Plans (377) OFFICE rn�v , . MF ` (CA's S'Q �.c-- Vk
,t
Bulletin
MILBRANDT ARCHITECTS )
Bulletin#: MA-26 Date: 12-07-17 ATTACHMENTS: MA-26.1-26.3
Job Name: Polygon at River Terrace East(Area 3)-Plan 2016D Job No: 1503
Bulletin issued at request of Nichole Thorpe at Polygon Vancouver and Tom Hochstatter at the City of Tigard.The building was placed
too close to the property line to allow a cantilevered fireplace bump-out with a direct vent condition as shown in original drawings.A
full-height chimney condition will not suffice.The plan has been revised to show a flush side elevation and the fireplace bumped into
the living area on the attached bulletin page:MA-26.1-MA-26.3 and any accompanying structural documents.
R14,VISION
Distribution
Job Site Paul McColm
Client Chris Walther Angela Grajewski Nichole Thorpe
Struct.Eng. Arne Solomon
City of Tigard Tom Hochstatter
25 CENTRAL WAY SUITE 210 : KIRKLAND,WA 98033 : 425.454.7130 : WWW.MILBRANDTARCH.COM
In
I
L
0
ol'5Y2"� En'
I
N
7/.....
12" TILE HEARTH
,.
•N
o „ I •
I I < Living
��
_r „, UL APPROVED 36" WIDE
FACTORY-BUILT DIRECT
. VENT GAS FIREPLACE
10 Porc
+-- — —00— o All FLOOR
o N 11
All
20 - -
. . A10 :
I
•
L_2-0 6 $H i 3-6,6-0 F 2-0 6-0 SH JI
oi 3'-7%2" I'-7�2X 3'_3" 3'_3" —77' 3'-73/2" i
12 17'-0" 9'-0"
All
26'-0"
PLAN 2610D MAIN LEVEL PLAN
1/4"=1'-0" FRENCH REVIVAL
clo
1761-
- 3 I11/a' 18X18X10 FTG.
16 . - IIr��j�W/ (2) #4 EA. WAY
S6.0 LII TYP. U.N.O.
1.
t L
4- - 13/aX9Y2 LVL •— �
-21/4"
In Ir
I -11)‘1-
I
--Ir-1 j WALLPONY;� ' r--fi- --
L I I 6 I I
I
13%X9Y LVL Vnl
S6.0 I I -5" I 1
--t-n--r n—r—ri —1 r1- � -meq �1
> _
.J J
It,' ,
'ry LI- 1 SLOPE 1
7
M I �i4"
i I
--- - --ice i
----I I A" CONC
'10,1.
/f\I _ 1 hr I L
--- -0
THICKENED
HDUB , 11 17'-0" tHDU8 SLAB EDGE
S6.0
S6.0
PLAN 2610D FOUNDATION PLAN
1/4"=1'-0" FRENCH REVIVAL
PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN
DATE: 12-06-17 SCALE 1/4" = 1'-0" PAGE:
PREPARED BY: Rae Hauff REF. SHEETS: A3, A6 MA-26.1
This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.
I U
RJ
RJ
1
DOWNSPOUT---►
....s1 rill
N rAREA 3
I /
\--DS FROM LOWER ROOF
DOWNSPOUT
PLAN 2610D ROOF PLAN
1/4"=1'-0" FRENCH REVIVAL
N % ti r II
I
0 1 - —
o
GT ABOVE I j
N LP A
ki t r
SGT ABOVE I I 1
I
(2)2
0
I � --
I
f II
GT ABOVE _____ '
LSL 13/,X1-4-
HDU8 mi � � HDU8
El
LZ 1
® (2X8STICK FRAME HDR J RIM BOARD
24" O.C. 10 1
All
S9.0
MAIN LEVEL SHEARWLLS
PLAN 2610D UPPER LEVEL FLOOR FRAMING
1/4"=1'-0" FRENCH REVIVAL
PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN
DATE: 12-06-17 SCALE: 1/4" = f-0" PAGE
PREPARED BY: Rae Hauff REF. SHEETS: A7, A8 MA-26.2
This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.
12
12
\-\\
FIBER—CEMENT LAP SIDING
5" EXPOSURE
14
12
D2
6� All
—0 L.-- 0
I . 1 1
12
All
PLAN 2610D LIVING SIDE ELEVATION
1/8 =1'-0" FRENCH REVIVAL
PROJECT NAME: River Terrace ARCH. JOB NO.: 1503 BULLETIN
DATE: 12-06-17 SCALE: 1/8" = 1'-0" PAGE:
PREPARED BY: Rae Hauff REF. SHEETS: A9 MA-26.3
This bulletin is a stand-alone document. Referenced sheets posted at online plan center have NOT been updated typically.