) next to a continuous two-way left turn lane with one direction of traffic diverted into the continuous two-way left turn lane. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3— Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. When two or more travel lanes are reduced to a single lane before the diversion, each lane shall be closed separately. Layout traffic control according to ODOT Standard Drawing TM 852 for 5-lane sections. 4. A shifting taper(1-/2) may be added in the diverted traffic direction across the continuous two-way left turn lane (as shown). This option is recommended when the speed is 45 mph or greater. Sign Spacing and Buffer Lengths (feet) Pasted Spadng Between Signs "Buffer" Speed A B C Space 20 50 25 100 100 100 75 30 100 35 350 350 350 125 40 150 45 180 SO S00 S00 500 210 55 250 60 285 65 700 700 700 325 70 1 1 365 Chapter 5 September 2016 2011 Edition Page 107 Diversion into a Continuous Left Turn Lane Diagram 430 ROAD WORK AHEAD;' Ihl B lyt CLANEii i LANE CLOSED AHEAD A II U2 I . I Buffer Protection Vehicle w/TMA(both Optional) See Chapter 4 Buffer • • 1,12 I ' U2 lei A II lht B 4 I ROAD WORK AHEAD September 2016 Chapter 5