Loading...
Plans (465) Contractor is responsible to check vI V\,✓-T i.- - l - SILT FENCE Roor�� ,�'�-' `-NN\\ site plans and notify designer of ,,I, �, (TYPICAL) ," PROTECTICI any errors or omissions prior to 1 ?52 5� ��XN`�- �/ _ �`� ' �5' 25' i ZONE !��\\ �\` start of construction. Plans and vv 1 I I,0 j o / o 1 n Q i �,' specifications shall be approved 1v �- , ROOT h MULCH-ES�4L.ISH li by local building officials prior PROTECTION II GRASS �� �, to the start of any construction. O O\'�_0'�/ 9N��O "%4k.* �,,; �O� I 0_, , o I WET WEATHER EROSION NOTES: O ' "' 'i'�= a ' 1. DURING WET WEATHER SEASON 1 0 �� w BER 1-APRIL 30)ALL SOILS SITE LEGEND. M / �I , :,-,„ EXPOOSED FOR MORE THAN 2 DAYS • \ � � , / \ ` % SHALL BE COVERED WITH PLASTICUtility Symbols: PATIO ` � 3 SHEETING,OR A 2-INCH LAYER OF 8„ 5,0 — MULCH,BARK,WOOD CHIPS, N� FIRE HYDRANT = SAWDUST,OR STRAW TO MINIMIZE O _ , � _ 5 8`+ EROSION POTENTIAL. CATCH BASIN -ir :11: � 2. EXPOSED SOILS SHALL BE SEEDED �� 3180A �� NO LATER THAN SEPTEMBER 1ST. STREET LIGHT i'''' ` ' BAINBRIDGE AMERICAN / �v�e EcthEanee , EROSION CONTROL NOTES: •— SANITARY SEWER / ',•738,.7. • �t :11 . —n—n—n— STORM DRAIN °` ;,3 0� 1. A STABILIZED GPSVEL �_ CONSTRUCTION ENTRANCE SHALL BE - • - WATER LINE / `-, o .-1 INSTALLED AS FIRST SITE / ACTIVITY. / 0 40'-0'. , of Fence Types: 2. EROSION CONTROL MEASURES 6'-0" WOOD FENCE / / #; ovew�- of SHALL BE INSPECTED DAILY AND 0 0 o MAINTAINED AS NECESSARY TO / ENSURE THEIR FUNCTION. / / a T.O.S. 3. EROSION CONTROL MEASURES / Tree Types: / rig , .„T 581.60 SHALL BE KEPT IN PLACE UNTIL CORNUS FLORIDA / GARAGE PERMANENT GROUND COVER IS / 11 LO�""� 5•-8 STA BUSHED. FLOWERING DOGWOOD' / _ ## . ° 2"MIN CAL. 5 -8 • - # r18 " PROVIDE GRAVEL STAGING / / S'-0 P.U.E a 4- AREA AT DRIVEWAY. FRAXINUS OXYCARPA / 111 3. �,/ RAYWOOD ASH' _ # ro (2 MIN QUARRY SPALLS � � q FOR SINGLE FAMILY SITES .� 2"MIN CAL. "� ' D � 'ACER CAMPESTRE ® °'�PROTECTION � 7A- .� _ m.64,- , _ 2"MIN CAL. 5' EXACT LOCATION ON LOT TO BE DETERMINED ` • • .: ' SIDELVALI� . 2 NC: i ; , ei AT THE TIME OF HOUSE CONSTRUCTION. / -4 r • � EXISTING TREE �, , ' WATER - _ SD SD SD SD SDc‘j SD $D SD SD SDR D SD SD hIPSANITARY STORM \ SS SS SS S -SS ssLATERAL • S SSSsS SS SS 1 1 , SW MADDIE LAN — — EXISTING TREE c 2 .,I / TY OF TIGARD / � w w w _w w w _ w w w w W W __ wv, w w — Approved by Planning 2` ' �� Date: I et Z 'I 1�7 _ _ N •nitialS: . 11()b ,, ,. n e PROPOSED COVERAGE AREA: REVISIONS Street Address: HOUSE: 1,738 Sq.Ft. MINIMUM BUILDING SETBACKS DRAWN: 10-19-2017 MJG SITE PLAN GENERAL REQUIREMENTS FOR LOTS F ,. 3. GARAGE: 583 Sq.Ft. ►� M ,� E E I N E HEIGHTS 13275 SW MADDIE L N n, COVERED ENTRY: 32 Sq.Ft. FRONT HOUSE: 15 FT. (From P.L.) w --©- E 11807 N.E. 99th Street COVERED PATIO: 0 Sq.Ft. FRONT PORCH 15 FT. (From P.L.) •.I Suite 1170 PATIO: (IMPERVIOUS) 168 Sq.Ft. CITY OF TIGARD, WASHINGTON CO, OREGON DRIVEWAY: (IMPERVIOUS) 403 Sq.Ft. GARAGE: 20 FT. (From P.L.) HOME SITE # 3 Vancouver, WA 98682 REAR YARD: 15 FT. (From P.L.) 0 S 20' LOCATED IN THE NE 1/4 OF SECTION 9, Office: 360.258.7900 TOTAL COVERED/IMPER. AREA:...2,924 Sq.Ft. SIDE YARD: 5 FT. (From P.L.) I TOWNSHIP 2 SOUTH,RANGE 1 WEST,WILLAMETTE MERIDIAN 5,687 Sq.Ft. 80% MAX. ALLOWABLE: =51.4%Sq.Ft. STREET SIDE: 10 FT. (From P.L.) _ „ PROPOSED COVERAGE % =51.4% SCALE: 1" - 20'-0