Re: River Terrace East Lots 173-179 Retaining Walls–Final inspection and approval letter
Vista Structural Enn-' � �, , as asked to visit the sites of East River Terrace Lots 173-179 for the purpose of
visually inspect g the foro., ^'~ '" ^' ite retaining walls at the front of the lots. Our site visits
vvereperform-~ ' �' s were for -d an. .y to pour at intervals of two to three lots during each site visit. Our
site visits were performed as follows:
May 30,2018–We inspected and approved Lots 178 and 179. The inspection letter for these two lots is attached.
June 5,2018–We inspected and approved Lots 176 and 177. The inspection letter for these two lots is attached.
June 12,2018–We inspected and approved Lots 173, 174,and 175. The inspection letter for these three lots is
attached.
All forms and rebar were installed as specified:on the citylapproveci plans, before our firm inspected and gave our
final approval for the contractor to pour concrete.
Our firm appreciates the oanything further,
please feel free to contact us.
Sincerely,
Vista Structural Engineering, LLC
Dennis Heier, P.E.
7citw 0
.41
VISTA
STRUCTURAL ENGINEERING,
NINEERING,
C
l47180VVDE[|ASTREET PHONE: 97I.645.0901
PORTLAND, OREGON 97229 - 1 - V|STASTRUCTURAL.COK4
Portland,Oregon
VISTAKansas City, Missouri
10 —STRUCTURAL—
May 30,2018
Polygon Northwest Company
703 Broadway Street,Suite 510
Vancouver,WA 98660
Re: River Terrace East Lots 178-179 Retaining Walls
Vista Str •ral gin:-ri,g, LLC, - -• to visit the site of East River Terrace Lots 178 and 179 for the purpose
of vi-gal • "- --„ . • steel placement for the site retaining walls at the front of the lots. Our findings
during our site visit are as . lows:
Lot 178
All forms were in general compliance with the engineering design. The footings met or exceeded the dimensions
required by the design. Footing and wall stem rebarit5
wereincompliance except for in the wall stem of the 10'-tall
wall. The vertical rebar in place during our site visit were bars @
12"o.c. The design calls for#5 vertical bars @
8"o.c.;while on site,our firm recommended adding a vertical#5 bar between each currently installed#5 bar,to
achieve 6"o.c.spacing.
Lot 179
All forms,footings,wall stems,and rebar placement were incorAplilance with the engineering design. No changes
were recommended during our site visit.
Our firm appreciates the opportunity to siarve7V%±u:If you have any questions or if you need anything further,
please feel free to contact us.
Sincerely,
Vista Structural Engineering, LLC
Dennis Heier, P.E. 5
g 0
S. 2 xi
t,Z14 • -#7 .}?
alt
IL8 \94;-.181111W- ON;
je-1414 -
VISTA STRUCTURAL ENGINEERING LLC
14718 NW DELIA STREET PHONE: 971,645.0901
PORTLAND, OREGON 97229 - 1 - VISTASTRUCTURAL.COM
Portland,Oregon J ' VISTA Kansas City, Missouri
—STRUCTURAL—
Lr
' -
June 5,2018
Polygon N• , -St • I pa4:4- __
703 Broad •-• •e", uit
Vancouver,WA 98660
Re: River Terrace East Lots 176-177 Retaining Walls
Vista Structural Engineering, LLC,was asked to visit the site of East River Terrace Lots 176 and 177 for the purpose
findings
during
visually inspecting the forms and steel placement for the site retaining walls at the front of the lots. Our
during our site visit are as follows:
Lot 176
All forms,footings,wall stems,and rebar placement were in compliance with the engineering design. No changes
were recommended during our site visit.
Lot 177
All forms,footings,wall stems,and rebar placement were in compliance with the engineering design. No changes
were recommended during our site visit.
•,A ---,
Our firm appreciates the opportunity to serve you. If you have any questions or if you need anything further,
please feel free to contact us.
Sincerely,
Vista Structural Engineering, LLC PM.
Dennis Heier, P.E. ,..
I
7.#7,- \I.\
\.4.
1 / ,,... i to
- # , r‘u
,47
1
ha
... __ .
VISTA STRUCTURAL ENGINEERING, LLC
14718 NW DELIA STREET PHONE: 971.645.0901
PORTLAND, OREGON 97229 - 1 - VISTASTRUCTURAL.COM
Portland,Oregon
VISA
,,,_,.....)
, Kansas City, Missouri
* TTRU CTUR AL—
June 12,2018
Polygon Northwest Company
703 Broadway Street,Suite 510
Vancouver,WA 98660
Re: River Terrace East Lots 173-175 Retaining Walls
Vista Structural Engineering, LLC,was askedtovisit the site of East River Terrace Lots 173, 174 and 175 for the
purpose of visually inspecting the forms andsteel placement for the site retaining walls at the front of the lots.
Our findings during our si ' ' are as follows:
Lot 173
All forms,footin , ..,10- - .- -.-..,.„„,..• -- - t wer- compliance with the engineering design. No changes
were recommended during our - e visit.
Lot 174
All forms,footings,wall stems,and rebar placement were in compliance with the engineering design. No changes
were recommended during our site visit.
Lot 175
All forms,footings,wall stems,and rebar placement were in co , ,4
,, 1,,,,nce with the engineering design. No changes
were recommended during our site visit.
Our firm appreciates the opportunity td serve you. If you naveAny Bons or if you need anything further,
please feel free to contact us.
Sincerely,
Vista Structural Engineering,LLC
1 ,
---......„
Dennis Heier, P.E. —
\ 0
0 °
t(!atii. 1 171 g
tig ..--
4. ?.)Co6.4
4)
" 14,
VISTA STRUCTURAL ENGINEERING, LIE
14718 NW DELIA STREET PHONE: 971.645.0901
PORTLAND, OREGON 97229 - 1 - VISTASTRUCTURAL.COM